M u h a m m a d A s i f S i r a i
PERSONAL INFORMATION
Father’s Name: Basheer Ahmed Khan
Date of Birth : 05 Feb 1991
Domicile : Muzafar Garh(Punjab)
N.I.C.No: 32303-0427608-1
Religion: ISLAM
Nationality: PAKISTANI
Marital Status: Married
Languages English, Urdu, Punjabi, Saraiki
E-mail: aasif.pk63@gmail.com
Mob # 00923000680775, 0333-8910572
TECHNICAL QUALIFICATION
1. 2006-09 Pujnab Board of Technical Education Lahore
Three years Diploma in Electronics Technology .
2. B-Tech (Electronics ) Bzu Multan (Result Waiting)
ACADAMIC QUALIFICATION
Matric (Science) 2006 BISE DG Khan Marks 644/1050
Computer Skill Sixth month, basic computer course (2006)
PROFESSIONAL EXPERIENCE
In Ericsson-Mobilink MS project 1st
January 2013 to till As a MS Engineer
• Expansions of TRX DCS,hardware and software
• Working with TN IPRAN supporting cards NPU3, NPU3B, NPU1C,
ETU2, ETU2B, MMU2D, MMU2H etc.
• Configuring manually &/or Making Script and loading,
Troubleshooting the latest Ericsson’s common traffic platform, the
SIU, for all (2G, 3G)
• Working with Ericsson RBS 6000 series i.e. RBS6201.
Installing, replacing DUG10, DUG20, RUS cards,
DUW30,and, RRU.
• Proactively conducting PMs & health Checks of deployed
Network Elements, also Emergency Handling using Ericsson
Standard Procedure.
• Efficient handling of Planned Activity Requests for Cutovers,
Re homing of RBSs, Expansions/enhancement Coverage by
changing Tilts of RF Antennae &/or Capacity of RBSs by
adding TRU//RUS/RUW and changing IDBs according to
situation , performing all those activities involving outages,
during Maintenance Windows provided by the valuable
customer.
Postal Address .Ahbab Medical store Railway Road Kot Addu Dist Muzafar Garh..
Permanent Address .Basti Sirai Bangla Shah jamal Tehseel kot Adu Dist Muzafar Garh…
• Successfully upgrading & saving backup of Transmission node
and RBS6000, Ericsson Family latest released SW.
• Trouble shooting Radios and Modems in case of any
operational problem or degraded RSL. Also, identifying LOS
problem.
• Creating new circuits at hardware level for leased media, DCN,
PSTN Traffic, Signaling Links and BTS sites.
• Handling IPRAN sites, issues which includes configuring
SFP’s, LAN ports, switch ports, WAN ports and creating
VLANS, Packets, bridges for traffic and O&M.
• Participated in Handovers for the swap of sites from 3206 to
6201 for STC.
• Performed technical support to fellow engineers for IPRAN to
trouble shoot the connectivity from Node B to PL-Aggregator
• Start-up of DCN network for TN, Hi-Caps and restoring of
PPPs link.
• Perform Antenna System Measurements such as Return loss,
VSWR and DTF for Distance to Fault using Site Master.
• Operation, maintenance, fault troubleshooting and replace the faulty
spares of the DXX during warranty on customer request.
• BSS installation RBS 6000 series at Ericsson Swap..
• Transmission Installation Mini link Release 3,Release
4.4,Release 5 series at Ericsson Swap
• Power Swaps Dures Emerson (Acura Optima 4845),PBC
6000 series at Ericsson Swap
• TN Upgradation
• Link Upgradation
• Service routing
• Transmission troubleshooting
• RBS Swap&Rectifier Swap
Tools Used
• OMTOMT49H- & 52F, for Ericsson RBS, RBS6000.
• Mini Link Craft V-2.20 for TN.
• BFTP server for Hi-Cap & BPFTP and CLI for TN.
• Element Manager for 3G
• Putty for SIU, and IP ping tests for media
verification for 3G
In CHINA COM SERVICE ( PVT)LTD ( CCSI) NOV 18-2012
Telenor-Vega- Project Working as a BSS Team Lead
• Installation and commissioning of SDR BS8700.BS8900,
• Installation and commissioning of Rectifier of ZXDU68w301
• Installation of RRU,MBR, LPBOX and antenna sub system.
• Troubleshooting and alarm removing expertise of ZTE ,SDR
• Cascading of RRU,R8881+R8882
Troubleshooting and alarm removing expertise of ZTE ,SDR
Working as a BSS Team Lead in CCS for ZTE SDR Project
Installation & Commissioning
• Installation and commissioning of SDR BBU 8700,8200,8800,8900
• Installation of RRU, LPBOX and antenna sub system.
• Installation of battery bank indoor and outdoor.12v & 2.0v.
• Design the template file according to site configuration by using LMT
Software.
• Expansions of TRX DCS,hardware and software
• Troubleshooting and alarm removing expertise of ZTE ,SDR
Associated Technologies Private Limited oct 2010 to Sep 2011
Huawie Solar Project
Installed complete solar sites
Installation and complete cabling of solar panel STP180S 24/ad in series as will as in parallel
combination,
Installation and cabling of Battety Banks ,Controller, Rectifier and alarm Boxes
Wi-Tribe Project Jan 2009 to Oct 2010 in Myson Engineering System
 Installation of Electek Rectifier ,Power DB,
 Installation of Microwave Link on Dragon Wave Equipment
Telenor-NSN- Swap Project
Since Sep.2009 working as Asst engineer in Myson Engineering System
 Installation and Commissioning of BTS Nokia Flexi
 Installation and troubleshooting of Delta, Electek and Power One Rectifier
 Installation & Configuration of 8E1, 16E1,32 E1 SRAL XD Siemens System.
 E1 Patching for NEC and SRAL XD and Different Alarm Patching
 Sweep test for Feeder Cable i.e VSWR and DTF Testing
Myson Engineering System Since 20th Feb 2007 To Dec 2007
NEC MOBILINK PROJECT
I am offering my duties in this company as a Trasmission Technician on the following positions:
My Current Responsibilities are:
 Installation of Microwave of NEC
 Installation & Configuration of 4E1 PDH System.
 Installation & Configuration of 16E1 PDH System.
 Installalion & configuration of 48E1 SDH System
 Installalion & configuration of C.Node
 Installation & configuration of STM1 NEO
 Installation & Configuration of XPIC System.
 Installation/Alignment of SB1, SB2, SB3,SB4
PROFESSIONAL SKILLS
.Six weeks in training Introduction to Digital & Analog Electronics.
.Six weeks training for Introduction & work in PCB, Hybrid CNC Drilling & Milling.
.Three weeks training in Exchange System Manufacturing.
.Three weeks training in EWSD Assembly, EWSD QAD.
. One month training regarding telephone repairing at TIP
. Four Months Field Training and Work at different Stations of EWSD Exchange System
Installation in Islamabad.
SKILLS & ABILITIES
.Have a Good Communication and interpersonal skill
.Ability to work independently. .Dedicated and willing to accept and meet challenges

Asif CV

  • 1.
    M u ha m m a d A s i f S i r a i PERSONAL INFORMATION Father’s Name: Basheer Ahmed Khan Date of Birth : 05 Feb 1991 Domicile : Muzafar Garh(Punjab) N.I.C.No: 32303-0427608-1 Religion: ISLAM Nationality: PAKISTANI Marital Status: Married Languages English, Urdu, Punjabi, Saraiki E-mail: aasif.pk63@gmail.com Mob # 00923000680775, 0333-8910572 TECHNICAL QUALIFICATION 1. 2006-09 Pujnab Board of Technical Education Lahore Three years Diploma in Electronics Technology . 2. B-Tech (Electronics ) Bzu Multan (Result Waiting) ACADAMIC QUALIFICATION Matric (Science) 2006 BISE DG Khan Marks 644/1050 Computer Skill Sixth month, basic computer course (2006) PROFESSIONAL EXPERIENCE In Ericsson-Mobilink MS project 1st January 2013 to till As a MS Engineer • Expansions of TRX DCS,hardware and software • Working with TN IPRAN supporting cards NPU3, NPU3B, NPU1C, ETU2, ETU2B, MMU2D, MMU2H etc. • Configuring manually &/or Making Script and loading, Troubleshooting the latest Ericsson’s common traffic platform, the SIU, for all (2G, 3G) • Working with Ericsson RBS 6000 series i.e. RBS6201. Installing, replacing DUG10, DUG20, RUS cards, DUW30,and, RRU. • Proactively conducting PMs & health Checks of deployed Network Elements, also Emergency Handling using Ericsson Standard Procedure. • Efficient handling of Planned Activity Requests for Cutovers, Re homing of RBSs, Expansions/enhancement Coverage by changing Tilts of RF Antennae &/or Capacity of RBSs by adding TRU//RUS/RUW and changing IDBs according to situation , performing all those activities involving outages, during Maintenance Windows provided by the valuable customer. Postal Address .Ahbab Medical store Railway Road Kot Addu Dist Muzafar Garh.. Permanent Address .Basti Sirai Bangla Shah jamal Tehseel kot Adu Dist Muzafar Garh…
  • 2.
    • Successfully upgrading& saving backup of Transmission node and RBS6000, Ericsson Family latest released SW. • Trouble shooting Radios and Modems in case of any operational problem or degraded RSL. Also, identifying LOS problem. • Creating new circuits at hardware level for leased media, DCN, PSTN Traffic, Signaling Links and BTS sites. • Handling IPRAN sites, issues which includes configuring SFP’s, LAN ports, switch ports, WAN ports and creating VLANS, Packets, bridges for traffic and O&M. • Participated in Handovers for the swap of sites from 3206 to 6201 for STC. • Performed technical support to fellow engineers for IPRAN to trouble shoot the connectivity from Node B to PL-Aggregator • Start-up of DCN network for TN, Hi-Caps and restoring of PPPs link. • Perform Antenna System Measurements such as Return loss, VSWR and DTF for Distance to Fault using Site Master. • Operation, maintenance, fault troubleshooting and replace the faulty spares of the DXX during warranty on customer request. • BSS installation RBS 6000 series at Ericsson Swap.. • Transmission Installation Mini link Release 3,Release 4.4,Release 5 series at Ericsson Swap • Power Swaps Dures Emerson (Acura Optima 4845),PBC 6000 series at Ericsson Swap • TN Upgradation • Link Upgradation • Service routing • Transmission troubleshooting • RBS Swap&Rectifier Swap Tools Used • OMTOMT49H- & 52F, for Ericsson RBS, RBS6000. • Mini Link Craft V-2.20 for TN. • BFTP server for Hi-Cap & BPFTP and CLI for TN. • Element Manager for 3G • Putty for SIU, and IP ping tests for media verification for 3G In CHINA COM SERVICE ( PVT)LTD ( CCSI) NOV 18-2012 Telenor-Vega- Project Working as a BSS Team Lead • Installation and commissioning of SDR BS8700.BS8900, • Installation and commissioning of Rectifier of ZXDU68w301 • Installation of RRU,MBR, LPBOX and antenna sub system. • Troubleshooting and alarm removing expertise of ZTE ,SDR • Cascading of RRU,R8881+R8882 Troubleshooting and alarm removing expertise of ZTE ,SDR Working as a BSS Team Lead in CCS for ZTE SDR Project Installation & Commissioning • Installation and commissioning of SDR BBU 8700,8200,8800,8900 • Installation of RRU, LPBOX and antenna sub system. • Installation of battery bank indoor and outdoor.12v & 2.0v. • Design the template file according to site configuration by using LMT Software. • Expansions of TRX DCS,hardware and software • Troubleshooting and alarm removing expertise of ZTE ,SDR
  • 3.
    Associated Technologies PrivateLimited oct 2010 to Sep 2011 Huawie Solar Project Installed complete solar sites Installation and complete cabling of solar panel STP180S 24/ad in series as will as in parallel combination, Installation and cabling of Battety Banks ,Controller, Rectifier and alarm Boxes Wi-Tribe Project Jan 2009 to Oct 2010 in Myson Engineering System  Installation of Electek Rectifier ,Power DB,  Installation of Microwave Link on Dragon Wave Equipment Telenor-NSN- Swap Project Since Sep.2009 working as Asst engineer in Myson Engineering System  Installation and Commissioning of BTS Nokia Flexi  Installation and troubleshooting of Delta, Electek and Power One Rectifier  Installation & Configuration of 8E1, 16E1,32 E1 SRAL XD Siemens System.  E1 Patching for NEC and SRAL XD and Different Alarm Patching  Sweep test for Feeder Cable i.e VSWR and DTF Testing Myson Engineering System Since 20th Feb 2007 To Dec 2007 NEC MOBILINK PROJECT I am offering my duties in this company as a Trasmission Technician on the following positions: My Current Responsibilities are:  Installation of Microwave of NEC  Installation & Configuration of 4E1 PDH System.  Installation & Configuration of 16E1 PDH System.  Installalion & configuration of 48E1 SDH System  Installalion & configuration of C.Node  Installation & configuration of STM1 NEO  Installation & Configuration of XPIC System.  Installation/Alignment of SB1, SB2, SB3,SB4 PROFESSIONAL SKILLS .Six weeks in training Introduction to Digital & Analog Electronics. .Six weeks training for Introduction & work in PCB, Hybrid CNC Drilling & Milling. .Three weeks training in Exchange System Manufacturing. .Three weeks training in EWSD Assembly, EWSD QAD. . One month training regarding telephone repairing at TIP . Four Months Field Training and Work at different Stations of EWSD Exchange System Installation in Islamabad. SKILLS & ABILITIES .Have a Good Communication and interpersonal skill .Ability to work independently. .Dedicated and willing to accept and meet challenges