Important Steps to Improve
Quality of Construction
Introduction
Quality of Construction needs to be at par because longevity, sustainability depends upon it.
In order to get the perfect output
- Perfect Planning
- Efficient Supervision
- Skilled Laborers
- Good quality of material are needed
Otherwise defect and failure is bound to come to any construction project.
Understanding project specification is very important. It determines several factors such as
budgeting, grade of the products etc. To have smooth execution efficient Architect vis a vis
Engineer as well.
Standard Establishment
Quality of Standards depends upon the project's geo location, complexity etc. Quality of
Standards needs to be determined by considering factors such as
- Industry Standards
- Certifications such as ISO, ISI, BIS etc.
- Requirements form the manufactures for all the products that are needed for the project
Standard need to set high and correct since its beginning. Each individual can work together
and raise the standard at par.
Team Integrity
During the beginning phase it is important to have discussion between the teams. It helps to
understand the
- Project Requirement
- Setting the timeline
- Task allocation of each individuals etc.
Once everything is well organized and everyone knows about their responsibilities teams
can work together with better coordination.
It helps to share better integration at each level of the project. At each level every team is
better aware about their responsibilities and pass the information to the others.
In one word Well coordinated progress process it is.
Skills Laborers for Better Output
In construction industry it is very difficult to get skilled and efficient labors.
Either you need to find the right one or you need to provide proper training to them to get
the work done efficiently. The role of skilled supervision is very important here.
Skilled supervisors can oversee the task progress on daily basis and helps to keep a proper
track of it. Labors needs to adhere the hierarchy and follow the instructions on timely
manner to meet the timeline, accelerate the progress because they are the people on
whom succession of a good project depends.
Using Advanced Technology
With the advanced era in Construction Industry technology is going to be the key in future.
The main challenge of introducing new technologies are the adaptability. In most cases key
people would not be willing to give the go ahead for it. Technology need not be introducing
complete revolution to the workforce all at once.
It should be choosing the right option as per the need of the project that does not disturb
the existing system but gradual introduction for future betterment.
Choosing right Material
The ultimate output of a construction depends upon its quality of materials. No matter
what you do if the quality of material is poor the end result will be compromised.
Before starting the project ensure to double check the quality of the material. Material such
as Cement, TMT Bars, Sand needs to be meeting the quality standards and project
specifications as well.
Once any material reached at site ensure to check its condition and if anything found
damaged then those should be replaced.
Summary
A Good Construction Output is a complete team effort. Combination of skilled labors, good
quality of materials, good subcontractors and a good management can make it successive.
Thank You
If you find the presentation informative do like and share.
To know more about Construction visit
https://shyamsteel.com/blog/

More Related Content

What's hot (12)

Board presentation
Board presentationBoard presentation
Board presentation
 
Mithun Pavithran Mechanical QAQC Engineer 1
Mithun Pavithran Mechanical QAQC Engineer 1Mithun Pavithran Mechanical QAQC Engineer 1
Mithun Pavithran Mechanical QAQC Engineer 1
 
Mems Journey Started As Associate Design Engineer Oct2005 @ Simyx
Mems Journey Started As Associate Design Engineer Oct2005 @ SimyxMems Journey Started As Associate Design Engineer Oct2005 @ Simyx
Mems Journey Started As Associate Design Engineer Oct2005 @ Simyx
 
Garrel Owens Resume 1
Garrel Owens Resume 1Garrel Owens Resume 1
Garrel Owens Resume 1
 
Letter of Reference for Praveen Kumar-signed
Letter of Reference for Praveen Kumar-signedLetter of Reference for Praveen Kumar-signed
Letter of Reference for Praveen Kumar-signed
 
Task 3
Task 3Task 3
Task 3
 
BenLeiferResume
BenLeiferResumeBenLeiferResume
BenLeiferResume
 
Why are the pre
Why are the preWhy are the pre
Why are the pre
 
Seven's Resume_20150316
Seven's Resume_20150316Seven's Resume_20150316
Seven's Resume_20150316
 
NEHARE VIVEK RAMESH
NEHARE VIVEK RAMESHNEHARE VIVEK RAMESH
NEHARE VIVEK RAMESH
 
Dad Resume (1) (2)
Dad Resume (1) (2)Dad Resume (1) (2)
Dad Resume (1) (2)
 
EPLee_Test_Analyst
EPLee_Test_AnalystEPLee_Test_Analyst
EPLee_Test_Analyst
 

Similar to Important Steps to Improve Quality of Construction

1. Response needed for the below postBased on the sophisticated .docx
1. Response needed for the below postBased on the sophisticated .docx1. Response needed for the below postBased on the sophisticated .docx
1. Response needed for the below postBased on the sophisticated .docx
jeremylockett77
 
1.1 introduction to real estate project management
1.1 introduction to real estate project management1.1 introduction to real estate project management
1.1 introduction to real estate project management
Irefuser1
 
Jonathan's Senior Project Research Paper
Jonathan's Senior Project Research PaperJonathan's Senior Project Research Paper
Jonathan's Senior Project Research Paper
JonathanHaynes
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)
murali perianan
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)
murali perianan
 
Managementscienceassignment (2)
Managementscienceassignment (2)Managementscienceassignment (2)
Managementscienceassignment (2)
tfkc1212
 
Project manager resume (1)
Project manager resume (1)Project manager resume (1)
Project manager resume (1)
antony gomez
 

Similar to Important Steps to Improve Quality of Construction (20)

1. Response needed for the below postBased on the sophisticated .docx
1. Response needed for the below postBased on the sophisticated .docx1. Response needed for the below postBased on the sophisticated .docx
1. Response needed for the below postBased on the sophisticated .docx
 
Dnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _ResumeDnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _Resume
 
Final Project.pptx
Final Project.pptxFinal Project.pptx
Final Project.pptx
 
How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...
 
How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...How to Navigate the Commissioning Process From Planning to Post Construction_...
How to Navigate the Commissioning Process From Planning to Post Construction_...
 
How to Navigate the Commissioning Process: From Planning to Post-Construction
How to Navigate the Commissioning Process: From Planning to Post-ConstructionHow to Navigate the Commissioning Process: From Planning to Post-Construction
How to Navigate the Commissioning Process: From Planning to Post-Construction
 
1.1 introduction to real estate project management
1.1 introduction to real estate project management1.1 introduction to real estate project management
1.1 introduction to real estate project management
 
my cv.doc
my cv.docmy cv.doc
my cv.doc
 
Research proposal implementation of project management
Research proposal implementation of project managementResearch proposal implementation of project management
Research proposal implementation of project management
 
Jonathan's Senior Project Research Paper
Jonathan's Senior Project Research PaperJonathan's Senior Project Research Paper
Jonathan's Senior Project Research Paper
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)
 
latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)latest.MLYS. murali.cv.april2014 (3)
latest.MLYS. murali.cv.april2014 (3)
 
Managementscienceassignment (2)
Managementscienceassignment (2)Managementscienceassignment (2)
Managementscienceassignment (2)
 
Ahmed EL Gamal CV
Ahmed EL Gamal CVAhmed EL Gamal CV
Ahmed EL Gamal CV
 
Topic 1 project management dcc40132 politeknik
Topic 1 project management dcc40132 politeknikTopic 1 project management dcc40132 politeknik
Topic 1 project management dcc40132 politeknik
 
execution chapter 2-1.ppt
execution chapter 2-1.pptexecution chapter 2-1.ppt
execution chapter 2-1.ppt
 
Project management
Project managementProject management
Project management
 
Project manager resume (1)
Project manager resume (1)Project manager resume (1)
Project manager resume (1)
 
Proposal .pdf
Proposal .pdfProposal .pdf
Proposal .pdf
 
my cv upto 2015 june
my cv upto 2015 junemy cv upto 2015 june
my cv upto 2015 june
 

More from Shyam Steel TMT Bar

More from Shyam Steel TMT Bar (15)

Factors to Keep in Mind for Construction Manufacturers and Buyers
Factors to Keep in Mind for Construction Manufacturers and BuyersFactors to Keep in Mind for Construction Manufacturers and Buyers
Factors to Keep in Mind for Construction Manufacturers and Buyers
 
Advantages, Disadvantages and Uses of Lightweight Concrete
Advantages, Disadvantages and Uses of Lightweight ConcreteAdvantages, Disadvantages and Uses of Lightweight Concrete
Advantages, Disadvantages and Uses of Lightweight Concrete
 
How to Control Dust at Construction Sites
How to Control Dust at Construction SitesHow to Control Dust at Construction Sites
How to Control Dust at Construction Sites
 
E Book ISR
E Book ISRE Book ISR
E Book ISR
 
Incredible Achievers
Incredible AchieversIncredible Achievers
Incredible Achievers
 
Types of Steel Bars in Used in Construction
Types of Steel Bars in Used in ConstructionTypes of Steel Bars in Used in Construction
Types of Steel Bars in Used in Construction
 
Types of Construction Materials
Types of Construction MaterialsTypes of Construction Materials
Types of Construction Materials
 
How to Calculate Weight of TMT Bars?
How to Calculate Weight of TMT Bars?How to Calculate Weight of TMT Bars?
How to Calculate Weight of TMT Bars?
 
Strength and Ductility of TMT Bars
Strength and Ductility of TMT BarsStrength and Ductility of TMT Bars
Strength and Ductility of TMT Bars
 
What is Corrosion in Reinforced Bars?
What is Corrosion in Reinforced Bars?What is Corrosion in Reinforced Bars?
What is Corrosion in Reinforced Bars?
 
What is the Difference Between FE 500 & FE 500D TMT Bar?
What is the Difference Between FE 500 & FE 500D TMT Bar?What is the Difference Between FE 500 & FE 500D TMT Bar?
What is the Difference Between FE 500 & FE 500D TMT Bar?
 
Frequently asked questions on TMT Rebar
Frequently asked questions on TMT RebarFrequently asked questions on TMT Rebar
Frequently asked questions on TMT Rebar
 
Manufacturing process of TMT Steel Bar
Manufacturing process of TMT Steel BarManufacturing process of TMT Steel Bar
Manufacturing process of TMT Steel Bar
 
Important Facts on TMT bar
Important Facts on TMT barImportant Facts on TMT bar
Important Facts on TMT bar
 
Important Facts on 500D TMT bar
Important Facts on 500D TMT barImportant Facts on 500D TMT bar
Important Facts on 500D TMT bar
 

Recently uploaded

BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
ApartmentWala1
 
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
asmaqueen5
 
Acibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin TurkeyAcibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin Turkey
Listing Turkey
 
9990771857 Call Girls in Dwarka Sector 08 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 08 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 08 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 08 Delhi (Call Girls) Delhi
delhimodel235
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
ApartmentWala1
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
ApartmentWala1
 
ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700
Truhomes
 
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRCall Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
asmaqueen5
 
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Call Girls In Seelampur  Delhi ↬8447779280}Seelampur Escorts Service In Delhi...Call Girls In Seelampur  Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
asmaqueen5
 
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
delhimodel235
 

Recently uploaded (20)

Majestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdfMajestique Viman Nagar Pune Brochure.pdf
Majestique Viman Nagar Pune Brochure.pdf
 
Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024
 
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial VenturesM3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
 
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
 
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
 
Acibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin TurkeyAcibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin Turkey
 
SVN Live 5.6.24 Weekly Property Broadcast
SVN Live 5.6.24 Weekly Property BroadcastSVN Live 5.6.24 Weekly Property Broadcast
SVN Live 5.6.24 Weekly Property Broadcast
 
9990771857 Call Girls in Dwarka Sector 08 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 08 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 08 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 08 Delhi (Call Girls) Delhi
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
 
Kolte Patil Kharadi Pune E Brochure.pdf
Kolte Patil Kharadi Pune E  Brochure.pdfKolte Patil Kharadi Pune E  Brochure.pdf
Kolte Patil Kharadi Pune E Brochure.pdf
 
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
 
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdfEldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
 
Mahindra Happinest Tathawade Pune Brochure.pdf
Mahindra Happinest Tathawade Pune Brochure.pdfMahindra Happinest Tathawade Pune Brochure.pdf
Mahindra Happinest Tathawade Pune Brochure.pdf
 
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports WorkTENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
 
ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700
 
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRCall Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
 
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Call Girls In Seelampur  Delhi ↬8447779280}Seelampur Escorts Service In Delhi...Call Girls In Seelampur  Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
 
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
 
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing TurkeyYedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
 

Important Steps to Improve Quality of Construction

  • 1. Important Steps to Improve Quality of Construction
  • 2. Introduction Quality of Construction needs to be at par because longevity, sustainability depends upon it. In order to get the perfect output - Perfect Planning - Efficient Supervision - Skilled Laborers - Good quality of material are needed Otherwise defect and failure is bound to come to any construction project. Understanding project specification is very important. It determines several factors such as budgeting, grade of the products etc. To have smooth execution efficient Architect vis a vis Engineer as well.
  • 3. Standard Establishment Quality of Standards depends upon the project's geo location, complexity etc. Quality of Standards needs to be determined by considering factors such as - Industry Standards - Certifications such as ISO, ISI, BIS etc. - Requirements form the manufactures for all the products that are needed for the project Standard need to set high and correct since its beginning. Each individual can work together and raise the standard at par.
  • 4. Team Integrity During the beginning phase it is important to have discussion between the teams. It helps to understand the - Project Requirement - Setting the timeline - Task allocation of each individuals etc. Once everything is well organized and everyone knows about their responsibilities teams can work together with better coordination. It helps to share better integration at each level of the project. At each level every team is better aware about their responsibilities and pass the information to the others. In one word Well coordinated progress process it is.
  • 5. Skills Laborers for Better Output In construction industry it is very difficult to get skilled and efficient labors. Either you need to find the right one or you need to provide proper training to them to get the work done efficiently. The role of skilled supervision is very important here. Skilled supervisors can oversee the task progress on daily basis and helps to keep a proper track of it. Labors needs to adhere the hierarchy and follow the instructions on timely manner to meet the timeline, accelerate the progress because they are the people on whom succession of a good project depends.
  • 6. Using Advanced Technology With the advanced era in Construction Industry technology is going to be the key in future. The main challenge of introducing new technologies are the adaptability. In most cases key people would not be willing to give the go ahead for it. Technology need not be introducing complete revolution to the workforce all at once. It should be choosing the right option as per the need of the project that does not disturb the existing system but gradual introduction for future betterment.
  • 7. Choosing right Material The ultimate output of a construction depends upon its quality of materials. No matter what you do if the quality of material is poor the end result will be compromised. Before starting the project ensure to double check the quality of the material. Material such as Cement, TMT Bars, Sand needs to be meeting the quality standards and project specifications as well. Once any material reached at site ensure to check its condition and if anything found damaged then those should be replaced.
  • 8. Summary A Good Construction Output is a complete team effort. Combination of skilled labors, good quality of materials, good subcontractors and a good management can make it successive.
  • 9. Thank You If you find the presentation informative do like and share. To know more about Construction visit https://shyamsteel.com/blog/