RREESSUUMMEE
AANNJJUULL..NN
(B.E ECE Engineer)
E-mail:anjulclt@gmail.com
Mobile:+96891128672,+96895408025
OO BBJJEECCTT IIVVEE
Seeking a full-time position in well-established Telecom Company that offers
professional growth and ample opportunity to learn and enrich my competencies in my
profession
EEDDUUCCAATT IIOO NNAALL QQ UUAALLIIFFIICCAATT IIOO NNSS
 Bachelor of Engineering(Electronics and communication), from Sri
SubramanyaEngineering College, Palani, India affiliated to University of Anna,2009
 12th
, fromUmbichyHajee HSS, India affiliated to State Board of Higher Secondary
Examination.
 1Oth
,from N.S.S HSS,Indiaaffiliated to State Board of examination
CCOO MM PPUUTT EERR KKNNOO WWLLEEDDGG EE
 Completed training in Cisco Certified Network Associate
 MS office
PPRROO FFEESSSSIIOO NNAALL EEXXPPEERRIIEENNCCEE
 NUT OMAN LLC-ASP FOR ERICSSON(AUGUST 2014 TILL DATE)
ERICSSON-OMANTEL SINGLE RAN PROJECT
 ROLE-IMPLEMENTATION ENGINEER
 Commissioning and integration of the site for both 3G (WCDMA) & 4G
(LTE)from scratch which includes running Cabinet script, O and M script,
Site Equipment Script & Iub Script and making CVs accordingly
 Creating and loading configuration scripts for Node B and ENode B
integration
 Technical SPOC for smart laptop implementation in ERICSSON-
OMANTEL PROJECT(3G/LTE/CARRIER EXPANSION)
 Implemented Mixed Mode UMTS900 activity
 DUS cascading for L800 and L2600 adition
 Delete and re-configuring the sites Using Moshell Commands.
 Good understanding and working experience with UTRAN Software &
License upgrades, Emergency activation of license and troubleshooting
 4th Carrier Addition/UMTS900 addition
 Software Upgradation of LTE/3G nodes via moshell
 Configuration of TCU in VSAT sites
 Defining TMA/RET in LTE NODES
 Troubleshouting based on signalling traces, VSWR, RSSI analysis
 Configuration of Cascaded RET for Hexa Band Antenna
 Capacity up-gradation and swapping of transmission equipments in
Outages
 Ethernet switch configuration (Ethernet Bridge, VLAN, WAN, RLMEI,
LAG).
 ERICSSON GLOBAL SERVICES LTD(NOV 2013-AUG 2014)
 XL-AXIATA NodeBINTEGRATION PROJECT
 Handling integration of ATM and IP Site’s RBS6201V2W, RBS6601W,RBS3418
in RNC3820, RNC3810 and in EVO RNC(using Secure
CRT,moshell,Filezilla,Citrix)
 Handles the daily fault management, fault surveillance and monitoring of
RBS6000 family node Bs (RB6101 and RBS6102) using OSS-RC10 RAN/WRAN
applications and WINFIOL
 New Site Integration with MOCN feature enable in RNC3820, RNC 3810, EVO
RNCAddition, Deletion & Modification of different control parameter for cell sites
3G nodes through the MO scripts and related operations
 Dealing with new site integration remotely including the script preparation for
RNC3820,RNC3810 and EVO RNC as well as for Node-B type RBS6201V2W,
RBS6601W,RBS3418.
 Handing over the site to customers without any alarm & defining the site in OSS.
 Cell creating in RNC, and responsible for speech, data call, QOS from RNC to
NODE end.
 Creation of all relation Scripts based on the radio input given from customer
 Capacity Upgradation of 3G Nodes
 3rd Carrier Activation
 Carrying out remote Software upgrade for RNC and Node B using SMO
 Post monitoring of newly integrated sites
 Parameters setting, Neighbor relation CR, RNC Parameters CR.
 NATIONAL UNITED TELECOMMUNICATION( June 2013 to Oct 2013)
ERICSSON-OMANTElPROJECT(INTEGRATION ENGG)
 Integration of ERICSSON 2g/3g/LTE (6201 CABINET)
 Creating and loading configuration scripts for Node B and ENode B
integration
 Second carrier addition in 3G nodes
 Troubleshooting of RBS for both internal and external alarm clearance
 Defining TMA/RET in LTE NODES
 Performed Addition, Deletion & Modification of different control
parameter for cell sites (3G, Transmission nodes) through the MO
scripts and related operations
 OEC-TECH (OMAN) (OCTOBER 2012 TO JUNE 2013)
 ERICSSON-OMANTELPROJECT(PROJECT ENGINEER)
 Integration of ERICSSON 2g/3g/LTE (6201 CABINET)
 Creating and loading configuration scripts for Node B and ENode B
integration
 Changing O&M IP’S of NODE B’s using Moshell
 Defining TMA/RET in LTE NODES
 Configuration and troubleshooting of O&M connectivity Node B
 E1 routing to cell sites to establish link between RBS to RNC,
 ATM to IP Migration(without missing license)
 Sector addition in 3G nodes
 Increasing the E1 capacity for ATM sites(3000 series)
 Capacity up-gradation and swapping of transmission equipments in
Outages
 Swapping the MMUs, NPUs and Radios during PWR, allowing network
nodes to carry data packets
 Software up gradation of Traffic Node up to Baseline R22M10
 Ethernet switch configuration (Ethernet Bridge, VLAN, WAN, RLMEI,
LAG).
 Ethernet traffic over E1 (Bridging)
 Ethernet traffic over Packet link.
 REIME GHANA (WEST AFRICA) (MARCH 2012 TO JULY 2012)
 AIRTEL MANAGEMENT SERVICE(TRAINING MANAGER)
 MS TRAINING MANAGER for ERICSSON
NODE-B 6000 SERIES, giving training for engineers over here forSITE
INTEGRATION,DUW swapping, ALARM CLEARANCE and
Modification of different control parameter for cell sites (3G,
Transmission nodes)through the MO scripts and related operations using
moshell,rbs element manager and hyper terminal
 Integration andMaintanence of ericsson 2g and 3g sites
(6202, 6201, 6101, 6601, 3216, 3116, 2116,)
 Troubleshooting of RBS for both internal and external alarm clearance
 Integration of Node-B with IP configuration for 3G
 Performed Addition, Deletion & Modification of different control
parameter for cell sites (3G, Transmission nodes) through the MO
scripts and related operations.
 DUW swapping
 Providing Centrally Online Support to other field Engineers
 Installation, commissioning and integration of Ericsson RBS (Both 2G
and 3G)indoor & outdoor
 CONVERON TECHNOLOGIES PVT. LTD
 AIRTEL(NOV 2011 TO JAN 2012)UGANDA, East Africa
 Integration & commissioning of Ericsson RBS 2G&3G (6101,
6201,2116v2,2106v3,2106i,2206 ,2206v2) indoor & outdoor.
 Troubleshooting of RBS for both internal and external alarm clearance
 Supervise ASPs Installation and Engineering staff to ensure: work
inaccordance with Ericsson procedures and methods,
appropriateImplementation Processes are followed; correct
methods,instructions,checklists and reports are used by ASP
 Verify and Rectify Antenna system Azimuth and Tilting. For site
acceptance.
 Rectify the Feeder high Peak by using Sweep Test, Feeder Grounding
 Performing drive test using TEMS in both idle and dedicated mode
 ERICSSON INDIAPVT. LTD(OUT SOURCED BY TICS)
Period : From SEPTEMBER 2010 to JULY 2011
Designation : BSS ENGINEER
 AIRCEL 2G&3G(SEPT 15 TO FEB 09)Coimbatore,Tamilnadu.
 Integration &commissioning of Ericsson RBS (6601, 6601E,
6201 , 6202.6101,6102 BTS)
 Creating and loading configuration scripts for Node B integration
 Configuration and troubleshooting of O&M connectivity Node B
 Integration& commissioning of Ericsson RBS (2964 and 2954)
 Commissioning of Transmission equipments Ericsson Traffic
node( Tn 6p&Tn 2p)
 Testing and commissioning of Traffic nodes, PDH, 7 ghz/15ghz
Radio.
 Up gradation of Microwave Radios
 Supervise ASPs Installation and Engineering staff to ensure:
work inaccordance with Ericsson procedures and methods,
appropriateImplementation Processes are followed; correct
methods,instructions,checklists and reports are used by ASP
 E1 routing to cell sites to establish link between RBS to RNC,
 Alarm extension for both 2G and 3G
 VODAFONE 3G(FEB 10 TO MAY 9)-MUMBAI
 Integration &commissioning of Ericsson RBS (6601, 6601E,
6201 and 6202 BTS) indoor & outdoor
 Creating and loading configuration scripts for Node B integration
( Node B
 Configuration and troubleshooting of O&M connectivity Node B
 Integration of New NODE B with RNC and verification of the
same, like
Handover and call Quality testing using Ericsson TEMS Mobile
phone.
 DUW SWAPPING
 Quality analysis
 BSNL 3G/2G( MAY 9 TO JULY 10)-HARYANA
 Performed troubleshooting fault’s and alarm clearing for 3G/2G
BTS, Nodes and Transmission Nodes.
 Acceptance test for both 2G(2954,2964) and 3G sites
 External alarm extension for both 2G and 3G sites
 Acceptance test for minilink
 Verify and Rectify Antenna system Azimuth and Tilting. For site
acceptance.
 Rectify the Feeder high Peak by using Sweep Test, Feeder
Grounding
 Quality analysis
 ECHO TELE SERVICES
Period :From JANUARY 2010 to SEPTEMBER 2010
Designation : Telecom Engineer
 VIDEOCON 2G(NSN-NEC)-CALICUT,KERALA
 Installation and commissioning of NEC microwave link
 Project Management for project rollout within timelines.
 Conducting site survey and LOS survey
 Reports & Assist the O&M ENGG in inspections & audits.
 Acceptance test of integrated sites
 Punch point clearance and quality analysis
 SSR ELECTRICAL AGENCIES
Period : From JUNE 2009 to DECEMBER 2009
Designation : Telecom Engineer
 AIRCEL/DOCOMO/BSNL-KERALA,TAMILNADU
 Had associated with the following projects of Bsnlindia(3G)
NEC of TATA DOCOMO and HUAWEI of AIRCEL
 Installation and commisioning of MICROWAVE LINKS
 Installation of GSM BTS(HUAWEI)
 Conducting site survey and LOS survey
 TOOLS
MOSHELL, WINFIOL,CITRIX, SECURE CRT,FILE ZILLA,Smart Laptop
Ericsson RBS Element Manager,Ericsson OMT 50.E,MINILINK CRAFT 2.20
EEXXPPEERRIIEENNCCEE ((RROO LLEE SSUUMM MM AARRIIEESS))
 Currently working in NUT Oman LLC as RAN Engineer
 Worked with GSC INDIA as NetworkEngineer,RAN Integration
 Worked with ERICSSON Oman as INTEGRATOR for 2G/3G/LTE
 Worked inERICSSONGHANA –AIRTEL MS PROJECT as TRAINING MANAGER
 WORKED IN ERICSSONUGANDA-AIRTEL PROJECT as RAN ENGINEER
 Has worked inERICSSON INDIA PVT LTD forAIRCEL 3Gproject in
Chennai,VODAFONE3G in Mumbai,andBSNL 3G/2Gproject in Haryana
 Had associated with the following projects of BSNL India(3G),NEC of TATA
DOCOMO and HUAWEI of AIRCEL under KERALA & TAMIL NADU circle
 Integration of ERICSSON NODE B,E-NODEB
 Installation and Commisioning of Micro Wave linKS
 Installaton of CDMA/GSM BTS
 Conducting site survey and LOS survey
 Installation of NETWORK MANAGEMENT SYSTEM(NMS)
 Reports & Assist the O&M ENGG in inspections & audits.
 Integration & commissioning of Ericsson 3G (6601,3418,6201,6202 and 3216,)
indoor & outdoor.
 Integration & commissioning of Ericsson BTS (2964, 2954,6000 SERIES)
 Testing and commissioning of Traffic nodes, PDH, 7 ghz/15ghz Radio.
 Up gradation of Microwave Radios
 E1 routing to cell sites to establish link between RBS to RNC,
MM AAIINN PPRROO JJEECCTT
 MULTI PROTOCOL COMMUNICATION CONTROLLER FOR ONBOARD MARINE
INSTRUMENTSDone in embedded system at KELTRON (A GOVT AIDED COMPANY).This
is done for Indian navy .Used mainly for the safe landing of helicopters in the ship
and also for finding out the distance of submarines
PPAARRTT IICCIIPPAATT EEDD SSEEMM IINNAARRSS
 BLUE TOOTH:-Which is an open wireless protocol for exchanging data over short
distances from fixed and mobile devices, creating personal area networks (PANs).
AACCHHIIEEVVEEMM EENNTT&AACCTT II VVIITT IIEESS
 Actively participated in THEOGONIA 2009 ( A national level technical symposium
and exhibition conducted by the ECE Department of the College)
RREEFFEERREENNCCEESS
KHALDOUN ABBADI
IMPLEMENTATION MANAGER
ERICSSON OMAN
SMS/MMS +96897054920
EMAIL-khaldoun.abbadi@ericsson.com
PPEERRSSOO NNAALL DDEETT AAIILLSS
Date of birth : 05-10-1987
Sex : Male
Nationality : Indian
Driving license : Holding valid Indian Driving License
Passport : H5691792
Strengths : self motivated,enthusiastic with Leadership
Qualities and Confidence of getting and taking
Along with a team
Languages known : English, Malayalam, Hindi,Tamil
Permanent Address : SWAPNAPURI (H)
MANNUR (P.O)
CALICUT (DT)
KERALA
INDIA, PIN-673328
I hereby declare that the information furnished above is true to the best of my knowledge.
CALICUT ANJUL.N

resume_anjuln

  • 1.
    RREESSUUMMEE AANNJJUULL..NN (B.E ECE Engineer) E-mail:anjulclt@gmail.com Mobile:+96891128672,+96895408025 OOBBJJEECCTT IIVVEE Seeking a full-time position in well-established Telecom Company that offers professional growth and ample opportunity to learn and enrich my competencies in my profession EEDDUUCCAATT IIOO NNAALL QQ UUAALLIIFFIICCAATT IIOO NNSS  Bachelor of Engineering(Electronics and communication), from Sri SubramanyaEngineering College, Palani, India affiliated to University of Anna,2009  12th , fromUmbichyHajee HSS, India affiliated to State Board of Higher Secondary Examination.  1Oth ,from N.S.S HSS,Indiaaffiliated to State Board of examination CCOO MM PPUUTT EERR KKNNOO WWLLEEDDGG EE  Completed training in Cisco Certified Network Associate  MS office PPRROO FFEESSSSIIOO NNAALL EEXXPPEERRIIEENNCCEE  NUT OMAN LLC-ASP FOR ERICSSON(AUGUST 2014 TILL DATE) ERICSSON-OMANTEL SINGLE RAN PROJECT  ROLE-IMPLEMENTATION ENGINEER  Commissioning and integration of the site for both 3G (WCDMA) & 4G (LTE)from scratch which includes running Cabinet script, O and M script, Site Equipment Script & Iub Script and making CVs accordingly  Creating and loading configuration scripts for Node B and ENode B integration  Technical SPOC for smart laptop implementation in ERICSSON- OMANTEL PROJECT(3G/LTE/CARRIER EXPANSION)  Implemented Mixed Mode UMTS900 activity  DUS cascading for L800 and L2600 adition  Delete and re-configuring the sites Using Moshell Commands.
  • 2.
     Good understandingand working experience with UTRAN Software & License upgrades, Emergency activation of license and troubleshooting  4th Carrier Addition/UMTS900 addition  Software Upgradation of LTE/3G nodes via moshell  Configuration of TCU in VSAT sites  Defining TMA/RET in LTE NODES  Troubleshouting based on signalling traces, VSWR, RSSI analysis  Configuration of Cascaded RET for Hexa Band Antenna  Capacity up-gradation and swapping of transmission equipments in Outages  Ethernet switch configuration (Ethernet Bridge, VLAN, WAN, RLMEI, LAG).  ERICSSON GLOBAL SERVICES LTD(NOV 2013-AUG 2014)  XL-AXIATA NodeBINTEGRATION PROJECT  Handling integration of ATM and IP Site’s RBS6201V2W, RBS6601W,RBS3418 in RNC3820, RNC3810 and in EVO RNC(using Secure CRT,moshell,Filezilla,Citrix)  Handles the daily fault management, fault surveillance and monitoring of RBS6000 family node Bs (RB6101 and RBS6102) using OSS-RC10 RAN/WRAN applications and WINFIOL  New Site Integration with MOCN feature enable in RNC3820, RNC 3810, EVO RNCAddition, Deletion & Modification of different control parameter for cell sites 3G nodes through the MO scripts and related operations  Dealing with new site integration remotely including the script preparation for RNC3820,RNC3810 and EVO RNC as well as for Node-B type RBS6201V2W, RBS6601W,RBS3418.  Handing over the site to customers without any alarm & defining the site in OSS.  Cell creating in RNC, and responsible for speech, data call, QOS from RNC to NODE end.  Creation of all relation Scripts based on the radio input given from customer  Capacity Upgradation of 3G Nodes  3rd Carrier Activation  Carrying out remote Software upgrade for RNC and Node B using SMO  Post monitoring of newly integrated sites  Parameters setting, Neighbor relation CR, RNC Parameters CR.  NATIONAL UNITED TELECOMMUNICATION( June 2013 to Oct 2013) ERICSSON-OMANTElPROJECT(INTEGRATION ENGG)  Integration of ERICSSON 2g/3g/LTE (6201 CABINET)  Creating and loading configuration scripts for Node B and ENode B integration  Second carrier addition in 3G nodes  Troubleshooting of RBS for both internal and external alarm clearance  Defining TMA/RET in LTE NODES
  • 3.
     Performed Addition,Deletion & Modification of different control parameter for cell sites (3G, Transmission nodes) through the MO scripts and related operations  OEC-TECH (OMAN) (OCTOBER 2012 TO JUNE 2013)  ERICSSON-OMANTELPROJECT(PROJECT ENGINEER)  Integration of ERICSSON 2g/3g/LTE (6201 CABINET)  Creating and loading configuration scripts for Node B and ENode B integration  Changing O&M IP’S of NODE B’s using Moshell  Defining TMA/RET in LTE NODES  Configuration and troubleshooting of O&M connectivity Node B  E1 routing to cell sites to establish link between RBS to RNC,  ATM to IP Migration(without missing license)  Sector addition in 3G nodes  Increasing the E1 capacity for ATM sites(3000 series)  Capacity up-gradation and swapping of transmission equipments in Outages  Swapping the MMUs, NPUs and Radios during PWR, allowing network nodes to carry data packets  Software up gradation of Traffic Node up to Baseline R22M10  Ethernet switch configuration (Ethernet Bridge, VLAN, WAN, RLMEI, LAG).  Ethernet traffic over E1 (Bridging)  Ethernet traffic over Packet link.  REIME GHANA (WEST AFRICA) (MARCH 2012 TO JULY 2012)  AIRTEL MANAGEMENT SERVICE(TRAINING MANAGER)  MS TRAINING MANAGER for ERICSSON NODE-B 6000 SERIES, giving training for engineers over here forSITE INTEGRATION,DUW swapping, ALARM CLEARANCE and Modification of different control parameter for cell sites (3G, Transmission nodes)through the MO scripts and related operations using moshell,rbs element manager and hyper terminal  Integration andMaintanence of ericsson 2g and 3g sites (6202, 6201, 6101, 6601, 3216, 3116, 2116,)  Troubleshooting of RBS for both internal and external alarm clearance  Integration of Node-B with IP configuration for 3G  Performed Addition, Deletion & Modification of different control parameter for cell sites (3G, Transmission nodes) through the MO scripts and related operations.  DUW swapping  Providing Centrally Online Support to other field Engineers
  • 4.
     Installation, commissioningand integration of Ericsson RBS (Both 2G and 3G)indoor & outdoor  CONVERON TECHNOLOGIES PVT. LTD  AIRTEL(NOV 2011 TO JAN 2012)UGANDA, East Africa  Integration & commissioning of Ericsson RBS 2G&3G (6101, 6201,2116v2,2106v3,2106i,2206 ,2206v2) indoor & outdoor.  Troubleshooting of RBS for both internal and external alarm clearance  Supervise ASPs Installation and Engineering staff to ensure: work inaccordance with Ericsson procedures and methods, appropriateImplementation Processes are followed; correct methods,instructions,checklists and reports are used by ASP  Verify and Rectify Antenna system Azimuth and Tilting. For site acceptance.  Rectify the Feeder high Peak by using Sweep Test, Feeder Grounding  Performing drive test using TEMS in both idle and dedicated mode  ERICSSON INDIAPVT. LTD(OUT SOURCED BY TICS) Period : From SEPTEMBER 2010 to JULY 2011 Designation : BSS ENGINEER  AIRCEL 2G&3G(SEPT 15 TO FEB 09)Coimbatore,Tamilnadu.  Integration &commissioning of Ericsson RBS (6601, 6601E, 6201 , 6202.6101,6102 BTS)  Creating and loading configuration scripts for Node B integration  Configuration and troubleshooting of O&M connectivity Node B  Integration& commissioning of Ericsson RBS (2964 and 2954)  Commissioning of Transmission equipments Ericsson Traffic node( Tn 6p&Tn 2p)  Testing and commissioning of Traffic nodes, PDH, 7 ghz/15ghz Radio.  Up gradation of Microwave Radios  Supervise ASPs Installation and Engineering staff to ensure: work inaccordance with Ericsson procedures and methods, appropriateImplementation Processes are followed; correct methods,instructions,checklists and reports are used by ASP  E1 routing to cell sites to establish link between RBS to RNC,  Alarm extension for both 2G and 3G  VODAFONE 3G(FEB 10 TO MAY 9)-MUMBAI  Integration &commissioning of Ericsson RBS (6601, 6601E, 6201 and 6202 BTS) indoor & outdoor  Creating and loading configuration scripts for Node B integration ( Node B  Configuration and troubleshooting of O&M connectivity Node B  Integration of New NODE B with RNC and verification of the same, like
  • 5.
    Handover and callQuality testing using Ericsson TEMS Mobile phone.  DUW SWAPPING  Quality analysis  BSNL 3G/2G( MAY 9 TO JULY 10)-HARYANA  Performed troubleshooting fault’s and alarm clearing for 3G/2G BTS, Nodes and Transmission Nodes.  Acceptance test for both 2G(2954,2964) and 3G sites  External alarm extension for both 2G and 3G sites  Acceptance test for minilink  Verify and Rectify Antenna system Azimuth and Tilting. For site acceptance.  Rectify the Feeder high Peak by using Sweep Test, Feeder Grounding  Quality analysis  ECHO TELE SERVICES Period :From JANUARY 2010 to SEPTEMBER 2010 Designation : Telecom Engineer  VIDEOCON 2G(NSN-NEC)-CALICUT,KERALA  Installation and commissioning of NEC microwave link  Project Management for project rollout within timelines.  Conducting site survey and LOS survey  Reports & Assist the O&M ENGG in inspections & audits.  Acceptance test of integrated sites  Punch point clearance and quality analysis  SSR ELECTRICAL AGENCIES Period : From JUNE 2009 to DECEMBER 2009 Designation : Telecom Engineer  AIRCEL/DOCOMO/BSNL-KERALA,TAMILNADU  Had associated with the following projects of Bsnlindia(3G) NEC of TATA DOCOMO and HUAWEI of AIRCEL  Installation and commisioning of MICROWAVE LINKS  Installation of GSM BTS(HUAWEI)  Conducting site survey and LOS survey
  • 6.
     TOOLS MOSHELL, WINFIOL,CITRIX,SECURE CRT,FILE ZILLA,Smart Laptop Ericsson RBS Element Manager,Ericsson OMT 50.E,MINILINK CRAFT 2.20 EEXXPPEERRIIEENNCCEE ((RROO LLEE SSUUMM MM AARRIIEESS))  Currently working in NUT Oman LLC as RAN Engineer  Worked with GSC INDIA as NetworkEngineer,RAN Integration  Worked with ERICSSON Oman as INTEGRATOR for 2G/3G/LTE  Worked inERICSSONGHANA –AIRTEL MS PROJECT as TRAINING MANAGER  WORKED IN ERICSSONUGANDA-AIRTEL PROJECT as RAN ENGINEER  Has worked inERICSSON INDIA PVT LTD forAIRCEL 3Gproject in Chennai,VODAFONE3G in Mumbai,andBSNL 3G/2Gproject in Haryana  Had associated with the following projects of BSNL India(3G),NEC of TATA DOCOMO and HUAWEI of AIRCEL under KERALA & TAMIL NADU circle  Integration of ERICSSON NODE B,E-NODEB  Installation and Commisioning of Micro Wave linKS  Installaton of CDMA/GSM BTS  Conducting site survey and LOS survey  Installation of NETWORK MANAGEMENT SYSTEM(NMS)  Reports & Assist the O&M ENGG in inspections & audits.  Integration & commissioning of Ericsson 3G (6601,3418,6201,6202 and 3216,) indoor & outdoor.  Integration & commissioning of Ericsson BTS (2964, 2954,6000 SERIES)  Testing and commissioning of Traffic nodes, PDH, 7 ghz/15ghz Radio.  Up gradation of Microwave Radios  E1 routing to cell sites to establish link between RBS to RNC, MM AAIINN PPRROO JJEECCTT  MULTI PROTOCOL COMMUNICATION CONTROLLER FOR ONBOARD MARINE INSTRUMENTSDone in embedded system at KELTRON (A GOVT AIDED COMPANY).This is done for Indian navy .Used mainly for the safe landing of helicopters in the ship and also for finding out the distance of submarines PPAARRTT IICCIIPPAATT EEDD SSEEMM IINNAARRSS  BLUE TOOTH:-Which is an open wireless protocol for exchanging data over short distances from fixed and mobile devices, creating personal area networks (PANs).
  • 7.
    AACCHHIIEEVVEEMM EENNTT&AACCTT IIVVIITT IIEESS  Actively participated in THEOGONIA 2009 ( A national level technical symposium and exhibition conducted by the ECE Department of the College) RREEFFEERREENNCCEESS KHALDOUN ABBADI IMPLEMENTATION MANAGER ERICSSON OMAN SMS/MMS +96897054920 EMAIL-khaldoun.abbadi@ericsson.com PPEERRSSOO NNAALL DDEETT AAIILLSS Date of birth : 05-10-1987 Sex : Male Nationality : Indian Driving license : Holding valid Indian Driving License Passport : H5691792 Strengths : self motivated,enthusiastic with Leadership Qualities and Confidence of getting and taking Along with a team Languages known : English, Malayalam, Hindi,Tamil Permanent Address : SWAPNAPURI (H) MANNUR (P.O) CALICUT (DT) KERALA INDIA, PIN-673328 I hereby declare that the information furnished above is true to the best of my knowledge. CALICUT ANJUL.N