SlideShare a Scribd company logo
1 of 2
Organizational Experience
Since 31st
Jan’11 Saint Gobain India Pvt. Ltd., Bhiwadi as Functional Area In-charge (Mechanical Maintenance)
Role:
• Leading a team of 20 people
• Preparing project schedules and monitoring projects with respect to cost, resource deployment, time over-runs & quality
compliance to ensure timely execution of projects
• Developing maintenance schedules for plant machinery, conducting periodic checks and documenting with a key focus on
reducing delays & enhancing equipment uptime
• Performing installation, commissioning & troubleshooting of:
o Equipment such as Centrifugal Blowers, Hydraulic Systems, Belt Conveyors, bucket elevators, Chain Conveyors, gearboxes,
compressors etc.
o Involved in Hydraulic Systems of Material unloading, glass packing, with complete overhauling of hydraulic system.
• Modifying & enhancing various machine drawings in process output.
• Conducted structural erection of Furnace and Float Bath during project
• Established mechanical machine shop from conceptualization till the installation of every machinery in the machine shop
• Planning/arranging spares for all the equipment; adhering to the preventive maintenance schedule to optimize their uptime
• Providing training for the people for sharing the technical know-how
• Ensuring 6S standards and managing Raw Material Unloading, Batch Plant, Furnace, Electro-static systems, & Float Bath.
• Implementing quality measures & safety standards and technological changes to enhance the operational efficiency
• Enabling modifications in equipment, process flow, working practices, consumables, and so on for controlling & reducing
conversion cost per unit produced
• Facilitating techniques for cycle time / cost reduction entailing identification of opportunities and analysis of data
• Minimizing redundant processes involved in the design & production and working towards value-addition
Highlights:
• Played a vital role in plant heating up & starting production in the plant by providing all mandatory & necessary mechanical
assistance.
• Successfully executed plant expansion / modification / upgradation projects such as providing EN 24 Chrome Coated Hydraulic
Cylinder for better wear resistance, in a critical process section
SUMIT GAUR
Mobile: +91-9711916587
E-Mail: sumit123.1986@gmail.com
Skills Set:
Mechanical Maintenance
Installation & Commissioning
Material/Spare Parts Planning
Project Management
Troubleshooting
Liaison & Coordination
Process Improvement
Training & Development
Reporting & Documentation
Testing & Inspections
Shift Operations
Team Management
Senior Level Assignments
Mechanical Maintenance ~ Project Management ~ Plant Operations
Over 8 years of experience in running successful method-oriented project and
maintenance operations and taking initiatives for business excellence through process
improvement.
Profile Snapshot
• Exhibits a strong and firm approach for sustaining / encouraging safe work environments
• Pivotal in starting of production with Saint Gobain India Pvt. Ltd. Bhiwadi Rajasthan.
• Led overall operations for executing projects within cost & time norms; participated in
project review meetings for evaluating project progress & de-bottlenecking
• Executed predictive, preventive, breakdown & shutdown maintenance schedules
(daily & turnaround) to prolong the life of equipment and conducted regular
inspection, repair & replacement of spare parts to control operations
• Managed end-to-end plant maintenance tasks from stage of conceptualization to
handover involving planning, procurement, execution, finalization of technical
specifications, vendor management & manpower planning
• Liaised with Maintenance Planning Group, Maintenance Department & management
and implemented Kaizen activities
• Possess excellent communication, analytical, organizational & problem solving skills
• Currently involved in designing & modifying a major Hydraulic System in raw material section
• Successful in reducing maintenance shutdown rate from 80% to 10% as well as saving maintenance costs by 80% through
effective roll-out of technical initiatives; such as re-designing & modifying the shafts of the gas operating valves
• Successfully designed & replaced the rubber rollers with Teflon rollers; and resolved a critical machine operation fault
• Escalated Overall Operating Efficiency (OEE) by 80% through measures such as re-designing of the counterweight of a conveyor
belt & arresting reverse-rotation of all the Centrifugal Blowers.
• Continuously improving the safety standards by designing and installing heavy duty chain lock; in counterweights of conveyor
belts; to eliminate probable human loss
• Accomplished successful installation of locally made Hardox Wear Resistant Liner Plates; instead of purchasing from original
supplier in Germany and was subsequently successful in achieving 75% process cost saving with enhanced production for plant.
• Recognized for increasing in-plant capability by 50% through effective maintenance; was appreciated for the same; by giving the first
prize for maximum number of implemented technical suggestions
3rd
Sep’07-29th
Jan’11 Jindal South West Steel Ltd., Bellary as Assistant Manager/ Shift In-charge
Role:
• Planned & effectuated predictive & preventive maintenance schedules of various equipment, spares & machinery in the Steel
Plant (Blast Furnaces & Corex Plants) for increasing their uptime and reliability
• Identified areas of obstruction & defects by conducting root cause analysis, failure mode & effect analysis to enhance
operational effectiveness
• Addressed occurrence of failures and dealt with stressful situations
• Managed material of Furnace, Water System, Slag Granulation Plant, Vertical bucket elevators, Hydraulics, Pneumatics and
Compressors (Screw, Centrifugal & Roots Blower)
• Evaluated vendor drawings & documents, piping layouts and inter-discipline drawings/ documents
• Monitored designs and fabricated Pipe Dustings, Tank, Vessels, Cones, Hoppers and Separators to ensure they were precise,
accurate, reproducible, fool-proof & specific to products
Education
2007 B.Tech. (Mechanical) from Shri Krishan Institute of Engineering & Technology, Kurukshetra University with 66.7%.
2003 XIIth from C.B.S.E Delhi with 81%.
2001 Xth from C.B.S.E Delhi with 81.8%.
Academic Project
• Design and Fabrication of Pneumatic Jack from Shri Krishan Institute of Engineering & Technology for 6 months
Trainings
• Denso India Ltd., Noida as College Trainee for 6 weeks in 2005
• Production of Maruti Parts (Alternators, Rotors, Regulators & other Engine Accessories) from Denso India Ltd., Noida in 2005
• UP Steels, Muzaffarnagar as College Trainee for 6 weeks in 2006
• Production of Turbines Runners from UP Steels, Muzaffarnagar in 2006
• JSW Steel Ltd. as GET (Graduate Engineer Trainee) in 2007
• Mechanical Maintenance from Saint Gobain Glass, Germany in 2011
Personal Details
Date of Birth: 28th
January 1986
Languages Known: Hindi, English, Punjabi, Kannada and Telugu
Address: House No. 1/5714-A, Street No. 17, Old Balbir Nagar, Shahdara, Delhi-110032

More Related Content

What's hot

Resume jaseem
Resume jaseemResume jaseem
Resume jaseemjaseem
 
Job description factory services engineer
Job description   factory services engineerJob description   factory services engineer
Job description factory services engineerBabatunde Sofoluwe
 
Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ finalScott Coombes
 
CamZoleta's Resume-Nov 2014
CamZoleta's Resume-Nov 2014CamZoleta's Resume-Nov 2014
CamZoleta's Resume-Nov 2014Cam Zoleta
 
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15Ian Carr SCMP, MCIPS
 
William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016Randy Kent
 
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
M. Obeidat- IPP3 Sr.Performance &  Efficiency engineerM. Obeidat- IPP3 Sr.Performance &  Efficiency engineer
M. Obeidat- IPP3 Sr.Performance & Efficiency engineerMohammed Obeidat, I.A
 
Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster Menezes
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resumeBrent Strahan
 
Storyboard_SPS_Payroll
Storyboard_SPS_PayrollStoryboard_SPS_Payroll
Storyboard_SPS_PayrollBalaguru SP
 

What's hot (19)

Resume jaseem
Resume jaseemResume jaseem
Resume jaseem
 
Resume of Srinivas
Resume of SrinivasResume of Srinivas
Resume of Srinivas
 
Resume_ Santosh Shewale
Resume_ Santosh ShewaleResume_ Santosh Shewale
Resume_ Santosh Shewale
 
Job description factory services engineer
Job description   factory services engineerJob description   factory services engineer
Job description factory services engineer
 
Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ final
 
CamZoleta's Resume-Nov 2014
CamZoleta's Resume-Nov 2014CamZoleta's Resume-Nov 2014
CamZoleta's Resume-Nov 2014
 
TEG(resume)
TEG(resume)TEG(resume)
TEG(resume)
 
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
 
William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016
 
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
M. Obeidat- IPP3 Sr.Performance &  Efficiency engineerM. Obeidat- IPP3 Sr.Performance &  Efficiency engineer
M. Obeidat- IPP3 Sr.Performance & Efficiency engineer
 
Resume 10_24_15
Resume 10_24_15Resume 10_24_15
Resume 10_24_15
 
Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical Engineer
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resume
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
Turbine maintenance
Turbine maintenanceTurbine maintenance
Turbine maintenance
 
Storyboard_SPS_Payroll
Storyboard_SPS_PayrollStoryboard_SPS_Payroll
Storyboard_SPS_Payroll
 
CV
CVCV
CV
 
Prashant__jcb
Prashant__jcbPrashant__jcb
Prashant__jcb
 
Resume
ResumeResume
Resume
 

Similar to SumitGaur_Resume

Similar to SumitGaur_Resume (20)

Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Resume
ResumeResume
Resume
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Anuraj Panicker
Anuraj PanickerAnuraj Panicker
Anuraj Panicker
 
Anuraj panicker
Anuraj panickerAnuraj panicker
Anuraj panicker
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
Tom Mikols Resume
Tom Mikols ResumeTom Mikols Resume
Tom Mikols Resume
 
vinayaktiwari (1)
vinayaktiwari (1)vinayaktiwari (1)
vinayaktiwari (1)
 
vikas goel
vikas goelvikas goel
vikas goel
 
vikas goel
vikas goelvikas goel
vikas goel
 
JackmcdowellCV
JackmcdowellCVJackmcdowellCV
JackmcdowellCV
 
CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5
 
Sudhanshu Final
Sudhanshu FinalSudhanshu Final
Sudhanshu Final
 
kashif( 23-2-15)
kashif( 23-2-15)kashif( 23-2-15)
kashif( 23-2-15)
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
 
Paul brayman chronological
Paul brayman chronologicalPaul brayman chronological
Paul brayman chronological
 
karthigairaj Process control andTechnical service resume
karthigairaj Process control andTechnical service resumekarthigairaj Process control andTechnical service resume
karthigairaj Process control andTechnical service resume
 

SumitGaur_Resume

  • 1. Organizational Experience Since 31st Jan’11 Saint Gobain India Pvt. Ltd., Bhiwadi as Functional Area In-charge (Mechanical Maintenance) Role: • Leading a team of 20 people • Preparing project schedules and monitoring projects with respect to cost, resource deployment, time over-runs & quality compliance to ensure timely execution of projects • Developing maintenance schedules for plant machinery, conducting periodic checks and documenting with a key focus on reducing delays & enhancing equipment uptime • Performing installation, commissioning & troubleshooting of: o Equipment such as Centrifugal Blowers, Hydraulic Systems, Belt Conveyors, bucket elevators, Chain Conveyors, gearboxes, compressors etc. o Involved in Hydraulic Systems of Material unloading, glass packing, with complete overhauling of hydraulic system. • Modifying & enhancing various machine drawings in process output. • Conducted structural erection of Furnace and Float Bath during project • Established mechanical machine shop from conceptualization till the installation of every machinery in the machine shop • Planning/arranging spares for all the equipment; adhering to the preventive maintenance schedule to optimize their uptime • Providing training for the people for sharing the technical know-how • Ensuring 6S standards and managing Raw Material Unloading, Batch Plant, Furnace, Electro-static systems, & Float Bath. • Implementing quality measures & safety standards and technological changes to enhance the operational efficiency • Enabling modifications in equipment, process flow, working practices, consumables, and so on for controlling & reducing conversion cost per unit produced • Facilitating techniques for cycle time / cost reduction entailing identification of opportunities and analysis of data • Minimizing redundant processes involved in the design & production and working towards value-addition Highlights: • Played a vital role in plant heating up & starting production in the plant by providing all mandatory & necessary mechanical assistance. • Successfully executed plant expansion / modification / upgradation projects such as providing EN 24 Chrome Coated Hydraulic Cylinder for better wear resistance, in a critical process section SUMIT GAUR Mobile: +91-9711916587 E-Mail: sumit123.1986@gmail.com Skills Set: Mechanical Maintenance Installation & Commissioning Material/Spare Parts Planning Project Management Troubleshooting Liaison & Coordination Process Improvement Training & Development Reporting & Documentation Testing & Inspections Shift Operations Team Management Senior Level Assignments Mechanical Maintenance ~ Project Management ~ Plant Operations Over 8 years of experience in running successful method-oriented project and maintenance operations and taking initiatives for business excellence through process improvement. Profile Snapshot • Exhibits a strong and firm approach for sustaining / encouraging safe work environments • Pivotal in starting of production with Saint Gobain India Pvt. Ltd. Bhiwadi Rajasthan. • Led overall operations for executing projects within cost & time norms; participated in project review meetings for evaluating project progress & de-bottlenecking • Executed predictive, preventive, breakdown & shutdown maintenance schedules (daily & turnaround) to prolong the life of equipment and conducted regular inspection, repair & replacement of spare parts to control operations • Managed end-to-end plant maintenance tasks from stage of conceptualization to handover involving planning, procurement, execution, finalization of technical specifications, vendor management & manpower planning • Liaised with Maintenance Planning Group, Maintenance Department & management and implemented Kaizen activities • Possess excellent communication, analytical, organizational & problem solving skills
  • 2. • Currently involved in designing & modifying a major Hydraulic System in raw material section • Successful in reducing maintenance shutdown rate from 80% to 10% as well as saving maintenance costs by 80% through effective roll-out of technical initiatives; such as re-designing & modifying the shafts of the gas operating valves • Successfully designed & replaced the rubber rollers with Teflon rollers; and resolved a critical machine operation fault • Escalated Overall Operating Efficiency (OEE) by 80% through measures such as re-designing of the counterweight of a conveyor belt & arresting reverse-rotation of all the Centrifugal Blowers. • Continuously improving the safety standards by designing and installing heavy duty chain lock; in counterweights of conveyor belts; to eliminate probable human loss • Accomplished successful installation of locally made Hardox Wear Resistant Liner Plates; instead of purchasing from original supplier in Germany and was subsequently successful in achieving 75% process cost saving with enhanced production for plant. • Recognized for increasing in-plant capability by 50% through effective maintenance; was appreciated for the same; by giving the first prize for maximum number of implemented technical suggestions 3rd Sep’07-29th Jan’11 Jindal South West Steel Ltd., Bellary as Assistant Manager/ Shift In-charge Role: • Planned & effectuated predictive & preventive maintenance schedules of various equipment, spares & machinery in the Steel Plant (Blast Furnaces & Corex Plants) for increasing their uptime and reliability • Identified areas of obstruction & defects by conducting root cause analysis, failure mode & effect analysis to enhance operational effectiveness • Addressed occurrence of failures and dealt with stressful situations • Managed material of Furnace, Water System, Slag Granulation Plant, Vertical bucket elevators, Hydraulics, Pneumatics and Compressors (Screw, Centrifugal & Roots Blower) • Evaluated vendor drawings & documents, piping layouts and inter-discipline drawings/ documents • Monitored designs and fabricated Pipe Dustings, Tank, Vessels, Cones, Hoppers and Separators to ensure they were precise, accurate, reproducible, fool-proof & specific to products Education 2007 B.Tech. (Mechanical) from Shri Krishan Institute of Engineering & Technology, Kurukshetra University with 66.7%. 2003 XIIth from C.B.S.E Delhi with 81%. 2001 Xth from C.B.S.E Delhi with 81.8%. Academic Project • Design and Fabrication of Pneumatic Jack from Shri Krishan Institute of Engineering & Technology for 6 months Trainings • Denso India Ltd., Noida as College Trainee for 6 weeks in 2005 • Production of Maruti Parts (Alternators, Rotors, Regulators & other Engine Accessories) from Denso India Ltd., Noida in 2005 • UP Steels, Muzaffarnagar as College Trainee for 6 weeks in 2006 • Production of Turbines Runners from UP Steels, Muzaffarnagar in 2006 • JSW Steel Ltd. as GET (Graduate Engineer Trainee) in 2007 • Mechanical Maintenance from Saint Gobain Glass, Germany in 2011 Personal Details Date of Birth: 28th January 1986 Languages Known: Hindi, English, Punjabi, Kannada and Telugu Address: House No. 1/5714-A, Street No. 17, Old Balbir Nagar, Shahdara, Delhi-110032