This document discusses the requirements for facilities under Good Laboratory Practice (GLP) regulations. It states that test facilities must be of appropriate size and construction to minimize disturbances that could affect study validity. There must be adequate separation of different activities through physical or organizational means. Specific facility requirements are outlined for housing test systems, handling test and reference items, storing records and samples, and disposing of waste. Calibrated apparatus must be maintained and suitable computer systems validated.