1. Resume
Personal Details
Full Name : Murali Perianan
Email address : muraliperianan@yahoo.com
Nationality : Malaysian
Current Address : SW 1- Regensi Condominium, Jalan Pelangi, Klang, Selangor.
Telephone (H/Phone) : 012-7836559 & 010-2939002
Sex /Status : Male / Married. Age: 41
Languages : English / Malay / Tamil
Education : Degree: Bachelor of Science in Construction Management
: Diploma: Civil Engineering
Course/Traning Attended : Certified Project Management – Temasek Polytech Singapore
: Concept in Construction Productivity Enhancement -Singapore
: Building Construction Safety (CIDB) – Malaysia.
: Building Construction Safety Supervisor (BCSS) – Singapore
: Lifting Supervisors Safety – Dubai.
: Microsoft Project 2002 .
:First Aider ,Dubai Heart Centre- Dubai.
:Basic Fire fighting – Malaysia Fighting Department.
: Scaffolding Competent Person, Institute Of Scaffolding - Dubai.
: Metal & Steel Fabrication, Industrial Training Institute, Malaysia.
: Conquas Training for Builders, - Singapore (BCA).
: Structure Steel . Modul 1 & 2 Cert -IES.
2. Professional Bodies : Profesional Cert in Project Management –Temasek Polytechnic / IES
:Registered Certified Project Engineer – IES
: Registered Member - Institution Of Engineer, Singapore (IES)
Working Experience (More Then 18 years)
June 2014– Till: (Pembinaan Bintang Baru Sdn. Bhd.)
Job Assignment: Architecture Manager
Current project: Proposed Mixed Development Including Office Suite, Condominium
and Car Park at Sungai Way for Mahsing Developer. – Malaysia.
• Site Planning, coordination and execution of matters relating to construction
project.
• Manage and monitor projects progress to ensure timely completion of works.
Liase with sub-contractors and consultants to ensure smooth progression and
timely completion of quality works.
• Determine the appropriate construction methods and schedule all
required construction site activities into logical, specific steps, budgeting the
time required to meet established deadlines and oversee the performance of
all contractors and are responsible for ensuring all work is completed on
schedule.
• Coordinates, and supervises the construction process from the
conceptual development stage through final construction on a timely and
economical basis.
• Oversee the organization, scheduling, and implementation of the
project to execute the given designs.
June 2013 – April 2014: (AVA Global Pte.Ltd.)
Job Assignment: Project Manager (Façade Works)
Current project: Proposed Mixed Development At New Upper Changi Road –
Singapore.
• Site Planning, coordination and execution of matters relating to construction
project.
• Manage and monitor projects progress to ensure timely completion of works.
Liase with sub-contractors and consultants to ensure smooth progression and
timely completion of quality works.
3. • Determine the appropriate construction methods and schedule all
required construction site activities into logical, specific steps, budgeting the
time required to meet established deadlines and oversee the performance of
all contractors and are responsible for ensuring all work is completed on
schedule.
• Coordinates, and supervises the construction process from the
conceptual development stage through final construction on a timely and
economical basis.
• Oversee the organization, scheduling, and implementation of the
project to execute the given designs.
Feb 2012 – June 2013: (QXY Resourcess Pte.Ltd.)
Job Assignment: Site Manager (C&S)
Current project: Proposed Erection of 2 Linked Block At Tan Tock Seng Hospital –
Singapore.
• Responsible for overall construction site by ensuring that work is done safely,
on time and to the right quality standards.
• Oversee operation on a day to day basis.
• To attend client site meetings and up-dating site progress to Project Manager
and client.
• Organise and chair meeting with own subcon and attend to site coordination
meeting.
April 2011 – Jan 2012 (Tycoon Construction Pte. Ltd.)
Job Assignment: Project Engineer (C&S)
Current project: Up-grading of existing Jurong West Primary School -Singapore
• To assist Project Manager in planning and monitoring of projects and to
ensure work progress smoothly and completed within time frame and budget.
• To coordinate with site team on the requisition and ordering of construction
materials,plant,machineries,tools and accessories.
• Monitoring,updating and keep track of work schedule.
4. Feb 2010 – March 2011 (GSIB Sdn Bhd)
Job Assignment: Project Executive (Architectural)
Completed Project: Up-grading Turnberry Villas Bungalows for Sime Darby .
MALAYSIA
• Assist in documentation, report, data preparation and drawing interpretation.
• Review project drawing and resolve technical problems promptly.
• Planning, implementation and monitoring the entire construction process.
• Assist in resolving all technical and site issues. Assist on overall construction
site planning, construction activities, operation and completion the work on
time and within budget.
• Ensure all technical and engineering aspect of the building project meet
customer’s and statutory requirements.
May 2008 – Jan 2010 (Obayashi Corporation)
Job Assignment: Chief Engineer (C&S / Achitectural)
Completed project: Dubai Metro Project (MRT Project). - DUBAI
• Direct and monitor the progress of construction activities, the quality of
construction, and safety. Work together with several subordinates, such as
consultants and site engineers in expediting the works at site.
• Review engineering and architectural drawings and specifications to monitor
progress and ensure compliance with plans and specifications.
• Oversee the organization, scheduling, and implementation of the project to
execute the given designs. Verify and certify subcontractor’s progress claim.
• Responsible for coordinating and managing people, materials, equipment and
schedules and the safety of employees and the general public.
Jan 2006– April 2008 ( Atlaw Housing Development) - Malaysia
Job Assignment: Construction Manager (C&S)
*Completed the following main project:
a) 118 Units Double storey Link House At Bt.8 Jln. Meru Klang - Malaysia.
b) 2 blocks 9 storey Apartment. Pulau Indah. Malaysia.
• Overall involved in the planning and execution of site activities
5. • Determine the appropriate construction methods and schedule all
required construction site activities into logical, specific steps, budgeting the time
required to meet established deadlines and oversee the performance of all
contractors and are responsible for ensuring all work is completed on schedule.
• Direct and monitor the progress of construction activities, the quality of
construction, and safety. Work together with several subordinates, such as
consultants, site engineers and site supervisors in expediting the works at site.
• Review engineering and architectural drawings and specifications to
monitor progress and ensure compliance with plans and specifications.
• Meet regularly with Clients, contractors, architects, and other design
professionals to monitor and coordinate all phases of the construction project.
• Coordinates, and supervises the construction process from the conceptual
development stage through final construction on a timely and economical basis.
• Oversee the organization, scheduling, and implementation of the project
to execute the given designs.
• Responsible for coordinating and managing people, materials, and
equipment; budgets, schedules, and contracts; and the safety of employees and the
general public.
Mac 1999 – Jan 2004 (Stone Empire) - Malaysia
Job Assignment: Site Engineer (Architectural)
*Completed the following main project :
a) Putra Jaya Convention Centre. Putra Jaya. Malaysia
b) Stone works at kraft Tangan/Handy craft. Malaysia
c) 26 units Bungalow at POLO CLUB at Damansara, Malaysia
• To monitor construction work progress and coordinate with supplier and subcon.
•
• To attend site inspection and resolve site issues.
•
• To prepare site documentation and reports.
•
• To plan and organize workflow.
Feb 1996 – Feb 1999 (Wellcom Communication / Televenture) - Malaysia
Job Assignment: Technical Assistant.
Transmission /Civil works - Installation of corrugate sub-duct, manhole and electrical
poles for Celcom, Maxis ,Telecom and TNB.
6. • Supervise the Contractor’s work in accordance with the construction drawings
and specifications.
• Check on all materials, machines, etc. before allowing contractor to start work.
Other:
Noticed Period : 1 Month Notice
Expected Salary : RM 7,500/Permonth (neg)
7. • Supervise the Contractor’s work in accordance with the construction drawings
and specifications.
• Check on all materials, machines, etc. before allowing contractor to start work.
Other:
Noticed Period : 1 Month Notice
Expected Salary : RM 7,500/Permonth (neg)