SlideShare a Scribd company logo
1 of 4
Muhammad Kamran Alvi
[Address]House No P-3774,St#No.1,Hafeezabad,Faisalabad,Pakistan.
E-mail:mkamran.alvi@gmail.com,muhammad.alvi01@mobilink.net,
Ph.#0302-8430141
Work Experience
Mobilink GSM - Pakistan Mobile Communication Limited ( Oct 2011 – present)
A Vimpelcom Telecom Company
 Title of job: Engineer Fiber Optics Operations (December 2014 to Present)
The main responsibility is to make Sure the operation and maintenance of Optical Transmission Network Of
Mobilink (OFJAN, LDI/SDH & DWDM Equipment).
• Maintaining Optical Network ie Ericsson based SPO Nodes[1400 Series], OFJAN and LDI network on Huwei
network nodes in C-2 and C-3 regions.
• Alarms handling including service, communication and equipment alarms of OFJAN, LDI, SDH & DWDM
Huawei equipment.
• Prepare Link Budget report on monthly basis to analyze the proper functioning of Mobilink Backbone Fiber
Optical System.
• Troubleshooting and Maintenance of OFC(Optical Fiber Cable) route of length 1400 Km.
• Conducted ATP/PAT for 3G links in the region and maintaining optical values in Metro and long Haul(Based
on PAU and LGX).
• Monitoring on IPTNMS , Ericsson Network and SNCP Protection SPO Configuration.
• Providing On Line support to field teams at IPTNMS and SOEM during planned activities.
• Vendor coordination on all levels to meet certain on site challenges that includes planned or un-foreseen
cable cuts and threats.
 Worked As:- Lead MBU Engineer (March 2014 to December 2014)
The responsibility is to maintain the cluster of Ericsson based 150 BTS cell sites in terms of
BSS/Txn/ENV/QoS/RFO issues.
• Maintaining BTS sites in Central region (Khushab/Joharabad) under Micro Business Unit
(MBU) Structure.
• Supervising ATP/PAT at local level in the region that include TXN[X-pic links],BSS and Power related
issues.
• Monitoring on IPTNMS , Ericsson Network and SNCP Protection SPO Configuration , TN
Nodes(2p,6p,20p,Cn) alarms.
• Monitoring & Maintenance of RF KPIs, Low CSSR, High DCR,RTC Drops, SD/TCH Blocking, HO
degradation, Zero Calls Rectification .
• Following up on issues related to other departments such as deployment, optimization, cell planning
and Coordination with different departments BSS planning, NOC, optimization, NSS, Cell planning for the
projection and resolution of different BSS issues.
• Good working experience at currently installed Ericsson based RBS6000 series.
• Working with different quality assurance Teams to enhance the TCH and call connectivity.
• Vendor coordination at all levels to meet the KPIs with in timelines efficiently.
 An Extra Mile:- Worked voluntarily as central region Rep. with PMCL Infrastructure
sharing Team.
The main responsibility is to provide DC sharing with OMO including Telenor,CM PAK,Warid and U-fone.
• Main objective was to reduce the fuel consumption for sites and hence providing DC power solutions.
• DC power offered/implemented and also shared on guest sites to overcome fuel demanding issues.
• Providing proper battery backups for enhanced backup and lower fuel utilization.
• Proper coordination with OMOs during the project led to completion of more than 100 BTS sites that
includes guest and HOST sites.
 Worked As: - Level-1 CM Engineer (April 2011 to March 2014)
The responsibility is to provide NOC based TXN/ BSS/ ENV back-Office support and Performance
related activities.
• Troubleshoot system problems such as Handover failure, Poor originations, Frequency-related issues,
and Interference. Identify causes of RF interference, make recommendations and provide solutions for
reducing interference.
• Analyzing the Network Key Performance Indicators (KPI’s) and reduce Drop calls and resolving
Ineffective attempts trouble tickets raised by QoS.
• Good working experience on Citrix presentation server client to maintain Ericsson network KPIs.
• Hands on experience on Alcatel-Lucent BSS entities B11/B10/B09(BSC/BTS/MFS/TC).
• Coordination with vendors to minimize MTTR. Develop relevant applicable solutions / reports to
overcome identified network deficiencies.
• Cooridnation with OAN/NOC level-2/QoS nationwide teams and providing a regional update on recent
HW implementation and rectification.
• Generates reports and analyses reports for validation and reporting to higher management.
• Own the problem escalation process and take appropriate steps to manage technical breakdowns or
faults.
• Technical warehouse inventory management.Coordination with nationwide teams.
• Eradicating and taking follow up incase of ENV issues on major Nodes/NE locations.
• Proper Co ordination with Security teams to preventing theft incidents 24/7.
Work Achievements
• Co-ordination with level-2 teams during BSC migrations and Traffic shiftings for the region.
• Implementation of TXN plans during off-loading of Huawei Of-Jans.
• Supervision during Cutt overs and reparenting of BTS sites.
• Providing support during Alcatel swap to Ericsson in the region.
• Successful completion of DC power project in the region.
Trainings
• 2 days Hands on prctice on Alcatel BSCs at Lahore
• IP/MPLS training in mobilink hosue FSD
• Attended 3G Awareness session at Lahore.
• Attended training session of self motivation in lahore.
Technical Equipment:
• Sun Rise BERT
• LITE 3000
• Anritsu Site Master
• Acterna MTS-8000 JDSU OTDR,
• EXFO FLS-300 Light Source Meter
• Optical Fiber Cable Locator
• ALCATEL OMC-R(OMC-1 & OMC-4)
• E/// IPTNMS (For Monitoring CII Region SPO/TN Nodes)
Telecom Packages/Software
IPTNMS,SOEM(Ericsson),Huwie U-2000 Client,OMC-R Alcatel Lucent , PROCOMM (MOTOROLLA) ,
Motorola OMCR GUI (X Manager),ALCATEL(BSC,TC,BTS)Terminal,(Ericsson based)Citrix Presentation
server Client,Microsoft office(Excel,word,Out look,Power point),BTS NEM,TC NEM
Education
Bachelor Of Telecommunication Engineering (2005-2009)
The GC University Faisalabad, Pakistan
Academic Achievements
• Management of IEEE seminar at GCUF as Coordinator.
• Team lead during final year project at GCUF.
• High proficiency in English speaking and communication
Reference
Furnished upon request
kamran cv updated

More Related Content

What's hot

CV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-DatacenterCV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-Datacenter
neeladri kumar
 
jay prakash_Resume
jay prakash_Resumejay prakash_Resume
jay prakash_Resume
jay prakash
 
John Z Farhat Cv Sept 30th 2010 A
John Z Farhat Cv  Sept 30th 2010 AJohn Z Farhat Cv  Sept 30th 2010 A
John Z Farhat Cv Sept 30th 2010 A
JzF
 

What's hot (20)

Resume
ResumeResume
Resume
 
CV Selby Khoza
CV Selby KhozaCV Selby Khoza
CV Selby Khoza
 
DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 
Donald resume new
Donald resume newDonald resume new
Donald resume new
 
IBS PST - BY MALIK ISSA
IBS PST - BY MALIK ISSAIBS PST - BY MALIK ISSA
IBS PST - BY MALIK ISSA
 
Ramesh CV
Ramesh CVRamesh CV
Ramesh CV
 
Distributed Antenna Systems and Compact Base Stations: When to Use Which?
Distributed Antenna Systems and Compact Base Stations: When to Use Which?Distributed Antenna Systems and Compact Base Stations: When to Use Which?
Distributed Antenna Systems and Compact Base Stations: When to Use Which?
 
Engineer WMArieta
Engineer WMArietaEngineer WMArieta
Engineer WMArieta
 
Jishan resume
Jishan resumeJishan resume
Jishan resume
 
Sukanta_CV
Sukanta_CVSukanta_CV
Sukanta_CV
 
Eslam CV-19062016
Eslam CV-19062016Eslam CV-19062016
Eslam CV-19062016
 
In Building Solution
In Building SolutionIn Building Solution
In Building Solution
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
Tanveer HFC CV 1.1
Tanveer HFC CV 1.1Tanveer HFC CV 1.1
Tanveer HFC CV 1.1
 
3G IP Architecture
3G IP Architecture3G IP Architecture
3G IP Architecture
 
CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_
 
Nitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/CloudNitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/Cloud
 
CV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-DatacenterCV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-Datacenter
 
jay prakash_Resume
jay prakash_Resumejay prakash_Resume
jay prakash_Resume
 
John Z Farhat Cv Sept 30th 2010 A
John Z Farhat Cv  Sept 30th 2010 AJohn Z Farhat Cv  Sept 30th 2010 A
John Z Farhat Cv Sept 30th 2010 A
 

Similar to kamran cv updated (20)

Avinash_cv for Txn
Avinash_cv for TxnAvinash_cv for Txn
Avinash_cv for Txn
 
CV - Saif ul amIn-Mgmt
CV - Saif ul amIn-MgmtCV - Saif ul amIn-Mgmt
CV - Saif ul amIn-Mgmt
 
Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV
 
CV - Rashid
CV - RashidCV - Rashid
CV - Rashid
 
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
 
Archana Mishra Resume
Archana Mishra ResumeArchana Mishra Resume
Archana Mishra Resume
 
Resume
ResumeResume
Resume
 
priyank _cv
priyank _cvpriyank _cv
priyank _cv
 
Emad_CV (2)
Emad_CV (2)Emad_CV (2)
Emad_CV (2)
 
Emad_CV (2)
Emad_CV (2)Emad_CV (2)
Emad_CV (2)
 
Ganesh Wankhede CV
Ganesh Wankhede CVGanesh Wankhede CV
Ganesh Wankhede CV
 
CV_HAFIZ_FAROOQ
CV_HAFIZ_FAROOQCV_HAFIZ_FAROOQ
CV_HAFIZ_FAROOQ
 
Attique Mahmood_CV
Attique Mahmood_CVAttique Mahmood_CV
Attique Mahmood_CV
 
EMEA OJI. CV__
EMEA OJI. CV__EMEA OJI. CV__
EMEA OJI. CV__
 
Waqas_Abbasi
Waqas_AbbasiWaqas_Abbasi
Waqas_Abbasi
 
Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015
 
Emad_CV (2)
Emad_CV (2)Emad_CV (2)
Emad_CV (2)
 
Ashish_CV
Ashish_CVAshish_CV
Ashish_CV
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNAN
 
Faizan CV.
Faizan CV.Faizan CV.
Faizan CV.
 

kamran cv updated

  • 1. Muhammad Kamran Alvi [Address]House No P-3774,St#No.1,Hafeezabad,Faisalabad,Pakistan. E-mail:mkamran.alvi@gmail.com,muhammad.alvi01@mobilink.net, Ph.#0302-8430141 Work Experience Mobilink GSM - Pakistan Mobile Communication Limited ( Oct 2011 – present) A Vimpelcom Telecom Company  Title of job: Engineer Fiber Optics Operations (December 2014 to Present) The main responsibility is to make Sure the operation and maintenance of Optical Transmission Network Of Mobilink (OFJAN, LDI/SDH & DWDM Equipment). • Maintaining Optical Network ie Ericsson based SPO Nodes[1400 Series], OFJAN and LDI network on Huwei network nodes in C-2 and C-3 regions. • Alarms handling including service, communication and equipment alarms of OFJAN, LDI, SDH & DWDM Huawei equipment. • Prepare Link Budget report on monthly basis to analyze the proper functioning of Mobilink Backbone Fiber Optical System. • Troubleshooting and Maintenance of OFC(Optical Fiber Cable) route of length 1400 Km. • Conducted ATP/PAT for 3G links in the region and maintaining optical values in Metro and long Haul(Based on PAU and LGX). • Monitoring on IPTNMS , Ericsson Network and SNCP Protection SPO Configuration. • Providing On Line support to field teams at IPTNMS and SOEM during planned activities. • Vendor coordination on all levels to meet certain on site challenges that includes planned or un-foreseen cable cuts and threats.  Worked As:- Lead MBU Engineer (March 2014 to December 2014) The responsibility is to maintain the cluster of Ericsson based 150 BTS cell sites in terms of BSS/Txn/ENV/QoS/RFO issues. • Maintaining BTS sites in Central region (Khushab/Joharabad) under Micro Business Unit (MBU) Structure.
  • 2. • Supervising ATP/PAT at local level in the region that include TXN[X-pic links],BSS and Power related issues. • Monitoring on IPTNMS , Ericsson Network and SNCP Protection SPO Configuration , TN Nodes(2p,6p,20p,Cn) alarms. • Monitoring & Maintenance of RF KPIs, Low CSSR, High DCR,RTC Drops, SD/TCH Blocking, HO degradation, Zero Calls Rectification . • Following up on issues related to other departments such as deployment, optimization, cell planning and Coordination with different departments BSS planning, NOC, optimization, NSS, Cell planning for the projection and resolution of different BSS issues. • Good working experience at currently installed Ericsson based RBS6000 series. • Working with different quality assurance Teams to enhance the TCH and call connectivity. • Vendor coordination at all levels to meet the KPIs with in timelines efficiently.  An Extra Mile:- Worked voluntarily as central region Rep. with PMCL Infrastructure sharing Team. The main responsibility is to provide DC sharing with OMO including Telenor,CM PAK,Warid and U-fone. • Main objective was to reduce the fuel consumption for sites and hence providing DC power solutions. • DC power offered/implemented and also shared on guest sites to overcome fuel demanding issues. • Providing proper battery backups for enhanced backup and lower fuel utilization. • Proper coordination with OMOs during the project led to completion of more than 100 BTS sites that includes guest and HOST sites.  Worked As: - Level-1 CM Engineer (April 2011 to March 2014) The responsibility is to provide NOC based TXN/ BSS/ ENV back-Office support and Performance related activities. • Troubleshoot system problems such as Handover failure, Poor originations, Frequency-related issues, and Interference. Identify causes of RF interference, make recommendations and provide solutions for reducing interference. • Analyzing the Network Key Performance Indicators (KPI’s) and reduce Drop calls and resolving Ineffective attempts trouble tickets raised by QoS. • Good working experience on Citrix presentation server client to maintain Ericsson network KPIs. • Hands on experience on Alcatel-Lucent BSS entities B11/B10/B09(BSC/BTS/MFS/TC). • Coordination with vendors to minimize MTTR. Develop relevant applicable solutions / reports to overcome identified network deficiencies. • Cooridnation with OAN/NOC level-2/QoS nationwide teams and providing a regional update on recent HW implementation and rectification. • Generates reports and analyses reports for validation and reporting to higher management. • Own the problem escalation process and take appropriate steps to manage technical breakdowns or faults. • Technical warehouse inventory management.Coordination with nationwide teams. • Eradicating and taking follow up incase of ENV issues on major Nodes/NE locations. • Proper Co ordination with Security teams to preventing theft incidents 24/7.
  • 3. Work Achievements • Co-ordination with level-2 teams during BSC migrations and Traffic shiftings for the region. • Implementation of TXN plans during off-loading of Huawei Of-Jans. • Supervision during Cutt overs and reparenting of BTS sites. • Providing support during Alcatel swap to Ericsson in the region. • Successful completion of DC power project in the region. Trainings • 2 days Hands on prctice on Alcatel BSCs at Lahore • IP/MPLS training in mobilink hosue FSD • Attended 3G Awareness session at Lahore. • Attended training session of self motivation in lahore. Technical Equipment: • Sun Rise BERT • LITE 3000 • Anritsu Site Master • Acterna MTS-8000 JDSU OTDR, • EXFO FLS-300 Light Source Meter • Optical Fiber Cable Locator • ALCATEL OMC-R(OMC-1 & OMC-4) • E/// IPTNMS (For Monitoring CII Region SPO/TN Nodes) Telecom Packages/Software IPTNMS,SOEM(Ericsson),Huwie U-2000 Client,OMC-R Alcatel Lucent , PROCOMM (MOTOROLLA) , Motorola OMCR GUI (X Manager),ALCATEL(BSC,TC,BTS)Terminal,(Ericsson based)Citrix Presentation server Client,Microsoft office(Excel,word,Out look,Power point),BTS NEM,TC NEM Education Bachelor Of Telecommunication Engineering (2005-2009) The GC University Faisalabad, Pakistan Academic Achievements • Management of IEEE seminar at GCUF as Coordinator. • Team lead during final year project at GCUF. • High proficiency in English speaking and communication Reference Furnished upon request