the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
Cv mohamed al-jabri - 2018
1. 1
Duties included:
- INTERCHANGE AND ROADS SOUTH DHAHRAN HOME OWNERSHIP- {SDHOP} -ARAMCO PROJECT -
KINGDOM OF SAUDI ARABIA
Duties included:
- Construction of Under Pass Intersection of Palestine Street & Al-hamra Street with King Abdul Aziz Road,
Jeddah King Abdul-Aziz Tunnel Project, Jeddah, Saudi Arabia.
Construction of Under Pass Intersections: ABU BAKAR INTERSECTION#1&PRINCE MUTEB INTERSECTION#2,
Najran Project Tunnel, Saudi Arabia, Najran
Previous Duties & Responsibilities: Technical Coordinationwithgovernment andservice agenciesto relocation
all utilities obstruct with our tunnel, review the tender design after finish insure soil investigation, follow schedule
planning, shop drawing, follow all the construction submittal QA/QC plan, HSE Plan, Manpower-Equipment List,
Inspection & Material Inspection Request, Method statement & Construction Sequence for consultant, follow all
Construction activities at site, weeklyconstruction meetingwith the client and consultant, dailyconstructionmeeting
with my team, weekly meeting with our project manager and our project staff.
EMPLOYMENT HISTORY
IT Knowledge
Windows,MSOffice,
Primavera,
AutoCAD.
LANGUAGES
Arabic, English.
REFERENCES
Shall be provided upon request.
Jun, 21, 1965
+966 581950004
En_m_algabry@hotmail.com
.
Seeking a challenging career at a local/multi-national or International organization, where there is scope for
demonstration for myskills in Management, Civil Engineering & Construction. To be an active team member who
contributed in development of the projects performed by this team, complete my career in the field to achieve
myself and join a successful team adds to my career.
Result oriented, proactive and industrious professional with extensive hands on experience in the areas of
Management, Civil Engineering & Construction. Thirty years of work inthe implementation of engineering projects
Distinctive and Private Construction in the field of
Reinforcement Concrete bridgesandtunnels, Systemprecast pre-stressedpost tensioned& Cast inthe
site with & without pre-stressedpost tensioned, Steel bridges, Steel Structures.
Establishment andmaintenance ofHighwayRoads andinternal Roads.
Infrastructure and public utilities representedinthe establishment of water Plants and Sewage, structural
and Mechanical department, constructionandSinking Shaft;constructionelevatedwater tower tanks
(budget tanks) bysystemof slipForm and heavyLiftingof Rft. Concrete slabs.
Regressionlinesto sewage without opencut, technologypipe jacking methodfor Pre -cast concrete pipes,
Pedestriantunnelsunder rail andhighways, concrete Phrases.
.
OBJECTIVE
CORE COMPETENCIES
Egyptian
SITE MANAGER at Contracting & Construction Enterprises - CCE
INTERCHANGE AND ROADS SOUTH DHAHRAN HOME OWNERSHIP-{SDHOP}-
ARAMCO PROJECT- KINGDOM OF SAUDI ARABIA- Contract No. 6600037520
linkedin.com/in/mohamed-elgabery-37bba653
Mohamed Elgabery
Site Manager
Contracting & Construction
Enterprises - CCE
KSA -(Sep 2016 – Present)
ConstructionManager
China Civil Engineering
Construction Corporation
Branch in K.S.A. {CCECC}
KSA -(Feb 2014 – Aug 2016)
2. 2
Duties included:
- CONSTRUCTION OF BRIDGE PROJECTS
Construction ofUnder Pass and Over Pass Intersectionof Prince MitebStreet withOthmanStreet andPrince Naïf
Street, Dammam.
Duties included:
- Bridge, Intersectionof king Fahdstreet withPalestine street, Jeddah, Saudi Arabia
- Resident Engineer withSaudi Consolidated Engineering Company, Khatib& Alami, Project Treatment plant sewage
western Mecca, Saudi Arabia
- Sector Manager of Tunnels withDr.Ahmed Abdul Warith& Partners office,
Project to extendthe network of sewage at northof Jeddah.
- ConstructionManager withAlRajhi Alliance for HaramainHighSpeed Rail LinkAL ARRAB CO.
Project HARAMAIN HIGH SPEEDRAIL LINKPROJECT - AIR BASE INTERCHANGE
{HHR-A2-AF-Ol}. (For the Bridges ofArea2 & Area3)
- ConstructionManager withADVANCEDGLOBAL CONSTRUCTION CO.
Project Constructionof Bridge Projects, King Abdul Aziz International Airport – Jeddah.
Duties included:
- Water and Sewage {Plants & pipes}of new Cairo City -
- Elevatedwater Tower Tanks Byslipform andheavyLifting Method
- Regressionlines to sewage without opencut, technologypipe jacking methodfor Pre -cast concrete pipes.
- Pedestrian tunnels under rail and highways, concrete Phrases.
Duties included:
- Establishment andmaintenance of HighwayRoads andinternal Roads.
- Medina, Saudi Arabia
Duties included:
- The Returnandirrigation project, {pumpstation - ejectionline - purificationstation}.
- Alexandria the immediate solution project {Ejectment lines, Tunnelswithpipe jacking method}.
ConstructionManager
ADVANCED CONSTRUCTION CO.
KSA (Jan 2013 – Jan 2014)
ConstructionManager
AL-ASWAD EST. For Trading &
Contracting
KSA (May 2005 – Dec 2012)
Continued
.
ConstructionManager
Egyptian Arab Company for
Contracting
EGY (Nov 1997 – Apr 2005)
ConstructionManager
Bonais Co. For Trading &
Contracting
KSA (Mar 1994 – Oct 1997)
Site Engineer
Egyptian Arab Company for
Contracting
EGY (Aug 1987 – Feb 1994)
3. 3
Bachelor`s Degree, Civil Engineering,
Faculty of Engineering
Cairo University, July – 1987
Reinforced Concrete Project
Civil Engineering
Construction
Bridges & Tunnels
Highways – Roads
Infrastructure
Deep Foundation
Utilities
Water Plants and Sewage
Elevated tanks
Regression lines
Primavera
PMP
EDUCATION
SKILLS
Continued
.
Safety issues