1. Abdul Jabbar
Objective:
Seeking a challenging job in an organization where I can contribute to its
growth along with enhancing my professional skills. Being committed to
excellence I posses the drive & energy to follow through and I am willing to
take projects to completion by meeting challenges through innovations.
Summary: I have extensively worked on GSM 2G / 2.5G / 3G /LTE in
areas of BSS, PDH/SDH microwave transmission equipment. Also worked
for the EDGE implementation network wide, as per customer requirement.
My expertise include; System integration, installation, commissioning &
trouble shooting. I can apply the full scope of experience in
Telecommunication documentation and communication skills. Share ideas
with positive attitude, effective problem Solver with planning and design
proficiency. I have extensive hands on Experience on ERICSSON (TRM and
BSS), HUAWEI (TRM and BSS), NEC, and ZTE SDR [ZX-DR (8900A,
8700, 8200, W301)] equipments.
Experience: Telecom Swap Engineer 2G/3G/LTE
ERICSSON (16th
Jun 2016 - to date)
ProjectDescription Etisalat
Job Description
Key Responsibilities:
I am working as a SWAP Engineer on Ericsson project in Dubai region for Etisalat; my responsibilities
are installation, commissioning and configuration of Ericsson Radio Base Station Operation and
maintenance of RBS (Ericsson) 6000and flamingo series for both 900 and 1800 GSM network and
Ericsson Transmission Mini Link Traffic Node 2P, 6P, 20P and Compact Node. Experience of Ping test
for E1 port visibility of Ericsson Nodealarms that occur in and any other alarm that occur from
the Radio Base Station. Working experience, as a SWAP Engineer, of fault finding and fault
assessment. Basic core network knowledge in to identify problems outside the a SWAP
Engineer
DUG: Installation of IDB in RBS
DUW 3G: Installation of 3G scripts
LTU: Installation and integration
TCU: working on transmission
2. Experience: Telecom Swap Engineer 2G/3G/
ZTE Pakistan (25th
Jun 2015 - to date)
ProjectDescription Mobilink
Job Description
Key Responsibilities:
I am working as a SWAP Engineer on ZTE Mobilink project in C3 region; my responsibilities are
installation, commissioning and configuration of ZTE Radio Base Station SDR BC8910A and Ericsson
Transmission Mini Link Traffic Node 2P, 6P, 20P and Compact Node. Experience of Ping test for E1
port visibility of Ericsson Node with PRO-Win and Cola soft ping test tool.
ZTE(SDRBC8910A):
Installation, commissioning and configuration of ZTE Radio Base Station SDR BC8910A.
Sound knowledge of Operation & Maintenance, Terminal Version LMT and EOMS version
with the handling of O&M activities. Supervise the installation of Outdoor/Indoor equipment
such as GSM Antenna, Duplexer and Feeder system. Experienced Sweep Test, VSWR and
DTF Experienced on Site acceptance. Conduct of troubleshooting of alarms that occur in SDR
BC8910A during malfunction of equipment such as BBU, RRU8863 , RRU8881 and any
other alarm that occur from the Radio Base Station. Working experience, as a SWAP
Engineer, of fault finding and fault assessment. Basic core network knowledge in to identify
problems outside the a SWAP Engineer
Experience: Telecom RAN Supervisor
Ericsson Pakistan 01st
Aug 2013- 01st
Jan 2015
ProjectDescription Mobilink
Job Description
Key Responsibilities:
Installation and Commissioning 2G
Performing expansion activities for 2G
Configuring and monitoring SAU for alarms through OMT.
Supervising successfulcutovers and alarm verification.
Useful experience of Traffic Node (CN, 2P, 6P, and 20P).
Experience of Installation, testing as well as troubleshooting of transmission
3. nodes.
Performing link up gradation of 1+1,2+0 and XPIC link
Performing XPD value as per requirement
Ensuring the site visibility through Traffic Node
Managing team for smooth, timely, efficient and proactive operation.
Perform Routine tests and routine site visits.
Perform different planned activities especially on live equipments.
Conduct Test Call on every site, preparation for site Acceptance.
Responsible for loading IDB site configuration using OMT software.
Sweep test of feeder cable using Anritsu / Bird site master test equipment.
Troubleshooting VSWR and Fault location before and after swap.
Installation and Commissioning of rectifiers.
Conducting Site Survey for the new and Swap out sites.
Conducting LOS through Flag test, mirror test and Path survey (if needed).
Conducting LOS Survey for Rollout Sites
Create and update/manage trouble tickets for any detected problem.
Perform periodic content service testing such as loop testing; call testing, VSWR
and etc.
Performing quality visits and ensuring quality as per E// Standard.
Working on Microwave (Ericsson) MINILINK (CLASSIC, HIGH
CAPACITY), TRAFFIC NODES.
. Many times Media Cut over activities individually performed successfully
on deferent Transmutation nods.
Operation and maintenance of RBS (Ericsson) 2206, 2207/ 2106, 2107 and
flamingo series for both 900 and 1800 GSM network.
Involvement in Transmission links` up gradation (cutover) from low
capacity to high capacity (Traffic node to HC and classic to Traffic node).
NEC PASO LINK for TX with Huawei BTS.
. Sites Integration and troubleshooting of routine internal alarms.
Connectivity of sites at the time of Expansion and Power on activities.
. Routine checking and FAULT ATTENDANCE at TRAFIC NODE and
HUB SITES
Cross connectivity in Traffic Nodes.
Handling of Power related issues at sites. (GENSET, A/C, LC, Rectifier
etc).
Strong GSM BSS product knowledge with experience in routine
maintenance and troubleshooting in the several of the following areas:
OMC-R, BSC, BTS.
Well-versed in the software loading for all sub-systems for upgrade and
patching processes.
. Operation and maintenance of RBS (Ericsson) 6000and flamingo series
for both 900 and 1800 GSM network.
4 Installation, mounting, Commissioning IDU & ODU “Ericsson”
microwave (Mini Link 2E1, 16E1) units. Classic & Traffic Node Sites.
Supervise the installation of directional Antennas with their specified
orientation and proper tilts with TMA.
4. Installation of BBS, Rectifier and all kind of A.C & D.C works
Troubleshooting all related faults.
.
Experience: Telecom SeniorSupervisor
Alcatel-Lucent Pakistan(30th
May 2006- 30th
July 2013)
ProjectDescription Mobilink
Job Description
MXBSC (Base Station Controller)
Installation & hardware troubleshooting of Alcatel BSC,
Power up the BSC, alarm patching, alarm generating & alarm
verification of BSC,
Commissioning of BSC & troubleshoot the software faults.
Installed the JBXCCP card for ABIS control,
Installed the JBXTP card for controlling the M7 signaling
towards MSC,
Install the JBXOMCP card for loading all files,
Install the JBXSSW card for switching purpose.
BSC HW audit and CCP addition
LIU troubleshooting
Swap in Central-III for G2 BSC to MXBSC
Transcoder
Experience of Installation & hardware troubleshooting of
Alcatel Transcoder,
Power up the transcoder,
Install the MT120 cards for transcoder.
Commissioning & card configuration of transcoder.
BTS (Base Transceiver system)
Installation, Commissioning and maintenance of Evolium
BTS A9100,A9110 in Mobilink (South, Centre-III &
Centre-IIRegions) & Zong (North Region) Projects.
Installation, Commissioning and On-Air BTS sites(Indoor,
Outdoor & Micro BTS)
Daisy Chain sites configuration
VSWR problem resolution
Add TRE to equipped A9100 BTS
Call drop BSS resolution
BTS configuration
5. Faulty equipment (TRE, SUMA,ANC, Duplexer…)
resolution
Performed Swap operation from Motorola to Alcatel
Synchronize / Desynchronize Master / slave site
Attach / Detach Secondary Abis
Conducting Expansions / reductions as per the work order
from the operator
Rep lace Faulty TRE’s
Power of TRE checked with power meter
Provide Technical Support
Alarm patching & alarm verifying of BTS
Troubleshooting
Off line Commissioning of the GSM & DCS Racks of BTS.
On air the site & complete software troubleshooting.
Installation of micro BTS and complete troubleshooting with
Off line & On line Commissioning.
Sweep Test
Sweep test of BTS Sites through Anitsu site master.
Save the values & trouble shoot the hard ware faults.
Surveys
Complete survey & proposal the location for BTS sites,
BSC sites, Transcoder & also proposed the locations in
Mobilink MSC. Making survey reports & survey drawings on
AutoCAD.
Swap from Motorola to Alcatel in South Region(2011)
As site supervisor my responsibilities have been:
Complete site survey
Online commissioning in a limited time
Alarms patching
Responsible for site, until Drive Test done successfully.
Installation of BSC’s
Dismantling BSC’s
BSC HW audit
BSC cutovers
Installation of Transcoder
Configure MT120 cards
Troubleshooting on TC
Experience: Electronics Technician
Pakistan Army (2001- 2003)
Did work in Pakistan army as Civil Technician in Rahim Yar Khan.
Worked in 139 infantry workshop company, Electrical & Mechanical
Engineers, on Military Electronics equipment
Performed troubleshooting and electronics equipment repairing
6. Educational Qualification:
Certificate (SolarInstallation and integration )
Duration: (2002-2003)
From: Govt. College of Technology, Rahim Yar Khan.
One year diploma (Electronics)
Session: (2002-2003)
From: Govt. College of Technology Rahim Yar Khan.
Matriculation
Session: (1995)
From: Govt. Pilot High School Rahim Yar Khan.
Personal Information:
Father’s Name Muhammad Anwar
Date ofBirth 1st
Sep, 1978
Contact # Home # (+92) -068-5956094
Cell # (+92) 0300 6701649, 0314 6684007
UAE#0097(0508676122
E-mail address mian.ajabbar@yahoo.com
mian.ajabbar@hotmail.com
Mailing Address Ghaffar Electric works, Gulmerg road, near
Agriculture College, Rahim Yar Khan, Pakistan