Four years of experience in telecom network with exposure in R&D Lab Support Engineer, Project planning, RF designing GPS planning coordinating, implementation, sever omni switches Integration and commissioning of Femtos UE tested mobiles BTS (CDMA and GSM) and microwave radios, RF survey and transmission (LOS).
Four years of experience in telecom network with exposure in R&D Lab Support Engineer, Project planning, RF designing GPS planning coordinating, implementation, sever omni switches Integration and commissioning of Femtos UE tested mobiles BTS (CDMA and GSM) and microwave radios, RF survey and transmission (LOS).
proxim-qb_81001With over 20 years in wireless innovation, Proxim introduces the Tsunami QB-8100, an incredibly cost-effective, high performance and non-line-of-sight 4G point-to-point wireless backhaul solution. With 300 Mbps data rates and up to 100 Mbps of real TCP/UDP throughout in a complete “Hop in a Box” solution, deployments in networks of all sizes will enjoy a quick return on investment.
Open optical networks: From Lowest TCO to new revenue generationADVA
Stephen Rettenberger's NGON & DCI World presentation looked at the increasing value of open line systems for unlocking spectrum, as well as the latest innovation in AI-based automation providing new opportunities for optical networks.
Submarine line termination equipment (SLTE) for open cablesADVA
Jörg-Peter Elbers’ NGON and DCI World presentation explored the specifics around open cables, technology developments and the implications for enhanced networking performance. The open cables concept for subsea transport was discussed as well as methods for the navigation and management of open cables and the key performance metrics for determining success.
New connectivity in 5G: Avoiding dead-ends in the road to mobile growthADVA
5G technology is maturing – and evolving. With more spectrum and attractive features, a wide range of new applications is emerging, creating an ecosystem for existing and new players. Those applications will materialize only if mobile innovation is backed up with an enhanced connectivity network supporting the 5G New Radio. In this presentation, Ulrich Kohn analyzed the impact of new mobile services on the capabilities and scalability requirements of mobile transport networks. He examined the roles of disaggregation and virtualization, and discussed the relevance of precise synchronization and best practices for its evolution.
In his ITSF 2020 session, Claude Besse explained how optical cesium offers the industry a new level of accuracy. He discussed how this ePRC+ technology’s outstanding frequency stability enables the deployment of ePRTC solutions that outperform even the most stringent recommendations, as well as how optical cesium offers significantly longer lifetime than existing cesium clocks.
proxim-qb_81001With over 20 years in wireless innovation, Proxim introduces the Tsunami QB-8100, an incredibly cost-effective, high performance and non-line-of-sight 4G point-to-point wireless backhaul solution. With 300 Mbps data rates and up to 100 Mbps of real TCP/UDP throughout in a complete “Hop in a Box” solution, deployments in networks of all sizes will enjoy a quick return on investment.
Open optical networks: From Lowest TCO to new revenue generationADVA
Stephen Rettenberger's NGON & DCI World presentation looked at the increasing value of open line systems for unlocking spectrum, as well as the latest innovation in AI-based automation providing new opportunities for optical networks.
Submarine line termination equipment (SLTE) for open cablesADVA
Jörg-Peter Elbers’ NGON and DCI World presentation explored the specifics around open cables, technology developments and the implications for enhanced networking performance. The open cables concept for subsea transport was discussed as well as methods for the navigation and management of open cables and the key performance metrics for determining success.
New connectivity in 5G: Avoiding dead-ends in the road to mobile growthADVA
5G technology is maturing – and evolving. With more spectrum and attractive features, a wide range of new applications is emerging, creating an ecosystem for existing and new players. Those applications will materialize only if mobile innovation is backed up with an enhanced connectivity network supporting the 5G New Radio. In this presentation, Ulrich Kohn analyzed the impact of new mobile services on the capabilities and scalability requirements of mobile transport networks. He examined the roles of disaggregation and virtualization, and discussed the relevance of precise synchronization and best practices for its evolution.
In his ITSF 2020 session, Claude Besse explained how optical cesium offers the industry a new level of accuracy. He discussed how this ePRC+ technology’s outstanding frequency stability enables the deployment of ePRTC solutions that outperform even the most stringent recommendations, as well as how optical cesium offers significantly longer lifetime than existing cesium clocks.
Communication and telecom engineer , worked as site engineer, senior engineer , project coordinator ,site supervisor in the filed of mobile network for vodafone egypt (Ericsson - SIAE ) - have 4 years experience
1. Ahmed Hedib Dessouki
C: 00965 55 376 944 - 65 64 8878 ahmedhedib@gmail.com
Professional Profile
Telecom expert, Open mind, Disciplined, Creative, Self-learner, clever troubleshooter and problem
solver.Excellentabilityto buildandworkina teamwitha flexible nature, excellent communication, co-
ordination and management skills.
Technical skills
Risk Assessment,Fire Fighting& first Aidsafety qualification.
Low voltage systems:CCTV,fire alarmsystem, anddata networkcablingandpiping.
Telephone Networkdesign,installationandImplementation.
Operation& Maintenance of STC “Saudi TelecomCompany”manage service experience.
Roll out & IP RAN, VLAN implementationof ZTEVendorin KSA.
Vastknowledge/experience of installation,reconfiguration,upgrading,splitting,andswapping
of MOTOROLA BTS cabinetsGSMandDCS.
Good handon telecomequipments;
ZTE BTS 2G/3G Node B Zx-SDR-BS8800 & ZTE Microwave type ZXMWNR8250.
HUAWEI:Mw transmissionsystem Opti-xRTN900 series.
MOTOROLA: BTS (Mcell6,H1, H2, mini & micro Horizon).
ERICSSON: 2G&3G RBS 6000 series,Mini-linkTN6P&20P, ADM nodes Tellabs(DXX6340,
DXX6350, 8630 & 8660 AccessSwitchesnodes).
ALCATEL, NEC & NOKIA PDH microwave transmissionsystems.
Experiencedsitemaster(ANRITSU& BIRD), SDH analyzers (ACTRENAANT 20SE) &GermanGPS.
Professional skills
Time management, Planningand professional manage service team management experience.
High grasp of English language reading, writing and speaking.
Self learning, Mind mapping, lateral thinking activities.
High appreciation of new technologies and Have an ability to turn an idea into reality.
Have the ability to organize, manage, undertake and willing to do whatever it takes to
achieve the highest value goals.
Have multitasking skills that helps efficiently done tasks.
Have nice interpersonal communicationskillsandhighsense of initiative.
Professional experience
Company:9- Contractor CompanyLTD
POSITION:(Ericsson2G expansionsupervisorengineer- Vodafone Egypt)
Achievements:
• Supervisingthe GSMInstallation Quality(checkinginstallingthe connectorsforall typesof
feeders,jumpers,cablesgroundings,weatherproofingontopandbottom, GSM antenna
jumperconnectorsweatherproofing,labelingroxeticinstallingwithsilicon,inside shelter
jumpersconnectorsonBTS coveredwithshrink).
• Lead inthe Installationandcommissioningof EricssonRBS TelecomworksbothforIndoorRBS
cabinet,TRMrack, Rectifierrack,AMMmagazine,Indoorunit, Layingandterminationof cables
and OutdoorantennaFeeder,Jumpers,Groundingasa subcontractorto Ericssonfor Vodafone
2G expansionproject.
2013 to 2014
2. • Performed Surveysitesforthe preparationof 2G expansionAccordingtoVEstandards.
• EricssonTrafficNode (2P, 6P&20P), RBS 2G&3G 6000 seriesinstallation&commissioning.
Company:ZTE KSA (SAUDIARABIA)
Position: 2G/3G Node B TelecomimplementationsupervisorEngineer(STC- 3G6project).
Achievements:
• Workingas SouthRegion Ti supervisorengineeron ZTE new+Swap Project(swappingfrom
NSN,HUAWEI to ZTE for 3G network).
• BeingZTE representative Ineedtovisitsitestocheckthe qualitystandardsand supervise the
Subcontractorin case of anycritical issues.
• Coordinationwiththe NOC&NMS Engineersforproperoperation.
• Strongexperienceof Installationandcommissioningof Node B(ZXSDRBS8800), Microwave
(ZXMWNR8250) and Dry alarm clearance of Node B.
• Responsible forupgradingnew VLANinMicrowave andNode Bas per Cisco Routingandto
synchronize the site withBSC/RNCthroughcorrectVLAN.
• (Apr-2012), startingout with SYSEL manage services STC-3G6projectat KSA South regionarea.
• (Jul-2012), have been optedto attendWOFPM& WOFCMplanningall overthe KSA kingdomat
the Head of STC in Riyadh departmentof operationandmaintenance.
• Attending"PAT"asSTC responsible forswapped&new STCsitesfromthe Quality,
Electromechanical andTelecomTeamsregardingto SA& NSA.
• Workingas Operation& maintenance coordinatorof STC forSYSEL CompanyinKSA south
region.
• Responsible forfollowingandclosing(Trouble Tickets) TTsfromNOC. Figuringthemout,
sendingteamstoperfectlyhandleandupdate the interventionsheet.
• Planand move teamstoperformtheirtasksefficiently.
• DoingSurveyforsite acceptance bothnew installationandswappedprojects.
• Reportall site minor,major andcritical snags and preparingworkfiles.
Company: SYSTEL- Egypt
Position: BSS Motorola engineer (Mobinile operator)
Achievements:
• Installing, Commissioning and Integrating MOTOROLA BTS cabinet types (Mcell-6, Horizon1,
HorizonII, Mini & micro) in GSM&DCS frequency bands.
• Starting from creating site E1’s at BSC, routing, on air downloading, equipment calibration,
commissioning, troubleshooting and integration till accepting new sites.
• Doing night actions Reconfiguration, downgrade, upgrade, swapping and splitting.
• Troubleshooting for common sites problems (VSWR, IOI and (+PB & -PB).
• Making both types of route back to back and drop-insert for microwave transmission
equipment "NEC, ALCATEL and NOKIA".
• Have an experience of Installing and downloading database of new Motorola BSC.
• (Aug-2007), obtaining the second highest evaluation among 60 more senior engineers.
• (Sep-2009),Have been driven as an instructor for Motorola Junior engineers in Motorola BTS
installation, calibration, and troubleshooting most common network problems.
• (Oct-2010), represent SYSTEL Company for starting HUAWEI project in south Egypt (Etisalat
operator) inthe microwave projectinstallationplanforinstalling HUAWEItransmissionsystem.
• Installing and commissioning of HUAWEI microwave transmission system type opti-X 950.
• Supervise the MWInstallation(checkinginstallationof Mw standards with all nuts & bolts, ODU
installation, supervise the installing of IF connectors, weather proofing on IF connectors,
installation of IDU, labeling on top and bottom.
Company: super service (Ericsson subcontractor- Egypt).
Position: Data Transmission Engineer.
Achievements:
2011 to 2012
2008 to 2011
2007 to 2008
3. (May-2008), Member of Ericsson transmission team of the higher bandwidth installation plan
project for all Vodafone switches (MSC) in Egypt.
InstallingEricssonTransmission equipmentsof ADM(AddDropMultiplexing) data Transmission
cabinets for Vodafone Egypt Project according to Vodafone standards.
Startingfromsurveying,installing,powering up, testing till accepting the new ADM cabinets in
Vodafone HUP’S & SWITCHES.
Testing Ericsson DXX nodes forty and fifty series (DXX 6340, DXX 6350) by network testing tool
SDH analyzers (ACTRENA ANT 20SE).
Installing & receiving new STM’s from fiber room in TE "telecom Egypt" to the ADMcabinets
and performing maintenance.
Military Service: Egyptian Air Forces.
Position: Reserved Officer Maintenance Engineer at Egyptian Air Forces.
Responsibilities:
Achieving missions and tasks under the authority of the Egyptian Air forces army.
Responsible for leading staff of soldiers and officials.
Troubleshooting and managing “GATR” Ground Air Transmitter Receiver System.
Managing AutomaticControl Room, WhichisspecializedinAviation,belongs tothe EgyptianAir
Defense.
ACADEMIC QUALIFICATION
• Bachelor of communication and electronics engineering (May – 2004).
• Faculty of Engineering, Cairo University – Egypt.
• Graduation Project: “Mobile ROBOT”.
• Project Grade: Excellent.
• General Grade: Good.
Personal Information
IQAMA Type: 18H Transferable
Driving License: in progress
Marital Status: Married
Nationality: Egyptian
Military service: Completed
Language Skills
English: professional writing & reading skills and Very good Listening & speaking.
Arabic: mother tongue
Computer Skills
Operating Systems: Microsoft Windows XP, Windows 2000, Windows 98.
Application Programs: Microsoft Word, Excel, Power Point & Outlook Express.
Computer Hardware: Good knowledge of Computer hardware and maintenance.
Papers:
Available upon request
Notice Period: As Per Call
2004 to 2007