HUSSEIN AHMAD SALEM
MEP CONSTRUCTION MANAGER
Address: Al farasa Tower- AL Buhaira Road.
Sharjah, UAE
Email add: hussein2333@hotmail.com
Mobile No.: 00971553108109
I am hardworking individual with a strong sense of responsibility and good analytical skills
with the atitude in learning. I am capable of adjusting to new and delicate situations. I am proficient in
construction, MEP Works as well as civil and construction works.
Objective
To enhance my capability as a senior electrical project engineer and MEP construction Manager
through practical application of my profession.
Skills and Competencies
• Good communication skills (Arabic, English)
• Driving skills (holder of UAE Driving License)
• Knowledgeable in both computer hardware and software maintenance and troubleshooting
• Excellent skills in MS Office applications (Word, Excel, PowerPoint, Outlook)
• Knowledgeable in computer software programs such as: Twido Soft (PLC), ORCAD 9.1,
PIC, DIALUX, CALCULUX, MATLAB, E-Tab, Ecodial, AUTOCAD (2D/3D)
• Experience in large Construction Civil works, Safety and MEP services.
• Experience in infrastructure construction works.
• Knowledgeable in British standards.
• Knowledgeable in project management activities.
• Familiar with DEWA/FEWA requirements.
Work Experience
Senior Electrical Project Engineer/MEP Construction Manager
March 2013 to present
Al Arabia Electomechanical-Juma Al Majid Group
Projects:
1. 39 villa Project-Mirdif-Dubai-UAE
Consultant: Adnan Safarini
Client:Juma Almajid
2. Juma Al Majid Tower-Business bay-Dubai-UAE((Tower (B+GF+46 Typical floor+penthouse +roof) and
parking building (4 basement +GF+9 floor +heathclub +pooldeck and roof)).
Consultant: KHATIB & ALAMI
Client:Juma Almajid.
• Planning, monitoring and supervising on-site M/E construction engineering activities
for assigned project whilst insuring M/E engineering activities comply with company and client
requirements.
• Monitoring progress of project at various stages to assure completion within time/cost
constraints simultaneously complying with established quality standards.
• Liaise with the main contractor regarding all project activities.
• Project co-ordination with the main contractor on site progress .handovers
,clearance for 1st
/2nd
/final fix in building finishes including slab/core wall/column works ie; electrical
conduiting ,risers cut-outs, mechanical sleeves, mechanical/electrical openings.
• Planning site activities in detail, setting targets and accurately forecasting completion
dates.
• Pepare shop drawing for all electrical systems.
• Performing procurement and submit the material submittal for consultant approval for
all electrical system.
• Designed and installed LV/MCC panels, SMDB,DB for power supply to power
services, lighting loads ,air conditioning loads ,LV motors as per project requirements.
• Supervising all electrical works including installation, troubleshooting, diagnosis and
correction of electrical problems in power distribution, electrical equipment’s and lighting systems.
• Coordinating with the mechanical, electrical and structural elements of all projects as
well as with contractors and design engineers to identify and resolve all potential interferences and
conflicts.
• Initiate request for information (RFI) in case of further clarification required if any.
• Follow up the project staff and coordination with the suppliers for material submittals
and sample approval.
• Follow up the project staff for the production of shop drawings, method statements
and project documentations.
• Ensure that drawings and materials submittals are obtained back from the consultant
on time as per the contractual requirements.
• Follow up the project site team for quantity surveying and preparation of all MEP
material requisition.
• Make additions to suppliers/subcontractors contract and agreement.
• Follow up the supplier for delivery of the materials on time as per the planned
material delivery procurement schedule.
• Attend technical discussion, coordination workshops and safety meeting.
• Ensure and monitor the execution of MEP project scope to be within the budget.
• Obtain all necessary permits from authority for MEP works.
• Daily communication between HVAC/Plumbing/electrical engineers and management
of project staff and handing over all NCR’s from the consultant.
• Implementation of the project’s quality and safety plans, and ensure the safety of
personnel and property.
• Preparation of handing over documents such as as built drawings, operation and
maintenance manual, warranty certificates and spare parts to client.
• Coordinate with the suppliers and system specialists for training the client/consultant.
Electrical Site Engineer/ Electrical Project Engineer
November 2007 up to February 2013
Al Hamad Contracting Company-Sharjah-UAE
Projects:
1. Dubai Cruise terminal
Consultant: Munseel
Client: Nakheel
2. Warehouses ,Retails showrooms ,Offices,Mosque and labor accommodation Buildings(G+3)
Consultant: Meecon
Client: Dubai Industrial City
3.23 Marina Tower (4Basement,Ground &92 floors)
Consultant: K.E.O international
Client: Hircon Internatonal
4.Pacific Development –Al marjan Island,R.A.K (Basement,2Parking and 9typical floors)
Consultant: Al Burj Consultant Engineering office
Client: Select Group
• Review tender drawings and specifications with the electrical design manager to ensure
adequacy of design information considering the following:
1. Identify any problems such as lack of compliance with standard and regulation.
2.Identify any variation to be notified to the engineer.
3.Assist in preparation and submission of cost incase of variation
• Prepare shop drawing for electrical systems.
• Prepare distribution boards load schedule and single line diagrams.
• Prepare lighting ,power shop drawing ,electrical room details, load schedules, metering
drawings and single line diagram for DEWA/FEWA submission.
• Ensure that drawings and materials submittals are obtained back from the consultant on time
as per the contractual requirements.
• Initiate request for information (RFI) in case of further clarification required if any.
• Check and coordination with the suppliers for material submittals and sample approval.
• Do quantity surveys and preparation of all electrical materials requisition.
• Prepare method statements for the installation, testing and commissioning of electrical
systems.
• Distribute the copies of the approved shop drawing stamped to the site.
• Supervise and ensure that the work being carried out and materials use conforms to approved
shop drawings, method statements, specifications and standards.
• Initiate two weeks look ahead plan in coordination with the planning engineer.
• Monitor the equipment’s/tools register at site while compiling the two weeks look ahead plan.
• Inspect the materials upon the receipt of daily material receiving report.
• Attend technical discussions, coordination workshops and safety meeting.
• Monitoring of work progress and daily scheduling of activities and man power complement.
• Ensure on time delivery of materials and equipment’s on site
• Conducts final inspections, testing and commissioning on each system to check on final
conformance to the approved plans and technical specifications.
• Ensure and monitor the execution of electrical project scope to be within the budget.
• Obtaining all necessary approval from DEWA/FEWA.
• Check on potential and existing delays to minimize the effect on the project completion by
doing a weekly progress report.
• Preparation of handing over documents such as as built drawings, operation and
maintenance manual, warranty certificates and spare parts to client.
• Coordinate with the suppliers and system specialists for training the client/consultant.
• Reply to the operator complains and rectify the problems/complains if any
Qualifications and Achievements
Tertiary BS Electrical Engineering / Power
Beirut Arab University
Beirut, Lebanon
October 2002 - June 2007
Seminars and Trainings
Electrical Engineering Safety: Protective Grounding, Electromagnetic Interference, Lightning
Protection, Measurements and Safety Codes
18-Hour Course
Sponsored/Conducted by BAU/CCC
June 2006
Beirut, Lebanon
MICROCHIP Microcontrollers (PIC)
20-Hour Course
Sponsored/Conducted by BAU/CCC
August 2005
Beirut, Lebanon
Electronic Automation Design using ORCAD 9.1
18-Hour Course
Sponsored/Conducted by BAU/CCC
March 2004
Beirut, Lebanon
Personal Information
Nationality Palestine
Marital Status Married
Passport No. 320791
Driving License No. 123935
Reference
Available upon request
This document has been completed in good faith and to the best of my knowledge and
belief this is a true, accurate and complete statement.
Engr. Hussein Ahmad Salem

Hussein Ahmad Salem-CV

  • 1.
    HUSSEIN AHMAD SALEM MEPCONSTRUCTION MANAGER Address: Al farasa Tower- AL Buhaira Road. Sharjah, UAE Email add: hussein2333@hotmail.com Mobile No.: 00971553108109 I am hardworking individual with a strong sense of responsibility and good analytical skills with the atitude in learning. I am capable of adjusting to new and delicate situations. I am proficient in construction, MEP Works as well as civil and construction works. Objective To enhance my capability as a senior electrical project engineer and MEP construction Manager through practical application of my profession. Skills and Competencies • Good communication skills (Arabic, English) • Driving skills (holder of UAE Driving License) • Knowledgeable in both computer hardware and software maintenance and troubleshooting • Excellent skills in MS Office applications (Word, Excel, PowerPoint, Outlook) • Knowledgeable in computer software programs such as: Twido Soft (PLC), ORCAD 9.1, PIC, DIALUX, CALCULUX, MATLAB, E-Tab, Ecodial, AUTOCAD (2D/3D) • Experience in large Construction Civil works, Safety and MEP services. • Experience in infrastructure construction works. • Knowledgeable in British standards. • Knowledgeable in project management activities. • Familiar with DEWA/FEWA requirements. Work Experience Senior Electrical Project Engineer/MEP Construction Manager March 2013 to present Al Arabia Electomechanical-Juma Al Majid Group Projects: 1. 39 villa Project-Mirdif-Dubai-UAE Consultant: Adnan Safarini Client:Juma Almajid 2. Juma Al Majid Tower-Business bay-Dubai-UAE((Tower (B+GF+46 Typical floor+penthouse +roof) and parking building (4 basement +GF+9 floor +heathclub +pooldeck and roof)). Consultant: KHATIB & ALAMI Client:Juma Almajid. • Planning, monitoring and supervising on-site M/E construction engineering activities for assigned project whilst insuring M/E engineering activities comply with company and client requirements.
  • 2.
    • Monitoring progressof project at various stages to assure completion within time/cost constraints simultaneously complying with established quality standards. • Liaise with the main contractor regarding all project activities. • Project co-ordination with the main contractor on site progress .handovers ,clearance for 1st /2nd /final fix in building finishes including slab/core wall/column works ie; electrical conduiting ,risers cut-outs, mechanical sleeves, mechanical/electrical openings. • Planning site activities in detail, setting targets and accurately forecasting completion dates. • Pepare shop drawing for all electrical systems. • Performing procurement and submit the material submittal for consultant approval for all electrical system. • Designed and installed LV/MCC panels, SMDB,DB for power supply to power services, lighting loads ,air conditioning loads ,LV motors as per project requirements. • Supervising all electrical works including installation, troubleshooting, diagnosis and correction of electrical problems in power distribution, electrical equipment’s and lighting systems. • Coordinating with the mechanical, electrical and structural elements of all projects as well as with contractors and design engineers to identify and resolve all potential interferences and conflicts. • Initiate request for information (RFI) in case of further clarification required if any. • Follow up the project staff and coordination with the suppliers for material submittals and sample approval. • Follow up the project staff for the production of shop drawings, method statements and project documentations. • Ensure that drawings and materials submittals are obtained back from the consultant on time as per the contractual requirements. • Follow up the project site team for quantity surveying and preparation of all MEP material requisition. • Make additions to suppliers/subcontractors contract and agreement. • Follow up the supplier for delivery of the materials on time as per the planned material delivery procurement schedule. • Attend technical discussion, coordination workshops and safety meeting. • Ensure and monitor the execution of MEP project scope to be within the budget. • Obtain all necessary permits from authority for MEP works. • Daily communication between HVAC/Plumbing/electrical engineers and management of project staff and handing over all NCR’s from the consultant. • Implementation of the project’s quality and safety plans, and ensure the safety of personnel and property. • Preparation of handing over documents such as as built drawings, operation and maintenance manual, warranty certificates and spare parts to client. • Coordinate with the suppliers and system specialists for training the client/consultant. Electrical Site Engineer/ Electrical Project Engineer November 2007 up to February 2013 Al Hamad Contracting Company-Sharjah-UAE Projects: 1. Dubai Cruise terminal
  • 3.
    Consultant: Munseel Client: Nakheel 2.Warehouses ,Retails showrooms ,Offices,Mosque and labor accommodation Buildings(G+3) Consultant: Meecon Client: Dubai Industrial City 3.23 Marina Tower (4Basement,Ground &92 floors) Consultant: K.E.O international Client: Hircon Internatonal 4.Pacific Development –Al marjan Island,R.A.K (Basement,2Parking and 9typical floors) Consultant: Al Burj Consultant Engineering office Client: Select Group • Review tender drawings and specifications with the electrical design manager to ensure adequacy of design information considering the following: 1. Identify any problems such as lack of compliance with standard and regulation. 2.Identify any variation to be notified to the engineer. 3.Assist in preparation and submission of cost incase of variation • Prepare shop drawing for electrical systems. • Prepare distribution boards load schedule and single line diagrams. • Prepare lighting ,power shop drawing ,electrical room details, load schedules, metering drawings and single line diagram for DEWA/FEWA submission. • Ensure that drawings and materials submittals are obtained back from the consultant on time as per the contractual requirements. • Initiate request for information (RFI) in case of further clarification required if any. • Check and coordination with the suppliers for material submittals and sample approval. • Do quantity surveys and preparation of all electrical materials requisition. • Prepare method statements for the installation, testing and commissioning of electrical systems. • Distribute the copies of the approved shop drawing stamped to the site. • Supervise and ensure that the work being carried out and materials use conforms to approved shop drawings, method statements, specifications and standards. • Initiate two weeks look ahead plan in coordination with the planning engineer. • Monitor the equipment’s/tools register at site while compiling the two weeks look ahead plan. • Inspect the materials upon the receipt of daily material receiving report. • Attend technical discussions, coordination workshops and safety meeting. • Monitoring of work progress and daily scheduling of activities and man power complement. • Ensure on time delivery of materials and equipment’s on site • Conducts final inspections, testing and commissioning on each system to check on final conformance to the approved plans and technical specifications. • Ensure and monitor the execution of electrical project scope to be within the budget. • Obtaining all necessary approval from DEWA/FEWA. • Check on potential and existing delays to minimize the effect on the project completion by doing a weekly progress report. • Preparation of handing over documents such as as built drawings, operation and maintenance manual, warranty certificates and spare parts to client.
  • 4.
    • Coordinate withthe suppliers and system specialists for training the client/consultant. • Reply to the operator complains and rectify the problems/complains if any Qualifications and Achievements Tertiary BS Electrical Engineering / Power Beirut Arab University Beirut, Lebanon October 2002 - June 2007 Seminars and Trainings Electrical Engineering Safety: Protective Grounding, Electromagnetic Interference, Lightning Protection, Measurements and Safety Codes 18-Hour Course Sponsored/Conducted by BAU/CCC June 2006 Beirut, Lebanon MICROCHIP Microcontrollers (PIC) 20-Hour Course Sponsored/Conducted by BAU/CCC August 2005 Beirut, Lebanon Electronic Automation Design using ORCAD 9.1 18-Hour Course Sponsored/Conducted by BAU/CCC March 2004 Beirut, Lebanon Personal Information Nationality Palestine Marital Status Married Passport No. 320791 Driving License No. 123935 Reference Available upon request This document has been completed in good faith and to the best of my knowledge and belief this is a true, accurate and complete statement. Engr. Hussein Ahmad Salem