SlideShare a Scribd company logo
IBRAHIM AHMED
NTA OSOGBO, Oke-Pupa, Abere Osogbo. Osun State.
E-mail: ahmed2k7@yahoo.com Tel: 08059358988/08069658346
OBJECTIVE
To work in an innovative environmentwhere enlightenmentdominatesandhard work as well as diligence
is rewarded.
WORKING EXPERIENCEWITH DATES
TECHNICAL ENGINEER
NTA-STARTV NETWORK LTD. April, 2010 till date
Afribank house fatai Atere way, Lagos.
 Uplink and Downlink Signal through Vsat and Broadband day to day.
 Operation and Maintenance of Digital earth station
 Tracking of Satellite Station for Receiving of Television Signals
 Installation, Operation and Maintenance of TVRO
 Outside Broadcasting using DSNG
 Logging of Daily Operation
 Training of IT Students and New employer
 Installation and Maintenance of Transmitter
 Maintaining and analyzed Faults on both Server hardware and Software
Infrastructure.
 System Assembling and Installations
 Managing all Work Station on day to day
 Logging fault on day to day, Visit Sites and Customers System when
necessary
 Knowledge on Microsoft Package, Power Point, Access, Excel and other
 Networking ConceptTraining on Satellite Communication and Tracking of
Signal through Up Converter.
 Training on VSAT Installation and Engineering Broad Casting
 Training on how to use Micro Wave Link to Track Signal
 LAN Troubleshooting
 Maintenance of diesel engine generator
 Maintenance of UPS and inverter
 Supervision of the installation of 200 kVA Transformer.
 Supervision of the installation of 500 kVA Transformer.
OIL OPTION SERVICES LIMITED, 2008
17, Akande Adebeshin Street,
Mafoluku, Oshodi Lagos.
TransmissionEngineer(ETISALAT PROJECT, ONDO OSUN).
 Execute Troubleshooting and maintenance of Alcatel Evolium NEs (Running on B10 &
B11 SW Version) via LMT & OMC-R (A1353 & A9153).
 Execute Hardware & Software configuration of Evolium BTS A9100
 Commissioning & maintenance of Microwave Transmission Link [AWY 9400, MXC
9500 (HARRIS-STRATEX ECLIPSE), MPR 9500].
 E1 Capacity increase of LX/UX and AWY PDH Access Radios.
 Site Integration including Cross-connectionto the BSC.
 Planning and execution of cutovers on Microwave links.
 Perform Routine O & M procedures for Transmission Networks.
 Installation of Batteries as Back up to the electricity supply to BTS sites.
 Power Termination on DB and RBS.
 Installation and maintenance of radio frequency antenna e.g. Katherine, Andrew.
 Installation and maintenance of sectorial (BTS) antenna (900GSM & 1800DCS).
 Termination of RF feeders.
 Installation of Diplexers.
 Troubleshooting of RF installations.
 Carrying out of VSWR and DTF Test using VSWR Tester.
 Proficient use of VSWR tester, compass and inclinometer
 Maintenance of comprehensive records on Transmission links, RBS sites equipments and
spares for all sites within my assigned area.
 Implementation and supervision of network Transmission & RBS expansion/upgrade.
 React to emergency faults and ensure that all faults are rectified within the stipulated
MTTR.
National YouthService Corps (NYSC)
(As Instructor in computer training institute) (2007-2008)
On Microsoftoffice
Industrial Training (IT) Warri Refining and Petrochemical Company (WRPC)
A subsidiary of (NNPC) in Power Plant & Utilities (as external operator) (2005)
Operation and maintenance of Gas Turbine, Steam Turbine, Boiler, Compressors, AC and
DC motors.
EDUCATIONAL QUALIFICATIONS
 Bachelor of engineering B. Eng. (Electrical/Computer Engineering) Second class
Honors.
 Senior Secondary Certificate Examination (SSCE)
 FirstSchool Leaving Certificate (FSLC)
INSTITUTION ATTENDED WITH DATES
Federal University of Technology,Minna,Niger State. 2001-2006
Community High School, AyetoroGbedeKogiState. 1991-1996
A.U.D ILGEA Primary School, AyetoroGbedeKogiState 1986-1991
PERSONAL DATA
Sex: Male
Date of Birth: 21st
July 1983
Marital Status: Married
State of Origin: Kogi
REFEREES
AS REQUESTED.

More Related Content

What's hot

latest2
latest2latest2
latest2
Ahmad Hedib
 
BridgeX_SURVEY_solutions
BridgeX_SURVEY_solutionsBridgeX_SURVEY_solutions
BridgeX_SURVEY_solutions
Robert Asher
 
ACE Balmoria (11) (1) (1) (2)
ACE Balmoria (11) (1) (1) (2)ACE Balmoria (11) (1) (1) (2)
ACE Balmoria (11) (1) (1) (2)
Ace Balmoria
 
Maxtena Product Catalog 2014 Antenna Solutions
Maxtena Product Catalog 2014 Antenna SolutionsMaxtena Product Catalog 2014 Antenna Solutions
Maxtena Product Catalog 2014 Antenna Solutions
Maxtena
 
Pushing 100G to the packet edge
Pushing 100G to the packet edgePushing 100G to the packet edge
Pushing 100G to the packet edge
ADVA
 
Abdallah Al Sagheir Cv
Abdallah Al Sagheir CvAbdallah Al Sagheir Cv
Abdallah Al Sagheir Cv
abdallahelsagheir
 
Gary S SelfResume
Gary S SelfResumeGary S SelfResume
Gary S SelfResume
GARY SELF
 
Ensemble Fiber Director
Ensemble Fiber DirectorEnsemble Fiber Director
Ensemble Fiber Director
Vincent Sleiffer
 
jairus-hands-on-technical-experience
jairus-hands-on-technical-experiencejairus-hands-on-technical-experience
jairus-hands-on-technical-experience
Jairus Kagondu
 
Seamless growth from 1G to 10G services with the ADVA FSP 150-XG108 Series
Seamless growth from 1G to 10G services with the ADVA FSP 150-XG108 SeriesSeamless growth from 1G to 10G services with the ADVA FSP 150-XG108 Series
Seamless growth from 1G to 10G services with the ADVA FSP 150-XG108 Series
ADVA
 
Increasing the usable Ka band spectrum for satellite communications--the CoRa...
Increasing the usable Ka band spectrum for satellite communications--the CoRa...Increasing the usable Ka band spectrum for satellite communications--the CoRa...
Increasing the usable Ka band spectrum for satellite communications--the CoRa...
techUK
 
Quintel 8 foot 8 port press release feb 2013
Quintel 8 foot 8 port press release feb 2013Quintel 8 foot 8 port press release feb 2013
Quintel 8 foot 8 port press release feb 2013
Nick Walker
 
400G High Speed interconnect product guide
400G High Speed interconnect product guide 400G High Speed interconnect product guide
400G High Speed interconnect product guide
MITS Component & System Corp.
 
Quintel 8 Port Press Release Feb2012 Final Copy
Quintel 8 Port Press Release Feb2012  Final CopyQuintel 8 Port Press Release Feb2012  Final Copy
Quintel 8 Port Press Release Feb2012 Final Copy
Nick Walker
 
ajay
ajayajay
Mohammed Asif Mohammed Mustafa
Mohammed Asif Mohammed MustafaMohammed Asif Mohammed Mustafa
Mohammed Asif Mohammed Mustafa
Md Asif
 
AHCENE RESUME FINAL
AHCENE RESUME FINALAHCENE RESUME FINAL
AHCENE RESUME FINAL
Ahcene Boudjema
 
U.S - Turkey Smart Grid Workshop - Mehmet Karadeniz
U.S - Turkey Smart Grid Workshop - Mehmet KaradenizU.S - Turkey Smart Grid Workshop - Mehmet Karadeniz
U.S - Turkey Smart Grid Workshop - Mehmet Karadeniz
Elder
 
fehmi doğan (CV)
fehmi doğan (CV)fehmi doğan (CV)
fehmi doğan (CV)
Fehmi Doğan
 
Timing in the pits: GNSS in challenging locations
Timing in the pits: GNSS in challenging locationsTiming in the pits: GNSS in challenging locations
Timing in the pits: GNSS in challenging locations
ADVA
 

What's hot (20)

latest2
latest2latest2
latest2
 
BridgeX_SURVEY_solutions
BridgeX_SURVEY_solutionsBridgeX_SURVEY_solutions
BridgeX_SURVEY_solutions
 
ACE Balmoria (11) (1) (1) (2)
ACE Balmoria (11) (1) (1) (2)ACE Balmoria (11) (1) (1) (2)
ACE Balmoria (11) (1) (1) (2)
 
Maxtena Product Catalog 2014 Antenna Solutions
Maxtena Product Catalog 2014 Antenna SolutionsMaxtena Product Catalog 2014 Antenna Solutions
Maxtena Product Catalog 2014 Antenna Solutions
 
Pushing 100G to the packet edge
Pushing 100G to the packet edgePushing 100G to the packet edge
Pushing 100G to the packet edge
 
Abdallah Al Sagheir Cv
Abdallah Al Sagheir CvAbdallah Al Sagheir Cv
Abdallah Al Sagheir Cv
 
Gary S SelfResume
Gary S SelfResumeGary S SelfResume
Gary S SelfResume
 
Ensemble Fiber Director
Ensemble Fiber DirectorEnsemble Fiber Director
Ensemble Fiber Director
 
jairus-hands-on-technical-experience
jairus-hands-on-technical-experiencejairus-hands-on-technical-experience
jairus-hands-on-technical-experience
 
Seamless growth from 1G to 10G services with the ADVA FSP 150-XG108 Series
Seamless growth from 1G to 10G services with the ADVA FSP 150-XG108 SeriesSeamless growth from 1G to 10G services with the ADVA FSP 150-XG108 Series
Seamless growth from 1G to 10G services with the ADVA FSP 150-XG108 Series
 
Increasing the usable Ka band spectrum for satellite communications--the CoRa...
Increasing the usable Ka band spectrum for satellite communications--the CoRa...Increasing the usable Ka band spectrum for satellite communications--the CoRa...
Increasing the usable Ka band spectrum for satellite communications--the CoRa...
 
Quintel 8 foot 8 port press release feb 2013
Quintel 8 foot 8 port press release feb 2013Quintel 8 foot 8 port press release feb 2013
Quintel 8 foot 8 port press release feb 2013
 
400G High Speed interconnect product guide
400G High Speed interconnect product guide 400G High Speed interconnect product guide
400G High Speed interconnect product guide
 
Quintel 8 Port Press Release Feb2012 Final Copy
Quintel 8 Port Press Release Feb2012  Final CopyQuintel 8 Port Press Release Feb2012  Final Copy
Quintel 8 Port Press Release Feb2012 Final Copy
 
ajay
ajayajay
ajay
 
Mohammed Asif Mohammed Mustafa
Mohammed Asif Mohammed MustafaMohammed Asif Mohammed Mustafa
Mohammed Asif Mohammed Mustafa
 
AHCENE RESUME FINAL
AHCENE RESUME FINALAHCENE RESUME FINAL
AHCENE RESUME FINAL
 
U.S - Turkey Smart Grid Workshop - Mehmet Karadeniz
U.S - Turkey Smart Grid Workshop - Mehmet KaradenizU.S - Turkey Smart Grid Workshop - Mehmet Karadeniz
U.S - Turkey Smart Grid Workshop - Mehmet Karadeniz
 
fehmi doğan (CV)
fehmi doğan (CV)fehmi doğan (CV)
fehmi doğan (CV)
 
Timing in the pits: GNSS in challenging locations
Timing in the pits: GNSS in challenging locationsTiming in the pits: GNSS in challenging locations
Timing in the pits: GNSS in challenging locations
 

Viewers also liked

Digiray Complete Documentation Set
Digiray Complete Documentation SetDigiray Complete Documentation Set
Digiray Complete Documentation Set
Charlie Morris
 
همزیستی نیروگاه های سیکل ترکیبی مقیاس بزرگ و گلخانه
همزیستی نیروگاه های سیکل ترکیبی مقیاس بزرگ و گلخانههمزیستی نیروگاه های سیکل ترکیبی مقیاس بزرگ و گلخانه
همزیستی نیروگاه های سیکل ترکیبی مقیاس بزرگ و گلخانه
siavash ariannia
 
Journey of cev
Journey of cevJourney of cev
Conceptos geometricos
Conceptos geometricosConceptos geometricos
Conceptos geometricos
danielc09
 
Presentación calidad en el servicio
Presentación calidad en el servicioPresentación calidad en el servicio
Presentación calidad en el servicio
VianeyhernandezT
 
A PROJECT REPORT ON
A PROJECT REPORT ONA PROJECT REPORT ON
A PROJECT REPORT ON
Biswajeet Samal
 
Exitus 2016 - brief (september)
Exitus   2016 - brief (september)Exitus   2016 - brief (september)
Exitus 2016 - brief (september)
capservegroup
 
Emani retailing training
Emani retailing trainingEmani retailing training
Emani retailing training
Tiffany Nash
 
Mobility
MobilityMobility
Mobility
Vmoksha Admin
 
Actividad inicial grupo2071027
Actividad inicial grupo2071027Actividad inicial grupo2071027
Actividad inicial grupo2071027
mhernandezvargasamayacarranza
 
Www.braddock.net
Www.braddock.netWww.braddock.net
Www.braddock.net
braddock1
 

Viewers also liked (11)

Digiray Complete Documentation Set
Digiray Complete Documentation SetDigiray Complete Documentation Set
Digiray Complete Documentation Set
 
همزیستی نیروگاه های سیکل ترکیبی مقیاس بزرگ و گلخانه
همزیستی نیروگاه های سیکل ترکیبی مقیاس بزرگ و گلخانههمزیستی نیروگاه های سیکل ترکیبی مقیاس بزرگ و گلخانه
همزیستی نیروگاه های سیکل ترکیبی مقیاس بزرگ و گلخانه
 
Journey of cev
Journey of cevJourney of cev
Journey of cev
 
Conceptos geometricos
Conceptos geometricosConceptos geometricos
Conceptos geometricos
 
Presentación calidad en el servicio
Presentación calidad en el servicioPresentación calidad en el servicio
Presentación calidad en el servicio
 
A PROJECT REPORT ON
A PROJECT REPORT ONA PROJECT REPORT ON
A PROJECT REPORT ON
 
Exitus 2016 - brief (september)
Exitus   2016 - brief (september)Exitus   2016 - brief (september)
Exitus 2016 - brief (september)
 
Emani retailing training
Emani retailing trainingEmani retailing training
Emani retailing training
 
Mobility
MobilityMobility
Mobility
 
Actividad inicial grupo2071027
Actividad inicial grupo2071027Actividad inicial grupo2071027
Actividad inicial grupo2071027
 
Www.braddock.net
Www.braddock.netWww.braddock.net
Www.braddock.net
 

Similar to ENGR. IBRAHIM AHMED. MNSE

MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
Mazhar Ali
 
APAA SIMON AHUNGWA
APAA SIMON AHUNGWAAPAA SIMON AHUNGWA
APAA SIMON AHUNGWA
apaa simon
 
Mir Ahmed Raza
Mir Ahmed RazaMir Ahmed Raza
Mir Ahmed Raza
Mir Ahmed Raza
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNAN
GOPALA46
 
EMEA OJI. CV__
EMEA OJI. CV__EMEA OJI. CV__
EMEA OJI. CV__
Emea Oji
 
Resume from bhupathi ramu
Resume from bhupathi ramuResume from bhupathi ramu
Resume from bhupathi ramu
SriramBhupathi1
 
Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV
Rohit jaswal
 
resume_anjuln
resume_anjulnresume_anjuln
resume_anjuln
ANJUL N
 
Rahul resume.
Rahul resume.Rahul resume.
Rahul resume.
Rahul KUmar
 
Asif CV
Asif CVAsif CV
Asif CV
Muhammad asif
 
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
abdul jabbar
 
shriram2016
shriram2016shriram2016
shriram2016
shriram t.s
 
CV - Rashid
CV - RashidCV - Rashid
CV - Rashid
Rashid Kt
 
Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)
Nabeel Aslam
 
Modassar Resume
Modassar ResumeModassar Resume
Modassar Resume
Md Modassar56
 
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
Shabbir Hussain
 
Donald resume new
Donald resume newDonald resume new
Donald resume new
Don (Chris) Kane
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
Bashir Malik
 
CV Telecom
CV TelecomCV Telecom
CV Telecom
TOUSIF HUSSAIN
 
kamran cv updated
kamran cv updatedkamran cv updated
kamran cv updated
kamran alvi
 

Similar to ENGR. IBRAHIM AHMED. MNSE (20)

MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
APAA SIMON AHUNGWA
APAA SIMON AHUNGWAAPAA SIMON AHUNGWA
APAA SIMON AHUNGWA
 
Mir Ahmed Raza
Mir Ahmed RazaMir Ahmed Raza
Mir Ahmed Raza
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNAN
 
EMEA OJI. CV__
EMEA OJI. CV__EMEA OJI. CV__
EMEA OJI. CV__
 
Resume from bhupathi ramu
Resume from bhupathi ramuResume from bhupathi ramu
Resume from bhupathi ramu
 
Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV
 
resume_anjuln
resume_anjulnresume_anjuln
resume_anjuln
 
Rahul resume.
Rahul resume.Rahul resume.
Rahul resume.
 
Asif CV
Asif CVAsif CV
Asif CV
 
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
 
shriram2016
shriram2016shriram2016
shriram2016
 
CV - Rashid
CV - RashidCV - Rashid
CV - Rashid
 
Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)
 
Modassar Resume
Modassar ResumeModassar Resume
Modassar Resume
 
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
 
Donald resume new
Donald resume newDonald resume new
Donald resume new
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
CV Telecom
CV TelecomCV Telecom
CV Telecom
 
kamran cv updated
kamran cv updatedkamran cv updated
kamran cv updated
 

Recently uploaded

A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 

Recently uploaded (20)

A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 

ENGR. IBRAHIM AHMED. MNSE

  • 1. IBRAHIM AHMED NTA OSOGBO, Oke-Pupa, Abere Osogbo. Osun State. E-mail: ahmed2k7@yahoo.com Tel: 08059358988/08069658346 OBJECTIVE To work in an innovative environmentwhere enlightenmentdominatesandhard work as well as diligence is rewarded. WORKING EXPERIENCEWITH DATES TECHNICAL ENGINEER NTA-STARTV NETWORK LTD. April, 2010 till date Afribank house fatai Atere way, Lagos.  Uplink and Downlink Signal through Vsat and Broadband day to day.  Operation and Maintenance of Digital earth station  Tracking of Satellite Station for Receiving of Television Signals  Installation, Operation and Maintenance of TVRO  Outside Broadcasting using DSNG  Logging of Daily Operation  Training of IT Students and New employer  Installation and Maintenance of Transmitter  Maintaining and analyzed Faults on both Server hardware and Software Infrastructure.  System Assembling and Installations  Managing all Work Station on day to day  Logging fault on day to day, Visit Sites and Customers System when necessary  Knowledge on Microsoft Package, Power Point, Access, Excel and other  Networking ConceptTraining on Satellite Communication and Tracking of Signal through Up Converter.  Training on VSAT Installation and Engineering Broad Casting  Training on how to use Micro Wave Link to Track Signal  LAN Troubleshooting  Maintenance of diesel engine generator  Maintenance of UPS and inverter  Supervision of the installation of 200 kVA Transformer.  Supervision of the installation of 500 kVA Transformer.
  • 2. OIL OPTION SERVICES LIMITED, 2008 17, Akande Adebeshin Street, Mafoluku, Oshodi Lagos. TransmissionEngineer(ETISALAT PROJECT, ONDO OSUN).  Execute Troubleshooting and maintenance of Alcatel Evolium NEs (Running on B10 & B11 SW Version) via LMT & OMC-R (A1353 & A9153).  Execute Hardware & Software configuration of Evolium BTS A9100  Commissioning & maintenance of Microwave Transmission Link [AWY 9400, MXC 9500 (HARRIS-STRATEX ECLIPSE), MPR 9500].  E1 Capacity increase of LX/UX and AWY PDH Access Radios.  Site Integration including Cross-connectionto the BSC.  Planning and execution of cutovers on Microwave links.  Perform Routine O & M procedures for Transmission Networks.  Installation of Batteries as Back up to the electricity supply to BTS sites.  Power Termination on DB and RBS.  Installation and maintenance of radio frequency antenna e.g. Katherine, Andrew.  Installation and maintenance of sectorial (BTS) antenna (900GSM & 1800DCS).  Termination of RF feeders.  Installation of Diplexers.  Troubleshooting of RF installations.  Carrying out of VSWR and DTF Test using VSWR Tester.  Proficient use of VSWR tester, compass and inclinometer  Maintenance of comprehensive records on Transmission links, RBS sites equipments and spares for all sites within my assigned area.  Implementation and supervision of network Transmission & RBS expansion/upgrade.  React to emergency faults and ensure that all faults are rectified within the stipulated MTTR. National YouthService Corps (NYSC) (As Instructor in computer training institute) (2007-2008) On Microsoftoffice Industrial Training (IT) Warri Refining and Petrochemical Company (WRPC) A subsidiary of (NNPC) in Power Plant & Utilities (as external operator) (2005) Operation and maintenance of Gas Turbine, Steam Turbine, Boiler, Compressors, AC and DC motors.
  • 3. EDUCATIONAL QUALIFICATIONS  Bachelor of engineering B. Eng. (Electrical/Computer Engineering) Second class Honors.  Senior Secondary Certificate Examination (SSCE)  FirstSchool Leaving Certificate (FSLC) INSTITUTION ATTENDED WITH DATES Federal University of Technology,Minna,Niger State. 2001-2006 Community High School, AyetoroGbedeKogiState. 1991-1996 A.U.D ILGEA Primary School, AyetoroGbedeKogiState 1986-1991 PERSONAL DATA Sex: Male Date of Birth: 21st July 1983 Marital Status: Married State of Origin: Kogi REFEREES AS REQUESTED.