INTRODUCTION
• East Central Railway is one of the biggest zones of the Indian
Railways, comprising five divisions – Danapur, Mughalsarai,
Dhanbad, Sonepur and Samastipur. As per the rules, each coach
needs repair after 18 months of running. So, Railway factory
under ECR is being set up east of Harnaut railway station by the
Indian Railways. Foundation stone wad laid by then President of India,
Honourable A.P.J Abdul Kalam, along with Railway Minister Mr. Nitish
Kumar.
• East Central Railway had no carriage repair workshop and was totally
dependent on ER and NER. In order to be self-reliant and improve
efficiency, workshop for overhauling of 50 coaches per month has
been set up at Harnaut on Bakhtiyarpur-Tilaiya line of Danapur
division of East Central Railway.
• The coach factory will have manpower strength of 1,200, including
officers and technical staff.The Harnaut workshop is being developed
on about 115 acres of land - workshop on 78 acres and staff quarters
on 37 acres.
MAIN ACTIVITY:-
• The workshop undertakes the periodic overhauling. According to
project in-charge Sunil Kumar, the railways has installed machines,
including bogie testing appratus, surface wheel lathe, plasma profile
cutting machines and other essential plants required for smooth
functioning of the workshop. With an optimum capacity to repair 50
coaches per month, the factory has already started production through
its carriage repair shop. "The intermediary overhauling block and
periodical overhauling, has been made functional.
• In the first phase, repair of non AC coaches will be taken up. After
augmentation, we will also take up maintenance of the AC coaches," he
said.t has so far carried out 139 POH of Non AC ICF Coaches. Its
present outturn is 20 coaches per month and target from 1 April 2014 is
30 coaches per month and gradually improving. Most of its
infrastructure was completed in 2013 and in the future there is a plan to
repair air-conditioned coaches as well.
1 INTRODUCTION OF RAILWAYS
2 MACHINE SHOP
3 PAINTING SHOP
4 WHEEL SHOP
5 SPRING SHOP
6 HEAT TREATMENT SHOP
7 JIG AND FIXTURE SHOP
8 BRAKING SYSTEM
9 SHELL SHOP
10 MATERIAL HANDLING SYSTEM
11 REFERENCE
LIST OF CONTENTS:-
5
0
3
3
THANK YOU

More Related Content

What's hot

Roller bearing used in railway coaches
Roller bearing used in railway coachesRoller bearing used in railway coaches
Roller bearing used in railway coaches
sachin deora
 
Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02
Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02
Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02
Hemant Rawat
 
Training report
Training reportTraining report
Training report
Sumit Kumar
 
Mechanical workshop, izzatnagar, bareilly
Mechanical workshop, izzatnagar, bareillyMechanical workshop, izzatnagar, bareilly
Mechanical workshop, izzatnagar, bareilly
AVANISH PRASAD DEVARIWAL
 
indutrial training report
indutrial training reportindutrial training report
indutrial training report
kanwaldeep singh
 
Indian railways summer trainning ppt
Indian railways summer trainning pptIndian railways summer trainning ppt
Indian railways summer trainning ppt
ALOK RAJ
 
indian railways ajmer workshop
indian railways ajmer workshop indian railways ajmer workshop
indian railways ajmer workshop
ANKIT SHARMA
 
N.E RAILWAY GORAKHPUR, PPT
N.E RAILWAY GORAKHPUR, PPTN.E RAILWAY GORAKHPUR, PPT
N.E RAILWAY GORAKHPUR, PPT
ANAND kumar
 
North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016
Awanish Kumar
 
UPSRTC Workshop,Lucknow
UPSRTC Workshop,LucknowUPSRTC Workshop,Lucknow
UPSRTC Workshop,Lucknow
Sudhir Yadav
 
Cheema
CheemaCheema
Gorakhpur railway report 2016
Gorakhpur railway report 2016Gorakhpur railway report 2016
Gorakhpur railway report 2016
Anurag Upadhyay
 
UPSRTC Industry traning ppt (1) shubham.pptx 27 sep
 UPSRTC Industry traning ppt (1) shubham.pptx 27 sep UPSRTC Industry traning ppt (1) shubham.pptx 27 sep
UPSRTC Industry traning ppt (1) shubham.pptx 27 sep
shubham saini
 
Ne railway gorakhpur summer training report
Ne railway gorakhpur summer training reportNe railway gorakhpur summer training report
Ne railway gorakhpur summer training report
Krishna Yadav
 
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
SolidWorks Freelance
 
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJBasic Training Centre lalgarh Bikaner PPT by AMIT RAJ
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ
AMIT RAJ
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
Vishal Singh
 
Coach rehabilitation workshop bhopal
Coach rehabilitation workshop bhopalCoach rehabilitation workshop bhopal
Coach rehabilitation workshop bhopal
Anuj Singh
 
liluahworkshop
liluahworkshopliluahworkshop
liluahworkshop
vishal kumar
 
swaraj tractor division
swaraj tractor divisionswaraj tractor division
swaraj tractor division
pradeep rana
 

What's hot (20)

Roller bearing used in railway coaches
Roller bearing used in railway coachesRoller bearing used in railway coaches
Roller bearing used in railway coaches
 
Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02
Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02
Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02
 
Training report
Training reportTraining report
Training report
 
Mechanical workshop, izzatnagar, bareilly
Mechanical workshop, izzatnagar, bareillyMechanical workshop, izzatnagar, bareilly
Mechanical workshop, izzatnagar, bareilly
 
indutrial training report
indutrial training reportindutrial training report
indutrial training report
 
Indian railways summer trainning ppt
Indian railways summer trainning pptIndian railways summer trainning ppt
Indian railways summer trainning ppt
 
indian railways ajmer workshop
indian railways ajmer workshop indian railways ajmer workshop
indian railways ajmer workshop
 
N.E RAILWAY GORAKHPUR, PPT
N.E RAILWAY GORAKHPUR, PPTN.E RAILWAY GORAKHPUR, PPT
N.E RAILWAY GORAKHPUR, PPT
 
North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016
 
UPSRTC Workshop,Lucknow
UPSRTC Workshop,LucknowUPSRTC Workshop,Lucknow
UPSRTC Workshop,Lucknow
 
Cheema
CheemaCheema
Cheema
 
Gorakhpur railway report 2016
Gorakhpur railway report 2016Gorakhpur railway report 2016
Gorakhpur railway report 2016
 
UPSRTC Industry traning ppt (1) shubham.pptx 27 sep
 UPSRTC Industry traning ppt (1) shubham.pptx 27 sep UPSRTC Industry traning ppt (1) shubham.pptx 27 sep
UPSRTC Industry traning ppt (1) shubham.pptx 27 sep
 
Ne railway gorakhpur summer training report
Ne railway gorakhpur summer training reportNe railway gorakhpur summer training report
Ne railway gorakhpur summer training report
 
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
 
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJBasic Training Centre lalgarh Bikaner PPT by AMIT RAJ
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
Coach rehabilitation workshop bhopal
Coach rehabilitation workshop bhopalCoach rehabilitation workshop bhopal
Coach rehabilitation workshop bhopal
 
liluahworkshop
liluahworkshopliluahworkshop
liluahworkshop
 
swaraj tractor division
swaraj tractor divisionswaraj tractor division
swaraj tractor division
 

Similar to indian railway

Report -Jklu Copy
Report -Jklu Copy Report -Jklu Copy
Report -Jklu Copy
Pramit Munshi
 
Internship Training (Mechanical Harnaut)
Internship Training (Mechanical Harnaut)Internship Training (Mechanical Harnaut)
Internship Training (Mechanical Harnaut)
TathagatSingh5
 
TRAINING REPORT FULL
TRAINING REPORT FULLTRAINING REPORT FULL
TRAINING REPORT FULL
anish malan
 
Railway carriage workshop Ajmer
Railway carriage workshop AjmerRailway carriage workshop Ajmer
Railway carriage workshop Ajmer
Bhupesh Jangid
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
Rajeev Bhargava
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
JAMSHED ALAM
 
Harnaut mechanicaL workshop summer training repoRT
Harnaut mechanicaL workshop summer training repoRTHarnaut mechanicaL workshop summer training repoRT
Harnaut mechanicaL workshop summer training repoRT
Rohit Bharti
 
Trainng report(2017 2018) amresh kumar chauhan
Trainng report(2017 2018) amresh kumar chauhanTrainng report(2017 2018) amresh kumar chauhan
Trainng report(2017 2018) amresh kumar chauhan
Amresh0024
 
Rajeev Bhargava_Resume'
Rajeev Bhargava_Resume'Rajeev Bhargava_Resume'
Rajeev Bhargava_Resume'
Rajeev Bhargava
 
Gorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training reportGorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training report
GALGOTIAS UNIVERSITY
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
rahul waghmare
 
Maintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysMaintenance and Manufacturing of Railways
Maintenance and Manufacturing of Railways
Swapnil Pawar
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)
Shikhar Gupta
 
Summer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsSummer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) Students
KashifRaza113
 
summer training report by NIKHIL SINGH
summer training report by NIKHIL SINGHsummer training report by NIKHIL SINGH
summer training report by NIKHIL SINGH
Nikhil Singh
 
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptxRE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
SHUBHAMSINGH673765
 
Amankanojiaa rdso ppt
Amankanojiaa rdso pptAmankanojiaa rdso ppt
Amankanojiaa rdso ppt
Aman Kanojia
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentation
TURENDARSAHU
 
Coach rehabilitation workshop bhopal (crws)
Coach rehabilitation workshop bhopal (crws)Coach rehabilitation workshop bhopal (crws)
Coach rehabilitation workshop bhopal (crws)
Anuj Singh
 
Summer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwaySummer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian Railway
Chirag Jain
 

Similar to indian railway (20)

Report -Jklu Copy
Report -Jklu Copy Report -Jklu Copy
Report -Jklu Copy
 
Internship Training (Mechanical Harnaut)
Internship Training (Mechanical Harnaut)Internship Training (Mechanical Harnaut)
Internship Training (Mechanical Harnaut)
 
TRAINING REPORT FULL
TRAINING REPORT FULLTRAINING REPORT FULL
TRAINING REPORT FULL
 
Railway carriage workshop Ajmer
Railway carriage workshop AjmerRailway carriage workshop Ajmer
Railway carriage workshop Ajmer
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Harnaut mechanicaL workshop summer training repoRT
Harnaut mechanicaL workshop summer training repoRTHarnaut mechanicaL workshop summer training repoRT
Harnaut mechanicaL workshop summer training repoRT
 
Trainng report(2017 2018) amresh kumar chauhan
Trainng report(2017 2018) amresh kumar chauhanTrainng report(2017 2018) amresh kumar chauhan
Trainng report(2017 2018) amresh kumar chauhan
 
Rajeev Bhargava_Resume'
Rajeev Bhargava_Resume'Rajeev Bhargava_Resume'
Rajeev Bhargava_Resume'
 
Gorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training reportGorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training report
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
 
Maintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysMaintenance and Manufacturing of Railways
Maintenance and Manufacturing of Railways
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)
 
Summer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsSummer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) Students
 
summer training report by NIKHIL SINGH
summer training report by NIKHIL SINGHsummer training report by NIKHIL SINGH
summer training report by NIKHIL SINGH
 
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptxRE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
 
Amankanojiaa rdso ppt
Amankanojiaa rdso pptAmankanojiaa rdso ppt
Amankanojiaa rdso ppt
 
Lhb coach documentation
Lhb coach  documentationLhb coach  documentation
Lhb coach documentation
 
Coach rehabilitation workshop bhopal (crws)
Coach rehabilitation workshop bhopal (crws)Coach rehabilitation workshop bhopal (crws)
Coach rehabilitation workshop bhopal (crws)
 
Summer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwaySummer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian Railway
 

More from PRIYANSHU KUMAR

irc 073,2018 document uploaded by Priyanshu Kumar,9608684800
irc 073,2018 document uploaded by Priyanshu Kumar,9608684800irc 073,2018 document uploaded by Priyanshu Kumar,9608684800
irc 073,2018 document uploaded by Priyanshu Kumar,9608684800
PRIYANSHU KUMAR
 
FWD report by priyanshu kumar ,960868480
FWD report by priyanshu kumar ,960868480FWD report by priyanshu kumar ,960868480
FWD report by priyanshu kumar ,960868480
PRIYANSHU KUMAR
 
irc 37 2018 pdf uploaded by priyanshu kumar,9608684800
irc 37 2018  pdf uploaded by priyanshu kumar,9608684800irc 37 2018  pdf uploaded by priyanshu kumar,9608684800
irc 37 2018 pdf uploaded by priyanshu kumar,9608684800
PRIYANSHU KUMAR
 
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
PRIYANSHU KUMAR
 
Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800
PRIYANSHU KUMAR
 
Retro Report Road Signage by Priyanshu Kumar 9608684800
Retro Report Road Signage by Priyanshu Kumar 9608684800Retro Report Road Signage by Priyanshu Kumar 9608684800
Retro Report Road Signage by Priyanshu Kumar 9608684800
PRIYANSHU KUMAR
 
Retro Report Road Marking by Priyanshu,9608684800
Retro Report Road Marking by Priyanshu,9608684800Retro Report Road Marking by Priyanshu,9608684800
Retro Report Road Marking by Priyanshu,9608684800
PRIYANSHU KUMAR
 
nsv REPORT BY PRIYANSHU KUMAR 9608684800
nsv REPORT BY PRIYANSHU KUMAR 9608684800nsv REPORT BY PRIYANSHU KUMAR 9608684800
nsv REPORT BY PRIYANSHU KUMAR 9608684800
PRIYANSHU KUMAR
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800
PRIYANSHU KUMAR
 
green building by Priyanshu kumar,9608684800
green building by Priyanshu kumar,9608684800green building by Priyanshu kumar,9608684800
green building by Priyanshu kumar,9608684800
PRIYANSHU KUMAR
 
Remote sensing by Priyanshu kumar, 9608684800
Remote sensing by Priyanshu kumar, 9608684800Remote sensing by Priyanshu kumar, 9608684800
Remote sensing by Priyanshu kumar, 9608684800
PRIYANSHU KUMAR
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
PRIYANSHU KUMAR
 
Remote sensing by priyanshu kumar,9608684800
Remote sensing by priyanshu kumar,9608684800Remote sensing by priyanshu kumar,9608684800
Remote sensing by priyanshu kumar,9608684800
PRIYANSHU KUMAR
 
Gajra gear ppt
Gajra gear pptGajra gear ppt
Gajra gear ppt
PRIYANSHU KUMAR
 
gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800
PRIYANSHU KUMAR
 

More from PRIYANSHU KUMAR (15)

irc 073,2018 document uploaded by Priyanshu Kumar,9608684800
irc 073,2018 document uploaded by Priyanshu Kumar,9608684800irc 073,2018 document uploaded by Priyanshu Kumar,9608684800
irc 073,2018 document uploaded by Priyanshu Kumar,9608684800
 
FWD report by priyanshu kumar ,960868480
FWD report by priyanshu kumar ,960868480FWD report by priyanshu kumar ,960868480
FWD report by priyanshu kumar ,960868480
 
irc 37 2018 pdf uploaded by priyanshu kumar,9608684800
irc 37 2018  pdf uploaded by priyanshu kumar,9608684800irc 37 2018  pdf uploaded by priyanshu kumar,9608684800
irc 37 2018 pdf uploaded by priyanshu kumar,9608684800
 
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
 
Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800Pavement Design Report by priyanshu kumar 9608684800
Pavement Design Report by priyanshu kumar 9608684800
 
Retro Report Road Signage by Priyanshu Kumar 9608684800
Retro Report Road Signage by Priyanshu Kumar 9608684800Retro Report Road Signage by Priyanshu Kumar 9608684800
Retro Report Road Signage by Priyanshu Kumar 9608684800
 
Retro Report Road Marking by Priyanshu,9608684800
Retro Report Road Marking by Priyanshu,9608684800Retro Report Road Marking by Priyanshu,9608684800
Retro Report Road Marking by Priyanshu,9608684800
 
nsv REPORT BY PRIYANSHU KUMAR 9608684800
nsv REPORT BY PRIYANSHU KUMAR 9608684800nsv REPORT BY PRIYANSHU KUMAR 9608684800
nsv REPORT BY PRIYANSHU KUMAR 9608684800
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800
 
green building by Priyanshu kumar,9608684800
green building by Priyanshu kumar,9608684800green building by Priyanshu kumar,9608684800
green building by Priyanshu kumar,9608684800
 
Remote sensing by Priyanshu kumar, 9608684800
Remote sensing by Priyanshu kumar, 9608684800Remote sensing by Priyanshu kumar, 9608684800
Remote sensing by Priyanshu kumar, 9608684800
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
Remote sensing by priyanshu kumar,9608684800
Remote sensing by priyanshu kumar,9608684800Remote sensing by priyanshu kumar,9608684800
Remote sensing by priyanshu kumar,9608684800
 
Gajra gear ppt
Gajra gear pptGajra gear ppt
Gajra gear ppt
 
gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800
 

Recently uploaded

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 

Recently uploaded (20)

basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 

indian railway

  • 1. SUBMITTED BY : ANNU KUMAR LAKSHYA 0812ME141025 SUBMITTED TO: PROF. AKBAR ALI SUMMER TRAINING MECHANICAL WORKSHOP E.C.R. HARNAUT
  • 2. INTRODUCTION • East Central Railway is one of the biggest zones of the Indian Railways, comprising five divisions – Danapur, Mughalsarai, Dhanbad, Sonepur and Samastipur. As per the rules, each coach needs repair after 18 months of running. So, Railway factory under ECR is being set up east of Harnaut railway station by the Indian Railways. Foundation stone wad laid by then President of India, Honourable A.P.J Abdul Kalam, along with Railway Minister Mr. Nitish Kumar. • East Central Railway had no carriage repair workshop and was totally dependent on ER and NER. In order to be self-reliant and improve efficiency, workshop for overhauling of 50 coaches per month has been set up at Harnaut on Bakhtiyarpur-Tilaiya line of Danapur division of East Central Railway. • The coach factory will have manpower strength of 1,200, including officers and technical staff.The Harnaut workshop is being developed on about 115 acres of land - workshop on 78 acres and staff quarters on 37 acres.
  • 3. MAIN ACTIVITY:- • The workshop undertakes the periodic overhauling. According to project in-charge Sunil Kumar, the railways has installed machines, including bogie testing appratus, surface wheel lathe, plasma profile cutting machines and other essential plants required for smooth functioning of the workshop. With an optimum capacity to repair 50 coaches per month, the factory has already started production through its carriage repair shop. "The intermediary overhauling block and periodical overhauling, has been made functional. • In the first phase, repair of non AC coaches will be taken up. After augmentation, we will also take up maintenance of the AC coaches," he said.t has so far carried out 139 POH of Non AC ICF Coaches. Its present outturn is 20 coaches per month and target from 1 April 2014 is 30 coaches per month and gradually improving. Most of its infrastructure was completed in 2013 and in the future there is a plan to repair air-conditioned coaches as well.
  • 4. 1 INTRODUCTION OF RAILWAYS 2 MACHINE SHOP 3 PAINTING SHOP 4 WHEEL SHOP 5 SPRING SHOP 6 HEAT TREATMENT SHOP 7 JIG AND FIXTURE SHOP 8 BRAKING SYSTEM 9 SHELL SHOP 10 MATERIAL HANDLING SYSTEM 11 REFERENCE LIST OF CONTENTS:-
  • 5.
  • 6.
  • 7. 5
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. 0
  • 18.
  • 19.
  • 20. 3
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31. 3
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.