Fleet Maintenance Center Study for Gloucester County Public Schools
EXECUTIVE SUMMARY
HISTORY: In early 2016, Gloucester County approached Hudson +
Associates Architects about possibility of undertaking a programming study
for a new vehicle maintenance and utilities center in conjunction with a
master plan for redevelopment of the Old Page Middle School site. The
master plan aspect of the Old Page Middle School site was eventually
dropped from the scope, and it was agreed that multiple sites would be
considered for the new Center.
CURRENT SITUATION: Maintenance for current County and School
board vehicles and equipment currently takes place in buildings that are
generally undersized and poorly suited to all types of vehicles in the
respective fleets. Certain major maintenance tasks cannot be performed
and must be tasked out to local, private shops. The Sheriff’s Department
opted to task all of its vehicle maintenance out to local shops due to
shortage of personnel and capabilities to suit its mission-essential needs.
Existing facilities are cramped, poorly lit and marginally ventilated. Storage
space for spare parts is limited, and the work environment is less-than-
pleasant for County personnel. Maintenance is performed in various,
scattered buildings. The Utilities Department likewise lacks sufficient
maintenance space and has current assets scattered among multiple,
marginally-suited buildings and yards. Many County assets such as trailers,
and towable equipment (generators, backhoes, mowers, etc.) are stored
outside in weather where they deteriorate. While County maintenance
personnel are meeting critical needs, they are doing so in facilities that are
far less-than-ideal.
METHOD OF ANALYSIS: Hudson + Associates Architects undertook
the following steps:
Major Tasks: What we looked for:
Meetings with key department
persons to understand
organizational needs
How departments are currently
organized; what does each person
do?
Meetings with key operational
persons to under organization
processes
How do personnel interact with
each other? With the current
facility?
Visits to all existing County
maintenance and storage facilities
currently in use
What is size, condition and layout of
current facilities? Identify
deficiencies
Visits to proposed sites within
Gloucester County and obtaining
local physical and topographical
data
Size and proportions of site,
elevation above floodplain, access
from streets, access to utilities,
opportunity to expand
Visits to facilities in other
neighboring counties that are
similar to the one proposed by this
Study
Evaluate comparative size,
amenities, functional layout, what
works well and signs of potential
obsolescence
PROPOSED SOLUTION: This Study contemplates design and
construction of a new, consolidated fleet maintenance and utility operations
center to suit requirement of the County, Utilities Department, School
Board, and Sheriff’s Department. Included will be the following major
program elements:
 Vehicle maintenance bays (garage) and related shop area
 School bus operations office
 Utilities Department office for maintainers
 Toilets, lockers and showers for maintenance personnel
Page 3
Fleet Maintenance Center Study for Gloucester County Public Schools
 Combined spares and parts storage with centralized inventory
management
 Vehicle wash bay (indoor)
 Vehicle fueling island (outdoor, covered) and oil-water separator
 Central warehouse storage for Utilities Department and County
equipment
 Outdoor covered storage for trailers, trailerable equipment and
materials
 Surface parking for fleet vehicles and personnel’s own vehicles
SITES FOR CONSIDERATION: The ideal site will have the following
attributes:
 Sufficient acreage to suit outdoor parking of the school bus fleet and
other County vehicles
 Suitable acreage and proportions for optimal workflow of vehicles,
parking and fueling
 Sufficient area to suit facility footprints, outdoor material storage, and
stormwater management
 Sufficient area to allow for future expansion of building(s) without
adverse impact on assets to remain
 Safety and ease of ingress into, and egress from, the site at adjacent
roadways
 Availability of utilities to support building(s) and site amenities
 Good vertical elevation above floodplain, and minimal impact from
wetlands
 Good soils for bearing pavements and building foundations
 Sufficient acreage for future expansion
Three sites were considered:
 Old Page Middle School site (off Rt. 17, near current School
Transportation Ctr.)
 Land adjacent to the T.C Walker Center (off T.C. Walker Road)
 Land Adjacent to the new Page Middle School site (off T.C. Walker
Road)
The site adjacent to the T.C. Walker Center was ruled out fairly quickly
because it was too small and was predominantly at too low a vertical
elevation to build upon. Also, to build the facility at this site would
constrain future reuse of the T.C. Walker Center as a school, if desired.
As for the other two sites:
 Old Page Middle School: site is favorable in size and flexibility, but
currently lacks ideal access to Route 17. Also, the site’s configuration
and current location of the water tower impact the layout and future
expansion. The existing School Transportation facility, however, may
be re-purposed for use by Utilities Maintenance, reducing need for
new construction to suits its needs. Lastly, this site may have higher
and beneficial use for economic development.
 Land Adjacent to the new Page Middle School: This site is also
favorable in size and flexibility, and offers good access to T.C. Walker
Road without adverse impact upon traffic flow in and out of the
Middle School. Its size and proportions are amenable to efficient use
and future expansion. This is a ‘virgin’ site, however, and will incur
higher costs to clear to support with new utilities. Also, T.C. Walker
Road must be widened to add new turn lanes into the center.
Page 4
Fleet Maintenance Center Study for Gloucester County Public Schools
PROPOSED BUILDING AND SITE DEVELOPMENT COSTS: A
preliminary, estimated budget is included herein that contemplates
construction of the new, consolidated Transportation and Utility Center and
all related site development. A separate estimate is included for each site,
due to the differing conditions and programmatic elements at each site.
Please note that:
 The overall figures are for budgeting purposes only, and is not based
on definitive design of the building(s) or site amenities.
 Additional site investigation, such as geotechnical investigation of
soils may be warranted.
 The overall figures assume that the primary maintenance garage and
warehouse facility will be built using pre-engineered building
structure and walls built at least partial height of masonry for
durability.
 A single-story building is preferred to avoid cost of stairwells and an
elevator.
Conceptual building floor plans and overall site plans (one for each site) are
offered herein upon which the estimated costs are based.
TIMETABLE TO IMPLEMENT: The proposed Transportation and
Utility Center can be designed and built as soon as funding is authorized by
Gloucester County. Some time constraints to consider include:
 Once approved and design is authorized to commence, a detailed
survey of the selected site will be required. An updated wetlands
delineation may be required, depending upon the selected site and
preferred layout. This can take up to 8-10 weeks to accomplish.
 Geotechnical investigation will be required to determine foundation
and pavement subgrade requirements.
 There should be no unusual environmental permitting required;
however, up to 90 days should be allowed for County review of the
definitive site plan and stormwater management design. This can be
expedited as early in the design process as possible to reduce impact
on overall timeframe to permit the project.
 6-8 months should be allowed for design, which includes the
aforementioned civil design and environmental review.
 6 weeks should be allowed for bidding.
 4 weeks should be allowed for review of bids and determination of
an acceptable low bidder. The apparent low bidder should submit its
insurance paperwork and performance bond for review prior to
award of contract.
 Due to the extensive sitework required, 16-18 months should be
allowed for construction following award of contract.
Other time factors to consider:
 30-60 days should be allowed to equip and furnish the new facility, as
well as to set up data and communication systems.
 The ideal time to relocate operations and vehicle maintenance to the
completed facility, from perspective of schools and bus
transportation, is mid-summer. There is no favored time for Utilities
or County vehicle maintenance.
 There will be some costs to move the operation and maintenance
entities into a new facility. It may be advantageous to bring in a
company specializing in such moves to shorten the downtime of the
various units.
Page 5
OVERVIEW – STUDY OBJECTIVE
 Assess condition of existing transportation administration and maintenance
facilities
 Gain understanding of current and projected (future) operational and
maintenance needs by interviewing Schools & County staff
 Explore efficiencies gained by consolidating Schools and County fleet
maintenance into a single facility. Also explore consolidation with the County
Utilities Maintenance Division.
 Evaluate and compare up to three (3) sites for locating the consolidated facility
at Old Page MS, T.C.Walker Center & next to New Page MS
 Prepare a cost model to develop the project for funding purposes
Page 6
CURRENT SITUATION
 Current facilities are antiquated, undersized and crowded
 Buildings no longer suited to size and diversity of vehicles to be maintained
 Working conditions are marginal, and poor at County Garage
 Several tasks are outsourced that could otherwise be performed
 Spare parts often not readily on hand (lack of storage)
 Unsheltered vehicles and equipment deteriorate more rapidly
 No manpower or capacity to maintain Sheriff’s vehicles
 Inefficient use of manpower due to shortage of personnel
Page 7
36’L Bus in Maint. BayAerial View – Schools
Transportation Center
Front of
Building
Page 8
County Garage at Rt. 17 &
Providence Rd.
Page 9
Carriage Lane County & Utility
Maint. Dept. Facilities
COUNTY MAINTENANCE
SHED (SHELTER LOCATED
BEHIND TO LEFT)
UTILITIES
MAINTENANCE UNIT
BUILDING
UTILITIES
DEPARTMENT
ADMIN.
&CUSTOMER
SERVICE
CENTER
Utility Dept. Maint. Yard &
Facilities behind Southern States
Page 10
ADDITIONAL CHALLENGES
 Current buildings cannot be enlarged; poor value to enhance
 Equipment storage scattered in various locations
 County & Utilities: Shortage of maintenance & warehouse area
 Utilities “Yard” behind Southern States – buildings in poor condition
 Conditions adversely affect workflow, response & timely completion
 Excess employee time spent traveling between tasks & sites
 Longevity of vehicle & equipment assets is reduced
 Conditions not condusive to employee satisfaction or longevity
Page 11
NEW FACILITY OBJECTIVES
 Consolidate Schools & County fleet maintenance functions
 Modernize facilities that improve workflow and operational efficiency
 Increase storage capacity and maintenance capabilities
 Improve conditions for multiple County organizations under one project
 Enhance maintenance and extend life of vehicles & equipment
 Provide site layout that is spacious enough for larger, consolidated operation,
yet is efficient and cost-effective
 Site & building should have some initial growth capacity built-in
 Site must support opportunity to expand to suit longterm needs
Page 12
FLEET MAINTENANCE REQUIREMENTS
PUBLIC COUNTY & SHERIFF’S
SCHOOLS UTILITIES DEPT. TOTALS
Class 1 Passenger 49 45 72 166
Class 2 Trucks 34 29 9 72
Class 3 Buses 112* -- -- 112
Class 4 Trailers 8 17 3 ** 28
Class 5 Equipment 6 31 -- 37
TOTAL Vehicles 195 74 81 350
All Items 209 122 84 415
* 4 inspections/bus/year = 448 total inspections/year
** Includes Tactical Command Center
Page 13
TRANSPORTATION FACILITY PROGRAM
GARAGE:
 Maintenance Bays (7 double bays X 20’ wide x 110’ deep) 15,400 SF
 Parts Warehouse 3,100 SF
 Supervisor Office/Records/Break Area 800 SF
 Lockers/Toilets 1,000 SF
 Machine Shop/Batteries 1,500 SF
Sub-total, Garage 21,800 SF
TRANSPORTATION ADMINISTRATION OFFICE: 2,400 SF
Common Area/Circulation: 1,200 SF
Sub-Total, Transportation 25,400 SF
Page 14
TRANSPORTATION FACILITY PROGRAM
TRANSPORTATION PROGRAM: 25,400 SF
ADDITIONAL BUILDING PROGRAM:
 Equipment Maintenance Center (Off-road, mowers, tools) 1,750 SF
Total New Building Area, Old Page Site 27,150 SF
 Utilities Maintenance Division (Office/Lockers/Shop) 1,900 SF
Total New Building Area, New Page Site 29,050 SF
Page 15
TRANSPORTATION FACILITY PROGRAM
UTILITIES MAINTENANCE DIVISION:
 At the New Page site, Utilities Maintenance Division will have its offices and a
maintenance shop in the main, new building (totaling 1,900 SF) , sharing toilets and
other amenities with the Transportation/Garage functions.
 In addition, Utilities Maint. Div. will have a new 7,500 SF storage warehouse.
 Also, there will be another 7,500 SF of new outdoor covered shed area.
 At the Old Page site, Utilities Maintenance Division will re-occupy the existing,
vacated Transportation office & garage, totaling 7,500 SF.
 The existing building will require minor alterations and some renovations, including a
new roof.
 Also, there will be another 10,000 SF of new outdoor covered
shed area.
Page 16
Transportation
Administration
Consolidated
Vehicle Maint.
Utilities Maint.
Division
Equipment
Maintenance
Shared
MAINT. BAYS
UTIL.
MAINT.
DIV.
MACHINE
SHOP
PARTS
WASH
BAY
BRAKES
TIRES
EQUIP.
MAINT.
TRANSPORT’
N
ADMIN.
UTILITIES MAINT. DIVISION
OFFICES & SHOP INCLUDED
FOR NEW PAGE SITE
Page 17
Transportation
Administration
Consolidated
Vehicle Maint.
Equipment
Maintenance
Shared
MAINT. BAYS
MACHINE
SHOP
PARTS
WASH
BAY
BRAKES
TIRES
EQUIP.
MAINT.
TRANSPORT’
N
ADMIN.
ALTERNATE BUILDING PLAN
– REDUCED SIZE (OMITS
UTILITIES MAINT DIV.)
FOR OLD PAGE SITE
Page 18
FLEET MAINTENANCE – WHY 14 BAYS?
BUS
1
WASHBAY
BRAKES
TIRE
SHOP
TRUCK1
PASS
1
BUS
2
BUS
3
BUS
4
BUS
5
BUS
6
FLUIDS
PASS
3
PASS
2
TRUCK1
 Bays can also
“flex” as needed,
depending on
workload
 Trailers require less
time in shop, but
are typicallypulled
through
 One bay for “long-
term” work on
buses (#6)
Page 19
OLD PAGE MIDDLE SCHOOL SITE:
 Adequate acreage for larger, consolidated Transportation/County Garage
 Could support future expansion for Transportation & County Garage
 Site impacted somewhat by existing water tower & wetlands
 Existing transportation facility would not be affected by new construction
 Could locate at rear of site; preserve front of site for alternative use
 Access to Rt. 17 less than optimal, but could improve in future
 Utilities Maintenance Division is accommodated at existing Bus
Maint./Garage/Transportation Office, plus new Storage Sheds
 Reconfigured site and reused existing entrance drive at
north side of site; access on/off Rt. 17 is questionable
 Developed acreage & amenities now similar to New Page site
Page 20
T.C. WALKER
ROADEXISTING
SCHOOLS
TRANSPORTATION
OFFICE/MAINT.
CTR.
Page 21
T.C.
WALKER
ROAD
EXISTING SCHOOLS
TRANSPORTATION
OFFICE/MAINT. CTR.
– UTILITIES MAINT.
DIV.
EXISTIN
G WATER
TOWER
OLD PAGE SITE PLAN – Updated 2/23/17
0 100’ 400’
Page 22
T.C.
WALKER
ROAD
FUTURE ENTRY
ROAD
EXISTIN
G WATER
TOWER
OLD PAGE SITE PLAN – Updated 2/23/17
0 100’ 400’
FUTURE
EXPANSION
Page 23
NEW PAGE SCHOOL SITE:
 Adequate acreage for larger, consolidated Transportation/County Garage
 Could support future expansion
 Site minimally impacted by wetlands
 Access to T.C. Walker Road is optimal
 Can locate without impact to existing Middle School
 Preserves acreage for only one future school, but not two
 Utilities Maintenance Division is housed in new building with
Transporation; site also includes new Warehouse and Storage Sheds
 Add turn lanes off T.C. Walker Road
Page 24
T.C. WALKER
ROAD
EXISTING PAGE
MIDDLE
SCHOOL
Page 25
T.C. WALKER
ROAD
(WIDENED)
EXISTING PAGE
MIDDLE
SCHOOL
NEW PAGE SITE PLAN – Updated 2/23/17
0 100’ 400’
Page 26
T.C. WALKER
ROAD
(WIDENED)
EXISTING PAGE
MIDDLE
SCHOOL
NEW PAGE SITE PLAN – Updated 2/23/17
0 100’ 400’
FUTURE
EXPANSION
Page 27
T.C. WALKER CENTER SITE
 Limited acreage for a large, consolidated operations; impedes expansion
 Much of the site is at lower grade than existing Center
 Stream and wetlands impacts prevent full use of site
 Might limit future growth of T.C. Walker Center or return to use a school
 Access to T.C. Walker Road less than optimal, but workable
 Constraints to site layout and flow of traffic due to grade change
 Site cannot accommodate Utilities Maintenance Division
 Insufficient land at upper elevation to park all buses
 Soils might not be favorable to spread-footing foundations
 Potential impacts on existing Center during construction
 School Board determined this site is no longer to be considered
Page 28
EXISTING T.C.
WALKER
CENTER
T.C. WALKER
ROAD
30’60’
70’ 40’
25’
20’
50’
Page 29
EXISTING T.C.
WALKER
CENTER
T.C. WALKER
ROAD
Page 30
PROJECT COST ESTIMATE / COMPARISON
BUILDING COSTS OLD PAGE Site NEW PAGE Site
 Industrial Space (~$110/SF) $ 2,392,500 $ 2,442,000
 Office/Finished Space (~$175/SF) 945,000 1,198,750
Sub-Total, Primary Building $ 3,337,500 $ 3,640,750
 Utilities Maint. Div. Warehouse -- 500,000
 Re-Purpose Existing Transport’n Bldg. 112,500 --
 Re-Roof Existing Transport’n Bldg. 93,750 --
 Outdoor Covered Storage Shelter(s) 200,000 150,000
 Furnishings & Equipment 380,250 401,500
Sub-Total, Building Costs $ 4,124,000 $ 4,692,250
Page 31
PROJECT COST ESTIMATE / COMPARISON
SITEWORK COSTS OLD PAGE Site NEW PAGE Site
 Site Improvements $ 900,750 $ 1,567,600
 Grading & Drainage 220,350 265,975
 Utilities – Water/Sewer/Fuels 164,650 394,250
 Utilities - Electrical 240,000 381,000
Sub-Total, Sitework Costs $ 1,525,600 $ 2,608,825
w/Building Cost, Rounded 5,650,000 7,301,000
With Contingency (+10%) 6,215,000 8,031,000
Design + Engineering 497,000 642,000
Estimated Total Project Cost $ 6,712,000 $ 8,673,000
Site acreage 16.14 acres 16.39 acres
Sitework, Cost/acre $ 94,532/acre $ 159,172/acre
Page 32
GLOUCESTER COUNTY TRANSPORTATION CENTER STUDY
COST ESTIMATE FEBRUARY 23, 2017 QTY. $/UNIT COST QTY. $/UNIT COST
BUILDING COSTS
MAIN BUILDING SF
INDUSTRIAL SPACE SF 21,750 110.00 2,392,500 22,200 110.00 2,442,000 49,500
OFFICE/FINISHED SPACE SF 5,400 175.00 945,000 6,850 175.00 1,198,750 253,750
SUB-TOTAL, PRIMARY BUILDING SF 27,150 3,337,500 29,050 3,640,750 303,250
UTILITIES MAINT. DIV. - WAREHOUSE (NEW PAGE) SF - 10,000 50.00 500,000 500,000
RE-PURPOSE EXISTING TRANSPORT'N BLDG (OLD PAGE) SF 7,500 15.00 112,500 - (112,500)
RE-ROOF EXISTING TRANSPORT'N BLDG (OLD PAGE) SF 7,500 12.50 93,750 (93,750)
OUTDOOR COVERED STORAGE SHELTER(S) SF 10,000 20.00 200,000 7,500 20.00 150,000 (50,000)
FURNISHINGS & EQUIPMENT LS 380,250 401,500 21,250
SUB-TOTAL, BUILDING COSTS 4,124,000$ 4,692,250$ 568,250$
SITEWORK
SITE IMPROVEMENTS
IMPROVE T.C. WALKER ROAD LF - 1,800 225 405,000 405,000
ADD TURN LANE ON RT.17 LF 300 225 67,500 - (67,500)
SITE CLEARING AC 2.00 20,000 40,000 16.39 20,000 327,800 287,800
SITE DEMOLITION/PAVEMENT REMOVAL SF 38,000 - - -
EARTHWORK CY 18,150 5.00 90,750 26,460 5.00 132,300 41,550
CANOPY AT FUEL ISLAND SF 2,000 15.00 30,000 2,000 15.00 30,000 -
NEW PAVEMENT - FLEXIBLE SY 48,500 10.00 485,000 48,500 10.00 485,000 -
NEW PAVEMENT - RIGID SY 2,800 25.00 70,000 2,800 25.00 70,000 -
TURF/LANDSCAPING AC 3 25,000 75,000 3 25,000 75,000 -
FENCING LF 3,150 - 3,150 - -
GATES EA 2 15,000 30,000 2 15,000 30,000 -
SIGNAGE LS -- 5,000 5,000 -
SIDEWALK/EQUIPMENT PADS LS -- 7,500 7,500 -
GRADING & DRAINAGE -
BMP/RETENTION POND CY 6,000 15.00 90,000 9,000 15.00 135,000 45,000
CURB & GUTTER LF 3,000 7.50 22,500 3,000 7.50 22,500 -
DRAINAGE STRUCTURES EA 5 7,500 37,500 5 7,500 37,500 -
UNDERGROUND PIPING LF 1,000 30.00 30,000 1,000 30.00 30,000 -
EROSION & SEDIMENT CONTROL AC 16.14 2,500 40,350 16.39 2,500 40,975 625
OLD PAGE SITE NEW PAGE SITE
UNITS Δ
Page 33
GLOUCESTER COUNTY TRANSPORTATION CENTER STUDY
COST ESTIMATE FEBRUARY 23, 2017 QTY. $/UNIT COST QTY. $/UNIT COST
OLD PAGE SITE NEW PAGE SITE
UNITS Δ
UTILITIES
WATER/SEWER/FUELS
EXTEND WATER SERVICE, 8-INCH LF 600 64 38,400 -- - (38,400)
EXTEND WATER SERVICE, 16-INCH LF -- - 1,500 125 187,500 187,500
SANITARY SEWER - GRAVITY, 8-INCH LF 600 40 24,000 1,500 40 60,000 36,000
S.S. MANHOLE EA 1 20,000 20,000 2 20,000 40,000 20,000
S.S. GRINDER PUMP/LIFT STATION EA -- - 1 15,000 15,000 15,000
DOMESTIC WATER LINE, 3-INCH LF 250 30 7,500 350 30 10,500 3,000
SPRINKLER WATER LINE, 6-INCH LF 250 65 16,250 350 65 22,750 6,500
FIRE HYDRANTS EA 2 3,000 6,000 2 3,000 6,000 -
BACKFLOW PREVENTER EA 1 5,000 5,000 1 5,000 5,000 -
PROPANE GAS SERVICE & PAD LS -- 7,500 -- 7,500 -
RELOCATE FUEL ISLAND LS -- 10,000 -- 10,000 -
OIL-WATER SEPARATOR, FUEL PAD (20,000 GAL) EA 1 25,000 25,000 1 25,000 25,000 -
OIL-WATER SEPARATOR, BUILDING (1,500 GAL) EA 1 5,000 5,000 1 5,000 5,000 -
ELECTRICAL -
POWER TO BUILDING, AERIAL LF -- - 1,500 30 45,000 45,000
POWER TO BUILDING, BURIED, DUCTBANK LS -- 50,000 -- 50,000 -
TRANSFORMER EA 1 20,000 20,000 2 18,000 36,000 16,000
STANDBY GENERATOR, DIESEL, 150 KW EA 1 45,000 45,000 1 45,000 45,000 -
TELECOMMUNICATIONS LS -- 75,000 -- 155,000 80,000
SITE LIGHTING - POLES EA 20 2,500 50,000 20 2,500 50,000 -
SUB-TOTAL, SITEWORK COSTS 1,525,750$ 2,608,825$ 1,083,075$
SITE ACREAGE 16.14 16.39 0
SITEWORK COST / ACRE 94,532$ 159,172$ 64,640$
-
TOTAL CONSTRUCTION COSTS, ESTIMATED 5,649,750$ 7,301,075$ 1,651,325$
TOTAL CONSTRUCTION COSTS, ROUNDED 5,650,000 7,301,000 1,651,000
TOTAL CONSTRUCTION COSTS, W/CONTINGENCY (+10%) 6,215,000 8,031,000 1,816,000
DESIGN + ENGINEERING 497,000 642,000 145,000
ESTIMATED TOTAL PROJECT COST 6,712,000$ 8,673,000$ 1,961,000$
Page 34
SITES – COMPARATIVE DISCUSSION
Old Page
School site
New Page
School site
 Lesser cost to develop; minimal clearing and grading required
 Utilities already on (or near) site that appear adequate, including fueling
 Access to Route 17 remains configured as-is today – not ideal, but adequate
 Improving access to Rt. 17 not essential; but could be quite costly
 Re-utilizes existing Transportation office/garage; well-suited to Utilities
Maintenance Division needs
 Portion of existing site remains undeveloped – available for future expansion
 Higher cost to develop
 Relatively high site costs for clearing, earthwork and grading, new utilities
 Higher cost to build 100% new space for Utilities Maintenance Division
 Good access off T.C. Walker Road for optimized ingress/egress; but must
widen T.C. Walker Road with new turn lanes
 More flexible site arrangement & internal movement than Old Page
 Building at New Page site allows alternative use at Old Page site;
land used for this project is no longer available for a future school
Page 35
SITES – “BOTTOM LINE” COMPARISON
Old Page
School site
New Page
School site
Lower cost to redevelop
Access to Route 17, if unchanged, remains adequate but less than
ideal, and can present safety challenges for left-turning traffic
exiting the site
Re-purposes the existing School Transportation office & garage
for use by Utilities Maintenance Division
Higher cost to develop (nearly $2 million delta)
Ideal access off T.C. Walker Road; safe ingress/egress
Building at New Page site allows alternative use at Old Page site
Page 36
COMMENTS RECEIVED & RESPONSES
 Incorporate Mosquito Control Vehicle Parking
 The Mosquito Control vehicles (2) and its chemical storage/handling area
will be located inside the Warehouse with Utilities Maintenance, partitioned
off separately from other functions. At the Old Page site, this amounts to
one bay of the existing Schools Transportation Building.
 Recommend extending 8-inch water lines into site in order to include
fire sprinklers at the buildings and support new fire hydrants
Sprinklers will be required at the main Admin./Garage building, but will
likely not be required at the Warehouse due to its size and function. New
fire hydrants will be required at either site, and the cost estimate will be
increased to include more 8-inch water piping.
Page 37
COMMENTS RECEIVED & RESPONSES
 Consider reducing the number of buses that need to be stored on the
site to 160; and consolidate the buses in such a manner that, when all
parked on the site, they occupy as minimal a footprint as necessary, to
reduce acreage developed and new impervious surface.
 Will do. There may be reduction of impervious area by as much as 15,000-
30,000 SF, resulting in minor cost savings at both sites for new pavement,
earthwork/grading, and stormwater treatment.
 Revisit the estimated cost for sanitary sewer force main extension at the New
Page Site.
 Will do. Additional cost (minor) for a new force main to the New Page Middle
School pump station will be included. Will discuss further with Utilities if
Upgrade to the School pump station and/or force main beyond is needed. The
sewer discharge rate can be reduced with a holding tank at the New Page site.
Page 38
architecture
interior design
planning
RICHARD S. CORNER, AIA, CSI
SENIOR PARTNER
KEITH MUSHENSKI, AIAA
PARTNER
120 WEST QUEENS WAY, #201
HAMPTON, VA 23669
757 • 722 • 1964
www.hudsonarch.com
Page 39

More Related Content

What's hot

Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Fairfax County
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
Toronto Public Consultation Unit
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
Fairfax County
 
Senior Design Presntation - Spring Term
Senior Design Presntation - Spring TermSenior Design Presntation - Spring Term
Senior Design Presntation - Spring TermSteven E. Kreeley, EIT
 
NCDOT Rail Update
NCDOT Rail UpdateNCDOT Rail Update
NCDOT Rail Update
Charlotte Chamber
 
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Fairfax County
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
SCVTA
 
Trans facility timeline and other bs
Trans facility timeline and other bsTrans facility timeline and other bs
Trans facility timeline and other bs
Kenneth Hogge Sr
 
McLean Hunt Estates Pond Improvement Project
McLean Hunt Estates Pond Improvement ProjectMcLean Hunt Estates Pond Improvement Project
McLean Hunt Estates Pond Improvement Project
Fairfax County
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
Toronto Public Consultation Unit
 
Turkey Run at Truro Subdivision Stream Restoration
Turkey Run at Truro Subdivision Stream RestorationTurkey Run at Truro Subdivision Stream Restoration
Turkey Run at Truro Subdivision Stream Restoration
Fairfax County
 
Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3
Fairfax County
 
College Station Comprehensive Plan Transportation Update
College Station Comprehensive Plan Transportation UpdateCollege Station Comprehensive Plan Transportation Update
College Station Comprehensive Plan Transportation Update
City of College Station
 
North link capital committee briefing 4 14-11 final
North link capital committee briefing 4 14-11 finalNorth link capital committee briefing 4 14-11 final
North link capital committee briefing 4 14-11 final
seatransitblog
 
Lindsay Minck 2015
Lindsay Minck 2015Lindsay Minck 2015
Lindsay Minck 2015
Lindsay Minck
 
Size does matter - but when is big too big?
Size does matter - but when is big too big?Size does matter - but when is big too big?
Size does matter - but when is big too big?
JumpingJaq
 

What's hot (20)

Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities
 
Frank Del 0215
Frank Del 0215Frank Del 0215
Frank Del 0215
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
 
Senior Design Presntation - Spring Term
Senior Design Presntation - Spring TermSenior Design Presntation - Spring Term
Senior Design Presntation - Spring Term
 
NCDOT Rail Update
NCDOT Rail UpdateNCDOT Rail Update
NCDOT Rail Update
 
05.ENTRIPS
05.ENTRIPS05.ENTRIPS
05.ENTRIPS
 
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
 
VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
 
Trans facility timeline and other bs
Trans facility timeline and other bsTrans facility timeline and other bs
Trans facility timeline and other bs
 
McLean Hunt Estates Pond Improvement Project
McLean Hunt Estates Pond Improvement ProjectMcLean Hunt Estates Pond Improvement Project
McLean Hunt Estates Pond Improvement Project
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
Turkey Run at Truro Subdivision Stream Restoration
Turkey Run at Truro Subdivision Stream RestorationTurkey Run at Truro Subdivision Stream Restoration
Turkey Run at Truro Subdivision Stream Restoration
 
Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3Dead Run Stream Restoration Segment 2 – 3
Dead Run Stream Restoration Segment 2 – 3
 
College Station Comprehensive Plan Transportation Update
College Station Comprehensive Plan Transportation UpdateCollege Station Comprehensive Plan Transportation Update
College Station Comprehensive Plan Transportation Update
 
North link capital committee briefing 4 14-11 final
North link capital committee briefing 4 14-11 finalNorth link capital committee briefing 4 14-11 final
North link capital committee briefing 4 14-11 final
 
Resume
ResumeResume
Resume
 
Lindsay Minck 2015
Lindsay Minck 2015Lindsay Minck 2015
Lindsay Minck 2015
 
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
 
Size does matter - but when is big too big?
Size does matter - but when is big too big?Size does matter - but when is big too big?
Size does matter - but when is big too big?
 

Similar to Gloucester County Transportation Study

City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina
 
Judicial (Massey) Complex Master Plan Briefing July 2020
Judicial (Massey) Complex Master Plan Briefing July 2020Judicial (Massey) Complex Master Plan Briefing July 2020
Judicial (Massey) Complex Master Plan Briefing July 2020
Fairfax County
 
Designing of an airport
Designing of an airportDesigning of an airport
Designing of an airport
Nilanjana Pal
 
Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2
Kenneth Hogge Sr
 
WMATA Station Platform Reconstruction Capital Project Summer 2019
WMATA Station Platform Reconstruction Capital Project Summer 2019WMATA Station Platform Reconstruction Capital Project Summer 2019
WMATA Station Platform Reconstruction Capital Project Summer 2019
Fairfax County
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaul Blaetz
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011
Pronob Ghosh
 
The Process of Building A Green Project
The Process of Building A Green ProjectThe Process of Building A Green Project
The Process of Building A Green Project
Green Project Architects
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16Tim Bail
 
ProjectManagementGroupProject
ProjectManagementGroupProjectProjectManagementGroupProject
ProjectManagementGroupProjectPaola Montoya
 
LEED ND Squalicum Lofts
LEED ND Squalicum LoftsLEED ND Squalicum Lofts
LEED ND Squalicum Lofts
Cameron Plommer
 
MTC core capacity transit study
MTC core capacity transit studyMTC core capacity transit study
MTC core capacity transit study
Adina Levin
 
Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...
Pronob Ghosh
 
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert HastingsRV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
Rail~Volution
 
Leed Goals And Strategies 2.3.09
Leed Goals And Strategies 2.3.09Leed Goals And Strategies 2.3.09
Leed Goals And Strategies 2.3.09
Kim Mitchell
 
Gude Landfill Remediation - June 15, 2017
Gude Landfill Remediation - June 15, 2017Gude Landfill Remediation - June 15, 2017
Gude Landfill Remediation - June 15, 2017
Recycling and Resource Management Division
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
StittsvilleCentral.ca
 
Rockingham 2020
Rockingham 2020Rockingham 2020
Rockingham 2020James May
 
LOSS Element for Colonial Beach
LOSS Element for Colonial BeachLOSS Element for Colonial Beach
LOSS Element for Colonial BeachGary Mitchell
 

Similar to Gloucester County Transportation Study (20)

City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
 
Judicial (Massey) Complex Master Plan Briefing July 2020
Judicial (Massey) Complex Master Plan Briefing July 2020Judicial (Massey) Complex Master Plan Briefing July 2020
Judicial (Massey) Complex Master Plan Briefing July 2020
 
Designing of an airport
Designing of an airportDesigning of an airport
Designing of an airport
 
Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2
 
WMATA Station Platform Reconstruction Capital Project Summer 2019
WMATA Station Platform Reconstruction Capital Project Summer 2019WMATA Station Platform Reconstruction Capital Project Summer 2019
WMATA Station Platform Reconstruction Capital Project Summer 2019
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011
 
The Process of Building A Green Project
The Process of Building A Green ProjectThe Process of Building A Green Project
The Process of Building A Green Project
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16
 
ProjectManagementGroupProject
ProjectManagementGroupProjectProjectManagementGroupProject
ProjectManagementGroupProject
 
LEED ND Squalicum Lofts
LEED ND Squalicum LoftsLEED ND Squalicum Lofts
LEED ND Squalicum Lofts
 
MTC core capacity transit study
MTC core capacity transit studyMTC core capacity transit study
MTC core capacity transit study
 
Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...Geometry condition survey from panthapath to russel square report submited by...
Geometry condition survey from panthapath to russel square report submited by...
 
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert HastingsRV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
 
Leed Goals And Strategies 2.3.09
Leed Goals And Strategies 2.3.09Leed Goals And Strategies 2.3.09
Leed Goals And Strategies 2.3.09
 
Gude Landfill Remediation - June 15, 2017
Gude Landfill Remediation - June 15, 2017Gude Landfill Remediation - June 15, 2017
Gude Landfill Remediation - June 15, 2017
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
 
Rockingham 2020
Rockingham 2020Rockingham 2020
Rockingham 2020
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
LOSS Element for Colonial Beach
LOSS Element for Colonial BeachLOSS Element for Colonial Beach
LOSS Element for Colonial Beach
 

More from Kenneth Hogge Sr

FY23 Gloucester County P-Card PDF2.pdf
FY23 Gloucester County P-Card PDF2.pdfFY23 Gloucester County P-Card PDF2.pdf
FY23 Gloucester County P-Card PDF2.pdf
Kenneth Hogge Sr
 
Gloucester County, Va. 2023 Salaries.pdf
Gloucester County, Va. 2023 Salaries.pdfGloucester County, Va. 2023 Salaries.pdf
Gloucester County, Va. 2023 Salaries.pdf
Kenneth Hogge Sr
 
Dooley vs the Gloucester County, Virginia School Board Final Ruling Transcrip...
Dooley vs the Gloucester County, Virginia School Board Final Ruling Transcrip...Dooley vs the Gloucester County, Virginia School Board Final Ruling Transcrip...
Dooley vs the Gloucester County, Virginia School Board Final Ruling Transcrip...
Kenneth Hogge Sr
 
Dooley v Gloucester County School Board SCHOOL BOARD'S OBJECTION to fine and ...
Dooley v Gloucester County School Board SCHOOL BOARD'S OBJECTION to fine and ...Dooley v Gloucester County School Board SCHOOL BOARD'S OBJECTION to fine and ...
Dooley v Gloucester County School Board SCHOOL BOARD'S OBJECTION to fine and ...
Kenneth Hogge Sr
 
Dooley v Gloucester County School Board School Board’s Brief In Opposition To...
Dooley v Gloucester County School Board School Board’s Brief In Opposition To...Dooley v Gloucester County School Board School Board’s Brief In Opposition To...
Dooley v Gloucester County School Board School Board’s Brief In Opposition To...
Kenneth Hogge Sr
 
Dooley v Gloucester County School Board Plaintiff’s Brief In Support of Manda...
Dooley v Gloucester County School Board Plaintiff’s Brief In Support of Manda...Dooley v Gloucester County School Board Plaintiff’s Brief In Support of Manda...
Dooley v Gloucester County School Board Plaintiff’s Brief In Support of Manda...
Kenneth Hogge Sr
 
Transcript of Hearing Dooley v Gloucester County School Board 4 19 2023 Heari...
Transcript of Hearing Dooley v Gloucester County School Board 4 19 2023 Heari...Transcript of Hearing Dooley v Gloucester County School Board 4 19 2023 Heari...
Transcript of Hearing Dooley v Gloucester County School Board 4 19 2023 Heari...
Kenneth Hogge Sr
 
Isle of Wight County, Virginia Public Schools superintendent contract 2022
Isle of Wight County, Virginia Public Schools superintendent contract 2022 Isle of Wight County, Virginia Public Schools superintendent contract 2022
Isle of Wight County, Virginia Public Schools superintendent contract 2022
Kenneth Hogge Sr
 
GCPS ESSER Federal Funding Update 11.8.2022.pptx
GCPS ESSER Federal Funding Update 11.8.2022.pptxGCPS ESSER Federal Funding Update 11.8.2022.pptx
GCPS ESSER Federal Funding Update 11.8.2022.pptx
Kenneth Hogge Sr
 
P-Card Policies-Procedures 03-01-19.pdf
P-Card Policies-Procedures 03-01-19.pdfP-Card Policies-Procedures 03-01-19.pdf
P-Card Policies-Procedures 03-01-19.pdf
Kenneth Hogge Sr
 
Gloucester County Virginia Section 115 Travel Policy (PDF).pdf
Gloucester County Virginia Section 115 Travel Policy (PDF).pdfGloucester County Virginia Section 115 Travel Policy (PDF).pdf
Gloucester County Virginia Section 115 Travel Policy (PDF).pdf
Kenneth Hogge Sr
 
GCPS P-Card 3rd Qtr FY2022 lesson plans and more.pdf
GCPS P-Card 3rd Qtr FY2022 lesson plans and more.pdfGCPS P-Card 3rd Qtr FY2022 lesson plans and more.pdf
GCPS P-Card 3rd Qtr FY2022 lesson plans and more.pdf
Kenneth Hogge Sr
 
GCPS Snacks 3rd qtr fy2022.pdf
GCPS Snacks 3rd qtr fy2022.pdfGCPS Snacks 3rd qtr fy2022.pdf
GCPS Snacks 3rd qtr fy2022.pdf
Kenneth Hogge Sr
 
Gcps policy jfha harassment an retaliation
Gcps policy jfha harassment an retaliationGcps policy jfha harassment an retaliation
Gcps policy jfha harassment an retaliation
Kenneth Hogge Sr
 
Gcps policy jb equal educational opportunities non'discrimination
Gcps policy jb equal educational opportunities non'discriminationGcps policy jb equal educational opportunities non'discrimination
Gcps policy jb equal educational opportunities non'discrimination
Kenneth Hogge Sr
 
Gcps policy gba harassment and retaliation
Gcps policy gba harassment and retaliationGcps policy gba harassment and retaliation
Gcps policy gba harassment and retaliation
Kenneth Hogge Sr
 
Gcps policy gb equal employment opportunities non discrimination
Gcps policy gb equal employment opportunities non discriminationGcps policy gb equal employment opportunities non discrimination
Gcps policy gb equal employment opportunities non discrimination
Kenneth Hogge Sr
 
327 20
327 20327 20
Vdoe superintendent’s memo #202 21
Vdoe superintendent’s memo #202 21Vdoe superintendent’s memo #202 21
Vdoe superintendent’s memo #202 21
Kenneth Hogge Sr
 
Transgender student-model-policies (5)
Transgender student-model-policies (5)Transgender student-model-policies (5)
Transgender student-model-policies (5)
Kenneth Hogge Sr
 

More from Kenneth Hogge Sr (20)

FY23 Gloucester County P-Card PDF2.pdf
FY23 Gloucester County P-Card PDF2.pdfFY23 Gloucester County P-Card PDF2.pdf
FY23 Gloucester County P-Card PDF2.pdf
 
Gloucester County, Va. 2023 Salaries.pdf
Gloucester County, Va. 2023 Salaries.pdfGloucester County, Va. 2023 Salaries.pdf
Gloucester County, Va. 2023 Salaries.pdf
 
Dooley vs the Gloucester County, Virginia School Board Final Ruling Transcrip...
Dooley vs the Gloucester County, Virginia School Board Final Ruling Transcrip...Dooley vs the Gloucester County, Virginia School Board Final Ruling Transcrip...
Dooley vs the Gloucester County, Virginia School Board Final Ruling Transcrip...
 
Dooley v Gloucester County School Board SCHOOL BOARD'S OBJECTION to fine and ...
Dooley v Gloucester County School Board SCHOOL BOARD'S OBJECTION to fine and ...Dooley v Gloucester County School Board SCHOOL BOARD'S OBJECTION to fine and ...
Dooley v Gloucester County School Board SCHOOL BOARD'S OBJECTION to fine and ...
 
Dooley v Gloucester County School Board School Board’s Brief In Opposition To...
Dooley v Gloucester County School Board School Board’s Brief In Opposition To...Dooley v Gloucester County School Board School Board’s Brief In Opposition To...
Dooley v Gloucester County School Board School Board’s Brief In Opposition To...
 
Dooley v Gloucester County School Board Plaintiff’s Brief In Support of Manda...
Dooley v Gloucester County School Board Plaintiff’s Brief In Support of Manda...Dooley v Gloucester County School Board Plaintiff’s Brief In Support of Manda...
Dooley v Gloucester County School Board Plaintiff’s Brief In Support of Manda...
 
Transcript of Hearing Dooley v Gloucester County School Board 4 19 2023 Heari...
Transcript of Hearing Dooley v Gloucester County School Board 4 19 2023 Heari...Transcript of Hearing Dooley v Gloucester County School Board 4 19 2023 Heari...
Transcript of Hearing Dooley v Gloucester County School Board 4 19 2023 Heari...
 
Isle of Wight County, Virginia Public Schools superintendent contract 2022
Isle of Wight County, Virginia Public Schools superintendent contract 2022 Isle of Wight County, Virginia Public Schools superintendent contract 2022
Isle of Wight County, Virginia Public Schools superintendent contract 2022
 
GCPS ESSER Federal Funding Update 11.8.2022.pptx
GCPS ESSER Federal Funding Update 11.8.2022.pptxGCPS ESSER Federal Funding Update 11.8.2022.pptx
GCPS ESSER Federal Funding Update 11.8.2022.pptx
 
P-Card Policies-Procedures 03-01-19.pdf
P-Card Policies-Procedures 03-01-19.pdfP-Card Policies-Procedures 03-01-19.pdf
P-Card Policies-Procedures 03-01-19.pdf
 
Gloucester County Virginia Section 115 Travel Policy (PDF).pdf
Gloucester County Virginia Section 115 Travel Policy (PDF).pdfGloucester County Virginia Section 115 Travel Policy (PDF).pdf
Gloucester County Virginia Section 115 Travel Policy (PDF).pdf
 
GCPS P-Card 3rd Qtr FY2022 lesson plans and more.pdf
GCPS P-Card 3rd Qtr FY2022 lesson plans and more.pdfGCPS P-Card 3rd Qtr FY2022 lesson plans and more.pdf
GCPS P-Card 3rd Qtr FY2022 lesson plans and more.pdf
 
GCPS Snacks 3rd qtr fy2022.pdf
GCPS Snacks 3rd qtr fy2022.pdfGCPS Snacks 3rd qtr fy2022.pdf
GCPS Snacks 3rd qtr fy2022.pdf
 
Gcps policy jfha harassment an retaliation
Gcps policy jfha harassment an retaliationGcps policy jfha harassment an retaliation
Gcps policy jfha harassment an retaliation
 
Gcps policy jb equal educational opportunities non'discrimination
Gcps policy jb equal educational opportunities non'discriminationGcps policy jb equal educational opportunities non'discrimination
Gcps policy jb equal educational opportunities non'discrimination
 
Gcps policy gba harassment and retaliation
Gcps policy gba harassment and retaliationGcps policy gba harassment and retaliation
Gcps policy gba harassment and retaliation
 
Gcps policy gb equal employment opportunities non discrimination
Gcps policy gb equal employment opportunities non discriminationGcps policy gb equal employment opportunities non discrimination
Gcps policy gb equal employment opportunities non discrimination
 
327 20
327 20327 20
327 20
 
Vdoe superintendent’s memo #202 21
Vdoe superintendent’s memo #202 21Vdoe superintendent’s memo #202 21
Vdoe superintendent’s memo #202 21
 
Transgender student-model-policies (5)
Transgender student-model-policies (5)Transgender student-model-policies (5)
Transgender student-model-policies (5)
 

Recently uploaded

Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
SERUDS INDIA
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
Paul Smith
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
uptheratios
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
Mohammed325561
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
Revenue Department Kerala State
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
oklahomajudicialproc1
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
ahcitycouncil
 

Recently uploaded (20)

Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 

Gloucester County Transportation Study

  • 1. Fleet Maintenance Center Study for Gloucester County Public Schools HUDSON + ASSOCIATES ARCHITECTS FINAL DRAFT REPORT SUMMARY School Board Presentation: February 23, 2017 Page 2
  • 2. Fleet Maintenance Center Study for Gloucester County Public Schools EXECUTIVE SUMMARY HISTORY: In early 2016, Gloucester County approached Hudson + Associates Architects about possibility of undertaking a programming study for a new vehicle maintenance and utilities center in conjunction with a master plan for redevelopment of the Old Page Middle School site. The master plan aspect of the Old Page Middle School site was eventually dropped from the scope, and it was agreed that multiple sites would be considered for the new Center. CURRENT SITUATION: Maintenance for current County and School board vehicles and equipment currently takes place in buildings that are generally undersized and poorly suited to all types of vehicles in the respective fleets. Certain major maintenance tasks cannot be performed and must be tasked out to local, private shops. The Sheriff’s Department opted to task all of its vehicle maintenance out to local shops due to shortage of personnel and capabilities to suit its mission-essential needs. Existing facilities are cramped, poorly lit and marginally ventilated. Storage space for spare parts is limited, and the work environment is less-than- pleasant for County personnel. Maintenance is performed in various, scattered buildings. The Utilities Department likewise lacks sufficient maintenance space and has current assets scattered among multiple, marginally-suited buildings and yards. Many County assets such as trailers, and towable equipment (generators, backhoes, mowers, etc.) are stored outside in weather where they deteriorate. While County maintenance personnel are meeting critical needs, they are doing so in facilities that are far less-than-ideal. METHOD OF ANALYSIS: Hudson + Associates Architects undertook the following steps: Major Tasks: What we looked for: Meetings with key department persons to understand organizational needs How departments are currently organized; what does each person do? Meetings with key operational persons to under organization processes How do personnel interact with each other? With the current facility? Visits to all existing County maintenance and storage facilities currently in use What is size, condition and layout of current facilities? Identify deficiencies Visits to proposed sites within Gloucester County and obtaining local physical and topographical data Size and proportions of site, elevation above floodplain, access from streets, access to utilities, opportunity to expand Visits to facilities in other neighboring counties that are similar to the one proposed by this Study Evaluate comparative size, amenities, functional layout, what works well and signs of potential obsolescence PROPOSED SOLUTION: This Study contemplates design and construction of a new, consolidated fleet maintenance and utility operations center to suit requirement of the County, Utilities Department, School Board, and Sheriff’s Department. Included will be the following major program elements:  Vehicle maintenance bays (garage) and related shop area  School bus operations office  Utilities Department office for maintainers  Toilets, lockers and showers for maintenance personnel Page 3
  • 3. Fleet Maintenance Center Study for Gloucester County Public Schools  Combined spares and parts storage with centralized inventory management  Vehicle wash bay (indoor)  Vehicle fueling island (outdoor, covered) and oil-water separator  Central warehouse storage for Utilities Department and County equipment  Outdoor covered storage for trailers, trailerable equipment and materials  Surface parking for fleet vehicles and personnel’s own vehicles SITES FOR CONSIDERATION: The ideal site will have the following attributes:  Sufficient acreage to suit outdoor parking of the school bus fleet and other County vehicles  Suitable acreage and proportions for optimal workflow of vehicles, parking and fueling  Sufficient area to suit facility footprints, outdoor material storage, and stormwater management  Sufficient area to allow for future expansion of building(s) without adverse impact on assets to remain  Safety and ease of ingress into, and egress from, the site at adjacent roadways  Availability of utilities to support building(s) and site amenities  Good vertical elevation above floodplain, and minimal impact from wetlands  Good soils for bearing pavements and building foundations  Sufficient acreage for future expansion Three sites were considered:  Old Page Middle School site (off Rt. 17, near current School Transportation Ctr.)  Land adjacent to the T.C Walker Center (off T.C. Walker Road)  Land Adjacent to the new Page Middle School site (off T.C. Walker Road) The site adjacent to the T.C. Walker Center was ruled out fairly quickly because it was too small and was predominantly at too low a vertical elevation to build upon. Also, to build the facility at this site would constrain future reuse of the T.C. Walker Center as a school, if desired. As for the other two sites:  Old Page Middle School: site is favorable in size and flexibility, but currently lacks ideal access to Route 17. Also, the site’s configuration and current location of the water tower impact the layout and future expansion. The existing School Transportation facility, however, may be re-purposed for use by Utilities Maintenance, reducing need for new construction to suits its needs. Lastly, this site may have higher and beneficial use for economic development.  Land Adjacent to the new Page Middle School: This site is also favorable in size and flexibility, and offers good access to T.C. Walker Road without adverse impact upon traffic flow in and out of the Middle School. Its size and proportions are amenable to efficient use and future expansion. This is a ‘virgin’ site, however, and will incur higher costs to clear to support with new utilities. Also, T.C. Walker Road must be widened to add new turn lanes into the center. Page 4
  • 4. Fleet Maintenance Center Study for Gloucester County Public Schools PROPOSED BUILDING AND SITE DEVELOPMENT COSTS: A preliminary, estimated budget is included herein that contemplates construction of the new, consolidated Transportation and Utility Center and all related site development. A separate estimate is included for each site, due to the differing conditions and programmatic elements at each site. Please note that:  The overall figures are for budgeting purposes only, and is not based on definitive design of the building(s) or site amenities.  Additional site investigation, such as geotechnical investigation of soils may be warranted.  The overall figures assume that the primary maintenance garage and warehouse facility will be built using pre-engineered building structure and walls built at least partial height of masonry for durability.  A single-story building is preferred to avoid cost of stairwells and an elevator. Conceptual building floor plans and overall site plans (one for each site) are offered herein upon which the estimated costs are based. TIMETABLE TO IMPLEMENT: The proposed Transportation and Utility Center can be designed and built as soon as funding is authorized by Gloucester County. Some time constraints to consider include:  Once approved and design is authorized to commence, a detailed survey of the selected site will be required. An updated wetlands delineation may be required, depending upon the selected site and preferred layout. This can take up to 8-10 weeks to accomplish.  Geotechnical investigation will be required to determine foundation and pavement subgrade requirements.  There should be no unusual environmental permitting required; however, up to 90 days should be allowed for County review of the definitive site plan and stormwater management design. This can be expedited as early in the design process as possible to reduce impact on overall timeframe to permit the project.  6-8 months should be allowed for design, which includes the aforementioned civil design and environmental review.  6 weeks should be allowed for bidding.  4 weeks should be allowed for review of bids and determination of an acceptable low bidder. The apparent low bidder should submit its insurance paperwork and performance bond for review prior to award of contract.  Due to the extensive sitework required, 16-18 months should be allowed for construction following award of contract. Other time factors to consider:  30-60 days should be allowed to equip and furnish the new facility, as well as to set up data and communication systems.  The ideal time to relocate operations and vehicle maintenance to the completed facility, from perspective of schools and bus transportation, is mid-summer. There is no favored time for Utilities or County vehicle maintenance.  There will be some costs to move the operation and maintenance entities into a new facility. It may be advantageous to bring in a company specializing in such moves to shorten the downtime of the various units. Page 5
  • 5. OVERVIEW – STUDY OBJECTIVE  Assess condition of existing transportation administration and maintenance facilities  Gain understanding of current and projected (future) operational and maintenance needs by interviewing Schools & County staff  Explore efficiencies gained by consolidating Schools and County fleet maintenance into a single facility. Also explore consolidation with the County Utilities Maintenance Division.  Evaluate and compare up to three (3) sites for locating the consolidated facility at Old Page MS, T.C.Walker Center & next to New Page MS  Prepare a cost model to develop the project for funding purposes Page 6
  • 6. CURRENT SITUATION  Current facilities are antiquated, undersized and crowded  Buildings no longer suited to size and diversity of vehicles to be maintained  Working conditions are marginal, and poor at County Garage  Several tasks are outsourced that could otherwise be performed  Spare parts often not readily on hand (lack of storage)  Unsheltered vehicles and equipment deteriorate more rapidly  No manpower or capacity to maintain Sheriff’s vehicles  Inefficient use of manpower due to shortage of personnel Page 7
  • 7. 36’L Bus in Maint. BayAerial View – Schools Transportation Center Front of Building Page 8
  • 8. County Garage at Rt. 17 & Providence Rd. Page 9
  • 9. Carriage Lane County & Utility Maint. Dept. Facilities COUNTY MAINTENANCE SHED (SHELTER LOCATED BEHIND TO LEFT) UTILITIES MAINTENANCE UNIT BUILDING UTILITIES DEPARTMENT ADMIN. &CUSTOMER SERVICE CENTER Utility Dept. Maint. Yard & Facilities behind Southern States Page 10
  • 10. ADDITIONAL CHALLENGES  Current buildings cannot be enlarged; poor value to enhance  Equipment storage scattered in various locations  County & Utilities: Shortage of maintenance & warehouse area  Utilities “Yard” behind Southern States – buildings in poor condition  Conditions adversely affect workflow, response & timely completion  Excess employee time spent traveling between tasks & sites  Longevity of vehicle & equipment assets is reduced  Conditions not condusive to employee satisfaction or longevity Page 11
  • 11. NEW FACILITY OBJECTIVES  Consolidate Schools & County fleet maintenance functions  Modernize facilities that improve workflow and operational efficiency  Increase storage capacity and maintenance capabilities  Improve conditions for multiple County organizations under one project  Enhance maintenance and extend life of vehicles & equipment  Provide site layout that is spacious enough for larger, consolidated operation, yet is efficient and cost-effective  Site & building should have some initial growth capacity built-in  Site must support opportunity to expand to suit longterm needs Page 12
  • 12. FLEET MAINTENANCE REQUIREMENTS PUBLIC COUNTY & SHERIFF’S SCHOOLS UTILITIES DEPT. TOTALS Class 1 Passenger 49 45 72 166 Class 2 Trucks 34 29 9 72 Class 3 Buses 112* -- -- 112 Class 4 Trailers 8 17 3 ** 28 Class 5 Equipment 6 31 -- 37 TOTAL Vehicles 195 74 81 350 All Items 209 122 84 415 * 4 inspections/bus/year = 448 total inspections/year ** Includes Tactical Command Center Page 13
  • 13. TRANSPORTATION FACILITY PROGRAM GARAGE:  Maintenance Bays (7 double bays X 20’ wide x 110’ deep) 15,400 SF  Parts Warehouse 3,100 SF  Supervisor Office/Records/Break Area 800 SF  Lockers/Toilets 1,000 SF  Machine Shop/Batteries 1,500 SF Sub-total, Garage 21,800 SF TRANSPORTATION ADMINISTRATION OFFICE: 2,400 SF Common Area/Circulation: 1,200 SF Sub-Total, Transportation 25,400 SF Page 14
  • 14. TRANSPORTATION FACILITY PROGRAM TRANSPORTATION PROGRAM: 25,400 SF ADDITIONAL BUILDING PROGRAM:  Equipment Maintenance Center (Off-road, mowers, tools) 1,750 SF Total New Building Area, Old Page Site 27,150 SF  Utilities Maintenance Division (Office/Lockers/Shop) 1,900 SF Total New Building Area, New Page Site 29,050 SF Page 15
  • 15. TRANSPORTATION FACILITY PROGRAM UTILITIES MAINTENANCE DIVISION:  At the New Page site, Utilities Maintenance Division will have its offices and a maintenance shop in the main, new building (totaling 1,900 SF) , sharing toilets and other amenities with the Transportation/Garage functions.  In addition, Utilities Maint. Div. will have a new 7,500 SF storage warehouse.  Also, there will be another 7,500 SF of new outdoor covered shed area.  At the Old Page site, Utilities Maintenance Division will re-occupy the existing, vacated Transportation office & garage, totaling 7,500 SF.  The existing building will require minor alterations and some renovations, including a new roof.  Also, there will be another 10,000 SF of new outdoor covered shed area. Page 16
  • 16. Transportation Administration Consolidated Vehicle Maint. Utilities Maint. Division Equipment Maintenance Shared MAINT. BAYS UTIL. MAINT. DIV. MACHINE SHOP PARTS WASH BAY BRAKES TIRES EQUIP. MAINT. TRANSPORT’ N ADMIN. UTILITIES MAINT. DIVISION OFFICES & SHOP INCLUDED FOR NEW PAGE SITE Page 17
  • 18. FLEET MAINTENANCE – WHY 14 BAYS? BUS 1 WASHBAY BRAKES TIRE SHOP TRUCK1 PASS 1 BUS 2 BUS 3 BUS 4 BUS 5 BUS 6 FLUIDS PASS 3 PASS 2 TRUCK1  Bays can also “flex” as needed, depending on workload  Trailers require less time in shop, but are typicallypulled through  One bay for “long- term” work on buses (#6) Page 19
  • 19. OLD PAGE MIDDLE SCHOOL SITE:  Adequate acreage for larger, consolidated Transportation/County Garage  Could support future expansion for Transportation & County Garage  Site impacted somewhat by existing water tower & wetlands  Existing transportation facility would not be affected by new construction  Could locate at rear of site; preserve front of site for alternative use  Access to Rt. 17 less than optimal, but could improve in future  Utilities Maintenance Division is accommodated at existing Bus Maint./Garage/Transportation Office, plus new Storage Sheds  Reconfigured site and reused existing entrance drive at north side of site; access on/off Rt. 17 is questionable  Developed acreage & amenities now similar to New Page site Page 20
  • 21. T.C. WALKER ROAD EXISTING SCHOOLS TRANSPORTATION OFFICE/MAINT. CTR. – UTILITIES MAINT. DIV. EXISTIN G WATER TOWER OLD PAGE SITE PLAN – Updated 2/23/17 0 100’ 400’ Page 22
  • 22. T.C. WALKER ROAD FUTURE ENTRY ROAD EXISTIN G WATER TOWER OLD PAGE SITE PLAN – Updated 2/23/17 0 100’ 400’ FUTURE EXPANSION Page 23
  • 23. NEW PAGE SCHOOL SITE:  Adequate acreage for larger, consolidated Transportation/County Garage  Could support future expansion  Site minimally impacted by wetlands  Access to T.C. Walker Road is optimal  Can locate without impact to existing Middle School  Preserves acreage for only one future school, but not two  Utilities Maintenance Division is housed in new building with Transporation; site also includes new Warehouse and Storage Sheds  Add turn lanes off T.C. Walker Road Page 24
  • 25. T.C. WALKER ROAD (WIDENED) EXISTING PAGE MIDDLE SCHOOL NEW PAGE SITE PLAN – Updated 2/23/17 0 100’ 400’ Page 26
  • 26. T.C. WALKER ROAD (WIDENED) EXISTING PAGE MIDDLE SCHOOL NEW PAGE SITE PLAN – Updated 2/23/17 0 100’ 400’ FUTURE EXPANSION Page 27
  • 27. T.C. WALKER CENTER SITE  Limited acreage for a large, consolidated operations; impedes expansion  Much of the site is at lower grade than existing Center  Stream and wetlands impacts prevent full use of site  Might limit future growth of T.C. Walker Center or return to use a school  Access to T.C. Walker Road less than optimal, but workable  Constraints to site layout and flow of traffic due to grade change  Site cannot accommodate Utilities Maintenance Division  Insufficient land at upper elevation to park all buses  Soils might not be favorable to spread-footing foundations  Potential impacts on existing Center during construction  School Board determined this site is no longer to be considered Page 28
  • 30. PROJECT COST ESTIMATE / COMPARISON BUILDING COSTS OLD PAGE Site NEW PAGE Site  Industrial Space (~$110/SF) $ 2,392,500 $ 2,442,000  Office/Finished Space (~$175/SF) 945,000 1,198,750 Sub-Total, Primary Building $ 3,337,500 $ 3,640,750  Utilities Maint. Div. Warehouse -- 500,000  Re-Purpose Existing Transport’n Bldg. 112,500 --  Re-Roof Existing Transport’n Bldg. 93,750 --  Outdoor Covered Storage Shelter(s) 200,000 150,000  Furnishings & Equipment 380,250 401,500 Sub-Total, Building Costs $ 4,124,000 $ 4,692,250 Page 31
  • 31. PROJECT COST ESTIMATE / COMPARISON SITEWORK COSTS OLD PAGE Site NEW PAGE Site  Site Improvements $ 900,750 $ 1,567,600  Grading & Drainage 220,350 265,975  Utilities – Water/Sewer/Fuels 164,650 394,250  Utilities - Electrical 240,000 381,000 Sub-Total, Sitework Costs $ 1,525,600 $ 2,608,825 w/Building Cost, Rounded 5,650,000 7,301,000 With Contingency (+10%) 6,215,000 8,031,000 Design + Engineering 497,000 642,000 Estimated Total Project Cost $ 6,712,000 $ 8,673,000 Site acreage 16.14 acres 16.39 acres Sitework, Cost/acre $ 94,532/acre $ 159,172/acre Page 32
  • 32. GLOUCESTER COUNTY TRANSPORTATION CENTER STUDY COST ESTIMATE FEBRUARY 23, 2017 QTY. $/UNIT COST QTY. $/UNIT COST BUILDING COSTS MAIN BUILDING SF INDUSTRIAL SPACE SF 21,750 110.00 2,392,500 22,200 110.00 2,442,000 49,500 OFFICE/FINISHED SPACE SF 5,400 175.00 945,000 6,850 175.00 1,198,750 253,750 SUB-TOTAL, PRIMARY BUILDING SF 27,150 3,337,500 29,050 3,640,750 303,250 UTILITIES MAINT. DIV. - WAREHOUSE (NEW PAGE) SF - 10,000 50.00 500,000 500,000 RE-PURPOSE EXISTING TRANSPORT'N BLDG (OLD PAGE) SF 7,500 15.00 112,500 - (112,500) RE-ROOF EXISTING TRANSPORT'N BLDG (OLD PAGE) SF 7,500 12.50 93,750 (93,750) OUTDOOR COVERED STORAGE SHELTER(S) SF 10,000 20.00 200,000 7,500 20.00 150,000 (50,000) FURNISHINGS & EQUIPMENT LS 380,250 401,500 21,250 SUB-TOTAL, BUILDING COSTS 4,124,000$ 4,692,250$ 568,250$ SITEWORK SITE IMPROVEMENTS IMPROVE T.C. WALKER ROAD LF - 1,800 225 405,000 405,000 ADD TURN LANE ON RT.17 LF 300 225 67,500 - (67,500) SITE CLEARING AC 2.00 20,000 40,000 16.39 20,000 327,800 287,800 SITE DEMOLITION/PAVEMENT REMOVAL SF 38,000 - - - EARTHWORK CY 18,150 5.00 90,750 26,460 5.00 132,300 41,550 CANOPY AT FUEL ISLAND SF 2,000 15.00 30,000 2,000 15.00 30,000 - NEW PAVEMENT - FLEXIBLE SY 48,500 10.00 485,000 48,500 10.00 485,000 - NEW PAVEMENT - RIGID SY 2,800 25.00 70,000 2,800 25.00 70,000 - TURF/LANDSCAPING AC 3 25,000 75,000 3 25,000 75,000 - FENCING LF 3,150 - 3,150 - - GATES EA 2 15,000 30,000 2 15,000 30,000 - SIGNAGE LS -- 5,000 5,000 - SIDEWALK/EQUIPMENT PADS LS -- 7,500 7,500 - GRADING & DRAINAGE - BMP/RETENTION POND CY 6,000 15.00 90,000 9,000 15.00 135,000 45,000 CURB & GUTTER LF 3,000 7.50 22,500 3,000 7.50 22,500 - DRAINAGE STRUCTURES EA 5 7,500 37,500 5 7,500 37,500 - UNDERGROUND PIPING LF 1,000 30.00 30,000 1,000 30.00 30,000 - EROSION & SEDIMENT CONTROL AC 16.14 2,500 40,350 16.39 2,500 40,975 625 OLD PAGE SITE NEW PAGE SITE UNITS Δ Page 33
  • 33. GLOUCESTER COUNTY TRANSPORTATION CENTER STUDY COST ESTIMATE FEBRUARY 23, 2017 QTY. $/UNIT COST QTY. $/UNIT COST OLD PAGE SITE NEW PAGE SITE UNITS Δ UTILITIES WATER/SEWER/FUELS EXTEND WATER SERVICE, 8-INCH LF 600 64 38,400 -- - (38,400) EXTEND WATER SERVICE, 16-INCH LF -- - 1,500 125 187,500 187,500 SANITARY SEWER - GRAVITY, 8-INCH LF 600 40 24,000 1,500 40 60,000 36,000 S.S. MANHOLE EA 1 20,000 20,000 2 20,000 40,000 20,000 S.S. GRINDER PUMP/LIFT STATION EA -- - 1 15,000 15,000 15,000 DOMESTIC WATER LINE, 3-INCH LF 250 30 7,500 350 30 10,500 3,000 SPRINKLER WATER LINE, 6-INCH LF 250 65 16,250 350 65 22,750 6,500 FIRE HYDRANTS EA 2 3,000 6,000 2 3,000 6,000 - BACKFLOW PREVENTER EA 1 5,000 5,000 1 5,000 5,000 - PROPANE GAS SERVICE & PAD LS -- 7,500 -- 7,500 - RELOCATE FUEL ISLAND LS -- 10,000 -- 10,000 - OIL-WATER SEPARATOR, FUEL PAD (20,000 GAL) EA 1 25,000 25,000 1 25,000 25,000 - OIL-WATER SEPARATOR, BUILDING (1,500 GAL) EA 1 5,000 5,000 1 5,000 5,000 - ELECTRICAL - POWER TO BUILDING, AERIAL LF -- - 1,500 30 45,000 45,000 POWER TO BUILDING, BURIED, DUCTBANK LS -- 50,000 -- 50,000 - TRANSFORMER EA 1 20,000 20,000 2 18,000 36,000 16,000 STANDBY GENERATOR, DIESEL, 150 KW EA 1 45,000 45,000 1 45,000 45,000 - TELECOMMUNICATIONS LS -- 75,000 -- 155,000 80,000 SITE LIGHTING - POLES EA 20 2,500 50,000 20 2,500 50,000 - SUB-TOTAL, SITEWORK COSTS 1,525,750$ 2,608,825$ 1,083,075$ SITE ACREAGE 16.14 16.39 0 SITEWORK COST / ACRE 94,532$ 159,172$ 64,640$ - TOTAL CONSTRUCTION COSTS, ESTIMATED 5,649,750$ 7,301,075$ 1,651,325$ TOTAL CONSTRUCTION COSTS, ROUNDED 5,650,000 7,301,000 1,651,000 TOTAL CONSTRUCTION COSTS, W/CONTINGENCY (+10%) 6,215,000 8,031,000 1,816,000 DESIGN + ENGINEERING 497,000 642,000 145,000 ESTIMATED TOTAL PROJECT COST 6,712,000$ 8,673,000$ 1,961,000$ Page 34
  • 34. SITES – COMPARATIVE DISCUSSION Old Page School site New Page School site  Lesser cost to develop; minimal clearing and grading required  Utilities already on (or near) site that appear adequate, including fueling  Access to Route 17 remains configured as-is today – not ideal, but adequate  Improving access to Rt. 17 not essential; but could be quite costly  Re-utilizes existing Transportation office/garage; well-suited to Utilities Maintenance Division needs  Portion of existing site remains undeveloped – available for future expansion  Higher cost to develop  Relatively high site costs for clearing, earthwork and grading, new utilities  Higher cost to build 100% new space for Utilities Maintenance Division  Good access off T.C. Walker Road for optimized ingress/egress; but must widen T.C. Walker Road with new turn lanes  More flexible site arrangement & internal movement than Old Page  Building at New Page site allows alternative use at Old Page site; land used for this project is no longer available for a future school Page 35
  • 35. SITES – “BOTTOM LINE” COMPARISON Old Page School site New Page School site Lower cost to redevelop Access to Route 17, if unchanged, remains adequate but less than ideal, and can present safety challenges for left-turning traffic exiting the site Re-purposes the existing School Transportation office & garage for use by Utilities Maintenance Division Higher cost to develop (nearly $2 million delta) Ideal access off T.C. Walker Road; safe ingress/egress Building at New Page site allows alternative use at Old Page site Page 36
  • 36. COMMENTS RECEIVED & RESPONSES  Incorporate Mosquito Control Vehicle Parking  The Mosquito Control vehicles (2) and its chemical storage/handling area will be located inside the Warehouse with Utilities Maintenance, partitioned off separately from other functions. At the Old Page site, this amounts to one bay of the existing Schools Transportation Building.  Recommend extending 8-inch water lines into site in order to include fire sprinklers at the buildings and support new fire hydrants Sprinklers will be required at the main Admin./Garage building, but will likely not be required at the Warehouse due to its size and function. New fire hydrants will be required at either site, and the cost estimate will be increased to include more 8-inch water piping. Page 37
  • 37. COMMENTS RECEIVED & RESPONSES  Consider reducing the number of buses that need to be stored on the site to 160; and consolidate the buses in such a manner that, when all parked on the site, they occupy as minimal a footprint as necessary, to reduce acreage developed and new impervious surface.  Will do. There may be reduction of impervious area by as much as 15,000- 30,000 SF, resulting in minor cost savings at both sites for new pavement, earthwork/grading, and stormwater treatment.  Revisit the estimated cost for sanitary sewer force main extension at the New Page Site.  Will do. Additional cost (minor) for a new force main to the New Page Middle School pump station will be included. Will discuss further with Utilities if Upgrade to the School pump station and/or force main beyond is needed. The sewer discharge rate can be reduced with a holding tank at the New Page site. Page 38
  • 38. architecture interior design planning RICHARD S. CORNER, AIA, CSI SENIOR PARTNER KEITH MUSHENSKI, AIAA PARTNER 120 WEST QUEENS WAY, #201 HAMPTON, VA 23669 757 • 722 • 1964 www.hudsonarch.com Page 39