Mir Ahmed Raza
Riyadh) – Saudi Arabia | 00966-59-1440944 | mirahmedrazajee@gmail.com
Objective
To play a challenging and creative rolewith total commitmentand dedication inany given environment relevant
areas which suitmy profileand intend to build a career with leading corporate of hi-tech environment with
committed and dedicated people which will help me to explore myself fullyand realizemy potential willingto
work as a key player in challenging and creative environment. As a TransmissionEngineer.
·
Education
ELECTRICAL (ELECTRONICS) ENGINEERING (B.E.E), 73% |NOV 2001 -FEB 2006
· Major: GSM Communication Systems
· Antenna Radar and TV Power Electronics Related coursework:
· F.Sc. | Faculty of B.I.S. science C Abbott bad Pakistan.
· S.S.C, Secondary school certificate B.I.S.C Muzaffarabad Azad Kashmir.
Personal Details
Name: AHMED RAZA
Father's Name: Tariq Ahmed
Date of Birth: 15th September 1984
Nationality: Pakistani
Religion: Islam
Marital Status: Married
Iqama Status: SAUDI NETWORKERS SERVICE
Driving License: Valid SaudiDriving License
Language known: English, Arabic &Urdu
Certificate of Excellence in MCSE 2003
Certificate of Excellence in CISCO
Certificate of Excellence in A+ Hardware
Certificate of Excellence in Designing
Current Industry Telecom
Current Location (Riyadh) – SaudiArabia
Years of Experience 8 Year(s)
Preferred Work Location Any Arab Country
Page 2
Skills & Abilities
MANAGEMENT
Proven ability to manage with consistent results. Excellent organizational and analytical skills and the ability to lead
projects and get results. Adopts a systematic approachto problem solvingand effectivelyanalyze results andimplement
solutions. Dedicatedand committed, willingto take on challenging roles, tough assignments and work to tight deadlines.
Communication
Excellent communication skills teamed with the ability to develop rapport with employees and peers. Poised and
confident in dealing with individuals of all levels. Dedicated to building a highly motivated team aware of their role in
improving productivity and quality.
Leadership
Demonstratedproficiencyin handlingmultiple responsibilities and tasks simultaneouslyDemonstrated skills working ina
dynamic, fast pacedanddemanding environment Abilityto travel up to 10% of the time Fast learner - ableto grasp
concepts fromon-the-job trainingAbilityto work ina diverse multicultural environment.
Summary:
Experience of over 8 years as Engineer BSS/ Transmission (Microwave NEC, Traffic Node Minilink, HI CAP
Ercisson, NERA City Link, Interlink NERA Evolution , Marconi OMS & MDRS, Huawei RTN) NMS Applications
i.e. Netmaster , U2000 , PC-MG and Power (Emerson Networks, ZTE) experience on different BSC & BTS
(3GCDMA,GSM) Of Huawei, ZTE ,Ericsson. Involved in management and ins tallation, Commissioning,
Optimization i.e. drive test,Acceptance testing,monitoring & rectification of multifarious systemalarms of sites
connected with BSC .Good knowledge of newly emerging 3G technologies like WiMax & LTE
Specialties: MW Transmission Engineer
Experience:
Team lead Transmission PCE (Product Configuration Engineer)
Huawei STCUSF10&11 Project FROM NOVEMBER 2014 – TO DECEMBER 2015
· •Support and Supervise the configuration of STC Site.
•Responsible to do site configuration base on plan and design.
•Optimize the network design and configuration based on PO/contract, then output *.dB/BOM/BOQ files, which could
be in site model
• Convert *.dB/BOM/BOQ from Site Modelto Item Model which should be according to the Price List/Price Book
• Review *.dB/BOM/BOQ with all stakeholders from Solution Team/Project Team/Supply Chain
Responsible of complete of site configuration.
•Coordinate and provide technical support to other related department.
•Able to understand site solution, design and plan.
•Able to operator relate system, like: UniSTAR CFG for TransmissionOversea, CCM CC & CCM DC
•Create clear sales configuration on CFG system based on *.dB/Price Book in item model, then submit to CCM-CC system
•Publish clear sales configuration
·
Worked as Microwave Transmission Engineer (NOC)
MobilyMS Project FROM SEPTEMBER 2013 TO OCTOBER 2014
Page 3
· System: Ericsson-SOEM R8 SP2 (TN/HC/OMS) and NEC- PNMS.
· Provide Level 1 & 2 support to Field teams during outages and maintenance down times.
· Managed a network of 2000+ Ericsson and 300+ NEC Nodes with a team of FM engineers.
· Creation of Trouble Tickets and following up with the Field Teams for Troubleshooting.
· Creation of BB, RF Loops for Tracing and removal of Faults.
· BER Tests and Performance monitoring of Links for stability.
· Monitoring the MDT's for all the Microwave links including cut over, link upgrades and New Link Installations.
· Updating the Daily Reports and sending them to the customer.
· Managed a Network of 1600 RTN+512 Ericsson Nodes with a Field team of 12 Engineers. System: Ericsson-SoEM R8
SP2 (TN/HC/OMS),Huawei-iManager U2000 UNMS (RTN6XX/9XX/OSN1500)and NEC- PNMS.
· Experience of handling severalcritical outages within promised SLA. Provide alternate solutions to speed up fault
recovery.
· Address to capacity bottleneck issues raised by 2G/3G and provide solutions.
· Suggest link expansions by analyzing Microwave link utilizations.
· Add and Accept newlinks after verifying their performance.
· Reduce outage risks by creating preventive maintenance schedules for clearing alarms.
· Assign Field teams for issues and take follow ups in trackers.
· Upgrade nodes to latest software baseline recommended by RND.
Worked as Transmission Engineer
Huawei Zain MS Project FROM AUGUST 2011 – TO AUGUST 2013
· L1 & L2 Support to NOC as required for troubleshooting of network performance/Alarms issues.
· Provide 2nd levelsupport for CISCO & NEC MUXs TE/CX/C-Node/V-Node/U-Node.
· Fault finding and trouble shooting skills in U2000,T2000 H/W.Handling issues on network from NMS.
· Handling problem both related to Microwave and Optical transmission. Trouble shooting problems related to Huawei
RTN 910/950/980,NEC Microwave Paso-link NEO/Standard,IPASO Nodal solutions.
· Extensive Experience of Operation and Maintenance of Huawei Nodes Metro Series 1050/3000,NG-SDHseries OSN
1500/OSN 2500/OSN 3500/OSN 7500/OSN 9500,NG-WDM Series BWS1600Gand OTN Series OTN-6800/8800.
· Fault handling skills in U2000,T2000 &M2000.
· Integration and testing newly installed Nodes of SDH & DWDM.
· Expert skill areas are Optical network support,trouble shooting, Integration, project management,people management.
· Experience of Operation and Maintenance of Huawei Nodes MetroSeries 1050/3000,NG-SDHseries OSN 1500/OSN
2500/OSN 3500/OSN 7500/OSN 9500,OSN 6800/OSN8800,NG-WDM Series BWS1600Gand
Integration and testing newly installed Nodes of SDH & DWDM.
· Software Up gradation of OSN2500,OSN3500,OSN7500 and OSN9500 using Toolkit by simulation package and board
by board upgradation.
· Expert skill areas are Optical &MW network support, trouble shooting, Integration, project management,people
management and consultancy.
· Experienced in O & M, technicalSupport, Installation, Integration,HW testing, Troubleshooting, Commissioning, SDH
Service Grooming, Protection Configuration,externalalarms handling,Node replacement,and Disaster recovery of NEC
& Huawei MW, SDH, and OTN.
· Certified to provide 2nd levelsupport for NEC Nodal Solution IPASO 200/400 and IPASO 1000.
· Second level support to solve the issues of 2G, 3G and LTE transmission Network.
· Planning and implementing the solutions to improve all the KPI's of the Network.
· Providing L2 support to FO and FLM Team to solve the problems in time and to maintain the service SLA.
Page 4
· Working on CISCO,Huawei & NEC MUXs TE/CX/C-Node/V-Node/U-Node.Maintain Spare Parts inventory for the
Network.
· Assist Arabic TAG and GTAG to solve the critical issues. Responsible for Microwave and Optical fiber transmission
Network.
· Coordinate with 2G, 3Gand LTE team to diagnose the root cause of the problem.
· I have capability to handle transmission SDHand PDH from NSN equipment’s.
· Knowing LTE Technology Handle execution newNetwork Integration for Inmost Project SDH & PDHBack Bone as
commissioning Engineer and Team Leader for many areas in Indonesia.Equipment type: hiT7070 series, SMA Series,
and All Siemens Microwave product e.g. SRA4, SRal, SRT1F, SRT1C, CTR190, CTR210.Maintenance same on over 100
Mux’s.
IGTL WORKED AS A O&M TEAM LEADER
Huawei STCProject inWesternRegion. SEPTEMBER 2008 TO (JULY 2011).
· Trouble shooting of NEC, RTN 650,900,920 &950 M/W links. And Huawei 2Gand 3G BTS.
· Complete the PMRschedule on time by using Black berry WFMS system.
· Installation and Integration of BTS 3900,3012,3812,NODEB3900 in Tabukregion.
· Follow up the operation teams for trouble shooting of sites. Monitoring of system and alarm removing.
· Complete many work orders and Outage activities STC sites Operation and maintenance of NEC microwave system.
Commissioning and troubleshooting of NEC microwave system.
· Use side master to check GSM problem like VSWR. Doing commission new equipment’s and newsides. Work at NEC link
microwave system for STC sites.
· Pnmt Software installation and dialup connection.
· Commissioning and troubleshooting of NEC microwave system. Media patching at C-Node and MDF for STC sites.
· Use BER Tester for media checking at sites.
ZJPTCC K.S.A Co (Subcontractorof Huawei)
Transmissionengineer (OCTOBER 2007 TO SEPTEMBER 2008)
· Worked as Transmission engineer on Huawei, and Ericsson Products as a maintenance engineer for the following
operators in the KSA(MOBILY, and STC).
· Worked on OSN 1500,2500,3500,9500
· Configuration, Commissioning and testing of equipment (using T2000) Performed PATS of more than 60 sites in
different regions of KSA Performed MDTS successfully handling all kinds of issues
· Efficient use of analyzer, Bert meter and power meter.
· Testing and troubleshooting of all kinds of fibers from single mode To multimode fiber patching and troubleshooting of
E1
· Passive optical network technology (B-PON).Asymmetric digital subscriber line (A-DSL) Co-location and jump ring D-
SLAM
· Optical distribution frame (ODF) Optical network terminal (ONT)
· Optical time domain reflective meter (OTDR)
· WDM & PON splitter.
· Splicing & testing of multi & single fiber (Fujimori) Site integration & Troubleshooting
· Execute Quality Inspection of Site before hand over to customer. PAT of Sites & minimum criteria before integration
· Supervision of Installation RBS (2116,2216,2106,2107,2206,2207)Cable testing VSWR& DTP, TEMS Testing
· Antenna Sweep Testing using Anritsu Site Master. Installation & Alignment of Microwave Links (0.3,0.6, 1.2, 1.8)
· Installation Microwave Equipment ClassicNode & Traffic Node Raping of data cables and all so dogging
Page 5
· Laying of data cables and Fibers cables
· Diversion of old connection Installation of the whole side of STM.
· Working on Transmission of Traffic Node, Installation of the whole side of STM. Installation of tack blocks and strips.
· Making of all types of connectors of Feeder cable, IF Cable,Signal Cables,PCM Cables, and Installation of indoor jumpers.
· Configuration of Mini Link MMU Cards Classic / Traffic Node by using of MSM Mini Link Service Manager Software
(MSM).
· Externalalarm cable (DF and BAT Box) and El Patching in Crone.Equipment testing including BBS, Elclearance, Local
Loop Testing Making all types of DC Connectors.
· Installation of Battery Bank System (BBS).
· Perform Commissioning, Configuration &Integration of Transmission Equipment’s.Perform Commissioning,
Configuration &Integration of ISAM equipment of Huawei.. Knowledge in Troubleshooting of all Huaweiequipment’s.
· Knowledge of power systems.
· Knowledge of configuring IP, gateway, ports and Vlan Id.performs all Tests for the PAT.
· Installing & Commissioning MSAN indoor and outdoor equipment’s.Punching of E1 and alarm cables.
· Quality Checkand Clearing of Oils before Pat. Preparing the PAT document.
· Continuity checking and checking of Browsing in MDF. Knowledge in CWO and use of optic fibers.
· Preparing floor plan and NCD Conducting of synchronization test.
· Testing of all LT cards and SHDSL cards of Alcatel lucent. Testing all Optic Fiber components.
· Checking Dark fiber connectivity.
Test Equipment’s
Digital/Analog Millimeters
Bert Analyzer (ANT-20), Optical power meters
DWDMAnalyzer (OSA)
Oscilloscope
LANGUAGES
Urdu Native
English Fluent
Arabic Working knowledge
ACHIEVEMENTS.
· Best reputed as professional engineer wherever worked.
· Grade A throughout whole educational career.
· Good engineering knowledge,
· Got medals as player of football, cricket and athletics.
· Have credibility’s of managing tours, tournaments and ceremonies during the Education Career.
Thanks Best Regards
MIR AHMED RAZA

Mir Ahmed Raza

  • 1.
    Mir Ahmed Raza Riyadh)– Saudi Arabia | 00966-59-1440944 | mirahmedrazajee@gmail.com Objective To play a challenging and creative rolewith total commitmentand dedication inany given environment relevant areas which suitmy profileand intend to build a career with leading corporate of hi-tech environment with committed and dedicated people which will help me to explore myself fullyand realizemy potential willingto work as a key player in challenging and creative environment. As a TransmissionEngineer. · Education ELECTRICAL (ELECTRONICS) ENGINEERING (B.E.E), 73% |NOV 2001 -FEB 2006 · Major: GSM Communication Systems · Antenna Radar and TV Power Electronics Related coursework: · F.Sc. | Faculty of B.I.S. science C Abbott bad Pakistan. · S.S.C, Secondary school certificate B.I.S.C Muzaffarabad Azad Kashmir. Personal Details Name: AHMED RAZA Father's Name: Tariq Ahmed Date of Birth: 15th September 1984 Nationality: Pakistani Religion: Islam Marital Status: Married Iqama Status: SAUDI NETWORKERS SERVICE Driving License: Valid SaudiDriving License Language known: English, Arabic &Urdu Certificate of Excellence in MCSE 2003 Certificate of Excellence in CISCO Certificate of Excellence in A+ Hardware Certificate of Excellence in Designing Current Industry Telecom Current Location (Riyadh) – SaudiArabia Years of Experience 8 Year(s) Preferred Work Location Any Arab Country
  • 2.
    Page 2 Skills &Abilities MANAGEMENT Proven ability to manage with consistent results. Excellent organizational and analytical skills and the ability to lead projects and get results. Adopts a systematic approachto problem solvingand effectivelyanalyze results andimplement solutions. Dedicatedand committed, willingto take on challenging roles, tough assignments and work to tight deadlines. Communication Excellent communication skills teamed with the ability to develop rapport with employees and peers. Poised and confident in dealing with individuals of all levels. Dedicated to building a highly motivated team aware of their role in improving productivity and quality. Leadership Demonstratedproficiencyin handlingmultiple responsibilities and tasks simultaneouslyDemonstrated skills working ina dynamic, fast pacedanddemanding environment Abilityto travel up to 10% of the time Fast learner - ableto grasp concepts fromon-the-job trainingAbilityto work ina diverse multicultural environment. Summary: Experience of over 8 years as Engineer BSS/ Transmission (Microwave NEC, Traffic Node Minilink, HI CAP Ercisson, NERA City Link, Interlink NERA Evolution , Marconi OMS & MDRS, Huawei RTN) NMS Applications i.e. Netmaster , U2000 , PC-MG and Power (Emerson Networks, ZTE) experience on different BSC & BTS (3GCDMA,GSM) Of Huawei, ZTE ,Ericsson. Involved in management and ins tallation, Commissioning, Optimization i.e. drive test,Acceptance testing,monitoring & rectification of multifarious systemalarms of sites connected with BSC .Good knowledge of newly emerging 3G technologies like WiMax & LTE Specialties: MW Transmission Engineer Experience: Team lead Transmission PCE (Product Configuration Engineer) Huawei STCUSF10&11 Project FROM NOVEMBER 2014 – TO DECEMBER 2015 · •Support and Supervise the configuration of STC Site. •Responsible to do site configuration base on plan and design. •Optimize the network design and configuration based on PO/contract, then output *.dB/BOM/BOQ files, which could be in site model • Convert *.dB/BOM/BOQ from Site Modelto Item Model which should be according to the Price List/Price Book • Review *.dB/BOM/BOQ with all stakeholders from Solution Team/Project Team/Supply Chain Responsible of complete of site configuration. •Coordinate and provide technical support to other related department. •Able to understand site solution, design and plan. •Able to operator relate system, like: UniSTAR CFG for TransmissionOversea, CCM CC & CCM DC •Create clear sales configuration on CFG system based on *.dB/Price Book in item model, then submit to CCM-CC system •Publish clear sales configuration · Worked as Microwave Transmission Engineer (NOC) MobilyMS Project FROM SEPTEMBER 2013 TO OCTOBER 2014
  • 3.
    Page 3 · System:Ericsson-SOEM R8 SP2 (TN/HC/OMS) and NEC- PNMS. · Provide Level 1 & 2 support to Field teams during outages and maintenance down times. · Managed a network of 2000+ Ericsson and 300+ NEC Nodes with a team of FM engineers. · Creation of Trouble Tickets and following up with the Field Teams for Troubleshooting. · Creation of BB, RF Loops for Tracing and removal of Faults. · BER Tests and Performance monitoring of Links for stability. · Monitoring the MDT's for all the Microwave links including cut over, link upgrades and New Link Installations. · Updating the Daily Reports and sending them to the customer. · Managed a Network of 1600 RTN+512 Ericsson Nodes with a Field team of 12 Engineers. System: Ericsson-SoEM R8 SP2 (TN/HC/OMS),Huawei-iManager U2000 UNMS (RTN6XX/9XX/OSN1500)and NEC- PNMS. · Experience of handling severalcritical outages within promised SLA. Provide alternate solutions to speed up fault recovery. · Address to capacity bottleneck issues raised by 2G/3G and provide solutions. · Suggest link expansions by analyzing Microwave link utilizations. · Add and Accept newlinks after verifying their performance. · Reduce outage risks by creating preventive maintenance schedules for clearing alarms. · Assign Field teams for issues and take follow ups in trackers. · Upgrade nodes to latest software baseline recommended by RND. Worked as Transmission Engineer Huawei Zain MS Project FROM AUGUST 2011 – TO AUGUST 2013 · L1 & L2 Support to NOC as required for troubleshooting of network performance/Alarms issues. · Provide 2nd levelsupport for CISCO & NEC MUXs TE/CX/C-Node/V-Node/U-Node. · Fault finding and trouble shooting skills in U2000,T2000 H/W.Handling issues on network from NMS. · Handling problem both related to Microwave and Optical transmission. Trouble shooting problems related to Huawei RTN 910/950/980,NEC Microwave Paso-link NEO/Standard,IPASO Nodal solutions. · Extensive Experience of Operation and Maintenance of Huawei Nodes Metro Series 1050/3000,NG-SDHseries OSN 1500/OSN 2500/OSN 3500/OSN 7500/OSN 9500,NG-WDM Series BWS1600Gand OTN Series OTN-6800/8800. · Fault handling skills in U2000,T2000 &M2000. · Integration and testing newly installed Nodes of SDH & DWDM. · Expert skill areas are Optical network support,trouble shooting, Integration, project management,people management. · Experience of Operation and Maintenance of Huawei Nodes MetroSeries 1050/3000,NG-SDHseries OSN 1500/OSN 2500/OSN 3500/OSN 7500/OSN 9500,OSN 6800/OSN8800,NG-WDM Series BWS1600Gand Integration and testing newly installed Nodes of SDH & DWDM. · Software Up gradation of OSN2500,OSN3500,OSN7500 and OSN9500 using Toolkit by simulation package and board by board upgradation. · Expert skill areas are Optical &MW network support, trouble shooting, Integration, project management,people management and consultancy. · Experienced in O & M, technicalSupport, Installation, Integration,HW testing, Troubleshooting, Commissioning, SDH Service Grooming, Protection Configuration,externalalarms handling,Node replacement,and Disaster recovery of NEC & Huawei MW, SDH, and OTN. · Certified to provide 2nd levelsupport for NEC Nodal Solution IPASO 200/400 and IPASO 1000. · Second level support to solve the issues of 2G, 3G and LTE transmission Network. · Planning and implementing the solutions to improve all the KPI's of the Network. · Providing L2 support to FO and FLM Team to solve the problems in time and to maintain the service SLA.
  • 4.
    Page 4 · Workingon CISCO,Huawei & NEC MUXs TE/CX/C-Node/V-Node/U-Node.Maintain Spare Parts inventory for the Network. · Assist Arabic TAG and GTAG to solve the critical issues. Responsible for Microwave and Optical fiber transmission Network. · Coordinate with 2G, 3Gand LTE team to diagnose the root cause of the problem. · I have capability to handle transmission SDHand PDH from NSN equipment’s. · Knowing LTE Technology Handle execution newNetwork Integration for Inmost Project SDH & PDHBack Bone as commissioning Engineer and Team Leader for many areas in Indonesia.Equipment type: hiT7070 series, SMA Series, and All Siemens Microwave product e.g. SRA4, SRal, SRT1F, SRT1C, CTR190, CTR210.Maintenance same on over 100 Mux’s. IGTL WORKED AS A O&M TEAM LEADER Huawei STCProject inWesternRegion. SEPTEMBER 2008 TO (JULY 2011). · Trouble shooting of NEC, RTN 650,900,920 &950 M/W links. And Huawei 2Gand 3G BTS. · Complete the PMRschedule on time by using Black berry WFMS system. · Installation and Integration of BTS 3900,3012,3812,NODEB3900 in Tabukregion. · Follow up the operation teams for trouble shooting of sites. Monitoring of system and alarm removing. · Complete many work orders and Outage activities STC sites Operation and maintenance of NEC microwave system. Commissioning and troubleshooting of NEC microwave system. · Use side master to check GSM problem like VSWR. Doing commission new equipment’s and newsides. Work at NEC link microwave system for STC sites. · Pnmt Software installation and dialup connection. · Commissioning and troubleshooting of NEC microwave system. Media patching at C-Node and MDF for STC sites. · Use BER Tester for media checking at sites. ZJPTCC K.S.A Co (Subcontractorof Huawei) Transmissionengineer (OCTOBER 2007 TO SEPTEMBER 2008) · Worked as Transmission engineer on Huawei, and Ericsson Products as a maintenance engineer for the following operators in the KSA(MOBILY, and STC). · Worked on OSN 1500,2500,3500,9500 · Configuration, Commissioning and testing of equipment (using T2000) Performed PATS of more than 60 sites in different regions of KSA Performed MDTS successfully handling all kinds of issues · Efficient use of analyzer, Bert meter and power meter. · Testing and troubleshooting of all kinds of fibers from single mode To multimode fiber patching and troubleshooting of E1 · Passive optical network technology (B-PON).Asymmetric digital subscriber line (A-DSL) Co-location and jump ring D- SLAM · Optical distribution frame (ODF) Optical network terminal (ONT) · Optical time domain reflective meter (OTDR) · WDM & PON splitter. · Splicing & testing of multi & single fiber (Fujimori) Site integration & Troubleshooting · Execute Quality Inspection of Site before hand over to customer. PAT of Sites & minimum criteria before integration · Supervision of Installation RBS (2116,2216,2106,2107,2206,2207)Cable testing VSWR& DTP, TEMS Testing · Antenna Sweep Testing using Anritsu Site Master. Installation & Alignment of Microwave Links (0.3,0.6, 1.2, 1.8) · Installation Microwave Equipment ClassicNode & Traffic Node Raping of data cables and all so dogging
  • 5.
    Page 5 · Layingof data cables and Fibers cables · Diversion of old connection Installation of the whole side of STM. · Working on Transmission of Traffic Node, Installation of the whole side of STM. Installation of tack blocks and strips. · Making of all types of connectors of Feeder cable, IF Cable,Signal Cables,PCM Cables, and Installation of indoor jumpers. · Configuration of Mini Link MMU Cards Classic / Traffic Node by using of MSM Mini Link Service Manager Software (MSM). · Externalalarm cable (DF and BAT Box) and El Patching in Crone.Equipment testing including BBS, Elclearance, Local Loop Testing Making all types of DC Connectors. · Installation of Battery Bank System (BBS). · Perform Commissioning, Configuration &Integration of Transmission Equipment’s.Perform Commissioning, Configuration &Integration of ISAM equipment of Huawei.. Knowledge in Troubleshooting of all Huaweiequipment’s. · Knowledge of power systems. · Knowledge of configuring IP, gateway, ports and Vlan Id.performs all Tests for the PAT. · Installing & Commissioning MSAN indoor and outdoor equipment’s.Punching of E1 and alarm cables. · Quality Checkand Clearing of Oils before Pat. Preparing the PAT document. · Continuity checking and checking of Browsing in MDF. Knowledge in CWO and use of optic fibers. · Preparing floor plan and NCD Conducting of synchronization test. · Testing of all LT cards and SHDSL cards of Alcatel lucent. Testing all Optic Fiber components. · Checking Dark fiber connectivity. Test Equipment’s Digital/Analog Millimeters Bert Analyzer (ANT-20), Optical power meters DWDMAnalyzer (OSA) Oscilloscope LANGUAGES Urdu Native English Fluent Arabic Working knowledge ACHIEVEMENTS. · Best reputed as professional engineer wherever worked. · Grade A throughout whole educational career. · Good engineering knowledge, · Got medals as player of football, cricket and athletics. · Have credibility’s of managing tours, tournaments and ceremonies during the Education Career. Thanks Best Regards MIR AHMED RAZA