INFORMATION ARCHITECTURE DELIVERABLES

STRATEGY & SELLING IA

Dushyant Kanungo
10036175
So what is IA?
The term, coined by Richard Saul Wurman in 1976, is defined by the
Information Architecture Institute as:

            “The structural design of shared information environments.”


     “The art and science of organizing and labelling web sites, intranets, online
          communities and software to support usability and findability.”


  “An emerging community of practice focused on bringing principles of design and
                    architecture to the digital landscape.”




                     The Information Architecture Institute: What is IA? – [www]
                 http://iainstitute.org/en/learn/resources/what_is_ia.php - 24/02/2012
Why IA matters?
• The cost of finding the information
• The cost of NOT finding the information
• The cost of construction
• The cost of maintenance
• The cost of training
• The value of brand




Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
$how me the money!


“Low intranet usability (due to poor Information Architecture) costs the
  world economy $100 billion per year in lost employee productivity.”


                                                                               -Jakob Nielson




 Jakob Neilson: Foreword to Rosenfeld and Morville's Book on Information Architecture (2nd edition) -
         [www] http://www.useit.com/books/rosenfeldmorvilleforeword2.html - 24/02/2012
WOW! So what is the problem?
• Still a emerging domain
• Ignorance on executive level in organisations
• Grey areas in domain (Graphic Design, Interaction Design, Usability)
• Global recession and cost cutting




        Making The Case || Selling The Case
The Curious Case of Information Architecture
• The benefits of a complete IA cannot be quantified
  • Broad & shallow hierarchy v/s narrow & deep hierarchy
  • The ROI case may only be valid for large industrial scale intranet
  • Factors which influence information seeking behaviour


• The benefits of many IA components can’t ever be quantified
  • How detailed a search component should be?
  • How to measure the number of people NOT being able to find information?


• Most claims for quantified IA benefits can’t be validated
  • IA is not a technical problem. It is a people problem.
  • Varying people perspective, prejudice, politics and skills

             Measuring Information Architecture Quality: Panel Presentations - [www]
                     http://instone.org/files/MeasureIA-Panel.pdf - 24/02/2012
Selling Information Architecture - 1
• Show the problem (And how you can help fix it)
  • Make clear case for executives – cut to the chase
  • Research the background information prepare a list of compelling reasons


• Benefit the bottom line
  • The ROI case – Investment Returns with time frame & estimated losses in absence
  • The productivity case


• Don’t promise the silver bullet
  • Present cases of dependencies, risk management and mitigating case scenarios



      Samantha Starmer [2006], Selling information architecture: Getting executives to say “yes”
                            - [www] http://bit.ly/zesdjG - 24/02/2012,
            - Bulletin of the American Society for Information Science and Technology
Selling Information Architecture - 2
• Play the politics
   • Know the organisation – culture and decision making process
   • Talk to the right people at right time and in right order
   • Listen, listen & listen


• Pay attention to style
   • Facts based raw data or verbatim quotes from users?
   • Think about who you need to sell in each pitch and prepare accordingly




        Samantha Starmer [2006], Selling information architecture: Getting executives to say “yes”
                              - [www] http://bit.ly/zesdjG - 24/02/2012,
              - Bulletin of the American Society for Information Science and Technology
Selling Information Architecture - 3
• User sensitivity “Boot Camp” sessions
• Site evaluation
• Strategy sessions
• Competitive & Comparative analysis
• Follow the tool sales people
• Be aggressive and be early

• Plan is your best friend
• Education is the half battle
• Get off your high horse

Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
Sold!

• The deliverables for sales?
• The usual suspect:
   • A contract outlining Key areas of research
   • Phase wise high level breakup of the plan




Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
Sold!

• The deliverables for sales?
• The usual suspect:
    • A contract outlining Key areas of research
    • Phase wise high level breakup of the plan




Research               Strategy                 Design                  Implementation           Administration




 Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
Research
                                           Content         Context

                                                      IA


                                                     Users


                                        A Research Framework
• Context
   • Business goals, funding, politics, culture, technology, human resources
• Content
   • Document/data types, content objects, metadata, volume, existing structure
• Users
   • Audience, tasks, needs, information seeking behaviour, experience, vocabularies

Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
What is IA Strategy?
• IA strategy provides high level recommendations regarding:

   • Information Architecture Administration
   • Technology Integration
   • Top-Down or Bottom-Up Emphasis
   • Organisation & Labelling System (Top-Down)
   • Document Type Identification (Bottom-Up)
   • Metadata Field Definitions
   • Navigation System Design




Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
Making the IA Strategy - 1
              Think             Articulate               Communicate                     Test

•   Convert research data into creative ideas
•   Diagrams, metaphors, stories, scenarios, blueprints, wireframes
•   Present, react, brainstorm
•   Closed card sorts, prototypes



                                Local       ||     Local        ||    Local


Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
Making the IA Strategy - 2
• Metaphor exploration
     • Organisational, functional, visual metaphors
• Scenarios
     • Investigative & serendipity modes
• Case Studies & Stories
     • Tailored for audience’s vocabulary
• Conceptual Diagrams
     • Centralisation of core issues
• BluePrints & Wireframes
     • Relationships between content components
     • Architect’s tools for transformation


Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
IA Strategy Deliverables
• IA Strategy Report
   • Detailed strategy, direction & scope
     • Executive summery, audience, mission and vision for the site
     • Architectural strategy, approach & lessons learned
     • Content management – rules, roles, resources, templates, metadata, thesaurus


• IA Strategy Presentation
     • High-level strategy, direction & scope


• Project Plan for Design
     • Teams, deliverables, schedule & budget



Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
Thank You!
• Q&A

References:
 • Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
 • Samantha Starmer [2006], Selling information architecture: Getting executives to say “yes” [www] http://bit.ly/zesdjG -
   24/02/2012, Bulletin of the American Society for Information Science and Technology
 • Measuring Information Architecture Quality: Panel Presentations - [www] http://instone.org/files/MeasureIA-Panel.pdf -
   24/02/2012
 • Jakob Neilson: Foreword to Rosenfeld and Morville's Book on Information Architecture (2nd edition) - [www]
   http://www.useit.com/books/rosenfeldmorvilleforeword2.html - 24/02/2012
 • The Information Architecture Institute: What is IA? – [www] http://iainstitute.org/en/learn/resources/what_is_ia.php -
   24/02/2012




Presentation prepared by Dushyant Kanungo, Student ID: 10036175, for the module ‘UFCEKF-20-2 Information Architecture’
 at the University of the West of England, Bristol, UK. dushyant.kanungo@uwe.ac.uk | http://www.dushyantkanungo.com

Information Architecture Deliverables

  • 1.
    INFORMATION ARCHITECTURE DELIVERABLES STRATEGY& SELLING IA Dushyant Kanungo 10036175
  • 2.
    So what isIA? The term, coined by Richard Saul Wurman in 1976, is defined by the Information Architecture Institute as: “The structural design of shared information environments.” “The art and science of organizing and labelling web sites, intranets, online communities and software to support usability and findability.” “An emerging community of practice focused on bringing principles of design and architecture to the digital landscape.” The Information Architecture Institute: What is IA? – [www] http://iainstitute.org/en/learn/resources/what_is_ia.php - 24/02/2012
  • 3.
    Why IA matters? •The cost of finding the information • The cost of NOT finding the information • The cost of construction • The cost of maintenance • The cost of training • The value of brand Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
  • 4.
    $how me themoney! “Low intranet usability (due to poor Information Architecture) costs the world economy $100 billion per year in lost employee productivity.” -Jakob Nielson Jakob Neilson: Foreword to Rosenfeld and Morville's Book on Information Architecture (2nd edition) - [www] http://www.useit.com/books/rosenfeldmorvilleforeword2.html - 24/02/2012
  • 5.
    WOW! So whatis the problem? • Still a emerging domain • Ignorance on executive level in organisations • Grey areas in domain (Graphic Design, Interaction Design, Usability) • Global recession and cost cutting Making The Case || Selling The Case
  • 6.
    The Curious Caseof Information Architecture • The benefits of a complete IA cannot be quantified • Broad & shallow hierarchy v/s narrow & deep hierarchy • The ROI case may only be valid for large industrial scale intranet • Factors which influence information seeking behaviour • The benefits of many IA components can’t ever be quantified • How detailed a search component should be? • How to measure the number of people NOT being able to find information? • Most claims for quantified IA benefits can’t be validated • IA is not a technical problem. It is a people problem. • Varying people perspective, prejudice, politics and skills Measuring Information Architecture Quality: Panel Presentations - [www] http://instone.org/files/MeasureIA-Panel.pdf - 24/02/2012
  • 7.
    Selling Information Architecture- 1 • Show the problem (And how you can help fix it) • Make clear case for executives – cut to the chase • Research the background information prepare a list of compelling reasons • Benefit the bottom line • The ROI case – Investment Returns with time frame & estimated losses in absence • The productivity case • Don’t promise the silver bullet • Present cases of dependencies, risk management and mitigating case scenarios Samantha Starmer [2006], Selling information architecture: Getting executives to say “yes” - [www] http://bit.ly/zesdjG - 24/02/2012, - Bulletin of the American Society for Information Science and Technology
  • 8.
    Selling Information Architecture- 2 • Play the politics • Know the organisation – culture and decision making process • Talk to the right people at right time and in right order • Listen, listen & listen • Pay attention to style • Facts based raw data or verbatim quotes from users? • Think about who you need to sell in each pitch and prepare accordingly Samantha Starmer [2006], Selling information architecture: Getting executives to say “yes” - [www] http://bit.ly/zesdjG - 24/02/2012, - Bulletin of the American Society for Information Science and Technology
  • 9.
    Selling Information Architecture- 3 • User sensitivity “Boot Camp” sessions • Site evaluation • Strategy sessions • Competitive & Comparative analysis • Follow the tool sales people • Be aggressive and be early • Plan is your best friend • Education is the half battle • Get off your high horse Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
  • 10.
    Sold! • The deliverablesfor sales? • The usual suspect: • A contract outlining Key areas of research • Phase wise high level breakup of the plan Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
  • 11.
    Sold! • The deliverablesfor sales? • The usual suspect: • A contract outlining Key areas of research • Phase wise high level breakup of the plan Research Strategy Design Implementation Administration Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
  • 12.
    Research Content Context IA Users A Research Framework • Context • Business goals, funding, politics, culture, technology, human resources • Content • Document/data types, content objects, metadata, volume, existing structure • Users • Audience, tasks, needs, information seeking behaviour, experience, vocabularies Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
  • 13.
    What is IAStrategy? • IA strategy provides high level recommendations regarding: • Information Architecture Administration • Technology Integration • Top-Down or Bottom-Up Emphasis • Organisation & Labelling System (Top-Down) • Document Type Identification (Bottom-Up) • Metadata Field Definitions • Navigation System Design Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
  • 14.
    Making the IAStrategy - 1 Think Articulate Communicate Test • Convert research data into creative ideas • Diagrams, metaphors, stories, scenarios, blueprints, wireframes • Present, react, brainstorm • Closed card sorts, prototypes Local || Local || Local Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
  • 15.
    Making the IAStrategy - 2 • Metaphor exploration • Organisational, functional, visual metaphors • Scenarios • Investigative & serendipity modes • Case Studies & Stories • Tailored for audience’s vocabulary • Conceptual Diagrams • Centralisation of core issues • BluePrints & Wireframes • Relationships between content components • Architect’s tools for transformation Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
  • 16.
    IA Strategy Deliverables •IA Strategy Report • Detailed strategy, direction & scope • Executive summery, audience, mission and vision for the site • Architectural strategy, approach & lessons learned • Content management – rules, roles, resources, templates, metadata, thesaurus • IA Strategy Presentation • High-level strategy, direction & scope • Project Plan for Design • Teams, deliverables, schedule & budget Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly
  • 17.
    Thank You! • Q&A References: • Peter Morville & Louise Rosenfeild [2002] Information Architecture for the World Wide Web, 2nd Edition , O’Reilly • Samantha Starmer [2006], Selling information architecture: Getting executives to say “yes” [www] http://bit.ly/zesdjG - 24/02/2012, Bulletin of the American Society for Information Science and Technology • Measuring Information Architecture Quality: Panel Presentations - [www] http://instone.org/files/MeasureIA-Panel.pdf - 24/02/2012 • Jakob Neilson: Foreword to Rosenfeld and Morville's Book on Information Architecture (2nd edition) - [www] http://www.useit.com/books/rosenfeldmorvilleforeword2.html - 24/02/2012 • The Information Architecture Institute: What is IA? – [www] http://iainstitute.org/en/learn/resources/what_is_ia.php - 24/02/2012 Presentation prepared by Dushyant Kanungo, Student ID: 10036175, for the module ‘UFCEKF-20-2 Information Architecture’ at the University of the West of England, Bristol, UK. dushyant.kanungo@uwe.ac.uk | http://www.dushyantkanungo.com