Construction Safety Protocol
By
Rajesh Prasad
ED Metro RVNL
For better visualization
and understanding..
(26.05.2018)
First Principle in Safety……..
• Do not PLAY with Safety….
- A matter of concern….
Good Physique
Regular Check ups
Preventive Measures &
Medicines
Proper & Timely Cure &
Restoration
A KEY TO LONG HEALTH LIFE OF MAN/STRUCTURE
Good Construction
Regular Inspections
Preventive Measures &
Materials
Proper & Timely Repairs &
Restoration
Construction Safety ProtocolAdequate care till baby is born
Construction Safety
Protocol: Near miss
is equally important
Herbert Heinrich showed that for every accident resulting in a
fatality or major disabling injury, there are approximately 300 unsafe
incidents. The take-home message is that by reducing the number of
near-misses you also reduce the chance of the fatality occurring,
because you have lowered frequency of at-risk behaviours.
1
Major
accident
29
Minor injury errors
300 Non –injury errors
UNSAFE CONDITIONS and practices
Heinrich 300-29-1 Model
1
29
300
Major Injury
Minor Injury
Near Misses
Near Misses must be reported and analysed…
PPE is the first of it’s requirements in
safety protocol
Safety Protocol : Little care make you safer
Safety Protocol : Be attentive and never relax…
Safety Protocol: Ensuring safety improves
body language and work culture..
Do not use
shortcut…
Basic principles of Safety Protocol:
Read and follow safety booklets for
safe construction protocol
Careless vis-a-vis Careful
Careful
Careless
Safety Protocol:
Cleanliness at
work sites
ensures better
Safety protocol..
Safe Construction protocol
brings a lot of happiness…
Construction Safety Protocol should be
part of team culture…
TEAMWORK divides the tasks and
multiplies the SUCCESS
It is linked to your safety and creates
safety culture at work site
Do not play with safety
and do not
compromise…
Safety Protocol:
Do not play with safety and do not make jokes
of it…
Safety Protocol:
Never play and never try to have fun…
Safety Protocol:
Never relax and play…
Construction Safety Protocol:
Do not play with safety and do not think
elsewhere
Ladder to success in project implementation is
to follow Safety regulations
Wearing safety harness correctly brings
confidence…
Non-wearing of safety harness may finish
you…
Display the safety posters and standards at worksite
Construction Safety Protocol:
All have to be careful…
Construction Safety Protocol:
For electrical matter and for earthing, take
extra precautions…
Safety first vs Safety last – choice is yours …
Construction Safety Protocol:
Look for danger and help others…
Construction Safety Protocol:
At site concentrate on works not on paper
Construction Safety Protocol:
Choice is yours?
Worksite is not the place to play, to enjoy or
to have fun…
Ultimate aim of Construction Safety Protocol
is to Construct Safe…
Helmet must, Safety first at workplaces…
Safety First Helmet Must
Never take chances…
Construction Safety Protocol:
Avoid phone and social media at worksite…
Construction Safety Protocol:
Love your family not the neighbors and
concentrate at workplace..
Construction Safety Protocol:
A FEW FACTS:
 The first few weeks on each new site is the most
dangerous.
 Accidents are more frequent at the end of the
day.
 Construction over busy roads.
 Safety helmets, Hi-viz jackets, safety boots do
prevent injury and death.
 Light weight shoes-such as trainers or runners
are not suitable at site.
 Idling/Stoppage of worksite make the worksite
vulnerable…
Construction Accidents
• 56% falls from height
• 21% trapped by something collapsing or
overturning
• 10% struck by a moving vehicle
• 5% contact with electricity or electrical discharge
• 4% struck by a flying/falling object during machine
lifting of materials
• 3% contact with moving machinery or material
being machined
• 1% exposure to a hot or harmful substance
Breakdown of fatalities according to type
of accident in construction industry
Safe Access on Site
 Everyone can get to their place of work
safely
 Edges from which people could fall are
provided with double guard rails or other
suitable edge protection
 Holes are protected with clearly marked and
fixed covers to prevent falls
 Site is tidy
 Good Lighting
 Fenced off from public
Working at Height
Height HAZARDS on Construction Sites
Holes in Floors, Gaps on Working Platforms, Shafts and
Stairwells not Adequately Covered, Barricaded, Fenced Off
 Using ladders or scaffolding without
proper fixing is crazy
 Never use incomplete scaffolding.
 Make sure there are hand rails and toe
boards at all edges
 Things fall on sites, wear your helmet
 Before starting work at heights check for
clearance from any overhead power lines
LETHAL LADDERS
 Right for the job. Would scaffolding
or a cherry picker be better?
 In good shape
 Secured near the top
 On a firm base and footing
 Rising at least 1 meter beyond the landing
place
or that there is a proper hand hold
Always have a firm grip on the ladder and
keep a good balance
Ladders kill a lot of people.
Make sure the ladder is:-
CRANE SAFETY
• The weight of the load must be carefully
estimated
• The crane must be fitted with an automatic safe
load indicator (one that works)
• The crane must always work on a hard, level base
• The load must be properly fixed and secured
• The banksman must be trained to give clear
signals
• Third party inspection and trials
• Testing and third party inspection of wire rope.
• Checklist
Very Simply :-
Traffic Vehicles & Plant
 Vehicles and pedestrians should be
kept apart on- site – separate them
as much as possible using barriers
 Adequate clearance around slewing
vehicles
 Avoid reversing where possible &
use one-way system
 Vehicles should have reversing
alarms/sirens
ELECTRICITY
• Treat electricity with respect
• Check constantly that cables are not
damaged or worn
• Keep trailing cables off the ground
and away from water
• Never overload or use makeshift
plugs and fuses
Good practice with electricity at site:-
PPE on-site
Most construction sites require at least:
• Hard hat
• Safety Boots
• Hi-viz jacket
• Safety Glasses
Wear them always for your safety
Construction Site Safety
No job is so important that it cannot be done
safely
UNDER NO CIRCUMSTANCES ARE PERSONS
WORKING ON SITE TO PUT THEMSELVES IN
DANGER
BEST - BE Safe Today
Checks…
• Ensuring work permits
• Internal/ External safe audits in regular
frequencies
• Checklists throughout the construction phase
• Display safety posters and assurance
• Preparation of audit reports for check
• Indentifying non conformant, non compliance
• Near misses actions which has ability to
cause risk
• Legal requirements
May not get the chance of hospital trip
SAFETY MEASURES TAKEN AT WORK SITE
Proper barricading at site to protect Motorists, Pedestrians,
Workmen, Plant & Equipment from accident
• Display of temporary traffic signs as per the requirement of the
Traffic Police.
SAFETY MEASURES TAKEN AT WORK SITE
SAFETY MEASURES TAKEN AT WORK SITE
Protection of worksite…
(Pile Cap work)
SAFETY MEASURES TAKEN AT WORK SITE
Height gauge and safety fish net provided for safety of
pedestrian and vehicular traffic
Height Gauge
Safety Fish Net
DAKSHINESWAR STATION
Safe work practices adopted during erection at
cable stayed bridge site
Monitoring System at tunnel site
• Controlled blasting
• Monitoring system for
measuring vibration in the
existing tunnel during
blasting of 3rd line.
• Seismograph equipment was
installed in near by existing
tunnel wall during every
blasting to record the
blasting amplitude and
frequency of shock wave.
The summary of blast vibration
and Fast Fourier Transform
Analysis (FFT)
PPV = 4.572 mm/s< 10mm/sec.
Noise = 106.0 dB < 146 dB
• 6 nos. sensors have been installed on the stay
cables subjected to maximum loads. The ROBO
Control System of M/s Mageba .
• The structural monitoring system issues alarm
notification based on measurements by the on-
structure instrumentation when pre-defined
threshold values of structural loads are passed.
MONITORING SYSTEM, CABLE STAYED BRIDGE SITE
Vivekananda Flyover suddenly collapsed on 31.03.2016
IIT KGP REPORT- DEC 2017
- Poor Contract - Poor Workmanship
- Poor Design - Poor Supervision
- Poor Material
Handle
Media
With
Care
I-GIRDER STEEL FRAME LOCKING
ARRANGEMENT
STEEL FRAME LOCKING ARRANAGEMENT
WE, CARE FOR THE SAFETY OF YOUNG AND
OLD
ALL SHOULD FOLLOW THE SAFETY RULES AS
DISCUSSED AND TOLD
AFTER THOUGHT….
Safety -- a small investment
for a rich future.
Safety can distinguish you.
Lack of safety can extinguish
you.
Safety comes in cans :
I can, you can, we can.
ALERT TODAY – ALIVE
TOMORROW
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.05.18

More Related Content

What's hot

Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at heightsankarnagar
 
Liftingproedure
LiftingproedureLiftingproedure
LiftingproedureZhai Rull
 
SG4:10 presentation
SG4:10 presentationSG4:10 presentation
SG4:10 presentationAlan Bate
 
Nylon Web Slings Inspection Checklist
Nylon Web Slings Inspection ChecklistNylon Web Slings Inspection Checklist
Nylon Web Slings Inspection ChecklistHoist and Crane Depot
 
TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsAlan Bassett
 
Rigger signalman handbook
Rigger  signalman handbookRigger  signalman handbook
Rigger signalman handbooknhivan
 
Lifting Sling Safety
Lifting Sling SafetyLifting Sling Safety
Lifting Sling SafetyHvacmach
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.pptIrfanAwan25
 
Industrial safetY of height works
Industrial safetY of height worksIndustrial safetY of height works
Industrial safetY of height worksPavan Noel
 
Safe Rigging Training
Safe Rigging TrainingSafe Rigging Training
Safe Rigging TrainingDan Junkins
 
Working at-height
Working at-height Working at-height
Working at-height Reliance
 
Scaffold ladder
Scaffold ladderScaffold ladder
Scaffold ladderbronzecs
 

What's hot (20)

Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at height
 
Liftingproedure
LiftingproedureLiftingproedure
Liftingproedure
 
SG4:10 presentation
SG4:10 presentationSG4:10 presentation
SG4:10 presentation
 
A fall protection
A fall protectionA fall protection
A fall protection
 
Lifting tools
Lifting toolsLifting tools
Lifting tools
 
Fall Protection Systems Training by
Fall Protection Systems Training byFall Protection Systems Training by
Fall Protection Systems Training by
 
Nylon Web Slings Inspection Checklist
Nylon Web Slings Inspection ChecklistNylon Web Slings Inspection Checklist
Nylon Web Slings Inspection Checklist
 
OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements
 
TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operations
 
Rigger signalman handbook
Rigger  signalman handbookRigger  signalman handbook
Rigger signalman handbook
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 
Lifting Sling Safety
Lifting Sling SafetyLifting Sling Safety
Lifting Sling Safety
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 
HEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORTHEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORT
 
Scaffolds Training by Pennsylvania L&I
Scaffolds Training by Pennsylvania L&IScaffolds Training by Pennsylvania L&I
Scaffolds Training by Pennsylvania L&I
 
Industrial safetY of height works
Industrial safetY of height worksIndustrial safetY of height works
Industrial safetY of height works
 
Safe Rigging Training
Safe Rigging TrainingSafe Rigging Training
Safe Rigging Training
 
Working at-height
Working at-height Working at-height
Working at-height
 
Scaffold ladder
Scaffold ladderScaffold ladder
Scaffold ladder
 
Below the hook
Below the hook Below the hook
Below the hook
 

Similar to Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.05.18

PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...Rajesh Prasad
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safetyDebajit Roy
 
Construction safety session 1 (new)
Construction safety session 1 (new)Construction safety session 1 (new)
Construction safety session 1 (new)VancityInstitute
 
construction site safety.pptx
construction site safety.pptxconstruction site safety.pptx
construction site safety.pptxHirenThakkar31
 
117921179 saudi-aramco-safety-handbook
117921179 saudi-aramco-safety-handbook117921179 saudi-aramco-safety-handbook
117921179 saudi-aramco-safety-handbookkhalil maroun
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14fahadansari131
 
constructionsafety-EAA.pdf
constructionsafety-EAA.pdfconstructionsafety-EAA.pdf
constructionsafety-EAA.pdfssuser2c065e
 
Construction safety
Construction  safetyConstruction  safety
Construction safetyRanty Poddar
 
Safety equipments
Safety equipments Safety equipments
Safety equipments Dip Kadia
 
construction safety.pptx
construction safety.pptxconstruction safety.pptx
construction safety.pptxMarwa Merghani
 
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptxIdentify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptxCanberra Institute of technology
 
Safety-Ass-4group-5.pptx
Safety-Ass-4group-5.pptxSafety-Ass-4group-5.pptx
Safety-Ass-4group-5.pptxRoman Shrestha
 
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Waqas Ahmad
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxAamirAbbas75
 
Construction Site Hazards & Safety Equipment
Construction Site Hazards & Safety Equipment Construction Site Hazards & Safety Equipment
Construction Site Hazards & Safety Equipment AmrullahKhan1
 

Similar to Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.05.18 (20)

PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
 
Construction safety
Construction safetyConstruction safety
Construction safety
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safety
 
Construction safety session 1 (new)
Construction safety session 1 (new)Construction safety session 1 (new)
Construction safety session 1 (new)
 
construction site safety.pptx
construction site safety.pptxconstruction site safety.pptx
construction site safety.pptx
 
117921179 saudi-aramco-safety-handbook
117921179 saudi-aramco-safety-handbook117921179 saudi-aramco-safety-handbook
117921179 saudi-aramco-safety-handbook
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
 
CTE Unit 2.pptx
CTE Unit 2.pptxCTE Unit 2.pptx
CTE Unit 2.pptx
 
Safety plan
Safety planSafety plan
Safety plan
 
s1
s1s1
s1
 
constructionsafety-EAA.pdf
constructionsafety-EAA.pdfconstructionsafety-EAA.pdf
constructionsafety-EAA.pdf
 
Construction safety
Construction  safetyConstruction  safety
Construction safety
 
Safety equipments
Safety equipments Safety equipments
Safety equipments
 
construction safety.pptx
construction safety.pptxconstruction safety.pptx
construction safety.pptx
 
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptxIdentify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
 
Safety-Ass-4group-5.pptx
Safety-Ass-4group-5.pptxSafety-Ass-4group-5.pptx
Safety-Ass-4group-5.pptx
 
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
 
SITE INDUCTION Version 2
SITE INDUCTION Version 2SITE INDUCTION Version 2
SITE INDUCTION Version 2
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
 
Construction Site Hazards & Safety Equipment
Construction Site Hazards & Safety Equipment Construction Site Hazards & Safety Equipment
Construction Site Hazards & Safety Equipment
 

More from Rajesh Prasad

Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Rajesh Prasad
 
20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdf20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdfRajesh Prasad
 
Cyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNLCyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNLRajesh Prasad
 
RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021 RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021 Rajesh Prasad
 
Management Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdfManagement Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdfRajesh Prasad
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21Rajesh Prasad
 
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op..."Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...Rajesh Prasad
 
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRajesh Prasad
 
Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....Rajesh Prasad
 
Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....Rajesh Prasad
 
Infrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalInfrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalRajesh Prasad
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...Rajesh Prasad
 
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Rajesh Prasad
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Rajesh Prasad
 
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...Rajesh Prasad
 
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...Rajesh Prasad
 

More from Rajesh Prasad (20)

Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...
 
20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdf20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdf
 
Cyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNLCyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNL
 
RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021 RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021
 
Management Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdfManagement Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdf
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
 
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op..."Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
 
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
 
Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....
 
Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....
 
Infrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalInfrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West Bengal
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
 
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
 
The RVNL Story 2019
The RVNL Story 2019The RVNL Story 2019
The RVNL Story 2019
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
 
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
PPT on execution of 680 m long tunnel ensuring safety of the adjoining rail t...
 
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
Execution of 680 m long tunnel ensuring safety of the adjoining rail tunnel w...
 

Recently uploaded

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 

Recently uploaded (20)

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 

Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.05.18

  • 1. Construction Safety Protocol By Rajesh Prasad ED Metro RVNL For better visualization and understanding.. (26.05.2018)
  • 2. First Principle in Safety…….. • Do not PLAY with Safety…. - A matter of concern….
  • 3. Good Physique Regular Check ups Preventive Measures & Medicines Proper & Timely Cure & Restoration A KEY TO LONG HEALTH LIFE OF MAN/STRUCTURE Good Construction Regular Inspections Preventive Measures & Materials Proper & Timely Repairs & Restoration
  • 4. Construction Safety ProtocolAdequate care till baby is born
  • 5.
  • 6. Construction Safety Protocol: Near miss is equally important
  • 7. Herbert Heinrich showed that for every accident resulting in a fatality or major disabling injury, there are approximately 300 unsafe incidents. The take-home message is that by reducing the number of near-misses you also reduce the chance of the fatality occurring, because you have lowered frequency of at-risk behaviours. 1 Major accident 29 Minor injury errors 300 Non –injury errors UNSAFE CONDITIONS and practices
  • 8. Heinrich 300-29-1 Model 1 29 300 Major Injury Minor Injury Near Misses Near Misses must be reported and analysed…
  • 9. PPE is the first of it’s requirements in safety protocol
  • 10. Safety Protocol : Little care make you safer
  • 11. Safety Protocol : Be attentive and never relax…
  • 12. Safety Protocol: Ensuring safety improves body language and work culture..
  • 13. Do not use shortcut… Basic principles of Safety Protocol:
  • 14. Read and follow safety booklets for safe construction protocol
  • 16. Cleanliness at work sites ensures better Safety protocol..
  • 17. Safe Construction protocol brings a lot of happiness…
  • 18. Construction Safety Protocol should be part of team culture… TEAMWORK divides the tasks and multiplies the SUCCESS
  • 19. It is linked to your safety and creates safety culture at work site
  • 20. Do not play with safety and do not compromise… Safety Protocol:
  • 21. Do not play with safety and do not make jokes of it… Safety Protocol:
  • 22. Never play and never try to have fun… Safety Protocol:
  • 23. Never relax and play… Construction Safety Protocol:
  • 24. Do not play with safety and do not think elsewhere
  • 25. Ladder to success in project implementation is to follow Safety regulations
  • 26. Wearing safety harness correctly brings confidence…
  • 27. Non-wearing of safety harness may finish you…
  • 28. Display the safety posters and standards at worksite Construction Safety Protocol:
  • 29. All have to be careful… Construction Safety Protocol:
  • 30. For electrical matter and for earthing, take extra precautions…
  • 31. Safety first vs Safety last – choice is yours … Construction Safety Protocol:
  • 32. Look for danger and help others… Construction Safety Protocol:
  • 33. At site concentrate on works not on paper Construction Safety Protocol:
  • 35. Worksite is not the place to play, to enjoy or to have fun…
  • 36. Ultimate aim of Construction Safety Protocol is to Construct Safe…
  • 37. Helmet must, Safety first at workplaces…
  • 40. Avoid phone and social media at worksite… Construction Safety Protocol:
  • 41. Love your family not the neighbors and concentrate at workplace.. Construction Safety Protocol:
  • 42. A FEW FACTS:  The first few weeks on each new site is the most dangerous.  Accidents are more frequent at the end of the day.  Construction over busy roads.  Safety helmets, Hi-viz jackets, safety boots do prevent injury and death.  Light weight shoes-such as trainers or runners are not suitable at site.  Idling/Stoppage of worksite make the worksite vulnerable…
  • 43. Construction Accidents • 56% falls from height • 21% trapped by something collapsing or overturning • 10% struck by a moving vehicle • 5% contact with electricity or electrical discharge • 4% struck by a flying/falling object during machine lifting of materials • 3% contact with moving machinery or material being machined • 1% exposure to a hot or harmful substance Breakdown of fatalities according to type of accident in construction industry
  • 44. Safe Access on Site  Everyone can get to their place of work safely  Edges from which people could fall are provided with double guard rails or other suitable edge protection  Holes are protected with clearly marked and fixed covers to prevent falls  Site is tidy  Good Lighting  Fenced off from public
  • 45. Working at Height Height HAZARDS on Construction Sites Holes in Floors, Gaps on Working Platforms, Shafts and Stairwells not Adequately Covered, Barricaded, Fenced Off  Using ladders or scaffolding without proper fixing is crazy  Never use incomplete scaffolding.  Make sure there are hand rails and toe boards at all edges  Things fall on sites, wear your helmet  Before starting work at heights check for clearance from any overhead power lines
  • 46. LETHAL LADDERS  Right for the job. Would scaffolding or a cherry picker be better?  In good shape  Secured near the top  On a firm base and footing  Rising at least 1 meter beyond the landing place or that there is a proper hand hold Always have a firm grip on the ladder and keep a good balance Ladders kill a lot of people. Make sure the ladder is:-
  • 47. CRANE SAFETY • The weight of the load must be carefully estimated • The crane must be fitted with an automatic safe load indicator (one that works) • The crane must always work on a hard, level base • The load must be properly fixed and secured • The banksman must be trained to give clear signals • Third party inspection and trials • Testing and third party inspection of wire rope. • Checklist Very Simply :-
  • 48. Traffic Vehicles & Plant  Vehicles and pedestrians should be kept apart on- site – separate them as much as possible using barriers  Adequate clearance around slewing vehicles  Avoid reversing where possible & use one-way system  Vehicles should have reversing alarms/sirens
  • 49. ELECTRICITY • Treat electricity with respect • Check constantly that cables are not damaged or worn • Keep trailing cables off the ground and away from water • Never overload or use makeshift plugs and fuses Good practice with electricity at site:-
  • 50. PPE on-site Most construction sites require at least: • Hard hat • Safety Boots • Hi-viz jacket • Safety Glasses Wear them always for your safety
  • 51. Construction Site Safety No job is so important that it cannot be done safely UNDER NO CIRCUMSTANCES ARE PERSONS WORKING ON SITE TO PUT THEMSELVES IN DANGER BEST - BE Safe Today
  • 52. Checks… • Ensuring work permits • Internal/ External safe audits in regular frequencies • Checklists throughout the construction phase • Display safety posters and assurance • Preparation of audit reports for check • Indentifying non conformant, non compliance • Near misses actions which has ability to cause risk • Legal requirements
  • 53. May not get the chance of hospital trip
  • 54. SAFETY MEASURES TAKEN AT WORK SITE Proper barricading at site to protect Motorists, Pedestrians, Workmen, Plant & Equipment from accident
  • 55. • Display of temporary traffic signs as per the requirement of the Traffic Police. SAFETY MEASURES TAKEN AT WORK SITE
  • 56. SAFETY MEASURES TAKEN AT WORK SITE Protection of worksite… (Pile Cap work)
  • 57. SAFETY MEASURES TAKEN AT WORK SITE Height gauge and safety fish net provided for safety of pedestrian and vehicular traffic Height Gauge Safety Fish Net
  • 59. Safe work practices adopted during erection at cable stayed bridge site
  • 60. Monitoring System at tunnel site • Controlled blasting • Monitoring system for measuring vibration in the existing tunnel during blasting of 3rd line. • Seismograph equipment was installed in near by existing tunnel wall during every blasting to record the blasting amplitude and frequency of shock wave.
  • 61. The summary of blast vibration and Fast Fourier Transform Analysis (FFT) PPV = 4.572 mm/s< 10mm/sec. Noise = 106.0 dB < 146 dB
  • 62. • 6 nos. sensors have been installed on the stay cables subjected to maximum loads. The ROBO Control System of M/s Mageba . • The structural monitoring system issues alarm notification based on measurements by the on- structure instrumentation when pre-defined threshold values of structural loads are passed. MONITORING SYSTEM, CABLE STAYED BRIDGE SITE
  • 63. Vivekananda Flyover suddenly collapsed on 31.03.2016 IIT KGP REPORT- DEC 2017 - Poor Contract - Poor Workmanship - Poor Design - Poor Supervision - Poor Material
  • 65. I-GIRDER STEEL FRAME LOCKING ARRANGEMENT STEEL FRAME LOCKING ARRANAGEMENT
  • 66. WE, CARE FOR THE SAFETY OF YOUNG AND OLD ALL SHOULD FOLLOW THE SAFETY RULES AS DISCUSSED AND TOLD AFTER THOUGHT….
  • 67. Safety -- a small investment for a rich future. Safety can distinguish you. Lack of safety can extinguish you.
  • 68.
  • 69. Safety comes in cans : I can, you can, we can. ALERT TODAY – ALIVE TOMORROW