SlideShare a Scribd company logo
1 of 7
APAA SIMON AHUNGWA
NO 9 Madam Meg Shegbe Otene Str University View
Estate Alasia Lekki Epe Express Way Lagos State
PERSONAL DATA
DATE OF BIRTH: 25th
March 1983
PLACE OF BIRTH: Gboko, Benue State
NATIONALITY: Nigerian
SEX: Male
STATE OF ORIGIN: Benue
RELIGION: Christian
LOCAL GOVT. AREA: Konshisha
MARITAL STATUS: Single
PHONE NO.: 08037606784, 08027829312
E-MAIL: apaasimon@yahoo.com
OBJECTIVE
In pursuit of a challenging and rewarding environment to apply my professional skills with the aim of
making proficient contribution to the organisational goals.
Proactive, performance-driven professional progressive expertise in leadership and problem solving
services, and startup operations. Keen understanding of business priorities, genuine team player
committed to managing operations and projects flawlessly. Cross-functional communicator easily
interfaces with high-profile staff, vendors, and customers. Versatile, innovative, and loyal management
professional able to see the “big picture” while staying on top of all the details. Recognized for consistent
performance.
Research
Final Year Project-I design Super Regenerative Radio Receiver Used 20 MHz
EDUCATION BACKGROUND
Federal University of Technology Minna
B.Sc (B.Tech) Physics/Electronics 2004 - 2009
TILLEY GYADO COLLEGE IHUGH
(WASSCE) Benue State 2000 - 2001
Govt. Secondary School
(Korinya) Benue State 1997 -1998
MBAVAA Community Secondary School
(AMUA) Benue State 1994 - 1997
N.K.S.T PRIMARY SCHOOL GANDE
(FSLC) Benue State 1987 - 1993
WORKING EXPERIENCE
LMN Ericsson Nig. Ltd:
BSC Engineering
LMN Ericsson Nig. Ltd:
Team lead IBS (INBUILDING SOLUTION AIRTEL)
Configuration of the Traffic path on I.P. (Internet protocol) through the Minilinks (SITE INTEGRATION
UNIT).
Configuration of the 2G 3G node on I.P.
Cell on Wheels deployment (COW).
upgrade (MTN) project
Upgrade of the 2G physical installation and configuration
Upgrade of the 3G physical installation and configuration
Operation and maintenance of Nodes
Team lead FY13 (MTN) Project
Integration of 2g and 3g nodes
Supervision of Node installation equipments
Supervision of civil works
Supervision of power systems
ATP (Acceptance test protocol)
Modernization Project (Ericsson Rbs 6000 support for 2G and 3G)
- Hardware Configuration of 2G cabinets with new equipment, Dug and Rus.
- Hardware Configuration of 3G cabinets with Duw and Rus.
- Cross connectivity of Pulse Code Modulation (P.C.M) (E1).
- Software setup and configuration of 2G Rbs.
- Script configuration of 3G Rbs.
- Supervision of installation of cabinet on site.
- Trunked of power cables.
- Re-connection of power Dc to DC converter for 24 to 48 volts.
- Re- positioning of cabinet on site.
- Commissioning of Rbs on-air.
- Quality of transmission and availability (alarm clearing and optimization).
- Upgrading to higher configuration on the 2G network (increasing capacity Support).
LMN Ericsson Nig. Ltd:
JUNE 2014 – AUGUST 2014
3G INTEGRATION/SUPERVISION (MTN PROJECT NIGERIA)
Node B (3G) Integration 6000 series
Traffic Node Integration and troubleshooting (ATM/IP Configuration)
Site Supervisions and Integration
Supervising the Installation done by the ASP
Making sure the ASP get the materials needed to complete the installation on time
3G integration and troubleshooting
Transmission configuration and troubleshooting (ATM/IP)
Making sure day to day activities are closed and report sent to the appropriate person.
Performing ATP with customer
Giving the ASP support to complete the installation as soon as possible
LMN Ericsson Nigeria.
1391 Tiamiyu Savage Victoria Island Lagos State Nigeria.
Project June 2011 till July 2012
RBS 2G/3G SIU Integrator Engineer (IPRAN MTN / AIRTEL Project Nigeria)
3G/WCDMA technology (P4) roll out
WCDMAAlarms monitoring and Performance information to identify faults.
Perform software updates, Loading necessary scripts to integrate sites
Technical site surveys and inspection
Troubleshooting of Ericsson RBS faults
Antenna swap-out & performing sweep test on sectorial antennas
On site integration of 2G Cabinets, RBS 2216/ 2206 /2116 etc
On site configuration & troubleshooting of 2G Cabinets using OMT.
On site integration of NODE B cabinets, RBS6201/6102/6601/3116/3216 etc
On site troubleshooting of NODE B using EMAS/Ericsson Moshell
Migration of ATM base RBS to IP base RBS, 3G/2G
Integration, testing and troubleshooting of SIU-02
Upgrade 3G node with upgrade package
Replacing and Restoring DUW/CBU configuration using a backup or basic CV for NODE B (RBS
6000/3000)
Perform Connectivity Test for Element Manager Telnet Connection and Serial Connection for 3G.
Performing test on DUW, RUW, CBU, RAX/TX boards and Auxiliary units using Element Manager
Reloading of NODE B on the event of corrupt CV
LM Ericsson Nigeria.
17 Water Carrington Crescent Victoria Island Lagos State Nigeria.
3G Node B Airtel Roll out (1,310 Cabinets) (6102, 6201, 6101, 6601)
Oct. 2011 – June 2012
Team Lead AIRTEL 3G Node B Integration, Abuja (6000 cabinet)
Duties:
License file loading for all RBS3000/6000
Integration and commissioning of 6000 cabinet (6101,6102.6201and 6601)
CCR tool for CCR preparation, modification and script Modification/troubleshooting of issues.
site audits and quality control for Node B, correct snag list before ATP process.
Assist Back Office during upgrade process such as software, hardware and all activity involved in 3G
Airtel network.
Site inspection during the installation process, working closely with sub-contractors to ensure installation
process is according to Ericsson Mentoring of young local engineers in trouble shooting RBS3000/6000
Troubleshoot and Maintenance of RBS 3000/6000 series
Troubleshoot and Maintenance of Ericsson Traffic Node
Alarm tracing and fixing of faults on site
Knowledge transfer to student engineers to enable them trouble RBS3000/6000
Provide remote and on-site support to trainee engineers
Ability to use site master for sweep test
Liaising with ISM contractors to ensure Power is available at all times on site
Request and process spare release from warehouse to correct hardware faults on site
Re-integration and upgrade of Ericsson Node Bs from P5 to P6 to P7 and W10.
Ensuring target KPIs set by management are met.
Work closely with Front Office Surveillance to clear alarms, update and close trouble tickets.
Perform standard.
Integration & commissioning of new Nodes, loading of site scripts such as OAM
Transmission DCN for Minilink TN.
Backplane cross-connection of transmission link between modules (such as MMUs, LTU and NPU) in the
Minilink Traffic Nodes (TN) Access Module Magazine.
Scheduling Preventive maintenance for RBS 2000 and 3000 series.
Creation of daily and weekly report to management via Excel worksheet
LM Ericsson Nigeria.
17 Water Carrington Crescent Victoria Island Lagos State Nigeria.
WRAN troubleshooting for Ericsson (MS) (AIRTEL NIGERIA) 3216 and 3206
June 2011-August 2011
Duties:
Troubleshooting and fixing fault
Clearing of alarms and scratching of node
CCR tool for CCR preparation, modification and script Modification of NODE B/troubleshooting of
issues.
Integration of new Node 3000 series (3210 and 3206)
Checking of alarm log and liaising with the RNC to fix fault
LMN Ericsson Nigeria.
17 Water Carrington Crescent Victoria Island Lagos State Nigeria.
RBS 2000 and 6000 series (2G) Roll Out Integration Engr for Airtel Nigeria
JUNE 2010 to JUNE 2011
Duties:
RBS integration both 2206, 2216, 2216v2, 2207, 3000 and 6000 series
RBS 2000 series DRU”S and cabinet expansion, building and supervision of new Sites for Airtel network
Installation and commissioning of 500 RBS 6102 to expand the network
Installation and integrations of 2G 2206,2216,2207,2116,2216v2
Clearing alarm and maintenance of 2G site
Cabinet expansion (CABEX) on 2G cabinet
Cross connection for 2G integration.
CCR tool for CCR preparation, modification and script Modification/troubleshooting fault.
Supervision of ASPs on site to ensure proper installation and integration of RBS6102
Pick up of required hardware from ware house and deployment on site
Swap out of RBS 3000 with RBS 6000
Switch in configuration between 2/2/2 to 4/4/4 to 8/8/8 to 12+12+12
On site configuration of SIU to aggregates all GSM/WCDMA and LAN traffic to a single WAN interface
Loading and modifying SIU configuration by using SELMA or Ericsson Moshell
Duties:
Ability to login into the Ericsson traffic node and minilink E
Ability to do IP configuration, Traffic Node Software upgrade
Backplane cross-connection of transmission link between modules (such as MMUs, LTU and NPU) in the
Minilink Traffic Nodes (TN) Access Module Magazine.
Responsible for Technical Site Survey.
Troubleshoot and Maintenance of Ericsson Traffic Node and minilink E
Crossconnections of 3G E1’s,Links and capacity upgrade in Edo State Airtel 3G Rollout project (Mapping
and Dropping E1’s)
TECHNICAL SKILLS
Excellent knowledge of GSM/GPRS/UMTS systems
Ability to install and integrate Ericsson Node B (3000 and 6000 series) Equipment
Ability to install and integrate Ericsson 2G RBS(2206,2207 2116 and 2216) Equipment
Vast troubleshooting skills on Ericsson RBS(2G and 3G)
Network roll out and system commissioning
Ability to work with little or no supervision
Resourceful, goal oriented and high computer literacy
Ability to work with RBS6000 (especially 6102,6201and 6601)
Ability to work with RBS3000 (3206 and 3106)
Major ability on 2G Site Integrations up to 1800MHz configurations 12/12/12
Ability to troubleshoot, interpret alarm logs and to work to clear alarms (2G and 3G)
Ability to carry out all relevant site health checks
Ability to supervise ASPs and carry out installation inspections
Cabinet Expansion (CABEX) on 2 G
SOFTWARE PROFICIENCY
Ericsson Element Manager for RBS 3206, 3216, 3116, 3303, 6102, 6201,6601
Hyper Terminal Private Edition
MOSHELL 8.0b
BPFTP Server
OMT 37,39,41,49
Training
LMN Ericsson Nig. Ltd
June 2011- July 2011
ERICSSON RBS 6000 SERIES TRAINING (6601, 6101, 6301, 6102, 6201)
Installation Of 6000 Series Cabinet
(6601, 6101, 6301, 6102, 6201)
Integration Of 6000 Series Cabinet
(6601, 6101, 6301, 6102, 6201)
Knowing site hazards and how to be careful
Mast climbing techniques and climbing gadgets
RBS general supervision skills
National Youth Service Corps with Ericsson Nigeria
(On 2G and 3G 2010)
Seven months Industrial Training Experience with LMN Ericsson Nig. Ltd 2008(On 3G/2G)
Student Engineering Workshop Experience
FUT MINNA (SIWES) 2006
HOBBIES
Reading, Watching Football, Tourism, Listening to news and music
REFEREES
Eng Shatse Kakwagh
Ericsson Country Manager
In Chad.
Shatse.kakwagh@ericsson.com
+22799525283
08034567727
HILARIO MATORE
Senior BSC Eng Ericsson
Nigeria MTN Project
Hilario.mature@ericsson
Phone 07064173909
Prof. O.B Awoyogbe
Senior Lecturer
Physics/Electronics Department
F.U.T Minna
Phone: 08059995405
Integration Of 6000 Series Cabinet
(6601, 6101, 6301, 6102, 6201)
Knowing site hazards and how to be careful
Mast climbing techniques and climbing gadgets
RBS general supervision skills
National Youth Service Corps with Ericsson Nigeria
(On 2G and 3G 2010)
Seven months Industrial Training Experience with LMN Ericsson Nig. Ltd 2008(On 3G/2G)
Student Engineering Workshop Experience
FUT MINNA (SIWES) 2006
HOBBIES
Reading, Watching Football, Tourism, Listening to news and music
REFEREES
Eng Shatse Kakwagh
Ericsson Country Manager
In Chad.
Shatse.kakwagh@ericsson.com
+22799525283
08034567727
HILARIO MATORE
Senior BSC Eng Ericsson
Nigeria MTN Project
Hilario.mature@ericsson
Phone 07064173909
Prof. O.B Awoyogbe
Senior Lecturer
Physics/Electronics Department
F.U.T Minna
Phone: 08059995405

More Related Content

What's hot (19)

RAMZAN MALIK
RAMZAN MALIKRAMZAN MALIK
RAMZAN MALIK
 
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
 
Paul_Coulter_Resume_10_2016
Paul_Coulter_Resume_10_2016Paul_Coulter_Resume_10_2016
Paul_Coulter_Resume_10_2016
 
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resume
 
New Carlton Resume1(1)
New Carlton Resume1(1)New Carlton Resume1(1)
New Carlton Resume1(1)
 
Eslam CV-19062016
Eslam CV-19062016Eslam CV-19062016
Eslam CV-19062016
 
jack george cv
jack george cv jack george cv
jack george cv
 
Naveed CV (1) (1)
Naveed CV (1) (1)Naveed CV (1) (1)
Naveed CV (1) (1)
 
Junaid Eisa CV-May2016
Junaid Eisa CV-May2016Junaid Eisa CV-May2016
Junaid Eisa CV-May2016
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
Rone resume 092420
Rone resume 092420Rone resume 092420
Rone resume 092420
 
Devesh CV
Devesh CVDevesh CV
Devesh CV
 
Reden_CV
Reden_CVReden_CV
Reden_CV
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
 
Cv meynard
Cv meynardCv meynard
Cv meynard
 
n_aquino_CV
n_aquino_CVn_aquino_CV
n_aquino_CV
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
 
Resume-vinay
Resume-vinayResume-vinay
Resume-vinay
 

Similar to APAA SIMON AHUNGWA

Similar to APAA SIMON AHUNGWA (20)

resume_anjuln
resume_anjulnresume_anjuln
resume_anjuln
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
Isaac Williams CV
Isaac Williams CVIsaac Williams CV
Isaac Williams CV
 
Asif Naveed Resume
Asif Naveed ResumeAsif Naveed Resume
Asif Naveed Resume
 
Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015
 
Dennis A Santos
Dennis A SantosDennis A Santos
Dennis A Santos
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNAN
 
Engr M Ali
Engr M AliEngr M Ali
Engr M Ali
 
Mir Ahmed Raza
Mir Ahmed RazaMir Ahmed Raza
Mir Ahmed Raza
 
LOKESH YADAV RESUME
LOKESH YADAV  RESUMELOKESH YADAV  RESUME
LOKESH YADAV RESUME
 
AVISHESH BHARGAVA resume
AVISHESH BHARGAVA resumeAVISHESH BHARGAVA resume
AVISHESH BHARGAVA resume
 
CV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHITCV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHIT
 
Waqas_Abbasi
Waqas_AbbasiWaqas_Abbasi
Waqas_Abbasi
 
Amin Bolghari
Amin BolghariAmin Bolghari
Amin Bolghari
 
ENGR. IBRAHIM AHMED. MNSE
 ENGR. IBRAHIM AHMED. MNSE ENGR. IBRAHIM AHMED. MNSE
ENGR. IBRAHIM AHMED. MNSE
 
RESUME_Sushil
RESUME_SushilRESUME_Sushil
RESUME_Sushil
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
CV A. Hadiyanto Suroso
CV A. Hadiyanto SurosoCV A. Hadiyanto Suroso
CV A. Hadiyanto Suroso
 
priyank _cv
priyank _cvpriyank _cv
priyank _cv
 
Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV
 

APAA SIMON AHUNGWA

  • 1. APAA SIMON AHUNGWA NO 9 Madam Meg Shegbe Otene Str University View Estate Alasia Lekki Epe Express Way Lagos State PERSONAL DATA DATE OF BIRTH: 25th March 1983 PLACE OF BIRTH: Gboko, Benue State NATIONALITY: Nigerian SEX: Male STATE OF ORIGIN: Benue RELIGION: Christian LOCAL GOVT. AREA: Konshisha MARITAL STATUS: Single PHONE NO.: 08037606784, 08027829312 E-MAIL: apaasimon@yahoo.com OBJECTIVE In pursuit of a challenging and rewarding environment to apply my professional skills with the aim of making proficient contribution to the organisational goals. Proactive, performance-driven professional progressive expertise in leadership and problem solving services, and startup operations. Keen understanding of business priorities, genuine team player committed to managing operations and projects flawlessly. Cross-functional communicator easily interfaces with high-profile staff, vendors, and customers. Versatile, innovative, and loyal management professional able to see the “big picture” while staying on top of all the details. Recognized for consistent performance. Research Final Year Project-I design Super Regenerative Radio Receiver Used 20 MHz EDUCATION BACKGROUND Federal University of Technology Minna B.Sc (B.Tech) Physics/Electronics 2004 - 2009 TILLEY GYADO COLLEGE IHUGH (WASSCE) Benue State 2000 - 2001 Govt. Secondary School (Korinya) Benue State 1997 -1998 MBAVAA Community Secondary School (AMUA) Benue State 1994 - 1997 N.K.S.T PRIMARY SCHOOL GANDE (FSLC) Benue State 1987 - 1993
  • 2. WORKING EXPERIENCE LMN Ericsson Nig. Ltd: BSC Engineering LMN Ericsson Nig. Ltd: Team lead IBS (INBUILDING SOLUTION AIRTEL) Configuration of the Traffic path on I.P. (Internet protocol) through the Minilinks (SITE INTEGRATION UNIT). Configuration of the 2G 3G node on I.P. Cell on Wheels deployment (COW). upgrade (MTN) project Upgrade of the 2G physical installation and configuration Upgrade of the 3G physical installation and configuration Operation and maintenance of Nodes Team lead FY13 (MTN) Project Integration of 2g and 3g nodes Supervision of Node installation equipments Supervision of civil works Supervision of power systems ATP (Acceptance test protocol) Modernization Project (Ericsson Rbs 6000 support for 2G and 3G) - Hardware Configuration of 2G cabinets with new equipment, Dug and Rus. - Hardware Configuration of 3G cabinets with Duw and Rus. - Cross connectivity of Pulse Code Modulation (P.C.M) (E1). - Software setup and configuration of 2G Rbs. - Script configuration of 3G Rbs. - Supervision of installation of cabinet on site. - Trunked of power cables. - Re-connection of power Dc to DC converter for 24 to 48 volts. - Re- positioning of cabinet on site. - Commissioning of Rbs on-air. - Quality of transmission and availability (alarm clearing and optimization). - Upgrading to higher configuration on the 2G network (increasing capacity Support). LMN Ericsson Nig. Ltd: JUNE 2014 – AUGUST 2014 3G INTEGRATION/SUPERVISION (MTN PROJECT NIGERIA) Node B (3G) Integration 6000 series Traffic Node Integration and troubleshooting (ATM/IP Configuration) Site Supervisions and Integration Supervising the Installation done by the ASP Making sure the ASP get the materials needed to complete the installation on time
  • 3. 3G integration and troubleshooting Transmission configuration and troubleshooting (ATM/IP) Making sure day to day activities are closed and report sent to the appropriate person. Performing ATP with customer Giving the ASP support to complete the installation as soon as possible LMN Ericsson Nigeria. 1391 Tiamiyu Savage Victoria Island Lagos State Nigeria. Project June 2011 till July 2012 RBS 2G/3G SIU Integrator Engineer (IPRAN MTN / AIRTEL Project Nigeria) 3G/WCDMA technology (P4) roll out WCDMAAlarms monitoring and Performance information to identify faults. Perform software updates, Loading necessary scripts to integrate sites Technical site surveys and inspection Troubleshooting of Ericsson RBS faults Antenna swap-out & performing sweep test on sectorial antennas On site integration of 2G Cabinets, RBS 2216/ 2206 /2116 etc On site configuration & troubleshooting of 2G Cabinets using OMT. On site integration of NODE B cabinets, RBS6201/6102/6601/3116/3216 etc On site troubleshooting of NODE B using EMAS/Ericsson Moshell Migration of ATM base RBS to IP base RBS, 3G/2G Integration, testing and troubleshooting of SIU-02 Upgrade 3G node with upgrade package Replacing and Restoring DUW/CBU configuration using a backup or basic CV for NODE B (RBS 6000/3000) Perform Connectivity Test for Element Manager Telnet Connection and Serial Connection for 3G. Performing test on DUW, RUW, CBU, RAX/TX boards and Auxiliary units using Element Manager Reloading of NODE B on the event of corrupt CV LM Ericsson Nigeria. 17 Water Carrington Crescent Victoria Island Lagos State Nigeria. 3G Node B Airtel Roll out (1,310 Cabinets) (6102, 6201, 6101, 6601) Oct. 2011 – June 2012 Team Lead AIRTEL 3G Node B Integration, Abuja (6000 cabinet) Duties: License file loading for all RBS3000/6000 Integration and commissioning of 6000 cabinet (6101,6102.6201and 6601) CCR tool for CCR preparation, modification and script Modification/troubleshooting of issues. site audits and quality control for Node B, correct snag list before ATP process. Assist Back Office during upgrade process such as software, hardware and all activity involved in 3G Airtel network. Site inspection during the installation process, working closely with sub-contractors to ensure installation process is according to Ericsson Mentoring of young local engineers in trouble shooting RBS3000/6000 Troubleshoot and Maintenance of RBS 3000/6000 series Troubleshoot and Maintenance of Ericsson Traffic Node Alarm tracing and fixing of faults on site Knowledge transfer to student engineers to enable them trouble RBS3000/6000
  • 4. Provide remote and on-site support to trainee engineers Ability to use site master for sweep test Liaising with ISM contractors to ensure Power is available at all times on site Request and process spare release from warehouse to correct hardware faults on site Re-integration and upgrade of Ericsson Node Bs from P5 to P6 to P7 and W10. Ensuring target KPIs set by management are met. Work closely with Front Office Surveillance to clear alarms, update and close trouble tickets. Perform standard. Integration & commissioning of new Nodes, loading of site scripts such as OAM Transmission DCN for Minilink TN. Backplane cross-connection of transmission link between modules (such as MMUs, LTU and NPU) in the Minilink Traffic Nodes (TN) Access Module Magazine. Scheduling Preventive maintenance for RBS 2000 and 3000 series. Creation of daily and weekly report to management via Excel worksheet LM Ericsson Nigeria. 17 Water Carrington Crescent Victoria Island Lagos State Nigeria. WRAN troubleshooting for Ericsson (MS) (AIRTEL NIGERIA) 3216 and 3206 June 2011-August 2011 Duties: Troubleshooting and fixing fault Clearing of alarms and scratching of node CCR tool for CCR preparation, modification and script Modification of NODE B/troubleshooting of issues. Integration of new Node 3000 series (3210 and 3206) Checking of alarm log and liaising with the RNC to fix fault LMN Ericsson Nigeria. 17 Water Carrington Crescent Victoria Island Lagos State Nigeria. RBS 2000 and 6000 series (2G) Roll Out Integration Engr for Airtel Nigeria JUNE 2010 to JUNE 2011 Duties: RBS integration both 2206, 2216, 2216v2, 2207, 3000 and 6000 series RBS 2000 series DRU”S and cabinet expansion, building and supervision of new Sites for Airtel network Installation and commissioning of 500 RBS 6102 to expand the network Installation and integrations of 2G 2206,2216,2207,2116,2216v2 Clearing alarm and maintenance of 2G site Cabinet expansion (CABEX) on 2G cabinet Cross connection for 2G integration. CCR tool for CCR preparation, modification and script Modification/troubleshooting fault. Supervision of ASPs on site to ensure proper installation and integration of RBS6102 Pick up of required hardware from ware house and deployment on site Swap out of RBS 3000 with RBS 6000 Switch in configuration between 2/2/2 to 4/4/4 to 8/8/8 to 12+12+12 On site configuration of SIU to aggregates all GSM/WCDMA and LAN traffic to a single WAN interface Loading and modifying SIU configuration by using SELMA or Ericsson Moshell Duties: Ability to login into the Ericsson traffic node and minilink E
  • 5. Ability to do IP configuration, Traffic Node Software upgrade Backplane cross-connection of transmission link between modules (such as MMUs, LTU and NPU) in the Minilink Traffic Nodes (TN) Access Module Magazine. Responsible for Technical Site Survey. Troubleshoot and Maintenance of Ericsson Traffic Node and minilink E Crossconnections of 3G E1’s,Links and capacity upgrade in Edo State Airtel 3G Rollout project (Mapping and Dropping E1’s) TECHNICAL SKILLS Excellent knowledge of GSM/GPRS/UMTS systems Ability to install and integrate Ericsson Node B (3000 and 6000 series) Equipment Ability to install and integrate Ericsson 2G RBS(2206,2207 2116 and 2216) Equipment Vast troubleshooting skills on Ericsson RBS(2G and 3G) Network roll out and system commissioning Ability to work with little or no supervision Resourceful, goal oriented and high computer literacy Ability to work with RBS6000 (especially 6102,6201and 6601) Ability to work with RBS3000 (3206 and 3106) Major ability on 2G Site Integrations up to 1800MHz configurations 12/12/12 Ability to troubleshoot, interpret alarm logs and to work to clear alarms (2G and 3G) Ability to carry out all relevant site health checks Ability to supervise ASPs and carry out installation inspections Cabinet Expansion (CABEX) on 2 G SOFTWARE PROFICIENCY Ericsson Element Manager for RBS 3206, 3216, 3116, 3303, 6102, 6201,6601 Hyper Terminal Private Edition MOSHELL 8.0b BPFTP Server OMT 37,39,41,49 Training LMN Ericsson Nig. Ltd June 2011- July 2011 ERICSSON RBS 6000 SERIES TRAINING (6601, 6101, 6301, 6102, 6201) Installation Of 6000 Series Cabinet (6601, 6101, 6301, 6102, 6201)
  • 6. Integration Of 6000 Series Cabinet (6601, 6101, 6301, 6102, 6201) Knowing site hazards and how to be careful Mast climbing techniques and climbing gadgets RBS general supervision skills National Youth Service Corps with Ericsson Nigeria (On 2G and 3G 2010) Seven months Industrial Training Experience with LMN Ericsson Nig. Ltd 2008(On 3G/2G) Student Engineering Workshop Experience FUT MINNA (SIWES) 2006 HOBBIES Reading, Watching Football, Tourism, Listening to news and music REFEREES Eng Shatse Kakwagh Ericsson Country Manager In Chad. Shatse.kakwagh@ericsson.com +22799525283 08034567727 HILARIO MATORE Senior BSC Eng Ericsson Nigeria MTN Project Hilario.mature@ericsson Phone 07064173909 Prof. O.B Awoyogbe Senior Lecturer Physics/Electronics Department F.U.T Minna Phone: 08059995405
  • 7. Integration Of 6000 Series Cabinet (6601, 6101, 6301, 6102, 6201) Knowing site hazards and how to be careful Mast climbing techniques and climbing gadgets RBS general supervision skills National Youth Service Corps with Ericsson Nigeria (On 2G and 3G 2010) Seven months Industrial Training Experience with LMN Ericsson Nig. Ltd 2008(On 3G/2G) Student Engineering Workshop Experience FUT MINNA (SIWES) 2006 HOBBIES Reading, Watching Football, Tourism, Listening to news and music REFEREES Eng Shatse Kakwagh Ericsson Country Manager In Chad. Shatse.kakwagh@ericsson.com +22799525283 08034567727 HILARIO MATORE Senior BSC Eng Ericsson Nigeria MTN Project Hilario.mature@ericsson Phone 07064173909 Prof. O.B Awoyogbe Senior Lecturer Physics/Electronics Department F.U.T Minna Phone: 08059995405