SlideShare a Scribd company logo
1 of 4
Gary Blakeley
garyblakeley1@hotmail.co.uk
Tel: 07854066003
Gary Blakeley
Senior CE&I Engineer
Professional summary
Key skills and experience include the following:
• Production and checking of CE&I detail design documentation, drawings, calculations and
technical specifications.
• CE&I safety system detail design complying with industry standard BS 61508 and
ES_1_2190.
• Experience in the design of building access and intruder detection systems complying with
site and national standards.
• Technical and plant based knowledge of process instrumentation and hardwired safety
systems.
• Safety case engineering substantiation and Long Term Periodic Review (LTPR) activities.
• Detailed knowledge of nuclear radiometric equipment, radiometric access control systems
and safety case requirements.
• Experience of working with specialist analysing and monitoring equipment including
uranium analysers, NOX analysers and wireless communication systems.
• 10 years experience in leading engineering teams delivering engineering solutions
throughout operational nuclear plants.
• Production, management and delivery of active plant refurbishment projects.
• 15 years experience of Sellafield systems and procedures.
• P4 Pass holder with SC clearance
Professional qualifications/Registrations
Higher National Certificate: Electrical & Electronic Engineering (BTEC).
Ordinary National Certificate: Electrical & Electronic Engineering (BTEC).
NVQ Level III: Electrical and Instrumentation Engineering Maintenance.
City & Guilds Level 2: 2D AutoCAD.
Memberships/Affiliations
Incorporated Engineer (IENG) – The institution of Engineering and Technology.
Languages
English.
Employment history
Senior CE&I Engineer Amec, Cumbria 2014-Present
CE&I Engineer Amec, Cumbria 2013-2014
Engineering Shift Team Leader Sellafield Ltd, Cumbria 2009-2013
CE&I Technical Support Engineer Sellafield Ltd, Cumbria 2007-2009
Engineering Team Leader Sellafield Ltd, Cumbria 2003-2007
CE&I Craftsman Sellafield Ltd, Cumbria 1999-2003
Representative projects
Building Access and Intruder Detection system design
Lead CE&I Engineer responsible for the specification and detail design of the Building Access and
Intruder Detection Systems on a major project on the Sellafield Site. Responsible for allocation of
Page 1 of 4
Gary Blakeley, Senior CE&I Engineer
work, engagement of vendors and specification and checking of all detail design deliverables.
Working closely with the client leading assistance and assurance design reviews ensuring systems
are compliant with the nuclear designation of the building however; still maintaining operability of
the plant.
Glovebox depression alarm safety system design
Lead CE&I engineer responsible for the production of a safety system design package of works
complying with BS 61508. The aim of the project was to install a glovebox depression monitoring
and area evacuation alarm system in response current unworkable practices being carried out
within the facility. Responsible for leading the multi-discipline design team defining customer
requirements within technical specifications and production/checking of detail design deliverable
drawings and documentation. Deliverables include the following:
• System Safety Analysis.
• Safety Requirement Specifications.
• Safety Management Plan.
• Fault Sequence Group Configuration Diagrams.
• CE&I engineering drawings.
• Design Justification Report.
• Safety Verification Plan and Specification.
• Installation Method Statements.
Other responsibilities included leading of design reviews, allocation of work to other members of
the team and liaising with the client and project team ensuring a fit for purpose solution was
delivered.
Electrical metering and Energy Strategy Implementation
Senior CE&I Engineer responsible for the identification and development of concept design
solutions meeting the client’s needs of measuring the consumption of electricity throughout the site
and implementation of this information into a site energy strategy. A Functional Specification and
Site Energy Strategy was developed identifying the sites highest electrical loads, enabling
specification of suitable instrumentation and communication systems for including
ISA100Wireless protocol for further development.
Long Term Periodic Review Improvement Plans
Lead CE&I engineer responsible for the identification, delivery and technical content of
engineering solutions to close out engineering shortfalls identified during multiple facilities LTPRs.
Duties included identification of the strategy to be followed, prioritisation of activities, production of
and technical checking of documents and management of the engineering team to provide cost
effective and real risk reduction solutions to the identified shortfalls.
Engineering Substantiation and Long Term Periodic Reviews
Working under multiple contracts responsible for the production of CE&I Structure, System and
Component assessments and reviews within facilities on the Sellafield site. Experience in carrying
out SSC assessments on radiometric, level, flow, interlock, pressure, temperature and fire alarm
systems. Experience using Microsoft word and excellent CE&I report writing skills.
CE&I detail design
Working under the DSA contract providing CE&I support on various projects around the Sellafield
site. Responsible for the production of detailed work scope specifications, cost estimates and work
plans. Production of optioneering reports and researching available technologies to provide
Page 2 of 4
Gary Blakeley, Senior CE&I Engineer
alternative solutions to plant issues complying with modern standards. Liaising closely with all
stakeholders on a regular basis in order to produce CE&I design documentation and drawings for
manufacture and installation complying with British and site technical standards.
Engineering Shift Team Leader
In this role it was important to have a clear understanding of conventional safety and safety case
requirements in a dynamic operational facility to actively deliver solutions to complex engineering
systems; taking personal responsibility of plant issues and leading by example in a professional
responsible manner. Carrying out assessments of complex problems & identifying safe and robust
solutions. The role also included the following:
• Personally responsible for the delivery of specific and high quality work packages, to
demanding timescales for the engineering team.
• Improvement and maintenance of assets, by proactive monitoring, allowing early
identification of potential plant problems.
• Management and control of electrical, instrumentation and mechanical operations
throughout the facility. Ensuring routine and breakdown maintenance was completed within
challenging time and cost constraints, whilst ensuring minimal risk to operational plant and
personnel.
• Responsible for delivering planned and breakdown maintenance, safely and to exacting
standards, achieved by effectively compiling safe systems of work, scheduling and
arranging resources both internal and external to the company.
• Part of building emergency response team carrying out the role of Information Liaison
Officer. Responsible for communication of key incident information and accountancy of
building personnel within the Incident Control Centre. Responsible for the identification and
implementation of engineering activities to bring the plant to a safe state. Responsible for
coordinating activities at building muster points during building evacuation situation’s
including interrogation of the building BERCS system accounting for all building personnel
and activities to ensure the buildings security is not compromised at these times.
Uranium Transfer Facility Refurbishment
CE&I Engineer responsible for delivery of the CE&I installation and commissioning of a uranium
transfer facility critical to reprocessing operations at Sellafield. Systems included multiple
hardwired relay logic interlocks, electrical and air driven pumps and associated instrument
monitoring systems including level, pressure, flow and leak detection. Duties included production
of CE&I wiring diagrams, termination diagrams, method statements, commissioning
documentation and safe systems of work to ensure systems were installed and operational during
a major plant outage.
Magnox Reprocessing Asset Care Minor Projects
Plant based technical support engineer responsible for delivering multiple design and plant
refurbishment packages within an operational facility at Sellafield. Representative projects include:
• Thermal Denitration Reactor overhaul.
• Gamma monitoring system installation and commissioning.
• Technical specialist on plant effluent uranium analysing instrumentation and environmental
stack discharge monitors.
• Design and installation of instrument systems and production of CE&I drawings, PMP’s,
risk assessments, method statements, maintenance instructions and commissioning
documents.
Page 3 of 4
Gary Blakeley, Senior CE&I Engineer
Certifications and Training
Conducting Design Change Control (SLP 1.02.08)
Document Checking, Review and Approval (SLSP 4.05.09)
Constructability (S0789E)
Quality Assurance Induction
IOSH Managing Safely
Confined Space Supervisor
Risk Assessment
WANO task observation
Person Organising Work
Page 4 of 4

More Related Content

What's hot

Updated NEW SECCC1
Updated  NEW SECCC1Updated  NEW SECCC1
Updated NEW SECCC1Farhan Morai
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendationsubk1411
 
JDick Resume 9-2015
JDick Resume 9-2015JDick Resume 9-2015
JDick Resume 9-2015John Dick
 
166864 John Pappas Resume
166864 John Pappas Resume166864 John Pappas Resume
166864 John Pappas ResumeJohn Pappas
 
HCIS approval & procedure
HCIS approval & procedureHCIS approval & procedure
HCIS approval & proceduresudeeb kumar
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalSam DiPasquale
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceDHRUVA MISHRA
 
Khwaja Haque Resume(8-30-16)
Khwaja Haque Resume(8-30-16)Khwaja Haque Resume(8-30-16)
Khwaja Haque Resume(8-30-16)Khwaja Haque
 

What's hot (20)

Updated NEW SECCC1
Updated  NEW SECCC1Updated  NEW SECCC1
Updated NEW SECCC1
 
dovil jacildo cv
dovil jacildo cvdovil jacildo cv
dovil jacildo cv
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendations
 
JDick Resume 9-2015
JDick Resume 9-2015JDick Resume 9-2015
JDick Resume 9-2015
 
166864 John Pappas Resume
166864 John Pappas Resume166864 John Pappas Resume
166864 John Pappas Resume
 
HCIS approval & procedure
HCIS approval & procedureHCIS approval & procedure
HCIS approval & procedure
 
Srinivaskumar_cv_16
Srinivaskumar_cv_16Srinivaskumar_cv_16
Srinivaskumar_cv_16
 
Colin Crossley New CV
Colin Crossley New CVColin Crossley New CV
Colin Crossley New CV
 
Ahmed Elrassas CV_11_2015-rev2
Ahmed Elrassas CV_11_2015-rev2Ahmed Elrassas CV_11_2015-rev2
Ahmed Elrassas CV_11_2015-rev2
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
Resume Howard Greenstein
Resume Howard GreensteinResume Howard Greenstein
Resume Howard Greenstein
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experience
 
CV
CVCV
CV
 
Khwaja Haque Resume(8-30-16)
Khwaja Haque Resume(8-30-16)Khwaja Haque Resume(8-30-16)
Khwaja Haque Resume(8-30-16)
 
SNeshevich_2016
SNeshevich_2016SNeshevich_2016
SNeshevich_2016
 
Resume - RDL 150703
Resume - RDL 150703Resume - RDL 150703
Resume - RDL 150703
 
EPC Case study - RAY International
EPC Case study - RAY International EPC Case study - RAY International
EPC Case study - RAY International
 
AMR_SALAMA_CV
AMR_SALAMA_CVAMR_SALAMA_CV
AMR_SALAMA_CV
 
Ryan's Resume
Ryan's ResumeRyan's Resume
Ryan's Resume
 

Similar to Gary Blakeley CV

CARY HAMAR-UPDATED Resume10-07-15
CARY HAMAR-UPDATED  Resume10-07-15CARY HAMAR-UPDATED  Resume10-07-15
CARY HAMAR-UPDATED Resume10-07-15Cary Hamar
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profileGreg Sleeper
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profileGreg Sleeper
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resumebarun dutta
 
Construction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxConstruction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxmelvinjrobinson2199
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceDHRUVA MISHRA
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resumeBrent Strahan
 
David Covington Resume - LinkedIn
David Covington Resume - LinkedInDavid Covington Resume - LinkedIn
David Covington Resume - LinkedInDavid Covington
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobJibin Jacob
 
System%20security%20Engineer%20#1 (2)
System%20security%20Engineer%20#1 (2)System%20security%20Engineer%20#1 (2)
System%20security%20Engineer%20#1 (2)Mike Sanders
 

Similar to Gary Blakeley CV (20)

JCC RESUME 12.15.2015
JCC RESUME 12.15.2015JCC RESUME 12.15.2015
JCC RESUME 12.15.2015
 
CARY HAMAR-UPDATED Resume10-07-15
CARY HAMAR-UPDATED  Resume10-07-15CARY HAMAR-UPDATED  Resume10-07-15
CARY HAMAR-UPDATED Resume10-07-15
 
Geoffrey Rowling CV
Geoffrey Rowling CVGeoffrey Rowling CV
Geoffrey Rowling CV
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Mike Leeper Resume
Mike Leeper ResumeMike Leeper Resume
Mike Leeper Resume
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Senthil-CV[-1]
Senthil-CV[-1]Senthil-CV[-1]
Senthil-CV[-1]
 
Construction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxConstruction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docx
 
Gabe Martinez
Gabe MartinezGabe Martinez
Gabe Martinez
 
JKliethermesResume20171 (1)
JKliethermesResume20171 (1)JKliethermesResume20171 (1)
JKliethermesResume20171 (1)
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
Resume Jun-2015
Resume Jun-2015Resume Jun-2015
Resume Jun-2015
 
Brent_Strahan_resume
Brent_Strahan_resumeBrent_Strahan_resume
Brent_Strahan_resume
 
David Covington Resume - LinkedIn
David Covington Resume - LinkedInDavid Covington Resume - LinkedIn
David Covington Resume - LinkedIn
 
Tami_Strickland 8May15
Tami_Strickland 8May15Tami_Strickland 8May15
Tami_Strickland 8May15
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
 
System%20security%20Engineer%20#1 (2)
System%20security%20Engineer%20#1 (2)System%20security%20Engineer%20#1 (2)
System%20security%20Engineer%20#1 (2)
 
Resume of ECHeausler
Resume of ECHeausler Resume of ECHeausler
Resume of ECHeausler
 
SPEC Process Engineering&Construction
SPEC Process Engineering&ConstructionSPEC Process Engineering&Construction
SPEC Process Engineering&Construction
 

Gary Blakeley CV

  • 1. Gary Blakeley garyblakeley1@hotmail.co.uk Tel: 07854066003 Gary Blakeley Senior CE&I Engineer Professional summary Key skills and experience include the following: • Production and checking of CE&I detail design documentation, drawings, calculations and technical specifications. • CE&I safety system detail design complying with industry standard BS 61508 and ES_1_2190. • Experience in the design of building access and intruder detection systems complying with site and national standards. • Technical and plant based knowledge of process instrumentation and hardwired safety systems. • Safety case engineering substantiation and Long Term Periodic Review (LTPR) activities. • Detailed knowledge of nuclear radiometric equipment, radiometric access control systems and safety case requirements. • Experience of working with specialist analysing and monitoring equipment including uranium analysers, NOX analysers and wireless communication systems. • 10 years experience in leading engineering teams delivering engineering solutions throughout operational nuclear plants. • Production, management and delivery of active plant refurbishment projects. • 15 years experience of Sellafield systems and procedures. • P4 Pass holder with SC clearance Professional qualifications/Registrations Higher National Certificate: Electrical & Electronic Engineering (BTEC). Ordinary National Certificate: Electrical & Electronic Engineering (BTEC). NVQ Level III: Electrical and Instrumentation Engineering Maintenance. City & Guilds Level 2: 2D AutoCAD. Memberships/Affiliations Incorporated Engineer (IENG) – The institution of Engineering and Technology. Languages English. Employment history Senior CE&I Engineer Amec, Cumbria 2014-Present CE&I Engineer Amec, Cumbria 2013-2014 Engineering Shift Team Leader Sellafield Ltd, Cumbria 2009-2013 CE&I Technical Support Engineer Sellafield Ltd, Cumbria 2007-2009 Engineering Team Leader Sellafield Ltd, Cumbria 2003-2007 CE&I Craftsman Sellafield Ltd, Cumbria 1999-2003 Representative projects Building Access and Intruder Detection system design Lead CE&I Engineer responsible for the specification and detail design of the Building Access and Intruder Detection Systems on a major project on the Sellafield Site. Responsible for allocation of Page 1 of 4
  • 2. Gary Blakeley, Senior CE&I Engineer work, engagement of vendors and specification and checking of all detail design deliverables. Working closely with the client leading assistance and assurance design reviews ensuring systems are compliant with the nuclear designation of the building however; still maintaining operability of the plant. Glovebox depression alarm safety system design Lead CE&I engineer responsible for the production of a safety system design package of works complying with BS 61508. The aim of the project was to install a glovebox depression monitoring and area evacuation alarm system in response current unworkable practices being carried out within the facility. Responsible for leading the multi-discipline design team defining customer requirements within technical specifications and production/checking of detail design deliverable drawings and documentation. Deliverables include the following: • System Safety Analysis. • Safety Requirement Specifications. • Safety Management Plan. • Fault Sequence Group Configuration Diagrams. • CE&I engineering drawings. • Design Justification Report. • Safety Verification Plan and Specification. • Installation Method Statements. Other responsibilities included leading of design reviews, allocation of work to other members of the team and liaising with the client and project team ensuring a fit for purpose solution was delivered. Electrical metering and Energy Strategy Implementation Senior CE&I Engineer responsible for the identification and development of concept design solutions meeting the client’s needs of measuring the consumption of electricity throughout the site and implementation of this information into a site energy strategy. A Functional Specification and Site Energy Strategy was developed identifying the sites highest electrical loads, enabling specification of suitable instrumentation and communication systems for including ISA100Wireless protocol for further development. Long Term Periodic Review Improvement Plans Lead CE&I engineer responsible for the identification, delivery and technical content of engineering solutions to close out engineering shortfalls identified during multiple facilities LTPRs. Duties included identification of the strategy to be followed, prioritisation of activities, production of and technical checking of documents and management of the engineering team to provide cost effective and real risk reduction solutions to the identified shortfalls. Engineering Substantiation and Long Term Periodic Reviews Working under multiple contracts responsible for the production of CE&I Structure, System and Component assessments and reviews within facilities on the Sellafield site. Experience in carrying out SSC assessments on radiometric, level, flow, interlock, pressure, temperature and fire alarm systems. Experience using Microsoft word and excellent CE&I report writing skills. CE&I detail design Working under the DSA contract providing CE&I support on various projects around the Sellafield site. Responsible for the production of detailed work scope specifications, cost estimates and work plans. Production of optioneering reports and researching available technologies to provide Page 2 of 4
  • 3. Gary Blakeley, Senior CE&I Engineer alternative solutions to plant issues complying with modern standards. Liaising closely with all stakeholders on a regular basis in order to produce CE&I design documentation and drawings for manufacture and installation complying with British and site technical standards. Engineering Shift Team Leader In this role it was important to have a clear understanding of conventional safety and safety case requirements in a dynamic operational facility to actively deliver solutions to complex engineering systems; taking personal responsibility of plant issues and leading by example in a professional responsible manner. Carrying out assessments of complex problems & identifying safe and robust solutions. The role also included the following: • Personally responsible for the delivery of specific and high quality work packages, to demanding timescales for the engineering team. • Improvement and maintenance of assets, by proactive monitoring, allowing early identification of potential plant problems. • Management and control of electrical, instrumentation and mechanical operations throughout the facility. Ensuring routine and breakdown maintenance was completed within challenging time and cost constraints, whilst ensuring minimal risk to operational plant and personnel. • Responsible for delivering planned and breakdown maintenance, safely and to exacting standards, achieved by effectively compiling safe systems of work, scheduling and arranging resources both internal and external to the company. • Part of building emergency response team carrying out the role of Information Liaison Officer. Responsible for communication of key incident information and accountancy of building personnel within the Incident Control Centre. Responsible for the identification and implementation of engineering activities to bring the plant to a safe state. Responsible for coordinating activities at building muster points during building evacuation situation’s including interrogation of the building BERCS system accounting for all building personnel and activities to ensure the buildings security is not compromised at these times. Uranium Transfer Facility Refurbishment CE&I Engineer responsible for delivery of the CE&I installation and commissioning of a uranium transfer facility critical to reprocessing operations at Sellafield. Systems included multiple hardwired relay logic interlocks, electrical and air driven pumps and associated instrument monitoring systems including level, pressure, flow and leak detection. Duties included production of CE&I wiring diagrams, termination diagrams, method statements, commissioning documentation and safe systems of work to ensure systems were installed and operational during a major plant outage. Magnox Reprocessing Asset Care Minor Projects Plant based technical support engineer responsible for delivering multiple design and plant refurbishment packages within an operational facility at Sellafield. Representative projects include: • Thermal Denitration Reactor overhaul. • Gamma monitoring system installation and commissioning. • Technical specialist on plant effluent uranium analysing instrumentation and environmental stack discharge monitors. • Design and installation of instrument systems and production of CE&I drawings, PMP’s, risk assessments, method statements, maintenance instructions and commissioning documents. Page 3 of 4
  • 4. Gary Blakeley, Senior CE&I Engineer Certifications and Training Conducting Design Change Control (SLP 1.02.08) Document Checking, Review and Approval (SLSP 4.05.09) Constructability (S0789E) Quality Assurance Induction IOSH Managing Safely Confined Space Supervisor Risk Assessment WANO task observation Person Organising Work Page 4 of 4