Towards Zero
National Deep Retrofit Conference
Aviva Stadium
21 June 2017
The Dún Laoghaire-Rathdown Experience
Rochestown House, EuroPHit Deep Refurbishment Pilot Project
Andrée Dargan, DLR County Architect
Retrofitting Social Housing in DLR - Preamble
• EuroPHit Demonstration Site – Rochestown House
• Project Overview
• Build Process
• Energy Analysis
• Lessons Learned
Public Sector and LA Role
EuroPHit – Rochestown House
Retrofitting Social Housing in DLR – Pilot Project
Rochestown House, Phase 2 – EuroPHit EU Pilot Project,
A passive house upgrade of existing Housing for the Elderly
Dramatically Improving the Energy Performance and
Comfort of Existing Buildings with Step-by-Step
Refurbishment and Integration of Renewable Energy Systems (EUROPHIT )
Retrofitting Social Housing in DLR – Pilot Project
EuroPHit - Rochestown House
Rochestown House, Phase 2 – EuroPHit EU Pilot Project,
A passive house upgrade of existing Housing for the Elderly
Dramatically Improving the Energy Performance and
Comfort of Existing Buildings with Step-by-Step
Refurbishment and Integration of Renewable Energy Systems (EUROPHIT )
Training for design team
Training for tendering contractors
Further training for successful contractor
Supervision on site
Education on site – study trips
Monitoring and Verification
Post Project Analysis
Supported by DHPCLG & SEAI through BEC 2014
Retrofitting Social Housing in DLR – Pilot Project
EuroPHit - Rochestown House
• Located within the former walled garden
of an estate house near local shops and
amenities in Sallynoggin
• Existing small Bedsits were too small and
difficult to rent - dark, cold, damp
• Creating a new community of smart and
accessible buildings
• Long term living - range of unit types to
suit evolving needs
• Part of DLR downsizing project
• Multi Stakeholder - DLR, Local
Community, DHPCLG, SEAI, EuroPHit
COMMUNITY
Retrofitting Social Housing in DLR – Project Overview
Setting
PHASE 1
PHASE 2
PHASE 3
• The Site is being upgraded in three
phases – phases 1 and 2 complete,
phase 3 on site.
• Phase 2 - EuroPHit Deep
Refurbishment to EnerPHit Passive
House refurbishment standard
Retrofitting Social Housing in DLR – Project Overview
Site Layout
Retrofitting Social Housing in DLR – Project Overview
Phasing
PHASE 1 PHASE 1
Phase 1 – 18 bedsits upgraded to 12 one bed units
• Deep retrofit
• External insulation
• Demand control ventilation
• Upgrade of district heating from oil to gas
• From F/G BER to B2/C1 BER
Before upgrade
Finished project after upgrade
Retrofitting Social Housing in DLR – Project Overview
Phasing
PHASE 2
Retrofitting Social Housing in DLR – Project Overview
Phasing
PHASE 2
Phase 2 – 26 bedsits and 8 one bed apartments
upgraded to 34 one bed units
• Accessible/Ambulant with lift added
• Facilities – office, nurse’s station, laundry,
commercial kitchen, communal room
• Project cost c.€3.5m
• Energy efficiency elements c.€890k
Unit size before upgrade - 24m2 Unit size after upgrade - 48m2 Before upgrade
Retrofitting Social Housing in DLR – Project Overview
Phasing
Phase 2
• EnerPHit - PH refurbishment standard
• Upgrade of district heating from oil to gas micro
CHP serving Phases 2 and 3
• Airtightness below 1 air change per hour
• Heat recovery
• From F/G BER to A3/B2 BER
Unit size before upgrade - 24m2 Unit size after upgrade - 48m2 Before upgrade
Retrofitting Social Housing in DLR – Project Overview
Phasing
PHASE 3
Retrofitting Social Housing in DLR – Project Overview
Phasing
PHASE 3
Phase 3 - 14 new units
12 x 1 bed (58m2) and 2 x 2 bed (75m2)
8 will be wheelchair accessible, 6 will be ambulant accessible
• To Passive House standard
• Use of district heating from gas micro CHP in Phase 2
• Airtightness below 0.6 air change per hour
• Heat recovery
• Predicted A2 BER, nZEB compliant
Retrofitting Social Housing in DLR – Project Overview
Phasing
Single storey units Two storey blocks
Retrofitting Social Housing in DLR – Project Overview
Phasing
Construction Commenced November 2014
Completion Date August 2016
Retrofitting Social Housing in DLR – Rochestown House, Phase 2
Northwest view
Northeast view
Built during the early 1970’s
Floor, internal walls and roof - poured concrete
with little or no insulation incorporated
External walls - concrete panels with pebble
dash finish
Solar gains with heavy shading to the northwest
and quite open to the southeast
Plant room on the roof accommodating a low
efficiency oil-fired boiler
Retrofitting Social Housing in DLR – Building - Before
Existing Fabric
Relatively low floor to ceiling height
Ventilation mostly natural, using opening window sections and room-based fans
Retrofitting Social Housing in DLR – Building - Before
Existing Fabric
Internal views of existing communal area on the first floor
Interof Communal area on first floor
Retrofitting Social Housing in DLR – Building - Before
Existing Fabric
Retrofitting Social Housing in DLR – Energy Analysis - Before
Existing Fabric in PHPP
• Cost to heat this building
to 20ºC 24/7/365 would
be c.€53,000 per year
• Annual heating demand
410 kWh (m2a)
Ground Floor Plan
First Floor Plan
Second Floor Plan
Cross Section
• Additional lift and stair core
• New floor added on top of
existing
• New communal areas and
facilities
• New mini CHP and heat
recovery ventilation system
• Whole building externally
insulated
Retrofitting Social Housing in DLR – Construction - Proposal
Design Solution
Front Facade (Northwest)
Back Facade (Southeast)
Retrofitting Social Housing in DLR – Construction - Proposal
Design Solution
Existing concrete
wall panels:
‘U’Value
3.75 W/m²K
Externally
insulated with
200mm EPS
‘U’Value proposed
0.15 W/m²K
Existing wall
panels:
Externally
insulated with
250mm EPS
‘U’Value proposed
0.12 W/m²K
BACK FACADE
South East
New wall:
215mm aerated
block externally
insulated with
200mm EPS
‘U’Value:
0.13 W/m²K
FRONT FACADE
North West
New wall:
215mm aerated
block with
150mm EPS
‘U’Value:
0.16 W/m²K
Existing Floor:
150 mm concrete floor
‘U’Value 4.30 W/m²K
New Roof:
Insulated metal deck with
50mm sound insulation
150mm PIR insulation
‘U’Value:
0.13 W/m²K
Retrofitting Social Housing in DLR – Construction - Proposal
Specification
Retrofitting Social Housing in DLR – Construction - During
Wall Buildup
Retrofitting Social Housing in DLR – Construction - During
Roof Build-up
Retrofitting Social Housing in DLR – Construction - During
Fire Stopping
Recessed
Flush
Retrofitting Social Housing in DLR – Construction - During
Window Positioning
Retrofitting Social Housing in DLR – Construction - During
Recessed Window Detail
Window Cill detail in Therm
Retrofitting Social Housing in DLR – Construction - During
Recessed Window Detail
Window Cill detail
Main Contractor Proposal
Retrofitting Social Housing in DLR – Construction - During
Recessed Window Detail
Window Cill detail in Therm
Main Contractor Proposal
45% better!
Retrofitting Social Housing in DLR – Construction - During
Recessed Window Detail
Retrofitting Social Housing in DLR – Construction - During
Recessed Window Detail
Ψ Value = Ψ Value =
Steel angle
causing a massive
thermal bridge
(standard detail)
Steel angle
25mm set back
from the edge of
the insulation layer
(tender detail)
Retrofitting Social Housing in DLR – Construction - During
Flush Window Detail
. . . as per tender
drawings
Glazed Door Position . . .
. . . as required by door
manufacturer
. . . as required by door
manufacturer with 20mm
of insulation overlap.
Retrofitting Social Housing in DLR – Construction - During
Door Head Detail
. . . as per tender
drawings
Glazed Door Position . . .
. . . as required by door
manufacturer
. . . as required by door
manufacturer with 20mm
of insulation overlap
Psi value = 0.030 W/mK Psi value = 0.441 W/mK Psi value = 0.387 W/mK
Retrofitting Social Housing in DLR – Construction - During
Door Head Detail
at construction stage
at tender stage
Retrofitting Social Housing in DLR – Construction - During
Existing Foundation Detail
Internal Surface Temperature
>15 ºC
Minimum required height from top of foundation to top of floor slab: 290 mm
To insure that at skirting level the surface temperature is above 15 ºC
Retrofitting Social Housing in DLR – Construction - During
Existing Foundation Detail
In below / In above Out below / In above Out below / Out above
Retrofitting Social Housing in DLR – Construction - During
Airtight Line Decisions
Retrofitting Social Housing in DLR – Construction - During
Airtight Challenges
Retrofitting Social Housing in DLR – Construction - During
Airtight Taping
Retrofitting Social Housing in DLR – Construction - During
Ventilation Journey
Retrofitting Social Housing in DLR – Construction - During
Ventilation Journey
1st Option:
Decentralised system
Retrofitting Social Housing in DLR – Construction - During
Ventilation Journey
Advantages:
High overall HRV efficiency
Reduced duct nominal width
Disadvantages:
High capital cost
High maintenance level
2nd Option:
Centralised system
Retrofitting Social Housing in DLR – Construction - During
Ventilation Journey
Advantages:
Low capital cost
Low maintenance level
Disadvantages:
Low HRV efficiency
Increase duct nominal width
Fire dampers required (cost)
Parapet height increased
Load bearing structure (cost)
3rd Option:
4 Centralised units
Retrofitting Social Housing in DLR – Construction - During
Ventilation Journey
Advantages:
Low capital cost
Low maintenance level
Disadvantages:
Low HRV efficiency
Increase duct nominal width
Fire dampers required (cost)
Parapet height increased
Load bearing structure (cost)
Back to 1st Option
Decentralised system agreed
Retrofitting Social Housing in DLR – Construction - During
Ventilation Journey
Retrofitting Social Housing in DLR – Construction - During
Ventilation
Micro CHP
Gas Boilers First Floor Plant
Retrofitting Social Housing in DLR – Construction - During
District Heating
Heat Recovery Ventilation
(Communal room unit)
User controls
Retrofitting Social Housing in DLR – Construction - During
MHRV
BCMS System with remote access
BCMS
Retrofitting Social Housing in DLR – Energy Analysis - After
BCMS
Retrofitting Social Housing in DLR – Energy Analysis - After
Energy
Consumption
per Floor for
February 2017
Retrofitting Social Housing in DLR – Energy Analysis - After
BCMS
Retrofitting Social Housing in DLR – Energy Analysis - After
BCMS
• To heat this building to 20ºC
24/7/365 a reduction of 80%
in cost anticipated
• Annual heating demand
25 kWh (m2a)
Retrofitting Social Housing in DLR – Energy Analysis - After
Results of Upgrade in PHPP
.8
Before Retrofit
Annual heating demand 410 kWh (m2a)
After Retrofit
Annual heating demand 25 kWh (m2a)
Retrofitting Social Housing in DLR – Energy Analysis - After
Heating Energy Balance
Retrofitting Social Housing in DLR – Energy Analysis - After
• EnerPHit Certification process underway
• BER
Ground Floor B2
Middle Floor A3
Top Floor A3 (new build)
Certification
• Illustrates how existing stock can be reused even if it is in poor condition
• Greater awareness of the importance of Energy by Client and Tenants
• nZEB & PH - high standards with emphasis on on-site care and quality assurance,
required to ensure effective on-site attention to detail
• National up-skilling of the design and construction sectors is needed for either build
• Positive but huge learning experience for both Contractor and Design team
• Passive Consultant and Architects’ Department learned as the project developed -
Theory v Practice - be alert to impact on project costs
• Significant knowledge dissemination
Retrofitting Social Housing in DLR – Lessons Learned
General
- At design stage carry out an air leakage search
A way to learn more about the existing fabric
- At tender stage specify in detail each transparent component
G values, Uf values for each frame/glass type
- Programme in preliminary pressurisation tests for the entire building
Contractor to price for temporary seals for this preliminary tests
- Select Main Contractor with training and experience in PH / low energy construction
It will save hours of discussions (time is money)
- When selecting windows/doors check if construction fitting detail is acceptable from
the manufacturer point of view
Structure and weather future proof
- On site supervision
It’s crucial
Retrofitting Social Housing in DLR – Lessons Learned
Construction
EU / National
• EU policy
• National commitments
• Funding
• EuroPHit project
• Industry learning
Client
• Downsizing policy
• Quality housing stock
• Template for future refurbishments
• Less ongoing maintenance
• Smart building
• Development of new community
Tenant
• Part of new community
• Healthy
• Comfortable
• Economic
• Shared facilities
Interchangability
Replicability
Scalability
Retrofitting Social Housing in DLR – Rochestown House
Benefits of Project
• Sustainability - Social, Economic, Environmental
• Benefits to be achieved by designing an energy efficient
but also smart building have a huge impact
• Building should be smart (back of house) but must be user
friendly (front of house)
• Need post occupancy review to ensure expected
outcomes have been achieved
• Energy upgrade project has enabled Council's desired
downsizing policy to be kick-started, other projects now
underway
• 90% of existing building stock will still be in use in 2050,
Government's Housing Action Plan puts emphasis on
making best use of existing stock
• Funding implications for deep retrofit
• Policy does affect change but you need a led vision
• Benefit of pilot projects
• Construction employment opportunities
• New learning and standards
Retrofitting Social Housing in DLR – Rochestown House
Conclusions
Client – DLR Housing Department
Design Team
• Architects – DLR Architects’ Department
• Civil & Structural Engineers – Hanley Pepper & Assoc
• Mech & Elec Engineers – Ramsay Cox & Assoc
• Quantity Surveyors – Walsh Associates
• Passive House Consultants – MosArt
• PSDP – Scott & McNeill
Contractor
• Main Contractor - Manley Construction
• Mech Subcontactor - MPH Ltd
• Elec Subcontractor - D & N Group
• Airtightness - Advanced Airtight Solutions Ltd
Retrofitting Social Housing in DLR – Rochestown House
Retrofitting Social Housing in DLR – Rochestown House
Retrofitting Social Housing in DLR – Rochestown House
Retrofitting Social Housing in DLR – Rochestown House
Retrofitting Social Housing in DLR – Rochestown House
Retrofitting Social Housing in DLR – Rochestown House
Retrofitting Social Housing in DLR – Rochestown House
Retrofitting Social Housing in DLR – Rochestown House
Retrofitting Social Housing in DLR – Rochestown House
Retrofitting Social Housing in DLR – Rochestown House
Retrofitting Social Housing in DLR – Rochestown House
Retrofitting Social Housing in DLR – Rochestown House
Hair Dressers Communal LaundryMain StairsCorridor
Apartment Type A
Retrofitting Social Housing in DLR – Rochestown House
Apartment Type B
Retrofitting Social Housing in DLR – Rochestown House
Thank you
adargan@dlrcoco.ie
21 June 2017
Retrofitting Social Housing in DLR – Rochestown House
Retrofitting Social Housing in DLR – Rochestown House

More Related Content

Similar to Deep Retrofit: The Dun Laoghaire-Rathdown Experience

Beyond Zero Carbon Housing - Peter Conboy
Beyond Zero Carbon Housing - Peter ConboyBeyond Zero Carbon Housing - Peter Conboy
Beyond Zero Carbon Housing - Peter ConboyCreative Energy Homes
 
111127 Penwith Ha Heat Pod Project V3
111127 Penwith Ha Heat Pod Project V3111127 Penwith Ha Heat Pod Project V3
111127 Penwith Ha Heat Pod Project V3DenysStephens
 
Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)Lwj Welson
 
Tipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes projectTipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes projectTipperary Energy Agency
 
Reframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofitsReframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofitsPembina Institute
 
Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012richlandcollegetx
 
C harold d12124981 systems presentation
C harold d12124981 systems presentationC harold d12124981 systems presentation
C harold d12124981 systems presentationColette Harold
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalChris Humphries
 
Deep Retrofit: The Contractor's Perspective
Deep Retrofit: The Contractor's PerspectiveDeep Retrofit: The Contractor's Perspective
Deep Retrofit: The Contractor's PerspectiveSustainableEnergyAut
 
Telehouse north 2 presentation for dcw 2015 final
Telehouse north 2 presentation for dcw 2015 finalTelehouse north 2 presentation for dcw 2015 final
Telehouse north 2 presentation for dcw 2015 finalexcoolltd
 
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House InstituteDeep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House InstituteSustainableEnergyAut
 
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017Rod Yeoh
 
Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...Lauren-Lee Camp
 
Green Studio Handbook - Part 5
Green Studio Handbook - Part 5Green Studio Handbook - Part 5
Green Studio Handbook - Part 5Galala University
 
New Kid on the Block: Passive House Comes into Pittsburgh's Neighborhood
New Kid on the Block: Passive House Comes into Pittsburgh's NeighborhoodNew Kid on the Block: Passive House Comes into Pittsburgh's Neighborhood
New Kid on the Block: Passive House Comes into Pittsburgh's Neighborhoodlucyna99
 

Similar to Deep Retrofit: The Dun Laoghaire-Rathdown Experience (20)

Beyond Zero Carbon Housing - Peter Conboy
Beyond Zero Carbon Housing - Peter ConboyBeyond Zero Carbon Housing - Peter Conboy
Beyond Zero Carbon Housing - Peter Conboy
 
SERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & LessonsSERVE-ING Tipperary Results & Lessons
SERVE-ING Tipperary Results & Lessons
 
111127 Penwith Ha Heat Pod Project V3
111127 Penwith Ha Heat Pod Project V3111127 Penwith Ha Heat Pod Project V3
111127 Penwith Ha Heat Pod Project V3
 
Building services-i (2)
Building services-i (2)Building services-i (2)
Building services-i (2)
 
Tipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes projectTipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes project
 
Bill Quigley Passive solar house CI
Bill Quigley Passive solar house CIBill Quigley Passive solar house CI
Bill Quigley Passive solar house CI
 
Olson thc case_study
Olson thc case_studyOlson thc case_study
Olson thc case_study
 
Energy cork tea 29 oct15
Energy cork tea 29 oct15Energy cork tea 29 oct15
Energy cork tea 29 oct15
 
Reframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofitsReframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofits
 
Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012Pardon Our Thunderdust 2011-2012
Pardon Our Thunderdust 2011-2012
 
C harold d12124981 systems presentation
C harold d12124981 systems presentationC harold d12124981 systems presentation
C harold d12124981 systems presentation
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - Final
 
Deep Retrofit: The Contractor's Perspective
Deep Retrofit: The Contractor's PerspectiveDeep Retrofit: The Contractor's Perspective
Deep Retrofit: The Contractor's Perspective
 
Renner thc case_study.pdf
Renner thc case_study.pdfRenner thc case_study.pdf
Renner thc case_study.pdf
 
Telehouse north 2 presentation for dcw 2015 final
Telehouse north 2 presentation for dcw 2015 finalTelehouse north 2 presentation for dcw 2015 final
Telehouse north 2 presentation for dcw 2015 final
 
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House InstituteDeep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
 
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
Hero to Zero, Vancouver's New Rezoning Policy - Buildex Vancouver 2017
 
Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...Hero to Zero: Understand and meet Vancouver's new energy and emission require...
Hero to Zero: Understand and meet Vancouver's new energy and emission require...
 
Green Studio Handbook - Part 5
Green Studio Handbook - Part 5Green Studio Handbook - Part 5
Green Studio Handbook - Part 5
 
New Kid on the Block: Passive House Comes into Pittsburgh's Neighborhood
New Kid on the Block: Passive House Comes into Pittsburgh's NeighborhoodNew Kid on the Block: Passive House Comes into Pittsburgh's Neighborhood
New Kid on the Block: Passive House Comes into Pittsburgh's Neighborhood
 

More from SustainableEnergyAut

SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch SustainableEnergyAut
 
Public Sector Conference 2023 Leadership Showcase
Public Sector Conference  2023 Leadership ShowcasePublic Sector Conference  2023 Leadership Showcase
Public Sector Conference 2023 Leadership ShowcaseSustainableEnergyAut
 
SEAI Support Scheme Energy Audits - Briefing
SEAI Support Scheme Energy Audits - BriefingSEAI Support Scheme Energy Audits - Briefing
SEAI Support Scheme Energy Audits - BriefingSustainableEnergyAut
 
Reduce Your Use - Energy Performance Officers Webinar Presentation
Reduce Your Use - Energy Performance Officers Webinar PresentationReduce Your Use - Energy Performance Officers Webinar Presentation
Reduce Your Use - Energy Performance Officers Webinar PresentationSustainableEnergyAut
 
Reduce Your Use - Saving Energy in your Home Office
Reduce Your Use - Saving Energy in your Home OfficeReduce Your Use - Saving Energy in your Home Office
Reduce Your Use - Saving Energy in your Home OfficeSustainableEnergyAut
 
Electric Vehicle Dealer Webinar 10 November 2022
Electric Vehicle Dealer Webinar 10 November 2022Electric Vehicle Dealer Webinar 10 November 2022
Electric Vehicle Dealer Webinar 10 November 2022SustainableEnergyAut
 
SME Business Briefing November 2022
SME Business Briefing November 2022SME Business Briefing November 2022
SME Business Briefing November 2022SustainableEnergyAut
 
SEAI Quality Management Systems Fundimentals
SEAI Quality Management Systems FundimentalsSEAI Quality Management Systems Fundimentals
SEAI Quality Management Systems FundimentalsSustainableEnergyAut
 
SEAI One Stop Shop Workshop September 2022
SEAI One Stop Shop Workshop September 2022SEAI One Stop Shop Workshop September 2022
SEAI One Stop Shop Workshop September 2022SustainableEnergyAut
 
Session 1 - National Energy Research & Policy Conference 2022
Session 1 - National Energy Research & Policy Conference 2022Session 1 - National Energy Research & Policy Conference 2022
Session 1 - National Energy Research & Policy Conference 2022SustainableEnergyAut
 
Meet the Buyers Schools Workshop - 29th August 2022
Meet the Buyers Schools Workshop - 29th August 2022 Meet the Buyers Schools Workshop - 29th August 2022
Meet the Buyers Schools Workshop - 29th August 2022 SustainableEnergyAut
 
Session 3 - National Energy Research and Policy Conference 2022
Session 3 - National Energy Research and Policy Conference 2022Session 3 - National Energy Research and Policy Conference 2022
Session 3 - National Energy Research and Policy Conference 2022SustainableEnergyAut
 
Session 2 - National Energy Research and Policy Conference 2022
Session 2 - National Energy Research and Policy Conference 2022Session 2 - National Energy Research and Policy Conference 2022
Session 2 - National Energy Research and Policy Conference 2022SustainableEnergyAut
 
Session 1 - National Energy Research and Policy Conference 2022
Session 1 - National Energy Research and Policy Conference 2022Session 1 - National Energy Research and Policy Conference 2022
Session 1 - National Energy Research and Policy Conference 2022SustainableEnergyAut
 
Meet the Buyers Schools Workshop Presentation
Meet the Buyers Schools Workshop  Presentation Meet the Buyers Schools Workshop  Presentation
Meet the Buyers Schools Workshop Presentation SustainableEnergyAut
 
Public Sector Climate Action Leadership Briefing
Public Sector Climate Action Leadership BriefingPublic Sector Climate Action Leadership Briefing
Public Sector Climate Action Leadership BriefingSustainableEnergyAut
 

More from SustainableEnergyAut (20)

SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
SEAI Business Decarbonisation Supports SSRH and EXEED Schemes launch
 
Public Sector Conference 2023 Leadership Showcase
Public Sector Conference  2023 Leadership ShowcasePublic Sector Conference  2023 Leadership Showcase
Public Sector Conference 2023 Leadership Showcase
 
SME Business Briefing Feb 2023
SME Business Briefing Feb 2023SME Business Briefing Feb 2023
SME Business Briefing Feb 2023
 
SEAI 2022 Pilot Fellowship Call
SEAI 2022 Pilot Fellowship CallSEAI 2022 Pilot Fellowship Call
SEAI 2022 Pilot Fellowship Call
 
2022 Energy in Ireland Launch
2022 Energy in Ireland Launch2022 Energy in Ireland Launch
2022 Energy in Ireland Launch
 
SEAI Support Scheme Energy Audits - Briefing
SEAI Support Scheme Energy Audits - BriefingSEAI Support Scheme Energy Audits - Briefing
SEAI Support Scheme Energy Audits - Briefing
 
Reduce Your Use - Energy Performance Officers Webinar Presentation
Reduce Your Use - Energy Performance Officers Webinar PresentationReduce Your Use - Energy Performance Officers Webinar Presentation
Reduce Your Use - Energy Performance Officers Webinar Presentation
 
Reduce Your Use - Saving Energy in your Home Office
Reduce Your Use - Saving Energy in your Home OfficeReduce Your Use - Saving Energy in your Home Office
Reduce Your Use - Saving Energy in your Home Office
 
Electric Vehicle Dealer Webinar 10 November 2022
Electric Vehicle Dealer Webinar 10 November 2022Electric Vehicle Dealer Webinar 10 November 2022
Electric Vehicle Dealer Webinar 10 November 2022
 
Climate Action Roadmap Webinar
Climate Action Roadmap WebinarClimate Action Roadmap Webinar
Climate Action Roadmap Webinar
 
SME Business Briefing November 2022
SME Business Briefing November 2022SME Business Briefing November 2022
SME Business Briefing November 2022
 
SEAI Quality Management Systems Fundimentals
SEAI Quality Management Systems FundimentalsSEAI Quality Management Systems Fundimentals
SEAI Quality Management Systems Fundimentals
 
SEAI One Stop Shop Workshop September 2022
SEAI One Stop Shop Workshop September 2022SEAI One Stop Shop Workshop September 2022
SEAI One Stop Shop Workshop September 2022
 
Session 1 - National Energy Research & Policy Conference 2022
Session 1 - National Energy Research & Policy Conference 2022Session 1 - National Energy Research & Policy Conference 2022
Session 1 - National Energy Research & Policy Conference 2022
 
Meet the Buyers Schools Workshop - 29th August 2022
Meet the Buyers Schools Workshop - 29th August 2022 Meet the Buyers Schools Workshop - 29th August 2022
Meet the Buyers Schools Workshop - 29th August 2022
 
Session 3 - National Energy Research and Policy Conference 2022
Session 3 - National Energy Research and Policy Conference 2022Session 3 - National Energy Research and Policy Conference 2022
Session 3 - National Energy Research and Policy Conference 2022
 
Session 2 - National Energy Research and Policy Conference 2022
Session 2 - National Energy Research and Policy Conference 2022Session 2 - National Energy Research and Policy Conference 2022
Session 2 - National Energy Research and Policy Conference 2022
 
Session 1 - National Energy Research and Policy Conference 2022
Session 1 - National Energy Research and Policy Conference 2022Session 1 - National Energy Research and Policy Conference 2022
Session 1 - National Energy Research and Policy Conference 2022
 
Meet the Buyers Schools Workshop Presentation
Meet the Buyers Schools Workshop  Presentation Meet the Buyers Schools Workshop  Presentation
Meet the Buyers Schools Workshop Presentation
 
Public Sector Climate Action Leadership Briefing
Public Sector Climate Action Leadership BriefingPublic Sector Climate Action Leadership Briefing
Public Sector Climate Action Leadership Briefing
 

Recently uploaded

The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Roomdivyansh0kumar0
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerSuhani Kapoor
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Servicesexy call girls service in goa
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 

Recently uploaded (20)

E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
 
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Pratap Nagar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 

Deep Retrofit: The Dun Laoghaire-Rathdown Experience

  • 1. Towards Zero National Deep Retrofit Conference Aviva Stadium 21 June 2017 The Dún Laoghaire-Rathdown Experience Rochestown House, EuroPHit Deep Refurbishment Pilot Project Andrée Dargan, DLR County Architect
  • 2. Retrofitting Social Housing in DLR - Preamble • EuroPHit Demonstration Site – Rochestown House • Project Overview • Build Process • Energy Analysis • Lessons Learned Public Sector and LA Role
  • 3. EuroPHit – Rochestown House Retrofitting Social Housing in DLR – Pilot Project
  • 4. Rochestown House, Phase 2 – EuroPHit EU Pilot Project, A passive house upgrade of existing Housing for the Elderly Dramatically Improving the Energy Performance and Comfort of Existing Buildings with Step-by-Step Refurbishment and Integration of Renewable Energy Systems (EUROPHIT ) Retrofitting Social Housing in DLR – Pilot Project EuroPHit - Rochestown House
  • 5. Rochestown House, Phase 2 – EuroPHit EU Pilot Project, A passive house upgrade of existing Housing for the Elderly Dramatically Improving the Energy Performance and Comfort of Existing Buildings with Step-by-Step Refurbishment and Integration of Renewable Energy Systems (EUROPHIT ) Training for design team Training for tendering contractors Further training for successful contractor Supervision on site Education on site – study trips Monitoring and Verification Post Project Analysis Supported by DHPCLG & SEAI through BEC 2014 Retrofitting Social Housing in DLR – Pilot Project EuroPHit - Rochestown House
  • 6. • Located within the former walled garden of an estate house near local shops and amenities in Sallynoggin • Existing small Bedsits were too small and difficult to rent - dark, cold, damp • Creating a new community of smart and accessible buildings • Long term living - range of unit types to suit evolving needs • Part of DLR downsizing project • Multi Stakeholder - DLR, Local Community, DHPCLG, SEAI, EuroPHit COMMUNITY Retrofitting Social Housing in DLR – Project Overview Setting
  • 7. PHASE 1 PHASE 2 PHASE 3 • The Site is being upgraded in three phases – phases 1 and 2 complete, phase 3 on site. • Phase 2 - EuroPHit Deep Refurbishment to EnerPHit Passive House refurbishment standard Retrofitting Social Housing in DLR – Project Overview Site Layout
  • 8. Retrofitting Social Housing in DLR – Project Overview Phasing PHASE 1 PHASE 1
  • 9. Phase 1 – 18 bedsits upgraded to 12 one bed units • Deep retrofit • External insulation • Demand control ventilation • Upgrade of district heating from oil to gas • From F/G BER to B2/C1 BER Before upgrade Finished project after upgrade Retrofitting Social Housing in DLR – Project Overview Phasing
  • 10. PHASE 2 Retrofitting Social Housing in DLR – Project Overview Phasing PHASE 2
  • 11. Phase 2 – 26 bedsits and 8 one bed apartments upgraded to 34 one bed units • Accessible/Ambulant with lift added • Facilities – office, nurse’s station, laundry, commercial kitchen, communal room • Project cost c.€3.5m • Energy efficiency elements c.€890k Unit size before upgrade - 24m2 Unit size after upgrade - 48m2 Before upgrade Retrofitting Social Housing in DLR – Project Overview Phasing
  • 12. Phase 2 • EnerPHit - PH refurbishment standard • Upgrade of district heating from oil to gas micro CHP serving Phases 2 and 3 • Airtightness below 1 air change per hour • Heat recovery • From F/G BER to A3/B2 BER Unit size before upgrade - 24m2 Unit size after upgrade - 48m2 Before upgrade Retrofitting Social Housing in DLR – Project Overview Phasing
  • 13. PHASE 3 Retrofitting Social Housing in DLR – Project Overview Phasing PHASE 3
  • 14. Phase 3 - 14 new units 12 x 1 bed (58m2) and 2 x 2 bed (75m2) 8 will be wheelchair accessible, 6 will be ambulant accessible • To Passive House standard • Use of district heating from gas micro CHP in Phase 2 • Airtightness below 0.6 air change per hour • Heat recovery • Predicted A2 BER, nZEB compliant Retrofitting Social Housing in DLR – Project Overview Phasing
  • 15. Single storey units Two storey blocks Retrofitting Social Housing in DLR – Project Overview Phasing
  • 16. Construction Commenced November 2014 Completion Date August 2016 Retrofitting Social Housing in DLR – Rochestown House, Phase 2
  • 17. Northwest view Northeast view Built during the early 1970’s Floor, internal walls and roof - poured concrete with little or no insulation incorporated External walls - concrete panels with pebble dash finish Solar gains with heavy shading to the northwest and quite open to the southeast Plant room on the roof accommodating a low efficiency oil-fired boiler Retrofitting Social Housing in DLR – Building - Before Existing Fabric
  • 18. Relatively low floor to ceiling height Ventilation mostly natural, using opening window sections and room-based fans Retrofitting Social Housing in DLR – Building - Before Existing Fabric Internal views of existing communal area on the first floor
  • 19. Interof Communal area on first floor Retrofitting Social Housing in DLR – Building - Before Existing Fabric
  • 20. Retrofitting Social Housing in DLR – Energy Analysis - Before Existing Fabric in PHPP • Cost to heat this building to 20ºC 24/7/365 would be c.€53,000 per year • Annual heating demand 410 kWh (m2a)
  • 21. Ground Floor Plan First Floor Plan Second Floor Plan Cross Section • Additional lift and stair core • New floor added on top of existing • New communal areas and facilities • New mini CHP and heat recovery ventilation system • Whole building externally insulated Retrofitting Social Housing in DLR – Construction - Proposal Design Solution
  • 22. Front Facade (Northwest) Back Facade (Southeast) Retrofitting Social Housing in DLR – Construction - Proposal Design Solution
  • 23. Existing concrete wall panels: ‘U’Value 3.75 W/m²K Externally insulated with 200mm EPS ‘U’Value proposed 0.15 W/m²K Existing wall panels: Externally insulated with 250mm EPS ‘U’Value proposed 0.12 W/m²K BACK FACADE South East New wall: 215mm aerated block externally insulated with 200mm EPS ‘U’Value: 0.13 W/m²K FRONT FACADE North West New wall: 215mm aerated block with 150mm EPS ‘U’Value: 0.16 W/m²K Existing Floor: 150 mm concrete floor ‘U’Value 4.30 W/m²K New Roof: Insulated metal deck with 50mm sound insulation 150mm PIR insulation ‘U’Value: 0.13 W/m²K Retrofitting Social Housing in DLR – Construction - Proposal Specification
  • 24. Retrofitting Social Housing in DLR – Construction - During Wall Buildup
  • 25. Retrofitting Social Housing in DLR – Construction - During Roof Build-up
  • 26. Retrofitting Social Housing in DLR – Construction - During Fire Stopping
  • 27. Recessed Flush Retrofitting Social Housing in DLR – Construction - During Window Positioning
  • 28. Retrofitting Social Housing in DLR – Construction - During Recessed Window Detail
  • 29. Window Cill detail in Therm Retrofitting Social Housing in DLR – Construction - During Recessed Window Detail
  • 30. Window Cill detail Main Contractor Proposal Retrofitting Social Housing in DLR – Construction - During Recessed Window Detail
  • 31. Window Cill detail in Therm Main Contractor Proposal 45% better! Retrofitting Social Housing in DLR – Construction - During Recessed Window Detail
  • 32. Retrofitting Social Housing in DLR – Construction - During Recessed Window Detail
  • 33. Ψ Value = Ψ Value = Steel angle causing a massive thermal bridge (standard detail) Steel angle 25mm set back from the edge of the insulation layer (tender detail) Retrofitting Social Housing in DLR – Construction - During Flush Window Detail
  • 34. . . . as per tender drawings Glazed Door Position . . . . . . as required by door manufacturer . . . as required by door manufacturer with 20mm of insulation overlap. Retrofitting Social Housing in DLR – Construction - During Door Head Detail
  • 35. . . . as per tender drawings Glazed Door Position . . . . . . as required by door manufacturer . . . as required by door manufacturer with 20mm of insulation overlap Psi value = 0.030 W/mK Psi value = 0.441 W/mK Psi value = 0.387 W/mK Retrofitting Social Housing in DLR – Construction - During Door Head Detail
  • 36. at construction stage at tender stage Retrofitting Social Housing in DLR – Construction - During Existing Foundation Detail
  • 37. Internal Surface Temperature >15 ºC Minimum required height from top of foundation to top of floor slab: 290 mm To insure that at skirting level the surface temperature is above 15 ºC Retrofitting Social Housing in DLR – Construction - During Existing Foundation Detail
  • 38. In below / In above Out below / In above Out below / Out above Retrofitting Social Housing in DLR – Construction - During Airtight Line Decisions
  • 39. Retrofitting Social Housing in DLR – Construction - During Airtight Challenges
  • 40. Retrofitting Social Housing in DLR – Construction - During Airtight Taping
  • 41. Retrofitting Social Housing in DLR – Construction - During Ventilation Journey
  • 42. Retrofitting Social Housing in DLR – Construction - During Ventilation Journey
  • 43. 1st Option: Decentralised system Retrofitting Social Housing in DLR – Construction - During Ventilation Journey Advantages: High overall HRV efficiency Reduced duct nominal width Disadvantages: High capital cost High maintenance level
  • 44. 2nd Option: Centralised system Retrofitting Social Housing in DLR – Construction - During Ventilation Journey Advantages: Low capital cost Low maintenance level Disadvantages: Low HRV efficiency Increase duct nominal width Fire dampers required (cost) Parapet height increased Load bearing structure (cost)
  • 45. 3rd Option: 4 Centralised units Retrofitting Social Housing in DLR – Construction - During Ventilation Journey Advantages: Low capital cost Low maintenance level Disadvantages: Low HRV efficiency Increase duct nominal width Fire dampers required (cost) Parapet height increased Load bearing structure (cost)
  • 46. Back to 1st Option Decentralised system agreed Retrofitting Social Housing in DLR – Construction - During Ventilation Journey
  • 47. Retrofitting Social Housing in DLR – Construction - During Ventilation
  • 48. Micro CHP Gas Boilers First Floor Plant Retrofitting Social Housing in DLR – Construction - During District Heating
  • 49. Heat Recovery Ventilation (Communal room unit) User controls Retrofitting Social Housing in DLR – Construction - During MHRV
  • 50. BCMS System with remote access BCMS Retrofitting Social Housing in DLR – Energy Analysis - After
  • 51. BCMS Retrofitting Social Housing in DLR – Energy Analysis - After Energy Consumption per Floor for February 2017
  • 52. Retrofitting Social Housing in DLR – Energy Analysis - After BCMS
  • 53. Retrofitting Social Housing in DLR – Energy Analysis - After BCMS
  • 54. • To heat this building to 20ºC 24/7/365 a reduction of 80% in cost anticipated • Annual heating demand 25 kWh (m2a) Retrofitting Social Housing in DLR – Energy Analysis - After Results of Upgrade in PHPP .8
  • 55. Before Retrofit Annual heating demand 410 kWh (m2a) After Retrofit Annual heating demand 25 kWh (m2a) Retrofitting Social Housing in DLR – Energy Analysis - After Heating Energy Balance
  • 56. Retrofitting Social Housing in DLR – Energy Analysis - After • EnerPHit Certification process underway • BER Ground Floor B2 Middle Floor A3 Top Floor A3 (new build) Certification
  • 57. • Illustrates how existing stock can be reused even if it is in poor condition • Greater awareness of the importance of Energy by Client and Tenants • nZEB & PH - high standards with emphasis on on-site care and quality assurance, required to ensure effective on-site attention to detail • National up-skilling of the design and construction sectors is needed for either build • Positive but huge learning experience for both Contractor and Design team • Passive Consultant and Architects’ Department learned as the project developed - Theory v Practice - be alert to impact on project costs • Significant knowledge dissemination Retrofitting Social Housing in DLR – Lessons Learned General
  • 58. - At design stage carry out an air leakage search A way to learn more about the existing fabric - At tender stage specify in detail each transparent component G values, Uf values for each frame/glass type - Programme in preliminary pressurisation tests for the entire building Contractor to price for temporary seals for this preliminary tests - Select Main Contractor with training and experience in PH / low energy construction It will save hours of discussions (time is money) - When selecting windows/doors check if construction fitting detail is acceptable from the manufacturer point of view Structure and weather future proof - On site supervision It’s crucial Retrofitting Social Housing in DLR – Lessons Learned Construction
  • 59. EU / National • EU policy • National commitments • Funding • EuroPHit project • Industry learning Client • Downsizing policy • Quality housing stock • Template for future refurbishments • Less ongoing maintenance • Smart building • Development of new community Tenant • Part of new community • Healthy • Comfortable • Economic • Shared facilities Interchangability Replicability Scalability Retrofitting Social Housing in DLR – Rochestown House Benefits of Project
  • 60. • Sustainability - Social, Economic, Environmental • Benefits to be achieved by designing an energy efficient but also smart building have a huge impact • Building should be smart (back of house) but must be user friendly (front of house) • Need post occupancy review to ensure expected outcomes have been achieved • Energy upgrade project has enabled Council's desired downsizing policy to be kick-started, other projects now underway • 90% of existing building stock will still be in use in 2050, Government's Housing Action Plan puts emphasis on making best use of existing stock • Funding implications for deep retrofit • Policy does affect change but you need a led vision • Benefit of pilot projects • Construction employment opportunities • New learning and standards Retrofitting Social Housing in DLR – Rochestown House Conclusions
  • 61. Client – DLR Housing Department Design Team • Architects – DLR Architects’ Department • Civil & Structural Engineers – Hanley Pepper & Assoc • Mech & Elec Engineers – Ramsay Cox & Assoc • Quantity Surveyors – Walsh Associates • Passive House Consultants – MosArt • PSDP – Scott & McNeill Contractor • Main Contractor - Manley Construction • Mech Subcontactor - MPH Ltd • Elec Subcontractor - D & N Group • Airtightness - Advanced Airtight Solutions Ltd Retrofitting Social Housing in DLR – Rochestown House
  • 62. Retrofitting Social Housing in DLR – Rochestown House
  • 63. Retrofitting Social Housing in DLR – Rochestown House
  • 64. Retrofitting Social Housing in DLR – Rochestown House
  • 65. Retrofitting Social Housing in DLR – Rochestown House
  • 66. Retrofitting Social Housing in DLR – Rochestown House
  • 67. Retrofitting Social Housing in DLR – Rochestown House
  • 68. Retrofitting Social Housing in DLR – Rochestown House
  • 69. Retrofitting Social Housing in DLR – Rochestown House
  • 70. Retrofitting Social Housing in DLR – Rochestown House
  • 71. Retrofitting Social Housing in DLR – Rochestown House
  • 72. Retrofitting Social Housing in DLR – Rochestown House
  • 73. Hair Dressers Communal LaundryMain StairsCorridor Apartment Type A Retrofitting Social Housing in DLR – Rochestown House Apartment Type B
  • 74. Retrofitting Social Housing in DLR – Rochestown House
  • 75. Thank you adargan@dlrcoco.ie 21 June 2017 Retrofitting Social Housing in DLR – Rochestown House
  • 76. Retrofitting Social Housing in DLR – Rochestown House