In early 2015, the Schuylkill River Development Corporation (SRDC) sought professional service proposals for a study to determine the general feasibility of extending the Schuylkill River Trail (Schuylkill Banks) south along the river from the end of the Bartram’s Mile project near 56th Street to the Passyunk Crescent Park (proposed) at the Passyunk Avenue Bridge (Figure 1). The selected Study Team, made up of KSK Architects Planners Historians, Inc. (KSK), Urban Engineers, Inc. (Urban), and Conservation Matters, LLC, prepared the SRDC Schuylkill River Trail Feasibility Study, Bartram’s to Passyunk. The study has been prepared in general conformance with the Lower Schuylkill Master Plan issued by the Philadelphia Industrial Development Corporation (PIDC), Philadelphia City Planning Commission, and the Philadelphia Department of Commerce. The goal of this important project is to continue moving towards the completion of the Schuylkill River Trail.
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
This project included removal and replacement of fuel storage tanks for stand by generators at the Long Branch Sanitary Sewer Pump Station and New Alexandria Stormwater Pump Station. Existing underground storage tanks were replaced with new above ground fuel tanks. The project included installation of piping, valves, fuel polishing systems, day tanks, and appurtenances, as well as associated site work. This project was substantially complete on October 29, 2021.
In early 2015, the Schuylkill River Development Corporation (SRDC) sought professional service proposals for a study to determine the general feasibility of extending the Schuylkill River Trail (Schuylkill Banks) south along the river from the end of the Bartram’s Mile project near 56th Street to the Passyunk Crescent Park (proposed) at the Passyunk Avenue Bridge (Figure 1). The selected Study Team, made up of KSK Architects Planners Historians, Inc. (KSK), Urban Engineers, Inc. (Urban), and Conservation Matters, LLC, prepared the SRDC Schuylkill River Trail Feasibility Study, Bartram’s to Passyunk. The study has been prepared in general conformance with the Lower Schuylkill Master Plan issued by the Philadelphia Industrial Development Corporation (PIDC), Philadelphia City Planning Commission, and the Philadelphia Department of Commerce. The goal of this important project is to continue moving towards the completion of the Schuylkill River Trail.
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
This project included removal and replacement of fuel storage tanks for stand by generators at the Long Branch Sanitary Sewer Pump Station and New Alexandria Stormwater Pump Station. Existing underground storage tanks were replaced with new above ground fuel tanks. The project included installation of piping, valves, fuel polishing systems, day tanks, and appurtenances, as well as associated site work. This project was substantially complete on October 29, 2021.
Rehabilitation of Three Equalization Basins and Ancillary Facilities Fairfax County
This project included construction and rehabilitation of three equalization basins and ancillary facilities located at the Noman M. Cole, Jr. Pollution Control Plant. The basins temporarily store overflow wastewater resulting from heavy storm events that exceed the plant’s treatment capacity. Work included construction of a new concrete liner system for Equalization Basin QQ1, rehabilitation of existing pump stations and addition of a new underdrain pump station and stormwater pump station. Construction of a new flood protection system and addition of a new check dam and sluice gate in Hogge Run for emergency spill protection. The new liner system for QQ1 includes a concrete slab with an HDPE membrane liner constructed over a pipe underdrain collection system.
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Fairfax County
Fairfax County walkway construction of 1,600 linear feet of concrete sidewalk, curb ramps, curb and gutter, retaining wall, pavement markings and signage, drainage improvements and utility adjustments.
VTA North County Open House Presentation April 2014SCVTA
More info: http://bit.ly/1lEOxm9. This presentation provides an overview of VTA's active and planned projects in the North County, presented at an April 9, 2014 open house in Mountain View. The projects covered include the Light Rail Efficiency Program, El Camino Real Bus Rapid Transit, Silicon Valley Express Lanes, and a study to improve bus service in the area. All the projects are located in or affect Mountain View, Palo Alto, Sunnyvale and surrounding communities.
McLean Hunt Estates Pond Improvement ProjectFairfax County
The McLean Hunt Estates Pond Improvement Project consisted of retrofitting an existing dry pond to an extended detention dry pond. The goals of the project were to stabilize the incoming degraded channel constructing a step pool conveyance system; replace the existing corrugated metal pipe principal spillway pipe with reinforced concrete pipe; install a new riser structure with BMP plate to provide water quality benefits; and upgrade the asphalt trail into an access road to accommodate equipment/vehicles for future maintenance.
Rehabilitation of Three Equalization Basins and Ancillary Facilities Fairfax County
This project included construction and rehabilitation of three equalization basins and ancillary facilities located at the Noman M. Cole, Jr. Pollution Control Plant. The basins temporarily store overflow wastewater resulting from heavy storm events that exceed the plant’s treatment capacity. Work included construction of a new concrete liner system for Equalization Basin QQ1, rehabilitation of existing pump stations and addition of a new underdrain pump station and stormwater pump station. Construction of a new flood protection system and addition of a new check dam and sluice gate in Hogge Run for emergency spill protection. The new liner system for QQ1 includes a concrete slab with an HDPE membrane liner constructed over a pipe underdrain collection system.
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Fairfax County
Fairfax County walkway construction of 1,600 linear feet of concrete sidewalk, curb ramps, curb and gutter, retaining wall, pavement markings and signage, drainage improvements and utility adjustments.
VTA North County Open House Presentation April 2014SCVTA
More info: http://bit.ly/1lEOxm9. This presentation provides an overview of VTA's active and planned projects in the North County, presented at an April 9, 2014 open house in Mountain View. The projects covered include the Light Rail Efficiency Program, El Camino Real Bus Rapid Transit, Silicon Valley Express Lanes, and a study to improve bus service in the area. All the projects are located in or affect Mountain View, Palo Alto, Sunnyvale and surrounding communities.
McLean Hunt Estates Pond Improvement ProjectFairfax County
The McLean Hunt Estates Pond Improvement Project consisted of retrofitting an existing dry pond to an extended detention dry pond. The goals of the project were to stabilize the incoming degraded channel constructing a step pool conveyance system; replace the existing corrugated metal pipe principal spillway pipe with reinforced concrete pipe; install a new riser structure with BMP plate to provide water quality benefits; and upgrade the asphalt trail into an access road to accommodate equipment/vehicles for future maintenance.
Develop a Pre-Design Process Specifically for Green/ Sustainable Building Projects with A Goal to Provide Facilitation, Advice, Ideas, Research and Data to the Client for A Sustainable Project.
This presentation was part of my senior capstone course, Environmental Impact Assessment. I and four other seniors produced a report and final presentation of our LEED ND analysis of the squalicum lofts development in Bellingham, WA.
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert HastingsRail~Volution
What does it mean to build a sustainable corridor? How do you honor the overall goal of conserving resources, but also engage stakeholders to develop the right type of project for their community? Take a wider look at the national perspective on building sustainable corridors. What is being done across the country to conserve resources and involve communities in these efforts? Then hear stories about a successful sustainable corridor in Portland; Albuquerque's BRT project; and an urban green plan to transform existing park-and-ride lots along Los Angeles' growing transit network into more sustainable places.
Moderator: Shelley Poticha, AICP, Director, Urban Solutions, Natural Resources Defense Council; Board Member, Board of Directors, Rail~Volution, Washington, DC
Katherine Lemmon, Transportation Planning Manager, Metro, Los Angeles, California
Robert Hastings, Agency Architect, TriMet, Portland, Oregon
David Leard, AICP, Senior Management Consultant, HDR, Seattle, Washington
Montgomery County Department of Environmental Protection Division of Solid Waste Services - Gude Landfill Remediation Project Corrective Measures Implementation - June 2017
Dooley v Gloucester County School Board SCHOOL BOARD'S OBJECTION to fine and ...Kenneth Hogge Sr
COMES NOW Respondent Gloucester County School Board ("School Board"), by
counsel, and states as follows as its objection to the award of attorney's fees and costs to Kaitlyn
Dooley ("Petitioner") and the imposition of a fine pursuant to Va. Code§ 2.2-3714(C), to be paid to the Literary Fund.
Dooley v Gloucester County School Board School Board’s Brief In Opposition To...Kenneth Hogge Sr
COMES NOW Respondent Gloucester County School Board ("School Board"), by counsel, and states that pursuant to Va. Code§ 2.2-3700 et seq. ("FOIA"), the Petition for Injunction and Mandamus ("Petition") filed in this action by Kaitlyn Dooley ("Petitioner") does not state any violation of FOIA or entitle her to the relief she seeks. The School Board requests the Court deny Petitioner's request for relief and enter judgment in favor of the School Board.
Dooley v Gloucester County School Board Plaintiff’s Brief In Support of Manda...Kenneth Hogge Sr
COMES NOW Petitioner Katlyn Dooley, by counsel, for her Brief in Support of Mandamus, states as follows:
On December 14, 2021, the Gloucester County School Board ("The Board") convened a closed meeting during which one board member was repeatedly berated by fellow board members.
Transcript of Hearing Dooley v Gloucester County School Board 4 19 2023 Heari...Kenneth Hogge Sr
Transcript of Hearing Dooley v Gloucester County School Board 4 19 2023. Pertaining to closed school board meeting and Freedom of Information Act request denials by the Gloucester County, Virginia school board.
On December 18, 2020, the VDOE Superintendent published a memo titled, “Public Comments for the Proposed Model Policies for the Treatment of Transgender Students in Virginia’s Public Schools.”
Presentation by Jared Jageler, David Adler, Noelia Duchovny, and Evan Herrnstadt, analysts in CBO’s Microeconomic Studies and Health Analysis Divisions, at the Association of Environmental and Resource Economists Summer Conference.
Many ways to support street children.pptxSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
What is the point of small housing associations.pptxPaul Smith
Given the small scale of housing associations and their relative high cost per home what is the point of them and how do we justify their continued existance
Up the Ratios Bylaws - a Comprehensive Process of Our Organizationuptheratios
Up the Ratios is a non-profit organization dedicated to bridging the gap in STEM education for underprivileged students by providing free, high-quality learning opportunities in robotics and other STEM fields. Our mission is to empower the next generation of innovators, thinkers, and problem-solvers by offering a range of educational programs that foster curiosity, creativity, and critical thinking.
At Up the Ratios, we believe that every student, regardless of their socio-economic background, should have access to the tools and knowledge needed to succeed in today's technology-driven world. To achieve this, we host a variety of free classes, workshops, summer camps, and live lectures tailored to students from underserved communities. Our programs are designed to be engaging and hands-on, allowing students to explore the exciting world of robotics and STEM through practical, real-world applications.
Our free classes cover fundamental concepts in robotics, coding, and engineering, providing students with a strong foundation in these critical areas. Through our interactive workshops, students can dive deeper into specific topics, working on projects that challenge them to apply what they've learned and think creatively. Our summer camps offer an immersive experience where students can collaborate on larger projects, develop their teamwork skills, and gain confidence in their abilities.
In addition to our local programs, Up the Ratios is committed to making a global impact. We take donations of new and gently used robotics parts, which we then distribute to students and educational institutions in other countries. These donations help ensure that young learners worldwide have the resources they need to explore and excel in STEM fields. By supporting education in this way, we aim to nurture a global community of future leaders and innovators.
Our live lectures feature guest speakers from various STEM disciplines, including engineers, scientists, and industry professionals who share their knowledge and experiences with our students. These lectures provide valuable insights into potential career paths and inspire students to pursue their passions in STEM.
Up the Ratios relies on the generosity of donors and volunteers to continue our work. Contributions of time, expertise, and financial support are crucial to sustaining our programs and expanding our reach. Whether you're an individual passionate about education, a professional in the STEM field, or a company looking to give back to the community, there are many ways to get involved and make a difference.
We are proud of the positive impact we've had on the lives of countless students, many of whom have gone on to pursue higher education and careers in STEM. By providing these young minds with the tools and opportunities they need to succeed, we are not only changing their futures but also contributing to the advancement of technology and innovation on a broader scale.
Russian anarchist and anti-war movement in the third year of full-scale warAntti Rautiainen
Anarchist group ANA Regensburg hosted my online-presentation on 16th of May 2024, in which I discussed tactics of anti-war activism in Russia, and reasons why the anti-war movement has not been able to make an impact to change the course of events yet. Cases of anarchists repressed for anti-war activities are presented, as well as strategies of support for political prisoners, and modest successes in supporting their struggles.
Thumbnail picture is by MediaZona, you may read their report on anti-war arson attacks in Russia here: https://en.zona.media/article/2022/10/13/burn-map
Links:
Autonomous Action
http://Avtonom.org
Anarchist Black Cross Moscow
http://Avtonom.org/abc
Solidarity Zone
https://t.me/solidarity_zone
Memorial
https://memopzk.org/, https://t.me/pzk_memorial
OVD-Info
https://en.ovdinfo.org/antiwar-ovd-info-guide
RosUznik
https://rosuznik.org/
Uznik Online
http://uznikonline.tilda.ws/
Russian Reader
https://therussianreader.com/
ABC Irkutsk
https://abc38.noblogs.org/
Send mail to prisoners from abroad:
http://Prisonmail.online
YouTube: https://youtu.be/c5nSOdU48O8
Spotify: https://podcasters.spotify.com/pod/show/libertarianlifecoach/episodes/Russian-anarchist-and-anti-war-movement-in-the-third-year-of-full-scale-war-e2k8ai4
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
A process server is a authorized person for delivering legal documents, such as summons, complaints, subpoenas, and other court papers, to peoples involved in legal proceedings.
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
Gloucester County Transportation Study
1. Fleet Maintenance Center Study
for
Gloucester County Public Schools
HUDSON + ASSOCIATES ARCHITECTS
FINAL DRAFT REPORT SUMMARY
School Board Presentation: February 23, 2017
Page 2
2. Fleet Maintenance Center Study for Gloucester County Public Schools
EXECUTIVE SUMMARY
HISTORY: In early 2016, Gloucester County approached Hudson +
Associates Architects about possibility of undertaking a programming study
for a new vehicle maintenance and utilities center in conjunction with a
master plan for redevelopment of the Old Page Middle School site. The
master plan aspect of the Old Page Middle School site was eventually
dropped from the scope, and it was agreed that multiple sites would be
considered for the new Center.
CURRENT SITUATION: Maintenance for current County and School
board vehicles and equipment currently takes place in buildings that are
generally undersized and poorly suited to all types of vehicles in the
respective fleets. Certain major maintenance tasks cannot be performed
and must be tasked out to local, private shops. The Sheriff’s Department
opted to task all of its vehicle maintenance out to local shops due to
shortage of personnel and capabilities to suit its mission-essential needs.
Existing facilities are cramped, poorly lit and marginally ventilated. Storage
space for spare parts is limited, and the work environment is less-than-
pleasant for County personnel. Maintenance is performed in various,
scattered buildings. The Utilities Department likewise lacks sufficient
maintenance space and has current assets scattered among multiple,
marginally-suited buildings and yards. Many County assets such as trailers,
and towable equipment (generators, backhoes, mowers, etc.) are stored
outside in weather where they deteriorate. While County maintenance
personnel are meeting critical needs, they are doing so in facilities that are
far less-than-ideal.
METHOD OF ANALYSIS: Hudson + Associates Architects undertook
the following steps:
Major Tasks: What we looked for:
Meetings with key department
persons to understand
organizational needs
How departments are currently
organized; what does each person
do?
Meetings with key operational
persons to under organization
processes
How do personnel interact with
each other? With the current
facility?
Visits to all existing County
maintenance and storage facilities
currently in use
What is size, condition and layout of
current facilities? Identify
deficiencies
Visits to proposed sites within
Gloucester County and obtaining
local physical and topographical
data
Size and proportions of site,
elevation above floodplain, access
from streets, access to utilities,
opportunity to expand
Visits to facilities in other
neighboring counties that are
similar to the one proposed by this
Study
Evaluate comparative size,
amenities, functional layout, what
works well and signs of potential
obsolescence
PROPOSED SOLUTION: This Study contemplates design and
construction of a new, consolidated fleet maintenance and utility operations
center to suit requirement of the County, Utilities Department, School
Board, and Sheriff’s Department. Included will be the following major
program elements:
Vehicle maintenance bays (garage) and related shop area
School bus operations office
Utilities Department office for maintainers
Toilets, lockers and showers for maintenance personnel
Page 3
3. Fleet Maintenance Center Study for Gloucester County Public Schools
Combined spares and parts storage with centralized inventory
management
Vehicle wash bay (indoor)
Vehicle fueling island (outdoor, covered) and oil-water separator
Central warehouse storage for Utilities Department and County
equipment
Outdoor covered storage for trailers, trailerable equipment and
materials
Surface parking for fleet vehicles and personnel’s own vehicles
SITES FOR CONSIDERATION: The ideal site will have the following
attributes:
Sufficient acreage to suit outdoor parking of the school bus fleet and
other County vehicles
Suitable acreage and proportions for optimal workflow of vehicles,
parking and fueling
Sufficient area to suit facility footprints, outdoor material storage, and
stormwater management
Sufficient area to allow for future expansion of building(s) without
adverse impact on assets to remain
Safety and ease of ingress into, and egress from, the site at adjacent
roadways
Availability of utilities to support building(s) and site amenities
Good vertical elevation above floodplain, and minimal impact from
wetlands
Good soils for bearing pavements and building foundations
Sufficient acreage for future expansion
Three sites were considered:
Old Page Middle School site (off Rt. 17, near current School
Transportation Ctr.)
Land adjacent to the T.C Walker Center (off T.C. Walker Road)
Land Adjacent to the new Page Middle School site (off T.C. Walker
Road)
The site adjacent to the T.C. Walker Center was ruled out fairly quickly
because it was too small and was predominantly at too low a vertical
elevation to build upon. Also, to build the facility at this site would
constrain future reuse of the T.C. Walker Center as a school, if desired.
As for the other two sites:
Old Page Middle School: site is favorable in size and flexibility, but
currently lacks ideal access to Route 17. Also, the site’s configuration
and current location of the water tower impact the layout and future
expansion. The existing School Transportation facility, however, may
be re-purposed for use by Utilities Maintenance, reducing need for
new construction to suits its needs. Lastly, this site may have higher
and beneficial use for economic development.
Land Adjacent to the new Page Middle School: This site is also
favorable in size and flexibility, and offers good access to T.C. Walker
Road without adverse impact upon traffic flow in and out of the
Middle School. Its size and proportions are amenable to efficient use
and future expansion. This is a ‘virgin’ site, however, and will incur
higher costs to clear to support with new utilities. Also, T.C. Walker
Road must be widened to add new turn lanes into the center.
Page 4
4. Fleet Maintenance Center Study for Gloucester County Public Schools
PROPOSED BUILDING AND SITE DEVELOPMENT COSTS: A
preliminary, estimated budget is included herein that contemplates
construction of the new, consolidated Transportation and Utility Center and
all related site development. A separate estimate is included for each site,
due to the differing conditions and programmatic elements at each site.
Please note that:
The overall figures are for budgeting purposes only, and is not based
on definitive design of the building(s) or site amenities.
Additional site investigation, such as geotechnical investigation of
soils may be warranted.
The overall figures assume that the primary maintenance garage and
warehouse facility will be built using pre-engineered building
structure and walls built at least partial height of masonry for
durability.
A single-story building is preferred to avoid cost of stairwells and an
elevator.
Conceptual building floor plans and overall site plans (one for each site) are
offered herein upon which the estimated costs are based.
TIMETABLE TO IMPLEMENT: The proposed Transportation and
Utility Center can be designed and built as soon as funding is authorized by
Gloucester County. Some time constraints to consider include:
Once approved and design is authorized to commence, a detailed
survey of the selected site will be required. An updated wetlands
delineation may be required, depending upon the selected site and
preferred layout. This can take up to 8-10 weeks to accomplish.
Geotechnical investigation will be required to determine foundation
and pavement subgrade requirements.
There should be no unusual environmental permitting required;
however, up to 90 days should be allowed for County review of the
definitive site plan and stormwater management design. This can be
expedited as early in the design process as possible to reduce impact
on overall timeframe to permit the project.
6-8 months should be allowed for design, which includes the
aforementioned civil design and environmental review.
6 weeks should be allowed for bidding.
4 weeks should be allowed for review of bids and determination of
an acceptable low bidder. The apparent low bidder should submit its
insurance paperwork and performance bond for review prior to
award of contract.
Due to the extensive sitework required, 16-18 months should be
allowed for construction following award of contract.
Other time factors to consider:
30-60 days should be allowed to equip and furnish the new facility, as
well as to set up data and communication systems.
The ideal time to relocate operations and vehicle maintenance to the
completed facility, from perspective of schools and bus
transportation, is mid-summer. There is no favored time for Utilities
or County vehicle maintenance.
There will be some costs to move the operation and maintenance
entities into a new facility. It may be advantageous to bring in a
company specializing in such moves to shorten the downtime of the
various units.
Page 5
5. OVERVIEW – STUDY OBJECTIVE
Assess condition of existing transportation administration and maintenance
facilities
Gain understanding of current and projected (future) operational and
maintenance needs by interviewing Schools & County staff
Explore efficiencies gained by consolidating Schools and County fleet
maintenance into a single facility. Also explore consolidation with the County
Utilities Maintenance Division.
Evaluate and compare up to three (3) sites for locating the consolidated facility
at Old Page MS, T.C.Walker Center & next to New Page MS
Prepare a cost model to develop the project for funding purposes
Page 6
6. CURRENT SITUATION
Current facilities are antiquated, undersized and crowded
Buildings no longer suited to size and diversity of vehicles to be maintained
Working conditions are marginal, and poor at County Garage
Several tasks are outsourced that could otherwise be performed
Spare parts often not readily on hand (lack of storage)
Unsheltered vehicles and equipment deteriorate more rapidly
No manpower or capacity to maintain Sheriff’s vehicles
Inefficient use of manpower due to shortage of personnel
Page 7
7. 36’L Bus in Maint. BayAerial View – Schools
Transportation Center
Front of
Building
Page 8
9. Carriage Lane County & Utility
Maint. Dept. Facilities
COUNTY MAINTENANCE
SHED (SHELTER LOCATED
BEHIND TO LEFT)
UTILITIES
MAINTENANCE UNIT
BUILDING
UTILITIES
DEPARTMENT
ADMIN.
&CUSTOMER
SERVICE
CENTER
Utility Dept. Maint. Yard &
Facilities behind Southern States
Page 10
10. ADDITIONAL CHALLENGES
Current buildings cannot be enlarged; poor value to enhance
Equipment storage scattered in various locations
County & Utilities: Shortage of maintenance & warehouse area
Utilities “Yard” behind Southern States – buildings in poor condition
Conditions adversely affect workflow, response & timely completion
Excess employee time spent traveling between tasks & sites
Longevity of vehicle & equipment assets is reduced
Conditions not condusive to employee satisfaction or longevity
Page 11
11. NEW FACILITY OBJECTIVES
Consolidate Schools & County fleet maintenance functions
Modernize facilities that improve workflow and operational efficiency
Increase storage capacity and maintenance capabilities
Improve conditions for multiple County organizations under one project
Enhance maintenance and extend life of vehicles & equipment
Provide site layout that is spacious enough for larger, consolidated operation,
yet is efficient and cost-effective
Site & building should have some initial growth capacity built-in
Site must support opportunity to expand to suit longterm needs
Page 12
12. FLEET MAINTENANCE REQUIREMENTS
PUBLIC COUNTY & SHERIFF’S
SCHOOLS UTILITIES DEPT. TOTALS
Class 1 Passenger 49 45 72 166
Class 2 Trucks 34 29 9 72
Class 3 Buses 112* -- -- 112
Class 4 Trailers 8 17 3 ** 28
Class 5 Equipment 6 31 -- 37
TOTAL Vehicles 195 74 81 350
All Items 209 122 84 415
* 4 inspections/bus/year = 448 total inspections/year
** Includes Tactical Command Center
Page 13
13. TRANSPORTATION FACILITY PROGRAM
GARAGE:
Maintenance Bays (7 double bays X 20’ wide x 110’ deep) 15,400 SF
Parts Warehouse 3,100 SF
Supervisor Office/Records/Break Area 800 SF
Lockers/Toilets 1,000 SF
Machine Shop/Batteries 1,500 SF
Sub-total, Garage 21,800 SF
TRANSPORTATION ADMINISTRATION OFFICE: 2,400 SF
Common Area/Circulation: 1,200 SF
Sub-Total, Transportation 25,400 SF
Page 14
14. TRANSPORTATION FACILITY PROGRAM
TRANSPORTATION PROGRAM: 25,400 SF
ADDITIONAL BUILDING PROGRAM:
Equipment Maintenance Center (Off-road, mowers, tools) 1,750 SF
Total New Building Area, Old Page Site 27,150 SF
Utilities Maintenance Division (Office/Lockers/Shop) 1,900 SF
Total New Building Area, New Page Site 29,050 SF
Page 15
15. TRANSPORTATION FACILITY PROGRAM
UTILITIES MAINTENANCE DIVISION:
At the New Page site, Utilities Maintenance Division will have its offices and a
maintenance shop in the main, new building (totaling 1,900 SF) , sharing toilets and
other amenities with the Transportation/Garage functions.
In addition, Utilities Maint. Div. will have a new 7,500 SF storage warehouse.
Also, there will be another 7,500 SF of new outdoor covered shed area.
At the Old Page site, Utilities Maintenance Division will re-occupy the existing,
vacated Transportation office & garage, totaling 7,500 SF.
The existing building will require minor alterations and some renovations, including a
new roof.
Also, there will be another 10,000 SF of new outdoor covered
shed area.
Page 16
18. FLEET MAINTENANCE – WHY 14 BAYS?
BUS
1
WASHBAY
BRAKES
TIRE
SHOP
TRUCK1
PASS
1
BUS
2
BUS
3
BUS
4
BUS
5
BUS
6
FLUIDS
PASS
3
PASS
2
TRUCK1
Bays can also
“flex” as needed,
depending on
workload
Trailers require less
time in shop, but
are typicallypulled
through
One bay for “long-
term” work on
buses (#6)
Page 19
19. OLD PAGE MIDDLE SCHOOL SITE:
Adequate acreage for larger, consolidated Transportation/County Garage
Could support future expansion for Transportation & County Garage
Site impacted somewhat by existing water tower & wetlands
Existing transportation facility would not be affected by new construction
Could locate at rear of site; preserve front of site for alternative use
Access to Rt. 17 less than optimal, but could improve in future
Utilities Maintenance Division is accommodated at existing Bus
Maint./Garage/Transportation Office, plus new Storage Sheds
Reconfigured site and reused existing entrance drive at
north side of site; access on/off Rt. 17 is questionable
Developed acreage & amenities now similar to New Page site
Page 20
23. NEW PAGE SCHOOL SITE:
Adequate acreage for larger, consolidated Transportation/County Garage
Could support future expansion
Site minimally impacted by wetlands
Access to T.C. Walker Road is optimal
Can locate without impact to existing Middle School
Preserves acreage for only one future school, but not two
Utilities Maintenance Division is housed in new building with
Transporation; site also includes new Warehouse and Storage Sheds
Add turn lanes off T.C. Walker Road
Page 24
27. T.C. WALKER CENTER SITE
Limited acreage for a large, consolidated operations; impedes expansion
Much of the site is at lower grade than existing Center
Stream and wetlands impacts prevent full use of site
Might limit future growth of T.C. Walker Center or return to use a school
Access to T.C. Walker Road less than optimal, but workable
Constraints to site layout and flow of traffic due to grade change
Site cannot accommodate Utilities Maintenance Division
Insufficient land at upper elevation to park all buses
Soils might not be favorable to spread-footing foundations
Potential impacts on existing Center during construction
School Board determined this site is no longer to be considered
Page 28
32. GLOUCESTER COUNTY TRANSPORTATION CENTER STUDY
COST ESTIMATE FEBRUARY 23, 2017 QTY. $/UNIT COST QTY. $/UNIT COST
BUILDING COSTS
MAIN BUILDING SF
INDUSTRIAL SPACE SF 21,750 110.00 2,392,500 22,200 110.00 2,442,000 49,500
OFFICE/FINISHED SPACE SF 5,400 175.00 945,000 6,850 175.00 1,198,750 253,750
SUB-TOTAL, PRIMARY BUILDING SF 27,150 3,337,500 29,050 3,640,750 303,250
UTILITIES MAINT. DIV. - WAREHOUSE (NEW PAGE) SF - 10,000 50.00 500,000 500,000
RE-PURPOSE EXISTING TRANSPORT'N BLDG (OLD PAGE) SF 7,500 15.00 112,500 - (112,500)
RE-ROOF EXISTING TRANSPORT'N BLDG (OLD PAGE) SF 7,500 12.50 93,750 (93,750)
OUTDOOR COVERED STORAGE SHELTER(S) SF 10,000 20.00 200,000 7,500 20.00 150,000 (50,000)
FURNISHINGS & EQUIPMENT LS 380,250 401,500 21,250
SUB-TOTAL, BUILDING COSTS 4,124,000$ 4,692,250$ 568,250$
SITEWORK
SITE IMPROVEMENTS
IMPROVE T.C. WALKER ROAD LF - 1,800 225 405,000 405,000
ADD TURN LANE ON RT.17 LF 300 225 67,500 - (67,500)
SITE CLEARING AC 2.00 20,000 40,000 16.39 20,000 327,800 287,800
SITE DEMOLITION/PAVEMENT REMOVAL SF 38,000 - - -
EARTHWORK CY 18,150 5.00 90,750 26,460 5.00 132,300 41,550
CANOPY AT FUEL ISLAND SF 2,000 15.00 30,000 2,000 15.00 30,000 -
NEW PAVEMENT - FLEXIBLE SY 48,500 10.00 485,000 48,500 10.00 485,000 -
NEW PAVEMENT - RIGID SY 2,800 25.00 70,000 2,800 25.00 70,000 -
TURF/LANDSCAPING AC 3 25,000 75,000 3 25,000 75,000 -
FENCING LF 3,150 - 3,150 - -
GATES EA 2 15,000 30,000 2 15,000 30,000 -
SIGNAGE LS -- 5,000 5,000 -
SIDEWALK/EQUIPMENT PADS LS -- 7,500 7,500 -
GRADING & DRAINAGE -
BMP/RETENTION POND CY 6,000 15.00 90,000 9,000 15.00 135,000 45,000
CURB & GUTTER LF 3,000 7.50 22,500 3,000 7.50 22,500 -
DRAINAGE STRUCTURES EA 5 7,500 37,500 5 7,500 37,500 -
UNDERGROUND PIPING LF 1,000 30.00 30,000 1,000 30.00 30,000 -
EROSION & SEDIMENT CONTROL AC 16.14 2,500 40,350 16.39 2,500 40,975 625
OLD PAGE SITE NEW PAGE SITE
UNITS Δ
Page 33
33. GLOUCESTER COUNTY TRANSPORTATION CENTER STUDY
COST ESTIMATE FEBRUARY 23, 2017 QTY. $/UNIT COST QTY. $/UNIT COST
OLD PAGE SITE NEW PAGE SITE
UNITS Δ
UTILITIES
WATER/SEWER/FUELS
EXTEND WATER SERVICE, 8-INCH LF 600 64 38,400 -- - (38,400)
EXTEND WATER SERVICE, 16-INCH LF -- - 1,500 125 187,500 187,500
SANITARY SEWER - GRAVITY, 8-INCH LF 600 40 24,000 1,500 40 60,000 36,000
S.S. MANHOLE EA 1 20,000 20,000 2 20,000 40,000 20,000
S.S. GRINDER PUMP/LIFT STATION EA -- - 1 15,000 15,000 15,000
DOMESTIC WATER LINE, 3-INCH LF 250 30 7,500 350 30 10,500 3,000
SPRINKLER WATER LINE, 6-INCH LF 250 65 16,250 350 65 22,750 6,500
FIRE HYDRANTS EA 2 3,000 6,000 2 3,000 6,000 -
BACKFLOW PREVENTER EA 1 5,000 5,000 1 5,000 5,000 -
PROPANE GAS SERVICE & PAD LS -- 7,500 -- 7,500 -
RELOCATE FUEL ISLAND LS -- 10,000 -- 10,000 -
OIL-WATER SEPARATOR, FUEL PAD (20,000 GAL) EA 1 25,000 25,000 1 25,000 25,000 -
OIL-WATER SEPARATOR, BUILDING (1,500 GAL) EA 1 5,000 5,000 1 5,000 5,000 -
ELECTRICAL -
POWER TO BUILDING, AERIAL LF -- - 1,500 30 45,000 45,000
POWER TO BUILDING, BURIED, DUCTBANK LS -- 50,000 -- 50,000 -
TRANSFORMER EA 1 20,000 20,000 2 18,000 36,000 16,000
STANDBY GENERATOR, DIESEL, 150 KW EA 1 45,000 45,000 1 45,000 45,000 -
TELECOMMUNICATIONS LS -- 75,000 -- 155,000 80,000
SITE LIGHTING - POLES EA 20 2,500 50,000 20 2,500 50,000 -
SUB-TOTAL, SITEWORK COSTS 1,525,750$ 2,608,825$ 1,083,075$
SITE ACREAGE 16.14 16.39 0
SITEWORK COST / ACRE 94,532$ 159,172$ 64,640$
-
TOTAL CONSTRUCTION COSTS, ESTIMATED 5,649,750$ 7,301,075$ 1,651,325$
TOTAL CONSTRUCTION COSTS, ROUNDED 5,650,000 7,301,000 1,651,000
TOTAL CONSTRUCTION COSTS, W/CONTINGENCY (+10%) 6,215,000 8,031,000 1,816,000
DESIGN + ENGINEERING 497,000 642,000 145,000
ESTIMATED TOTAL PROJECT COST 6,712,000$ 8,673,000$ 1,961,000$
Page 34
34. SITES – COMPARATIVE DISCUSSION
Old Page
School site
New Page
School site
Lesser cost to develop; minimal clearing and grading required
Utilities already on (or near) site that appear adequate, including fueling
Access to Route 17 remains configured as-is today – not ideal, but adequate
Improving access to Rt. 17 not essential; but could be quite costly
Re-utilizes existing Transportation office/garage; well-suited to Utilities
Maintenance Division needs
Portion of existing site remains undeveloped – available for future expansion
Higher cost to develop
Relatively high site costs for clearing, earthwork and grading, new utilities
Higher cost to build 100% new space for Utilities Maintenance Division
Good access off T.C. Walker Road for optimized ingress/egress; but must
widen T.C. Walker Road with new turn lanes
More flexible site arrangement & internal movement than Old Page
Building at New Page site allows alternative use at Old Page site;
land used for this project is no longer available for a future school
Page 35
35. SITES – “BOTTOM LINE” COMPARISON
Old Page
School site
New Page
School site
Lower cost to redevelop
Access to Route 17, if unchanged, remains adequate but less than
ideal, and can present safety challenges for left-turning traffic
exiting the site
Re-purposes the existing School Transportation office & garage
for use by Utilities Maintenance Division
Higher cost to develop (nearly $2 million delta)
Ideal access off T.C. Walker Road; safe ingress/egress
Building at New Page site allows alternative use at Old Page site
Page 36
36. COMMENTS RECEIVED & RESPONSES
Incorporate Mosquito Control Vehicle Parking
The Mosquito Control vehicles (2) and its chemical storage/handling area
will be located inside the Warehouse with Utilities Maintenance, partitioned
off separately from other functions. At the Old Page site, this amounts to
one bay of the existing Schools Transportation Building.
Recommend extending 8-inch water lines into site in order to include
fire sprinklers at the buildings and support new fire hydrants
Sprinklers will be required at the main Admin./Garage building, but will
likely not be required at the Warehouse due to its size and function. New
fire hydrants will be required at either site, and the cost estimate will be
increased to include more 8-inch water piping.
Page 37
37. COMMENTS RECEIVED & RESPONSES
Consider reducing the number of buses that need to be stored on the
site to 160; and consolidate the buses in such a manner that, when all
parked on the site, they occupy as minimal a footprint as necessary, to
reduce acreage developed and new impervious surface.
Will do. There may be reduction of impervious area by as much as 15,000-
30,000 SF, resulting in minor cost savings at both sites for new pavement,
earthwork/grading, and stormwater treatment.
Revisit the estimated cost for sanitary sewer force main extension at the New
Page Site.
Will do. Additional cost (minor) for a new force main to the New Page Middle
School pump station will be included. Will discuss further with Utilities if
Upgrade to the School pump station and/or force main beyond is needed. The
sewer discharge rate can be reduced with a holding tank at the New Page site.
Page 38
38. architecture
interior design
planning
RICHARD S. CORNER, AIA, CSI
SENIOR PARTNER
KEITH MUSHENSKI, AIAA
PARTNER
120 WEST QUEENS WAY, #201
HAMPTON, VA 23669
757 • 722 • 1964
www.hudsonarch.com
Page 39