The Turkey Run @ Truro Subdivision Stream Restoration project in Fairfax County, VA restored 3,850 linear feet of stream channel and tributaries. The project improved stream morphology, removed an existing pedestrian bridge and replaced it along with six others, removed an existing trail and part of a parking lot, added materials to stabilize the stream bed and banks, controlled invasive species, and added structures to reduce erosion and improve habitat. The project is estimated to reduce phosphorus and nitrogen pollution and sediment entering Accotink Creek and the Potomac River annually.
Flatlick Branch Phase II Stream Restoration ProjectFairfax County
The Flatlick Branch Phase II Stream Restoration project included restoration of 4,600 linear feet of Flatlick Branch and its tributaries, provided a sustainable channel form, pattern and profile to meet today’s developed landscape, added in-stream habitat enhancement and flood plain restoration, rock structures to provide grade control throughout the channel and provide energy dissipation, and the planting of the stream areas with native vegetation.
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
This project included removal and replacement of fuel storage tanks for stand by generators at the Long Branch Sanitary Sewer Pump Station and New Alexandria Stormwater Pump Station. Existing underground storage tanks were replaced with new above ground fuel tanks. The project included installation of piping, valves, fuel polishing systems, day tanks, and appurtenances, as well as associated site work. This project was substantially complete on October 29, 2021.
Restore ~4,000 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020Fairfax County
A community meeting was held on Sept 30, 2020 to inform residents and gather information from them about the stream restoration project at Little Pimmit Run Tributary at Woodland Terrace.
Flatlick Branch Phase II Stream Restoration ProjectFairfax County
The Flatlick Branch Phase II Stream Restoration project included restoration of 4,600 linear feet of Flatlick Branch and its tributaries, provided a sustainable channel form, pattern and profile to meet today’s developed landscape, added in-stream habitat enhancement and flood plain restoration, rock structures to provide grade control throughout the channel and provide energy dissipation, and the planting of the stream areas with native vegetation.
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
This project included removal and replacement of fuel storage tanks for stand by generators at the Long Branch Sanitary Sewer Pump Station and New Alexandria Stormwater Pump Station. Existing underground storage tanks were replaced with new above ground fuel tanks. The project included installation of piping, valves, fuel polishing systems, day tanks, and appurtenances, as well as associated site work. This project was substantially complete on October 29, 2021.
Restore ~4,000 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Little Pimmit Run at Woodland Terrace Community Meeting 09 30-2020Fairfax County
A community meeting was held on Sept 30, 2020 to inform residents and gather information from them about the stream restoration project at Little Pimmit Run Tributary at Woodland Terrace.
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
2019 study evaluated several alternatives for replacement
Selected alternative would:
Eliminate the exposed sewer/stream crossing
Maintain level of sewer services to the community
Provide future access ease to Fairfax County’s wastewater operator
Improve system’s reliability in the area
Reduce future risk of sanitary sewer overflows
Reduce risk to public health and the environment
Leigh Meadow & Towlston Basin (0584DP/0103DP)Fairfax County
Leigh Meadow & Towlston Basin project was substantially completed on October 29, 2021. This project consists of 1,660 feet of stream restoration, a 22,300 cubic foot Regenerative Stormwater Conveyance (RSC) facility and a 28,500 cubic foot sand filter. The scope of work also included grading, excavation, pollution and sediment removal, and restoration planting.
This project included rehabilitation of four sanitary sewer metering vaults. These meter vaults included Dukes Car Wash, Lower Holmes Run, Tod Street, and Scotts Run. The Dukes Car Wash and Lower Holmes Run Meters are in the City of Alexandria, the Tod Street Meter is in Falls Church in the Providence District, and the Scotts Run Meter is in the Scotts Run Nature Preserve in the Dranesville District. Work included removal of existing control panels, conduits and metering equipment, rehabilitation of the interior of the vaults with a cementitious coating and epoxy liner system, installation of new control panels and conduit, and reinstallation of flow metering devices. This project was substantially complete on August 30, 2021.
The work on this project included investigation and repair to an 8-inch sewer line in Waterway Drive which had been previously lined with a plastic liner system. The project location was in Waterway Drive from Cavalier Court to the vicinity of Half Moon Circle. The project involved setting up a bypass system to remove sewage from the line so the pipe could be properly cleaned and inspected. Following this process, it was determined the plastic liner was causing capacity issues. It was determined that the liner could be repaired using internal methods and no excavation was needed. In addition, the five manholes associated with the segments of pipe in the project area were also rehabilitated. This project was substantially complete on June 25, 2021.
The project included rehabilitation of approximately 1,641 linear feet of 24-inch diameter pipe with cured-in-place pipe liner and replacement of 175 linear feet of sanitary sewer pipe. Crushed glass from the I-95 Landfill Complex was used as bedding material for the pipe replacement portion of work.
The Sutton Oaks Pond Improvements project is located within the Cub Run Watershed. This project included restoration and improvement of the maintenance access road, extension of the existing principal spillway pipe, extension of an existing storm sewer pipe, removal of sediment from the basin, stabilization of two incoming channels, minor grading of the dam embankment, installation of a forebay using imbricated stones, and stabilization of the emergency spillway.
Accotink Creek at Wakefield Park Stream Restoration ProjectFairfax County
Accotink Creek at Wakefield Park Stream Restoration project was substantially completed on November 23, 2021. This project consists of restoring, enhancing, and stabilizing of approximately 4,900 linear feet of stream channel through the installation of four Newbury Riffles within the main channel of Accotink Creek and one Newbury Riffle within a side channel to provide aquatic benefits, grade control, improve water quality and prevent further erosion.
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Fairfax County
Lake Siltation
Lake Accotink has been dredged three times over the past 40 years.
The most recent dredging was completed in May 2008.
An average of 20,000 CY of sediment is deposited in the lake per year.
The estimated average depth of the lake is less than 4 feet.
Park Master Plan Process
Master Plan began Spring 2016.
5 Public Meetings/Workshops held with Community.
6 Lake Management Options were shared with the public.
90% of public comments favored having the lake.
Board of Supervisors Approval of Funding
BOS approved request to seek funding for up to $30.5 million to proceed with Lake Accotink Dredging in October 2019 .
South Lakes Drive Walkway was substantially completed on September 17, 2021. The project included construction of 3,370 linear feet of sidewalk, pedestrian ramps, pedestrian signals, handrail, bus shelter and loading pads, curbs and gutters, asphalt milling and paving, pavement markings and signage, fire hydrant relocation, and drainage adjustment.
Accotink Tributary at Oakford Drive Stream RestorationFairfax County
The Accotink Tributary at Oakford Drive Stream Restoration project included restoration of approximately 1,538 linear feet of stream using natural channel design for restoration, enhancing and stabilizing the degraded stream channel, bed and bank to stabilize, enhance and provide water quality benefits, aesthetics, and prevent further erosion.
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
2019 study evaluated several alternatives for replacement
Selected alternative would:
Eliminate the exposed sewer/stream crossing
Maintain level of sewer services to the community
Provide future access ease to Fairfax County’s wastewater operator
Improve system’s reliability in the area
Reduce future risk of sanitary sewer overflows
Reduce risk to public health and the environment
Leigh Meadow & Towlston Basin (0584DP/0103DP)Fairfax County
Leigh Meadow & Towlston Basin project was substantially completed on October 29, 2021. This project consists of 1,660 feet of stream restoration, a 22,300 cubic foot Regenerative Stormwater Conveyance (RSC) facility and a 28,500 cubic foot sand filter. The scope of work also included grading, excavation, pollution and sediment removal, and restoration planting.
This project included rehabilitation of four sanitary sewer metering vaults. These meter vaults included Dukes Car Wash, Lower Holmes Run, Tod Street, and Scotts Run. The Dukes Car Wash and Lower Holmes Run Meters are in the City of Alexandria, the Tod Street Meter is in Falls Church in the Providence District, and the Scotts Run Meter is in the Scotts Run Nature Preserve in the Dranesville District. Work included removal of existing control panels, conduits and metering equipment, rehabilitation of the interior of the vaults with a cementitious coating and epoxy liner system, installation of new control panels and conduit, and reinstallation of flow metering devices. This project was substantially complete on August 30, 2021.
The work on this project included investigation and repair to an 8-inch sewer line in Waterway Drive which had been previously lined with a plastic liner system. The project location was in Waterway Drive from Cavalier Court to the vicinity of Half Moon Circle. The project involved setting up a bypass system to remove sewage from the line so the pipe could be properly cleaned and inspected. Following this process, it was determined the plastic liner was causing capacity issues. It was determined that the liner could be repaired using internal methods and no excavation was needed. In addition, the five manholes associated with the segments of pipe in the project area were also rehabilitated. This project was substantially complete on June 25, 2021.
The project included rehabilitation of approximately 1,641 linear feet of 24-inch diameter pipe with cured-in-place pipe liner and replacement of 175 linear feet of sanitary sewer pipe. Crushed glass from the I-95 Landfill Complex was used as bedding material for the pipe replacement portion of work.
The Sutton Oaks Pond Improvements project is located within the Cub Run Watershed. This project included restoration and improvement of the maintenance access road, extension of the existing principal spillway pipe, extension of an existing storm sewer pipe, removal of sediment from the basin, stabilization of two incoming channels, minor grading of the dam embankment, installation of a forebay using imbricated stones, and stabilization of the emergency spillway.
Accotink Creek at Wakefield Park Stream Restoration ProjectFairfax County
Accotink Creek at Wakefield Park Stream Restoration project was substantially completed on November 23, 2021. This project consists of restoring, enhancing, and stabilizing of approximately 4,900 linear feet of stream channel through the installation of four Newbury Riffles within the main channel of Accotink Creek and one Newbury Riffle within a side channel to provide aquatic benefits, grade control, improve water quality and prevent further erosion.
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Fairfax County
Lake Siltation
Lake Accotink has been dredged three times over the past 40 years.
The most recent dredging was completed in May 2008.
An average of 20,000 CY of sediment is deposited in the lake per year.
The estimated average depth of the lake is less than 4 feet.
Park Master Plan Process
Master Plan began Spring 2016.
5 Public Meetings/Workshops held with Community.
6 Lake Management Options were shared with the public.
90% of public comments favored having the lake.
Board of Supervisors Approval of Funding
BOS approved request to seek funding for up to $30.5 million to proceed with Lake Accotink Dredging in October 2019 .
South Lakes Drive Walkway was substantially completed on September 17, 2021. The project included construction of 3,370 linear feet of sidewalk, pedestrian ramps, pedestrian signals, handrail, bus shelter and loading pads, curbs and gutters, asphalt milling and paving, pavement markings and signage, fire hydrant relocation, and drainage adjustment.
Accotink Tributary at Oakford Drive Stream RestorationFairfax County
The Accotink Tributary at Oakford Drive Stream Restoration project included restoration of approximately 1,538 linear feet of stream using natural channel design for restoration, enhancing and stabilizing the degraded stream channel, bed and bank to stabilize, enhance and provide water quality benefits, aesthetics, and prevent further erosion.
Flatlick Branch III Stream Restoration June 6, 2020Fairfax County
The Flatlick Branch Phase III Stream Stabilization Project was substantially completed on April 10, 2020. The project aims to stabilize approximately 4000 linear feet of degraded stream channel from Walney Road to the culvert at Route 28 in Fairfax County and improve the water quality of the channel and downstream receiving waters.
Turkeycock Run at Mason District Park Stream Restoration ProjectFairfax County
The Turkeycock Run at Mason District Park Stream Restoration Project included 1,580 linear feet of stream restoration through natural channel design to enhance/stabilize and restore the stream channel to improve water quality.
The Oakton Community Park Phase 2A project consisted of a new reinforced concrete roundabout, concrete and asphalt sidewalks, curb ramps, concrete medians, and curb and gutter. The scope of work also included storm drainage, site improvements, asphalt restoration, pavement markings and other associated work.
Scotts Run Tributary at Windy Hill Road Stream StabilizationFairfax County
This stream stabilization is located within the Scotts Run Watershed in McLean, Va. The project restored 600 feet of intermittent stream using natural channel design, installed a new drop inlet, 32 linear feet of 36-inch diameter reinforced concrete pipe, an end wall at Box Elder Court, and installation of instream structures such as rock weir, imbricated toe protection, step pools, reinforced bed material.
Hunting Creek at Fairfield Stream RestorationFairfax County
The Hunting Creek at Fairchild Stream Restoration project, Substantially Completed on January 13, 2021, includes restoring, enhancing and stabilizing approximately 1,186 linear feet of stream channel in two segments and 166 linear feet of tributary through natural channel design to provide aquatic benefits, grade control, improve water quality and prevent further erosion. The work also included demolition of a condemned house and accessory structures including obtaining all associated demolition permits and restoration landscaping.
Similar to Turkey Run at Truro Subdivision Stream Restoration (20)
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
During a routine Closed-Circuit Television (CCTV) Camera inspection by Wastewater Collection Division (WCD), it was found that 45 linear feet of 8-inch asbestos reinforced concrete pipe (RCP) between MH-292 to MH-291 was within imminent danger of failing. The bottom of the RCP was missing within the 45 linear feet of repair and the pipe was on the verge of surcharging. After an immediate pre-construction meeting with Merrifield Nursery, it was agreed to work from 6pm-10am everyday of the week to avoid disruption and potentially placing patrons at risk during the biggest time of the year for Merrifield Garden Center. The contractor mobilized to the site and began the 20-foot excavation to replace 45 linear feet of broken gravity sewer. The project started on March 14th, 2022 and was substantially complete on March 23, 2022.
The Sully Basins Stormwater Pond Retrofits project was substantially completed on April 19, 2022. The project is located within the Cub Run watershed. The project consisted of repair and enhancement of multiple stormwater basins, 0326DP, 0964DP and 1484DP. The project also included construction of new stone cascades, stone weir basin structures and the construction of wetlands with high and low marsh areas. The project will facilitate improved sediment removal and improve downstream water quality using forebays and micro pools. Aquatic and natural habitat were also added within the three basins.
Clarks Crossing Road Improvements 05-13-22Fairfax County
The Clarks Crossing Road Pedestrian Access Improvement project improved the pedestrian and bicycle access along Clarks Crossing Road and was substantially completed on March 23, 2022.
This project completed the missing link between the existing sidewalk at Brookside Lane and the previously constructed sidewalk along Clarks Crossing Road. The scope of this project included construction of asphalt sidewalk, curb ramps, curb and gutter, drainage improvements along Brookside Lane and asphalt mill/overlay on Clarks Crossing and Brookside Lane.
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
Future wastewater flows in northern Fairfax County exceed existing system capacity
Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA
New pipes and pumps are needed to move future flows to treatment plant
NEXT STEPS
Field investigations / surveys
Finalize alignments and pump station layout
Use of open cut excavation
Use of trenchless methods
Easement acquisition needed
Develop traffic control plans
Description:
The project consists of a new, 23,000 square feet, two-story, four-bay fire station facility and associated improvements to the 3.3-acre site including storm water detention, landscaping and parking. The scope also included the demolition of the existing fire station, and a temporary fire station to house the Fire and Rescue Department during construction of the new facility. The key elements of the overall project include:
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
Scotts Run @ Old Meadow Road Stream Restoration was substantially completed on March 30, 2022. The Scotts Run project consisted of restoring, enhancement, and stabilizing of approximately 2,930 linear feet of eroding stream using Natural Channel Design criteria. This project included two phases: Phase I was funded by proffers from a private development and Phase II was County funded. Also included was the removal of invasive non-native plants and the installation of new plantings to stabilize the stream and floodplain.
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
The new 4-inch ductile iron force main will serve the surrounding community for the foreseeable future. Replacement of the force main will:
Reduce the level and frequency of maintenance required to keep the force main operating.
Prevent costly emergency repairs.
Provide residents with safe, reliable utility infrastructure.
Enhance the quality of life for residents.
Reduce risks to public health and the environment.
Burke Centre VRE Connector Phase IV project was substantially completed on March 7, 2022. This project enhanced the access to mass transit by creating a more direct connection from the VRE Station to the residential areas west of Premier Court. This project also connects the Oak Bluff community to the Virginia Rail Express (VRE) Burke Station and provides a multi-use shared pedestrian and bicycle trail for outdoor recreation.
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
Overarching Project Goals:
-Achieve Long Branch Central TMDL waste load reduction requirements.
-Provide long-term stability and have low maintenance.
-Improve water quality within the Long Branch Central Watershed.
-Improve habitat and environmental health (ecological lift).
Objectives: Share our project understanding with the council and seek input on the unique opportunities and housing goals for this site that could help guide
our master planning process.
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
4,800 linear feet of stream will be restored using Natural Channel Design methodologies
Pollutant reduction
1,439 lbs/total phosphorus
3,400 lbs/total nitrogen
462.1 tons of total suspended sediment
Protection of private property and public infrastructure
Increased ecological diversity with native vegetation
DEQ has awarded a SLAF grant to this project for these environmental benefits
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
The Lake Barton Dredging, Restoration, and Riser Modification project was substantially completed on December 29, 2021. The project is located within the Pohick Creek watershed. The project consisted of dredging and removal of approximately 19,100 cubic yards of sediment to restore the sediment trapping capacity and improve water quality. The project also included construction of new sediment forebays, in-lake haul roads, and riser modifications (new mid-level sluice gate and cold-water intake) to facilitate future maintenance, stabilize the shoreline, and improve downstream water quality. Fish habitat was also added within the lake.
Reston Arts Community Center Feasibility - Wrap UpFairfax County
This is the last of 5 engagement meetings. We are excited to report back what we heard from you – your preferences, priorities, questions, hopes, concerns. The information we received will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
Benefits of Consolidated Facility
Building and Site Efficiencies
Operational Efficiencies
Addresses Space Deficiencies
Addresses Renovations and Capital Renewal Requirements
for WCD
Provides for a Centrally Located Site that Accommodates Program
Consolidates Integrated Services on One Centrally Located Site
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
This is the 4th of 5 engagement meetings. We are excited to hear from you – your preferences, priorities, questions, hopes, concerns. The information we receive today will be used to inform the space allocations and cost estimating for discussion of the proffer by Fairfax County.
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since.
Aged pump station equipment – pumps, valves, fans, concrete, etc.
This aging equipment has the potential of causing:
Sanitary Sewer Overflows (SSO)
Sewer back-ups into homes
Environmental damages
Maintenance problems
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use resilient & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
These community outreach meetings are being conducted to understand community needs for a proposed arts venue in the Reston Town Center.
The proposed arts center would be a result of a proffer from Boston Properties in the next phase of Reston Town Center development (Block J).
The proffer would provide for an approximately 60,000 gross square foot facility to house a stage suitable for large-scale music and dance performances, as well as other arts-related amenities.
‘वोटर्स विल मस्ट प्रीवेल’ (मतदाताओं को जीतना होगा) अभियान द्वारा जारी हेल्पलाइन नंबर, 4 जून को सुबह 7 बजे से दोपहर 12 बजे तक मतगणना प्रक्रिया में कहीं भी किसी भी तरह के उल्लंघन की रिपोर्ट करने के लिए खुला रहेगा।
03062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
हम आग्रह करते हैं कि जो भी सत्ता में आए, वह संविधान का पालन करे, उसकी रक्षा करे और उसे बनाए रखे।" प्रस्ताव में कुल तीन प्रमुख हस्तक्षेप और उनके तंत्र भी प्रस्तुत किए गए। पहला हस्तक्षेप स्वतंत्र मीडिया को प्रोत्साहित करके, वास्तविकता पर आधारित काउंटर नैरेटिव का निर्माण करके और सत्तारूढ़ सरकार द्वारा नियोजित मनोवैज्ञानिक हेरफेर की रणनीति का मुकाबला करके लोगों द्वारा निर्धारित कथा को बनाए रखना और उस पर कार्यकरना था।
Welcome to the new Mizzima Weekly !
Mizzima Media Group is pleased to announce the relaunch of Mizzima Weekly. Mizzima is dedicated to helping our readers and viewers keep up to date on the latest developments in Myanmar and related to Myanmar by offering analysis and insight into the subjects that matter. Our websites and our social media channels provide readers and viewers with up-to-the-minute and up-to-date news, which we don’t necessarily need to replicate in our Mizzima Weekly magazine. But where we see a gap is in providing more analysis, insight and in-depth coverage of Myanmar, that is of particular interest to a range of readers.
role of women and girls in various terror groupssadiakorobi2
Women have three distinct types of involvement: direct involvement in terrorist acts; enabling of others to commit such acts; and facilitating the disengagement of others from violent or extremist groups.
Future Of Fintech In India | Evolution Of Fintech In IndiaTheUnitedIndian
Navigating the Future of Fintech in India: Insights into how AI, blockchain, and digital payments are driving unprecedented growth in India's fintech industry, redefining financial services and accessibility.
01062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
27052024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
31052024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
In a May 9, 2024 paper, Juri Opitz from the University of Zurich, along with Shira Wein and Nathan Schneider form Georgetown University, discussed the importance of linguistic expertise in natural language processing (NLP) in an era dominated by large language models (LLMs).
The authors explained that while machine translation (MT) previously relied heavily on linguists, the landscape has shifted. “Linguistics is no longer front and center in the way we build NLP systems,” they said. With the emergence of LLMs, which can generate fluent text without the need for specialized modules to handle grammar or semantic coherence, the need for linguistic expertise in NLP is being questioned.
ys jagan mohan reddy political career, Biography.pdfVoterMood
Yeduguri Sandinti Jagan Mohan Reddy, often referred to as Y.S. Jagan Mohan Reddy, is an Indian politician who currently serves as the Chief Minister of the state of Andhra Pradesh. He was born on December 21, 1972, in Pulivendula, Andhra Pradesh, to Yeduguri Sandinti Rajasekhara Reddy (popularly known as YSR), a former Chief Minister of Andhra Pradesh, and Y.S. Vijayamma.
ys jagan mohan reddy political career, Biography.pdf
Turkey Run at Truro Subdivision Stream Restoration
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Turkey Run @ Truro Subdivision Stream Restoration
Contract No. CN16125136
Project No. SD-000031-091
Tax Map ID 70-1
Braddock District
December 7, 2017
2. Turkey Run @ Truro Subdivision Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
3. Project Details
Turkey Run @ Truro Subdivision Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Description:
The Turkey Run @ Truro Subdivision Stream Restoration project was substantially completed within budget on October 19, 2017. This
project included restoring approximately 3,850 linear feet of stream channel and tributaries. The Tributary of Turkey Run which drains
directly to Accotink Creek in the Accotink Creek watershed is located in the center of Fairfax County, Virginia and drains southeast to
Accotink Bay, then Gunston Cove and finally to the Tidal Potomac River. Restoration of the stream was achieved through the use of
natural channel design principles.
Project Overview:
• Restoring stream morphology and connectivity to the adjacent floodplain and riparian zone
• Removing one pedestrian bridge and replacing the existing six pedestrian bridges with six new pedestrian bridges
• Removing and replacing the existing trail and used part of the parking lot
• Place Reinforced Bed Mix material to stabilize the stream bed and banks
• Control invasive species
• Reduce erosion using in-stream grade control structures including: Rock Sill, Boulder Toe Protection, Buried Rock Toe, Riffle with
Log Sill, Step Pools, Boulder Clusters and Modified Cross Vanes with woody debris
• Create overbank wetland areas and install surface and buried woody debris to support habitat improvement
• The project reduces total phosphorus by 772.96 pounds per year; reduces total nitrogen by 1,661.55 pounds per year; and
removes 265,770.63 pounds of sediment per year from this tributary leading to Potomac River
Project Team:
• Stormwater Planning Division (SWPD) –Vivian Bui, Charles Smith, Suzanne Foster, Justin Pistore
• Utilities Design and Construction Division (UDCD) - Yousef Rayyan, Bill Nolan, Tammy Michelli
• Project Inspector, UDCD - Jeff Bartlett, Howard Champ
• Urban Forestry- Ian Fuze
• Land Acquisition Division (LAD) – Beth Shubert
4. Turkey Run @ Truro Subdivision Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Tax Map No. 70-1
Upper Section of the project site
Lower Section of the project site
Trickle ditch
Driveway Culverts
The project Site
Entrance # 3
Entrance # 1
Entrance # 2
5. Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Turkey Run @ Truro Subdivision Stream Restoration
PRE-EXISTING CONDITION
6. Turkey Run @ Truro Subdivision Stream Restoration
POST CONSTRUCTION
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
7. Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Turkey Run @ Truro Subdivision Stream Restoration
PRE-EXISTING CONDITION
8. Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Turkey Run @ Truro Subdivision Stream Restoration
POST CONSTRUCTION
9. Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Turkey Run @ Truro Subdivision Stream Restoration
PRE-EXISTING CONDITION
10. Turkey Run @ Truro Subdivision Stream Restoration
POST CONSTRUCTION
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
11. Turkey Run @ Truro Subdivision Stream Restoration
POST CONSTRUCTION
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
12. Turkey Run @ Truro Subdivision Stream Restoration
PRE-EXISTING CONDITION
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
13. Turkey Run @ Truro Subdivision Stream Restoration
POST CONSTRUCTION
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
14. Before After
Turkey Run @ Truro Subdivision Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
15. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Matthew Kaiser, Public Information Officer
703-324-8455, TTY 711
Matthew.Kaiser@fairfaxcounty.gov
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch