SlideShare a Scribd company logo
Nuclear Power Plant Construction Specifications


    VAE conference, 15 June 2012, Vilnius
    ”How to properly prepare for the Visaginas NPP”



    Jens Gunnars, Inspecta Technology
    Mikael Kuokkanen, Inspecta Nuclear




1          2012-06-20
Nuclear Power Plant Construction Specifications



Contents

Part I – Introduction to and prerequisites for Nuclear Power projects
1) Brief overview of a NPP and major New Build project phases
2) Regulatory framework, Codes, Standards, and Specifications
3) Division into Safety Classes and implications to Specifications
4) Experiences on NPP projects

Part II – Opportunities and handling of some challenges in NPP projects
5) What is the extent of work in a New Build NPP
6) Implications on opportunities from the choice of Specifications
7) Important steps to be successful - start prepare in time

Summary


2         2012-06-20
Brief overview of a NPP


Major systems and components in a NPP




3         2012-06-20
Major project phases in NPP New Build projects
    Why should Licensee be involved during Engineering & Manufacturing in a Turn Key Project



                                                               0                         >60 Years



    Planning                  Engineering          Manufacturing
                              & Design             & Installation          Operation




100% initiative by       Successive more involvement by Supplier.   Licensee has 100%
Licensee                 However, at all times the Licensee still   responsibility and interest for
                         needs to maintain project leadership       long term operation
                         (also in Turn Key projects)



 Maintained project leadership by the licensee is essential in all phases since
 (i) the Licensee has full responsibility and interest for long term operation
 (ii) this can increase the opportunities for the local industry

4            6/20/2012
Regulatory framework, Codes, Standards, and Specifications
    Global principles but local regulation and control is needed



• Basic principles for nuclear safety are similar throughout the world, as originated
  from U.S. regulation (by NRC) and standards (by ANSI for nuclear and ASME for
  mechanical); and as generalised in IAEA safety handbooks and guides.
    − Power utilities have special cooperation forms for exchange of experiences (owner’s groups) and preparation
      of utility requirements e.g. in Europe (EUR).
    − Western European nuclear regulatory authorities (WENRA) are in the process of harmonising general safety
      and regulatory oversight practices.


• However, local legislation and often guidelines gives the country’s legal specification
  for the safety requirements and the way in which operations are controlled
    − Sweden: national regulation for general safety principles and mechanical equipment, as supervised by the
      Swedish Radiation Safety Authority (SSM) and inspected by the nuclear inspection bodies.
    − Finland: national safety regulation and also NPP guidelines (YVL Guides), as prepared by the Radiation and
      Nuclear Safety Authority (STUK), supported by the technical research organisations and inspection bodies.
    − France: national regulation and practices, with the regulatory body (ASN), technical support organisation
      (IRSN) and inspection bodies.
    − Germany: national regulation and nuclear standards (KTA), with local authorities, support organisation (GRS),
      and inspection bodies.




5              2012-06-20
Regulatory framework, Codes, Standards, and Specifications




                                                             Legal
                                  National                   Framework
                                 legislation


                               National Guides (YVL)
                              IAEA Safety Guidelines          Mandatory
                       Nuclear Codes (ANSI, ASME, RCCM)       Guides
                      Quality Management Stds (NQA-1, ISO)



                       Established Standards (EN, ISO)       Licensee
                       Specific Licensee Requirements        Requirements
                       Detailed Project Specifications




6        2012-06-20
Activities contributing to nuclear safety
    Why is nuclear power plant safety so different?


• Safety design
  − Defense-in-depth. Multiple barriers against radioactive releases into environment.
  − Safety functions. Process/electrical/automation systems protecting the barriers.

• Safety assessment
    −   Reactor dynamics – nuclear fission power generation after disturbances.
    −   Thermal hydraulics – water and steam flow in reactor circuit and containment.
    −   Structures and materials – structural capability, endurance and integrity.
    −   Risk assessment – failure scenarios, accident probabilities and consequences.

• Safety management
  − Safety culture & practices.
  − Quality assurance & control.
  − Operation & maintenance.

• Regulatory oversight
  − Licensing & permits.
  − Reviews & inspections.

7              2012-06-20
Division into Safety Classes
    Why is nuclear power plant safety so different?


• Safety design
  − Defense-in-depth. Multiple barriers against radioactive releases into environment.
  − Safety functions. Process/electrical/automation systems protecting the barriers.



                                         Safety Class 3
                        Safety Class 2



Safety Class 1




8          2012-06-20
Safety Classes and their implications to Specifications


Example from Sweden:

                    Safety Class      Safety Class      Safety Class       Safety Class
                         1                 2                 3                  4

Design and        ASME III, NB       ASME III, NC      ASME III, ND       EN 13445
strength                                                                  EN 13480
calculation
Material          All materials according to harmonized European standards are
                  approved and accepted. Note that ASME materials are not accepted
                  without additional requirements .
Welding           Certificate according to EN 729, EN 3834. All welding shall be done
                  according to qualified procedures and by qualified personnel.

Manufacturing          KBM               KBM                KBM                 KBM
and                 ASME III, NB      ASME III, NC       ASME III, ND
Installation

                    KBM = owners detailed quality specifications for mechanical equipment

9          2012-06-20
Experiences on NPP projects


Recent projects in Sweden

     • PULS (Power Uprate with Licensed Safety) Oskarshamn 3 (BWR).
       Structural verification of reactor systems, internal parts, turbine systems for
       increased power. Westinghouse, ALSTOM
     • FREJ – LOT 3 - Replacement of steam generators in Ringhals 4 – Verification of
       the structural integrity of reactor systems. AREVA
     • PLEX Oskarshamn 2, Structural verification of reactor systems, internal parts,
       turbine systems. AREVA, SIEMENS
     • GREAT/TURBO - Requalification of Ringhals 3/4 – turbine systems (PWR).
       ALSTOM
     • Replacement of RPV-heads I Ringhals 3 and 4 (PWR). MHI
     • Replacement of Internal parts in Ringhals 1 (BWR). AREVA
     • Forsmark TU12/MSR. Power uprate. SIEMENS, Balcke Duerr
     • Forsmark 3, KYR. Preparation of power uprate. Westinghouse
     • Forsmark 3, Generator replacement. ALSTOM



10           6/20/2012
Common experiences from NPP projects



Some challenges experienced during the projects

• Shortages of experienced designers and welders due to e.g. generation shift

• Start of manufacturing before full completion of design and engineering

• Worldwide shortage of qualified nuclear equipment manufacturers

• Many suppliers not used to the need of extensive documentation in nuclear
  industry

• Requirements not properly communicated through the supplier chain

• Personnel and method qualification issues when using a mixe of standards and
  suppliers own practices


11         2012-06-20
Nuclear Power Plant Construction Specifications



Contents

Part I – Introduction to and prerequisites for Nuclear Power projects
1) Brief overview of a NPP and major New Build project phases
2) Regulatory framework, Codes, Standards, and Specifications
3) Division into Safety Classes and implications to Specifications
4) Experiences on NPP projects

Part II – Opportunities and handling of some challenges in NPP projects
5) What is the extent of work in a New Build NPP
6) Implications to opportunities from the choice of Specifications
7) Important steps to be successful - start prepare in time

Summary


12         2012-06-20
What is the extent of work in a New Build NPP




13         2012-06-20
Implications on opportunities



• Safety Class 1 and 2:
  − Only few global suppliers for major components, usually ASME-oriented

• Safety Class 3 and 4 and Non-nuclear:
  − Majority of components and systems belong here-
  − Good opportunities for smaller suppliers.
  − The choice of code largely affects opportunities, especially for 4 & non-nuclear

• One major effect for any mechanical equipment supplier on the abilities to go
  nuclear is the choice of Code, ASME or ”EN”, ie European standards.




14         2012-06-20
Implications on opportunities from choice of Specifications



Choices for manufacturing of safety critical mechanical equipment:

• The ”full ASME-track”
  − Provides opportunity to export outside Europe (especially US, CAN)
  − Entire manufacturing adapted to a specific code
  − Certification by ASME, AIA. All continuous surveillance by manufacturer

• The ”European Track”
  − Choice of European EN-standards gives access to EU-market
  − Complies with EU-directives
  − Large involvement of various third parties during manufacturing

• The ”mixed Track”
  − ASME/EN is partly used
  − Mix between fundamentally different codes for one system gives difficulties

• In all cases:
  − Adjustments must in any case be made to national nuclear legislation

15          2012-06-20
Important steps to be successful - start prepare in time



• Choice of specifications is a basis (national guides and standards)

• Start prepare in time:

  − Detailed requirements breakdown

  − Training and education of suppliers and sub-suppliers

  − Qualify personnel and quality systems

  − Start a forum for cooperation between authorities, licensee and industry




16         2012-06-20
Expertise area examples for NPP New Build and Operation
                                                                                0                            60 Years



                                     Engineering               Manufacturing
      Planning                                                                             Operation
                                     & Design                  & Installation




 Evaluation of                                             Manufacturing
                              Codes & Stds                 Inspections              In Service Inspections
 Suppliers

 Project Risk Mgmt            Load Analysis              Welding Technology              Revisions

Basic Design Review          Structural Integrity            NDT & DT                   Modifications
                             Verification
 Preplanning for             Materials                         QC                      Mgmt of Defects
 60 years operation          Technology

 Sub Supplier Req            Constr License Appl            Site installation          Life Time Mgmt
                                                            inspections
 Regulatory
                                                          Oper License Appl
 License Application

      Training and qualification of personnel at authorities, licensee, suppliers in these areas important

17             6/20/2012
SUMMARY

Examples of initiatives to create opportunities for national industry

• Maintained project leadership by the licensee is essential in all project phases

• Choice of codes and standards that comply with national and European legislation
  and also that will promote national manufacturers

• Detailed requirements breakdown and then creation of clear specifications for the
  complete chain of suppliers and sub-suppliers

• Specification of both quality and documentation requirements.- high
  documentation requirements in the nuclear industry

• Training and education of suppliers and sub-suppliers – early on in the NPP
  project initiatives for training jointly by authorities, licensee and industry

• Create an open process between Authorities, Licensee, Contractor, Suppliers for
  cooperative handling of requirements

• Continue to build on the national expertise needed to support the nuclear industry


18        2012-06-20
FINAL WORDS…



• Inspecta Annual Nuclear Symposium is arranged 4-5 december 2012.
  Welcome!

• Thanks for listening!




 For further inquiries, please contact
 Inspecta Lithuania, Mr. Mantas Andriuskevicius,
 Mantas.Andriuskevicius@inspecta.com
 +370 61517558



19        2012-06-20

More Related Content

What's hot

Inspector ,ElectroMechanical engineer resume rev.01
Inspector ,ElectroMechanical  engineer resume rev.01Inspector ,ElectroMechanical  engineer resume rev.01
Inspector ,ElectroMechanical engineer resume rev.01yousef amrou
 
RBH standard cv June2016
RBH standard cv June2016RBH standard cv June2016
RBH standard cv June2016Richard Hyatt
 
2011 photovoltaic brochure_us_final
2011 photovoltaic brochure_us_final2011 photovoltaic brochure_us_final
2011 photovoltaic brochure_us_final
NiNa Ninita
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & ToubroJAIPRAKASH PATIL
 
Jeep AS 2067 Presentation By Peter Willis
Jeep AS 2067 Presentation By Peter WillisJeep AS 2067 Presentation By Peter Willis
Jeep AS 2067 Presentation By Peter WillisEngineers Australia
 
Asme codes and standards
Asme codes and standardsAsme codes and standards
Asme codes and standards
Dennise Gonzalez Pedre
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling Industry
Lloyd's Register Energy
 
Andrew Kranak Resume 2016
Andrew Kranak Resume 2016Andrew Kranak Resume 2016
Andrew Kranak Resume 2016Andrew Kranak
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)Vijayakumar Kumar
 
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Ibrahem Sakkot
 

What's hot (14)

resume
resumeresume
resume
 
Inspector ,ElectroMechanical engineer resume rev.01
Inspector ,ElectroMechanical  engineer resume rev.01Inspector ,ElectroMechanical  engineer resume rev.01
Inspector ,ElectroMechanical engineer resume rev.01
 
RBH standard cv June2016
RBH standard cv June2016RBH standard cv June2016
RBH standard cv June2016
 
2011 photovoltaic brochure_us_final
2011 photovoltaic brochure_us_final2011 photovoltaic brochure_us_final
2011 photovoltaic brochure_us_final
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & Toubro
 
Jeep AS 2067 Presentation By Peter Willis
Jeep AS 2067 Presentation By Peter WillisJeep AS 2067 Presentation By Peter Willis
Jeep AS 2067 Presentation By Peter Willis
 
Asme codes and standards
Asme codes and standardsAsme codes and standards
Asme codes and standards
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling Industry
 
Andrew Kranak Resume 2016
Andrew Kranak Resume 2016Andrew Kranak Resume 2016
Andrew Kranak Resume 2016
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
Eng.Ibrahim Sakkot ELECTRICAL ENG CV_1
 
MOHAMED SALEM C.V
MOHAMED  SALEM  C.VMOHAMED  SALEM  C.V
MOHAMED SALEM C.V
 
CV-4-1 -
CV-4-1 -CV-4-1 -
CV-4-1 -
 
Intertest
IntertestIntertest
Intertest
 

Viewers also liked

Rolinec_M_Case study Nuclear power plant construction EN final
Rolinec_M_Case study Nuclear power plant construction EN finalRolinec_M_Case study Nuclear power plant construction EN final
Rolinec_M_Case study Nuclear power plant construction EN finalRolinec Marek
 
safety aspects of nuclear reactor
safety aspects of nuclear reactorsafety aspects of nuclear reactor
safety aspects of nuclear reactorRajan Lanjekar
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plantcollege
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
Dr. Ramesh B
 
Nucleir power plant and characterization
Nucleir power plant and characterizationNucleir power plant and characterization
Nucleir power plant and characterizationHaris Setiawan
 
Kudankulam nuclear power plant- A critical analysis ( one of the World's safe...
Kudankulam nuclear power plant- A critical analysis ( one of the World's safe...Kudankulam nuclear power plant- A critical analysis ( one of the World's safe...
Kudankulam nuclear power plant- A critical analysis ( one of the World's safe...
Raj B Saha
 
R41805_Nuclear Power Plant Seismic Safety
R41805_Nuclear Power Plant Seismic SafetyR41805_Nuclear Power Plant Seismic Safety
R41805_Nuclear Power Plant Seismic SafetyAnthony Andrews
 
Basic Safety Concepts in Nuclear Engineering
Basic Safety Concepts in Nuclear EngineeringBasic Safety Concepts in Nuclear Engineering
Basic Safety Concepts in Nuclear Engineering
Global Risk Forum GRFDavos
 
THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...
THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...
THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...
Sayeed Mohammed
 
Nuclear power plant
Nuclear power plant Nuclear power plant
Nuclear power plant
Omraj Singh
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
tmishra3
 
nuclear reactors
nuclear reactors nuclear reactors
nuclear reactors
Yogesh Sinkar
 

Viewers also liked (13)

Rolinec_M_Case study Nuclear power plant construction EN final
Rolinec_M_Case study Nuclear power plant construction EN finalRolinec_M_Case study Nuclear power plant construction EN final
Rolinec_M_Case study Nuclear power plant construction EN final
 
safety aspects of nuclear reactor
safety aspects of nuclear reactorsafety aspects of nuclear reactor
safety aspects of nuclear reactor
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Nucleir power plant and characterization
Nucleir power plant and characterizationNucleir power plant and characterization
Nucleir power plant and characterization
 
Kudankulam nuclear power plant- A critical analysis ( one of the World's safe...
Kudankulam nuclear power plant- A critical analysis ( one of the World's safe...Kudankulam nuclear power plant- A critical analysis ( one of the World's safe...
Kudankulam nuclear power plant- A critical analysis ( one of the World's safe...
 
R41805_Nuclear Power Plant Seismic Safety
R41805_Nuclear Power Plant Seismic SafetyR41805_Nuclear Power Plant Seismic Safety
R41805_Nuclear Power Plant Seismic Safety
 
Safety Concepts of Plant Design
Safety Concepts of Plant DesignSafety Concepts of Plant Design
Safety Concepts of Plant Design
 
Basic Safety Concepts in Nuclear Engineering
Basic Safety Concepts in Nuclear EngineeringBasic Safety Concepts in Nuclear Engineering
Basic Safety Concepts in Nuclear Engineering
 
THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...
THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...
THERMAL ANALYSIS AND DESIGN OF A NATURAL DRAFT COOLING TOWER OF A 1000 MW NUC...
 
Nuclear power plant
Nuclear power plant Nuclear power plant
Nuclear power plant
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
nuclear reactors
nuclear reactors nuclear reactors
nuclear reactors
 

Similar to Jens Gunnars, „Inspecta Technology“ technikos vadovas, Mikael Kuokkanen, „Inspecta Nuclear“ technikos vadovas, „Branduolinės elektrinės statybos techniniai reikalavimai“

Mikael Kuokkkanen, Inspecta Nuclear (Švedija), „Visagino VAE projektas. Techn...
Mikael Kuokkkanen, Inspecta Nuclear (Švedija), „Visagino VAE projektas. Techn...Mikael Kuokkkanen, Inspecta Nuclear (Švedija), „Visagino VAE projektas. Techn...
Mikael Kuokkkanen, Inspecta Nuclear (Švedija), „Visagino VAE projektas. Techn...Versli Lietuva (Enterprise Lithuania)
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Versli Lietuva (Enterprise Lithuania)
 
1 3 amec
1 3 amec1 3 amec
1 3 amec
Ahmed Awaise
 
Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' UKTI2014
 
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
Mark Mitchell
 
Pip arc01015(architechtural & building utilities design criteria)
Pip arc01015(architechtural & building utilities design criteria)Pip arc01015(architechtural & building utilities design criteria)
Pip arc01015(architechtural & building utilities design criteria)
Muhammad Hassan
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Versli Lietuva (Enterprise Lithuania)
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Denis Senin
 
Localisation Readiness and Fabrication Code Opportunities
Localisation Readiness and Fabrication Code OpportunitiesLocalisation Readiness and Fabrication Code Opportunities
Localisation Readiness and Fabrication Code Opportunities
Mark Mitchell
 
61131730 transmission-line-case-study
61131730 transmission-line-case-study61131730 transmission-line-case-study
61131730 transmission-line-case-study
homeworkping4
 
Guest speaker presentation at 'Seminar Offshore Wind Energy' UGent – June 201...
Guest speaker presentation at 'Seminar Offshore Wind Energy' UGent – June 201...Guest speaker presentation at 'Seminar Offshore Wind Energy' UGent – June 201...
Guest speaker presentation at 'Seminar Offshore Wind Energy' UGent – June 201...
Pieter Jan Jordaens
 
South African Suppliers –Quality Management readiness for Nuclear
South African Suppliers –Quality Management readiness for NuclearSouth African Suppliers –Quality Management readiness for Nuclear
South African Suppliers –Quality Management readiness for Nuclear
Mark Mitchell
 
Inspecta OTD presentation
Inspecta OTD presentation Inspecta OTD presentation
Inspecta OTD presentation
inacatrine
 
ASME CODES & STANDARDS - department of metallurgy.ppt
ASME CODES & STANDARDS - department of metallurgy.pptASME CODES & STANDARDS - department of metallurgy.ppt
ASME CODES & STANDARDS - department of metallurgy.ppt
ssuserb6ce69
 
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sectorProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM R & D Pvt. Ltd.
 
05 2017 03_ralph_gottschalg_standardsbodyperspective
05 2017 03_ralph_gottschalg_standardsbodyperspective05 2017 03_ralph_gottschalg_standardsbodyperspective
05 2017 03_ralph_gottschalg_standardsbodyperspective
Sandia National Laboratories: Energy & Climate: Renewables
 
asmecodesstandards.ppt
asmecodesstandards.pptasmecodesstandards.ppt
asmecodesstandards.ppt
Shofwan Hilal
 
Norsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdfNorsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdf
SugunaSrinivasan2
 
Seismic evaluation of nuclear power plants - ICNPG - 2018 - Invited lecture b...
Seismic evaluation of nuclear power plants - ICNPG - 2018 - Invited lecture b...Seismic evaluation of nuclear power plants - ICNPG - 2018 - Invited lecture b...
Seismic evaluation of nuclear power plants - ICNPG - 2018 - Invited lecture b...
ProSIM R & D Pvt. Ltd.
 
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power PlantsSiesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
ProSIM R & D Pvt. Ltd.
 

Similar to Jens Gunnars, „Inspecta Technology“ technikos vadovas, Mikael Kuokkanen, „Inspecta Nuclear“ technikos vadovas, „Branduolinės elektrinės statybos techniniai reikalavimai“ (20)

Mikael Kuokkkanen, Inspecta Nuclear (Švedija), „Visagino VAE projektas. Techn...
Mikael Kuokkkanen, Inspecta Nuclear (Švedija), „Visagino VAE projektas. Techn...Mikael Kuokkkanen, Inspecta Nuclear (Švedija), „Visagino VAE projektas. Techn...
Mikael Kuokkkanen, Inspecta Nuclear (Švedija), „Visagino VAE projektas. Techn...
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
1 3 amec
1 3 amec1 3 amec
1 3 amec
 
Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen'
 
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
 
Pip arc01015(architechtural & building utilities design criteria)
Pip arc01015(architechtural & building utilities design criteria)Pip arc01015(architechtural & building utilities design criteria)
Pip arc01015(architechtural & building utilities design criteria)
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
Localisation Readiness and Fabrication Code Opportunities
Localisation Readiness and Fabrication Code OpportunitiesLocalisation Readiness and Fabrication Code Opportunities
Localisation Readiness and Fabrication Code Opportunities
 
61131730 transmission-line-case-study
61131730 transmission-line-case-study61131730 transmission-line-case-study
61131730 transmission-line-case-study
 
Guest speaker presentation at 'Seminar Offshore Wind Energy' UGent – June 201...
Guest speaker presentation at 'Seminar Offshore Wind Energy' UGent – June 201...Guest speaker presentation at 'Seminar Offshore Wind Energy' UGent – June 201...
Guest speaker presentation at 'Seminar Offshore Wind Energy' UGent – June 201...
 
South African Suppliers –Quality Management readiness for Nuclear
South African Suppliers –Quality Management readiness for NuclearSouth African Suppliers –Quality Management readiness for Nuclear
South African Suppliers –Quality Management readiness for Nuclear
 
Inspecta OTD presentation
Inspecta OTD presentation Inspecta OTD presentation
Inspecta OTD presentation
 
ASME CODES & STANDARDS - department of metallurgy.ppt
ASME CODES & STANDARDS - department of metallurgy.pptASME CODES & STANDARDS - department of metallurgy.ppt
ASME CODES & STANDARDS - department of metallurgy.ppt
 
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sectorProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sector
 
05 2017 03_ralph_gottschalg_standardsbodyperspective
05 2017 03_ralph_gottschalg_standardsbodyperspective05 2017 03_ralph_gottschalg_standardsbodyperspective
05 2017 03_ralph_gottschalg_standardsbodyperspective
 
asmecodesstandards.ppt
asmecodesstandards.pptasmecodesstandards.ppt
asmecodesstandards.ppt
 
Norsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdfNorsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdf
 
Seismic evaluation of nuclear power plants - ICNPG - 2018 - Invited lecture b...
Seismic evaluation of nuclear power plants - ICNPG - 2018 - Invited lecture b...Seismic evaluation of nuclear power plants - ICNPG - 2018 - Invited lecture b...
Seismic evaluation of nuclear power plants - ICNPG - 2018 - Invited lecture b...
 
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power PlantsSiesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
Siesmic Evaluation for Structural Integrity Assessment of Nuclear Power Plants
 

More from Versli Lietuva (Enterprise Lithuania)

NVS šalių tendencijos prekybos segmente
NVS šalių tendencijos prekybos segmenteNVS šalių tendencijos prekybos segmente
NVS šalių tendencijos prekybos segmente
Versli Lietuva (Enterprise Lithuania)
 
How to better exploit (not waste) a company’s scarcest resource Management At...
How to better exploit (not waste) a company’s scarcest resource Management At...How to better exploit (not waste) a company’s scarcest resource Management At...
How to better exploit (not waste) a company’s scarcest resource Management At...Versli Lietuva (Enterprise Lithuania)
 
Ar didėja Lietuvos įmonių konkurencingumas: kaip atrodėme anksčiau ir kur pat...
Ar didėja Lietuvos įmonių konkurencingumas: kaip atrodėme anksčiau ir kur pat...Ar didėja Lietuvos įmonių konkurencingumas: kaip atrodėme anksčiau ir kur pat...
Ar didėja Lietuvos įmonių konkurencingumas: kaip atrodėme anksčiau ir kur pat...Versli Lietuva (Enterprise Lithuania)
 
Building the cash machine (sales team and sale process management) (red)
Building the cash machine (sales team and sale process management) (red)Building the cash machine (sales team and sale process management) (red)
Building the cash machine (sales team and sale process management) (red)Versli Lietuva (Enterprise Lithuania)
 
UPS įgaliotosios atstovės Lietuvoje UAB „Skubios siuntos“ vadovai, „10 prakti...
UPS įgaliotosios atstovės Lietuvoje UAB „Skubios siuntos“ vadovai, „10 prakti...UPS įgaliotosios atstovės Lietuvoje UAB „Skubios siuntos“ vadovai, „10 prakti...
UPS įgaliotosios atstovės Lietuvoje UAB „Skubios siuntos“ vadovai, „10 prakti...Versli Lietuva (Enterprise Lithuania)
 
Audrius Matiukas, personalo konsultacijų bendrovės „PRIMUM ESSE“ konsultantas...
Audrius Matiukas, personalo konsultacijų bendrovės „PRIMUM ESSE“ konsultantas...Audrius Matiukas, personalo konsultacijų bendrovės „PRIMUM ESSE“ konsultantas...
Audrius Matiukas, personalo konsultacijų bendrovės „PRIMUM ESSE“ konsultantas...Versli Lietuva (Enterprise Lithuania)
 
Edmundas Piesarskas, „PRIMUM ESSE“ konsultantas, „Kultūriniai aspektai ekspor...
Edmundas Piesarskas, „PRIMUM ESSE“ konsultantas, „Kultūriniai aspektai ekspor...Edmundas Piesarskas, „PRIMUM ESSE“ konsultantas, „Kultūriniai aspektai ekspor...
Edmundas Piesarskas, „PRIMUM ESSE“ konsultantas, „Kultūriniai aspektai ekspor...Versli Lietuva (Enterprise Lithuania)
 
Justas Gavėnas, EKT verslo plėtros vadovas, sertifikuotas vadybos konsultanta...
Justas Gavėnas, EKT verslo plėtros vadovas, sertifikuotas vadybos konsultanta...Justas Gavėnas, EKT verslo plėtros vadovas, sertifikuotas vadybos konsultanta...
Justas Gavėnas, EKT verslo plėtros vadovas, sertifikuotas vadybos konsultanta...
Versli Lietuva (Enterprise Lithuania)
 
Audrius Matiukas, personalo konsultacijų bendrovės PRIMUM ESSE konsultantas, ...
Audrius Matiukas, personalo konsultacijų bendrovės PRIMUM ESSE konsultantas, ...Audrius Matiukas, personalo konsultacijų bendrovės PRIMUM ESSE konsultantas, ...
Audrius Matiukas, personalo konsultacijų bendrovės PRIMUM ESSE konsultantas, ...Versli Lietuva (Enterprise Lithuania)
 
Rūta Gudmonaitė, personalo konsultacijų bendrovės PRIMUM ESSE konsultantė, „K...
Rūta Gudmonaitė, personalo konsultacijų bendrovės PRIMUM ESSE konsultantė, „K...Rūta Gudmonaitė, personalo konsultacijų bendrovės PRIMUM ESSE konsultantė, „K...
Rūta Gudmonaitė, personalo konsultacijų bendrovės PRIMUM ESSE konsultantė, „K...Versli Lietuva (Enterprise Lithuania)
 
Kristina Biraitė, komercijos atašė Izraelyje, „Maisto produktų eksportas į Iz...
Kristina Biraitė, komercijos atašė Izraelyje, „Maisto produktų eksportas į Iz...Kristina Biraitė, komercijos atašė Izraelyje, „Maisto produktų eksportas į Iz...
Kristina Biraitė, komercijos atašė Izraelyje, „Maisto produktų eksportas į Iz...Versli Lietuva (Enterprise Lithuania)
 
Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...
Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...
Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...Versli Lietuva (Enterprise Lithuania)
 
Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...
Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...
Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...Versli Lietuva (Enterprise Lithuania)
 
Sigitas Šlepavičius, Branduolinės saugos departamento direktorius, Valstybinė...
Sigitas Šlepavičius, Branduolinės saugos departamento direktorius, Valstybinė...Sigitas Šlepavičius, Branduolinės saugos departamento direktorius, Valstybinė...
Sigitas Šlepavičius, Branduolinės saugos departamento direktorius, Valstybinė...Versli Lietuva (Enterprise Lithuania)
 
Sigitas Baltuška, UAB „Visagino atominė elektrinė“ išorinių reikalų direktori...
Sigitas Baltuška, UAB „Visagino atominė elektrinė“ išorinių reikalų direktori...Sigitas Baltuška, UAB „Visagino atominė elektrinė“ išorinių reikalų direktori...
Sigitas Baltuška, UAB „Visagino atominė elektrinė“ išorinių reikalų direktori...Versli Lietuva (Enterprise Lithuania)
 
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Versli Lietuva (Enterprise Lithuania)
 
Asta Augutytė, advokatų kontoros „Raidla Lejins & Norcous“ asocijuota teisini...
Asta Augutytė, advokatų kontoros „Raidla Lejins & Norcous“ asocijuota teisini...Asta Augutytė, advokatų kontoros „Raidla Lejins & Norcous“ asocijuota teisini...
Asta Augutytė, advokatų kontoros „Raidla Lejins & Norcous“ asocijuota teisini...Versli Lietuva (Enterprise Lithuania)
 

More from Versli Lietuva (Enterprise Lithuania) (20)

NVS šalių tendencijos prekybos segmente
NVS šalių tendencijos prekybos segmenteNVS šalių tendencijos prekybos segmente
NVS šalių tendencijos prekybos segmente
 
Building mafia offers for smbs
Building mafia offers for smbs Building mafia offers for smbs
Building mafia offers for smbs
 
How to better exploit (not waste) a company’s scarcest resource Management At...
How to better exploit (not waste) a company’s scarcest resource Management At...How to better exploit (not waste) a company’s scarcest resource Management At...
How to better exploit (not waste) a company’s scarcest resource Management At...
 
Ar didėja Lietuvos įmonių konkurencingumas: kaip atrodėme anksčiau ir kur pat...
Ar didėja Lietuvos įmonių konkurencingumas: kaip atrodėme anksčiau ir kur pat...Ar didėja Lietuvos įmonių konkurencingumas: kaip atrodėme anksčiau ir kur pat...
Ar didėja Lietuvos įmonių konkurencingumas: kaip atrodėme anksčiau ir kur pat...
 
How to prepare mafia offers under lithuanian circumstances (red)
How to prepare mafia offers under lithuanian circumstances (red)How to prepare mafia offers under lithuanian circumstances (red)
How to prepare mafia offers under lithuanian circumstances (red)
 
Building the cash machine (sales team and sale process management) (red)
Building the cash machine (sales team and sale process management) (red)Building the cash machine (sales team and sale process management) (red)
Building the cash machine (sales team and sale process management) (red)
 
UPS įgaliotosios atstovės Lietuvoje UAB „Skubios siuntos“ vadovai, „10 prakti...
UPS įgaliotosios atstovės Lietuvoje UAB „Skubios siuntos“ vadovai, „10 prakti...UPS įgaliotosios atstovės Lietuvoje UAB „Skubios siuntos“ vadovai, „10 prakti...
UPS įgaliotosios atstovės Lietuvoje UAB „Skubios siuntos“ vadovai, „10 prakti...
 
Leidinys "Aš pradedu verslą"
Leidinys "Aš pradedu verslą"Leidinys "Aš pradedu verslą"
Leidinys "Aš pradedu verslą"
 
Audrius Matiukas, personalo konsultacijų bendrovės „PRIMUM ESSE“ konsultantas...
Audrius Matiukas, personalo konsultacijų bendrovės „PRIMUM ESSE“ konsultantas...Audrius Matiukas, personalo konsultacijų bendrovės „PRIMUM ESSE“ konsultantas...
Audrius Matiukas, personalo konsultacijų bendrovės „PRIMUM ESSE“ konsultantas...
 
Edmundas Piesarskas, „PRIMUM ESSE“ konsultantas, „Kultūriniai aspektai ekspor...
Edmundas Piesarskas, „PRIMUM ESSE“ konsultantas, „Kultūriniai aspektai ekspor...Edmundas Piesarskas, „PRIMUM ESSE“ konsultantas, „Kultūriniai aspektai ekspor...
Edmundas Piesarskas, „PRIMUM ESSE“ konsultantas, „Kultūriniai aspektai ekspor...
 
Justas Gavėnas, EKT verslo plėtros vadovas, sertifikuotas vadybos konsultanta...
Justas Gavėnas, EKT verslo plėtros vadovas, sertifikuotas vadybos konsultanta...Justas Gavėnas, EKT verslo plėtros vadovas, sertifikuotas vadybos konsultanta...
Justas Gavėnas, EKT verslo plėtros vadovas, sertifikuotas vadybos konsultanta...
 
Audrius Matiukas, personalo konsultacijų bendrovės PRIMUM ESSE konsultantas, ...
Audrius Matiukas, personalo konsultacijų bendrovės PRIMUM ESSE konsultantas, ...Audrius Matiukas, personalo konsultacijų bendrovės PRIMUM ESSE konsultantas, ...
Audrius Matiukas, personalo konsultacijų bendrovės PRIMUM ESSE konsultantas, ...
 
Rūta Gudmonaitė, personalo konsultacijų bendrovės PRIMUM ESSE konsultantė, „K...
Rūta Gudmonaitė, personalo konsultacijų bendrovės PRIMUM ESSE konsultantė, „K...Rūta Gudmonaitė, personalo konsultacijų bendrovės PRIMUM ESSE konsultantė, „K...
Rūta Gudmonaitė, personalo konsultacijų bendrovės PRIMUM ESSE konsultantė, „K...
 
Kristina Biraitė, komercijos atašė Izraelyje, „Maisto produktų eksportas į Iz...
Kristina Biraitė, komercijos atašė Izraelyje, „Maisto produktų eksportas į Iz...Kristina Biraitė, komercijos atašė Izraelyje, „Maisto produktų eksportas į Iz...
Kristina Biraitė, komercijos atašė Izraelyje, „Maisto produktų eksportas į Iz...
 
Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...
Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...
Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...
 
Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...
Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...
Pascal van Delst, „Phood Consultancy” generalinis direktorius, „Pasaulinės ma...
 
Sigitas Šlepavičius, Branduolinės saugos departamento direktorius, Valstybinė...
Sigitas Šlepavičius, Branduolinės saugos departamento direktorius, Valstybinė...Sigitas Šlepavičius, Branduolinės saugos departamento direktorius, Valstybinė...
Sigitas Šlepavičius, Branduolinės saugos departamento direktorius, Valstybinė...
 
Sigitas Baltuška, UAB „Visagino atominė elektrinė“ išorinių reikalų direktori...
Sigitas Baltuška, UAB „Visagino atominė elektrinė“ išorinių reikalų direktori...Sigitas Baltuška, UAB „Visagino atominė elektrinė“ išorinių reikalų direktori...
Sigitas Baltuška, UAB „Visagino atominė elektrinė“ išorinių reikalų direktori...
 
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
 
Asta Augutytė, advokatų kontoros „Raidla Lejins & Norcous“ asocijuota teisini...
Asta Augutytė, advokatų kontoros „Raidla Lejins & Norcous“ asocijuota teisini...Asta Augutytė, advokatų kontoros „Raidla Lejins & Norcous“ asocijuota teisini...
Asta Augutytė, advokatų kontoros „Raidla Lejins & Norcous“ asocijuota teisini...
 

Recently uploaded

Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
Any kyc Account
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
daothibichhang1
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 

Recently uploaded (20)

Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdfBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc.pdf
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 

Jens Gunnars, „Inspecta Technology“ technikos vadovas, Mikael Kuokkanen, „Inspecta Nuclear“ technikos vadovas, „Branduolinės elektrinės statybos techniniai reikalavimai“

  • 1. Nuclear Power Plant Construction Specifications VAE conference, 15 June 2012, Vilnius ”How to properly prepare for the Visaginas NPP” Jens Gunnars, Inspecta Technology Mikael Kuokkanen, Inspecta Nuclear 1 2012-06-20
  • 2. Nuclear Power Plant Construction Specifications Contents Part I – Introduction to and prerequisites for Nuclear Power projects 1) Brief overview of a NPP and major New Build project phases 2) Regulatory framework, Codes, Standards, and Specifications 3) Division into Safety Classes and implications to Specifications 4) Experiences on NPP projects Part II – Opportunities and handling of some challenges in NPP projects 5) What is the extent of work in a New Build NPP 6) Implications on opportunities from the choice of Specifications 7) Important steps to be successful - start prepare in time Summary 2 2012-06-20
  • 3. Brief overview of a NPP Major systems and components in a NPP 3 2012-06-20
  • 4. Major project phases in NPP New Build projects Why should Licensee be involved during Engineering & Manufacturing in a Turn Key Project 0 >60 Years Planning Engineering Manufacturing & Design & Installation Operation 100% initiative by Successive more involvement by Supplier. Licensee has 100% Licensee However, at all times the Licensee still responsibility and interest for needs to maintain project leadership long term operation (also in Turn Key projects) Maintained project leadership by the licensee is essential in all phases since (i) the Licensee has full responsibility and interest for long term operation (ii) this can increase the opportunities for the local industry 4 6/20/2012
  • 5. Regulatory framework, Codes, Standards, and Specifications Global principles but local regulation and control is needed • Basic principles for nuclear safety are similar throughout the world, as originated from U.S. regulation (by NRC) and standards (by ANSI for nuclear and ASME for mechanical); and as generalised in IAEA safety handbooks and guides. − Power utilities have special cooperation forms for exchange of experiences (owner’s groups) and preparation of utility requirements e.g. in Europe (EUR). − Western European nuclear regulatory authorities (WENRA) are in the process of harmonising general safety and regulatory oversight practices. • However, local legislation and often guidelines gives the country’s legal specification for the safety requirements and the way in which operations are controlled − Sweden: national regulation for general safety principles and mechanical equipment, as supervised by the Swedish Radiation Safety Authority (SSM) and inspected by the nuclear inspection bodies. − Finland: national safety regulation and also NPP guidelines (YVL Guides), as prepared by the Radiation and Nuclear Safety Authority (STUK), supported by the technical research organisations and inspection bodies. − France: national regulation and practices, with the regulatory body (ASN), technical support organisation (IRSN) and inspection bodies. − Germany: national regulation and nuclear standards (KTA), with local authorities, support organisation (GRS), and inspection bodies. 5 2012-06-20
  • 6. Regulatory framework, Codes, Standards, and Specifications Legal National Framework legislation National Guides (YVL) IAEA Safety Guidelines Mandatory Nuclear Codes (ANSI, ASME, RCCM) Guides Quality Management Stds (NQA-1, ISO) Established Standards (EN, ISO) Licensee Specific Licensee Requirements Requirements Detailed Project Specifications 6 2012-06-20
  • 7. Activities contributing to nuclear safety Why is nuclear power plant safety so different? • Safety design − Defense-in-depth. Multiple barriers against radioactive releases into environment. − Safety functions. Process/electrical/automation systems protecting the barriers. • Safety assessment − Reactor dynamics – nuclear fission power generation after disturbances. − Thermal hydraulics – water and steam flow in reactor circuit and containment. − Structures and materials – structural capability, endurance and integrity. − Risk assessment – failure scenarios, accident probabilities and consequences. • Safety management − Safety culture & practices. − Quality assurance & control. − Operation & maintenance. • Regulatory oversight − Licensing & permits. − Reviews & inspections. 7 2012-06-20
  • 8. Division into Safety Classes Why is nuclear power plant safety so different? • Safety design − Defense-in-depth. Multiple barriers against radioactive releases into environment. − Safety functions. Process/electrical/automation systems protecting the barriers. Safety Class 3 Safety Class 2 Safety Class 1 8 2012-06-20
  • 9. Safety Classes and their implications to Specifications Example from Sweden: Safety Class Safety Class Safety Class Safety Class 1 2 3 4 Design and ASME III, NB ASME III, NC ASME III, ND EN 13445 strength EN 13480 calculation Material All materials according to harmonized European standards are approved and accepted. Note that ASME materials are not accepted without additional requirements . Welding Certificate according to EN 729, EN 3834. All welding shall be done according to qualified procedures and by qualified personnel. Manufacturing KBM KBM KBM KBM and ASME III, NB ASME III, NC ASME III, ND Installation KBM = owners detailed quality specifications for mechanical equipment 9 2012-06-20
  • 10. Experiences on NPP projects Recent projects in Sweden • PULS (Power Uprate with Licensed Safety) Oskarshamn 3 (BWR). Structural verification of reactor systems, internal parts, turbine systems for increased power. Westinghouse, ALSTOM • FREJ – LOT 3 - Replacement of steam generators in Ringhals 4 – Verification of the structural integrity of reactor systems. AREVA • PLEX Oskarshamn 2, Structural verification of reactor systems, internal parts, turbine systems. AREVA, SIEMENS • GREAT/TURBO - Requalification of Ringhals 3/4 – turbine systems (PWR). ALSTOM • Replacement of RPV-heads I Ringhals 3 and 4 (PWR). MHI • Replacement of Internal parts in Ringhals 1 (BWR). AREVA • Forsmark TU12/MSR. Power uprate. SIEMENS, Balcke Duerr • Forsmark 3, KYR. Preparation of power uprate. Westinghouse • Forsmark 3, Generator replacement. ALSTOM 10 6/20/2012
  • 11. Common experiences from NPP projects Some challenges experienced during the projects • Shortages of experienced designers and welders due to e.g. generation shift • Start of manufacturing before full completion of design and engineering • Worldwide shortage of qualified nuclear equipment manufacturers • Many suppliers not used to the need of extensive documentation in nuclear industry • Requirements not properly communicated through the supplier chain • Personnel and method qualification issues when using a mixe of standards and suppliers own practices 11 2012-06-20
  • 12. Nuclear Power Plant Construction Specifications Contents Part I – Introduction to and prerequisites for Nuclear Power projects 1) Brief overview of a NPP and major New Build project phases 2) Regulatory framework, Codes, Standards, and Specifications 3) Division into Safety Classes and implications to Specifications 4) Experiences on NPP projects Part II – Opportunities and handling of some challenges in NPP projects 5) What is the extent of work in a New Build NPP 6) Implications to opportunities from the choice of Specifications 7) Important steps to be successful - start prepare in time Summary 12 2012-06-20
  • 13. What is the extent of work in a New Build NPP 13 2012-06-20
  • 14. Implications on opportunities • Safety Class 1 and 2: − Only few global suppliers for major components, usually ASME-oriented • Safety Class 3 and 4 and Non-nuclear: − Majority of components and systems belong here- − Good opportunities for smaller suppliers. − The choice of code largely affects opportunities, especially for 4 & non-nuclear • One major effect for any mechanical equipment supplier on the abilities to go nuclear is the choice of Code, ASME or ”EN”, ie European standards. 14 2012-06-20
  • 15. Implications on opportunities from choice of Specifications Choices for manufacturing of safety critical mechanical equipment: • The ”full ASME-track” − Provides opportunity to export outside Europe (especially US, CAN) − Entire manufacturing adapted to a specific code − Certification by ASME, AIA. All continuous surveillance by manufacturer • The ”European Track” − Choice of European EN-standards gives access to EU-market − Complies with EU-directives − Large involvement of various third parties during manufacturing • The ”mixed Track” − ASME/EN is partly used − Mix between fundamentally different codes for one system gives difficulties • In all cases: − Adjustments must in any case be made to national nuclear legislation 15 2012-06-20
  • 16. Important steps to be successful - start prepare in time • Choice of specifications is a basis (national guides and standards) • Start prepare in time: − Detailed requirements breakdown − Training and education of suppliers and sub-suppliers − Qualify personnel and quality systems − Start a forum for cooperation between authorities, licensee and industry 16 2012-06-20
  • 17. Expertise area examples for NPP New Build and Operation 0 60 Years Engineering Manufacturing Planning Operation & Design & Installation Evaluation of Manufacturing Codes & Stds Inspections In Service Inspections Suppliers Project Risk Mgmt Load Analysis Welding Technology Revisions Basic Design Review Structural Integrity NDT & DT Modifications Verification Preplanning for Materials QC Mgmt of Defects 60 years operation Technology Sub Supplier Req Constr License Appl Site installation Life Time Mgmt inspections Regulatory Oper License Appl License Application Training and qualification of personnel at authorities, licensee, suppliers in these areas important 17 6/20/2012
  • 18. SUMMARY Examples of initiatives to create opportunities for national industry • Maintained project leadership by the licensee is essential in all project phases • Choice of codes and standards that comply with national and European legislation and also that will promote national manufacturers • Detailed requirements breakdown and then creation of clear specifications for the complete chain of suppliers and sub-suppliers • Specification of both quality and documentation requirements.- high documentation requirements in the nuclear industry • Training and education of suppliers and sub-suppliers – early on in the NPP project initiatives for training jointly by authorities, licensee and industry • Create an open process between Authorities, Licensee, Contractor, Suppliers for cooperative handling of requirements • Continue to build on the national expertise needed to support the nuclear industry 18 2012-06-20
  • 19. FINAL WORDS… • Inspecta Annual Nuclear Symposium is arranged 4-5 december 2012. Welcome! • Thanks for listening! For further inquiries, please contact Inspecta Lithuania, Mr. Mantas Andriuskevicius, Mantas.Andriuskevicius@inspecta.com +370 61517558 19 2012-06-20