SCOPE
• Fundamentals of Foam Bitumen Pavements
• Projects Undertaken
• Construction Methods Used
Foam Bitumen Stabilised Pavements
• What is Foam Bitumen Stabilised Pavements.
– It is a mixture of gravel, lime or cement, air, water and bitumen
– When air, water and bitumen are mixed with each other the
mixture expands greater than 10 times its original volume and
forms a fine mist or foam
– This foam is sprayed into the drum where it coats the fine
particles
– As the foam collapses most of the water is lost through steam
– The residual bitumen then has properties similar to its original
state and is well dispersed through the matrix in very small
droplets
– The bitumen droplets are attracted to and coat the finer
particles, forming a uniform matrix that effectively binds the
mixture together.
Foam Bitumen Stabilisation
Where to Use the Foam Bitumen Process
• A pavement that has been repeatedly patched to the
extent that pavement repairs are no longer cost
effective
• A weak granular base overlays a reasonably strong
subgrade
• Granular base is too thin to consider cementitious
binders
• Alternative to full depth asphalt in moderate to high
trafficked roads
• Unfavourable wet cyclic conditions
• To complete the rehabilitation quickly to prevent
disruption to businesses, residents and public
Foam Bitumen Stabilisation
Contracts Undertaken
• Within the Peninsula District of North Queensland, a number of
Foam Bitumen contracts have been carried out. The majority of
these projects have been on the Bruce Highway where the roads
have been affected by flood damage.
• The district is now also including foam bitumen pavements in new
pavements / reconstructed pavements.
• Foam Bitumen Pavements appear to be the desired choice for the
major highways in the District, Bruce, Palmerston, Captain Cook.
• The Cairns Regional Council has also done some minor works with
Foam Bitumen Stabilisation.
• Mackay Regional Council have also awarded DEW a foam
bitumen contract which we are currently undertaking.
Contracts Undertaken
• Department of Main Roads, Queensland (since
November 2008 to current)
– Bruce Highway – approximately 2.5km (El Arish)
– Bruce Highway – approximately 3.5km (Mourilyan)
– Bruce Highway – approximately 3.5km (Cardwell)
– Palmerston Highway – approximately 5km
– Palmerston Highway – approximately 2km
– Palmerston Highway – approximately 0.7km
– Palmerston Highway – approximately 3.5km
• Other Projects
– Mackay Regional Council Flood Damage Package 7 (Various
council roads)
Foam Bitumen
• Basic design of the pavements is to incorporate an
overlay, with 2% lime or 1.5% of cement and 3.5% of
bitumen.
• An overlay is only used when required and generally
consists of between 50mm and 100mm of Type 2.1
Gravel.
• The use of the overlay was for shape correction and
also to increase the quality of the pavement material,
ie gradings.
Foam Bitumen
• Design Considerations employed by Main Roads:
– Design period
– Design Traffic
– Subgrade Material Properties
– Pavement Material Properties
– Environmental Influences
– Construction and Maintenance Procedures
– Drainage
Benefits and Limitations
Benefits:
– Increased strength over granular pavement materials
– Relatively quick construction method
– Lower costs than Reconstruction
– Trafficked immediately (in the right conditions)
– Can be trafficked without a seal
– Decreased susceptibility to moisture during
construction.
– Can be reworked several days after final trimming
without extra binder
Benefits and Limitations
Limitations:
– Requires a suitable grading of fines in the pavement
material
– Purpose built equipment and experienced operators
are required
– Cost is greater than cement stabilisation
– Not suitable for all pavements (some pavements
show low strength gain, slow strength gain an
unsuitable grading)
Secondary Stabilising Agent and
Foaming Agent
• Secondary Stabilising Agent:
– Usually consists of cement or lime, lime is the preferred option,
although cement is cheaper
– Specified working time (4 hours) commences upon
incorporation, although bitumen is then required to be
incorporated within the next 1.5 hours
– Incorporated 50mm above the target depth.
– Purpose for secondary stabilising agent:
• Assist in strength increase
• Assist in dispersion of bitumen throughout mix
• Improves mix workability
• Reduces the plasticity Index
Lime spreading
Lime mixing
Lime mixing
Secondary Stabilising Agent and Foaming
Agent
• Foaming Agent
– A proprietary product is used
– Used to combat the anti foaming agent that has been put into
bitumen for transport reasons
– A maximum of 2% by mass should be added
– Generally we have found 0.5% is adequate to achieve half life
and expansion ratios
– Assists in the dispersion of bitumen to coat each particle of the
pavement
– Essential to be used, as bitumen will naturally foam when hit
with water, although the dispersion is still not as adequate
without the foaming agent
Half life/foaming
Things to consider with
Foamed Bitumen Stabilisation
• Safety is paramount when working in any environment, especially
under traffic and when using hot bitumen binder
• Typical application rates of foam bitumen are between 2-4%
bitumen with the addition of a binder i.e. lime or cement, around
about the 2% mark
• Sufficient pavement testing including testing of the subgrade is
crucial when determining mix design and potential for using foam
bitumen. Testing can cost approx. $3000 - $4000 per test, although
the bitumen savings it could produce are considerable
• Sealing rates over foam bitumen pavements are usually reduced
by at least 10% compared to normal pavements, common
problems are bleeding of seals and potential instability of asphalt
layers.
• A foaming agent is a must when foaming bitumen
Things to consider with
Foamed Bitumen Stabilisation
• Construction times are very important
• Moisture content of the pavement is important, and
generally in the range 60-80% of optimum
• Experienced construction teams are essential when
undertaking foam bitumen
• Although method is less susceptible to wet weather
than other pavements, work in wet weather should be
avoided as moisture can become trapped in lower
layers of pavement causing problems with compaction
• Allowing traffic on the surface prior to primer sealing is
not desirable, as the fines on the surface contain
bitumen, which will in turn get stuck to cars.
Bitumen hookup
Construction Methods
• Plant and Labour Crew
– Traffic Control
– Project Manager
– Supervisor
– Wirtgen WR2000 or WR2500 (Foam Bitumen Capabilities)
– Additional Mixer if required for pulverisation, cement / lime
incorporation
– Grader
– Loader (If Overlay)
– Trucks (If Overlay)
– Bitumen Tankers (Capable of attaching to the mixers bar)
– Watercarts
– Rollers (18t for up to 250mm, 21 tonne up to 300mm) include Pad foot,
Smooth Drum and Multi Tyred Rollers
– Generally also require 3-4 additional laborers on the ground for Quality
Assurance checks and day to day tasks
Construction Methods
• Methodology
– Generally, traffic control is set up to close 1 lane approx 500m
in length
– Place Overlay
– Pulverize pavement
– Spreading of lime / cement
– Mixing of lime /cement and water
– Incorporation of foamed bitumen
– Final Trimming of Pavement
– Sealing works
Production rates
• Indicative production rates achieved (daily/10 hr day)
on a 250 mm pavement with 50 mm overlay, 8 kg/m2
cement and 18.4 kg /m2 bitumen.
• 1200 m2 to 2,400 m2 per day (under one lane traffic).
• Production constraints
• Supply of materials i.e. gravel, bitumen, powder,
aggregates and additives.
• Stockpiles sites if required
• Traffic
• Weather
• Machine breakdowns
Foam Bitumen Stabilised Pavements.
Questions Relating to the Construction Activities.

More Related Content

What's hot

Boussinesq'S theory
Boussinesq'S theoryBoussinesq'S theory
Boussinesq'S theory
SANJEEV Wazir
 
What is Ground Improvement Techniques?
What is Ground Improvement Techniques?What is Ground Improvement Techniques?
What is Ground Improvement Techniques?
roks99
 
Marshall Mix Design: Lab Report
Marshall Mix Design: Lab ReportMarshall Mix Design: Lab Report
Marshall Mix Design: Lab Report
Priyansh Singh
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
NIWASHISH VISWAS
 
Grouting Methods
Grouting Methods Grouting Methods
Grouting Methods
Rushikesh Kolhe
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
GLA University
 
Vertical Drain
Vertical Drain Vertical Drain
Vertical Drain
Sanchari Halder
 
White topping
White toppingWhite topping
White topping
sandeepsalotagi
 
4. Highway Materials.pdf
4. Highway Materials.pdf4. Highway Materials.pdf
4. Highway Materials.pdf
Er. Bam Bhandari
 
GROUND IMPROVEMENT TECHNIQUES
GROUND IMPROVEMENT TECHNIQUES GROUND IMPROVEMENT TECHNIQUES
GROUND IMPROVEMENT TECHNIQUES
harshitha alishetty
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
pjainrahul
 
Design mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability methodDesign mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability method
Amardeep Singh
 
CNS layer (usefulsearch.org) (useful search)
CNS layer  (usefulsearch.org) (useful search) CNS layer  (usefulsearch.org) (useful search)
CNS layer (usefulsearch.org) (useful search)
Make Mannan
 
Presentation (prc I) Consistency , final & initial setting time test
Presentation (prc I) Consistency , final & initial setting time test Presentation (prc I) Consistency , final & initial setting time test
Presentation (prc I) Consistency , final & initial setting time test
ceky007
 
Transportation of Concrete - Notes for Civil engineering Students
Transportation of Concrete  - Notes for Civil engineering StudentsTransportation of Concrete  - Notes for Civil engineering Students
Transportation of Concrete - Notes for Civil engineering Students
Kezar Ali. Shah
 
Goetech. engg. Ch# 03 settlement analysis signed
Goetech. engg. Ch# 03 settlement analysis signedGoetech. engg. Ch# 03 settlement analysis signed
Goetech. engg. Ch# 03 settlement analysis signedIrfan Malik
 
DESIGN PROJECT FOR PAVEMENT
DESIGN PROJECT FOR PAVEMENTDESIGN PROJECT FOR PAVEMENT
DESIGN PROJECT FOR PAVEMENT
Sukhdarshan Singh
 
Soil stabilisation
Soil stabilisation Soil stabilisation
Soil stabilisation
pradip dangar
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROAD
kumawat123
 
compaction equipment
compaction equipmentcompaction equipment
compaction equipment
shailesh chauhan
 

What's hot (20)

Boussinesq'S theory
Boussinesq'S theoryBoussinesq'S theory
Boussinesq'S theory
 
What is Ground Improvement Techniques?
What is Ground Improvement Techniques?What is Ground Improvement Techniques?
What is Ground Improvement Techniques?
 
Marshall Mix Design: Lab Report
Marshall Mix Design: Lab ReportMarshall Mix Design: Lab Report
Marshall Mix Design: Lab Report
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 
Grouting Methods
Grouting Methods Grouting Methods
Grouting Methods
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
Vertical Drain
Vertical Drain Vertical Drain
Vertical Drain
 
White topping
White toppingWhite topping
White topping
 
4. Highway Materials.pdf
4. Highway Materials.pdf4. Highway Materials.pdf
4. Highway Materials.pdf
 
GROUND IMPROVEMENT TECHNIQUES
GROUND IMPROVEMENT TECHNIQUES GROUND IMPROVEMENT TECHNIQUES
GROUND IMPROVEMENT TECHNIQUES
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Design mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability methodDesign mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability method
 
CNS layer (usefulsearch.org) (useful search)
CNS layer  (usefulsearch.org) (useful search) CNS layer  (usefulsearch.org) (useful search)
CNS layer (usefulsearch.org) (useful search)
 
Presentation (prc I) Consistency , final & initial setting time test
Presentation (prc I) Consistency , final & initial setting time test Presentation (prc I) Consistency , final & initial setting time test
Presentation (prc I) Consistency , final & initial setting time test
 
Transportation of Concrete - Notes for Civil engineering Students
Transportation of Concrete  - Notes for Civil engineering StudentsTransportation of Concrete  - Notes for Civil engineering Students
Transportation of Concrete - Notes for Civil engineering Students
 
Goetech. engg. Ch# 03 settlement analysis signed
Goetech. engg. Ch# 03 settlement analysis signedGoetech. engg. Ch# 03 settlement analysis signed
Goetech. engg. Ch# 03 settlement analysis signed
 
DESIGN PROJECT FOR PAVEMENT
DESIGN PROJECT FOR PAVEMENTDESIGN PROJECT FOR PAVEMENT
DESIGN PROJECT FOR PAVEMENT
 
Soil stabilisation
Soil stabilisation Soil stabilisation
Soil stabilisation
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROAD
 
compaction equipment
compaction equipmentcompaction equipment
compaction equipment
 

Similar to Foam Bitumen Presentation

proof roads.pptx
proof roads.pptxproof roads.pptx
proof roads.pptx
DESHANTAGGARWAL1
 
moisture proofing of roads.pptx
moisture proofing of roads.pptxmoisture proofing of roads.pptx
moisture proofing of roads.pptx
DESHANTAGGARWAL1
 
materials of roads.pptx
materials of roads.pptxmaterials of roads.pptx
materials of roads.pptx
DESHANTAGGARWAL1
 
water proof roads.pptx
water proof roads.pptxwater proof roads.pptx
water proof roads.pptx
DESHANTAGGARWAL1
 
Roads & Pavements
Roads & PavementsRoads & Pavements
Roads & Pavements
Aaqib Iqbal
 
Training seminar 4_merged.pdf
Training seminar 4_merged.pdfTraining seminar 4_merged.pdf
Training seminar 4_merged.pdf
ssuser7ba2051
 
CONCRETE PPT SA JBP
CONCRETE PPT SA JBPCONCRETE PPT SA JBP
CONCRETE PPT SA JBP
Suyash Awasthi
 
Vivek Gupta (CE-4th REC AZAMGARH)
Vivek Gupta (CE-4th REC AZAMGARH)Vivek Gupta (CE-4th REC AZAMGARH)
Vivek Gupta (CE-4th REC AZAMGARH)
vivekkgupta21
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....
RaazYadav6
 
crri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxcrri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptx
RipanJena
 
Presentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,deptPresentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,dept
Lovely Professional University
 
Road construction pavements flexible rigid
Road construction pavements flexible rigidRoad construction pavements flexible rigid
Road construction pavements flexible rigid
KumarS250747
 
CONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSCONSTRUCTION OF ROADS
CONSTRUCTION OF ROADS
reemajadwani
 
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
DanielWisman1
 
Lowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesLowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure services
Ar Jitendra
 
New ppt on road construction
New ppt on road construction New ppt on road construction
New ppt on road construction
Kuldeep317348
 
water bound macadam road
water bound macadam roadwater bound macadam road
water bound macadam road
Rohan chansoriya
 
Road-Bed-Construction PPT report- Construction materials and testing
Road-Bed-Construction PPT report- Construction materials and testingRoad-Bed-Construction PPT report- Construction materials and testing
Road-Bed-Construction PPT report- Construction materials and testing
ssuser5f4884
 
Polymer road technology
Polymer road technologyPolymer road technology
Polymer road technology
Nikhil Bhole
 
Technology of soil stabilization
Technology of soil stabilizationTechnology of soil stabilization
Technology of soil stabilization
Григорий Мо
 

Similar to Foam Bitumen Presentation (20)

proof roads.pptx
proof roads.pptxproof roads.pptx
proof roads.pptx
 
moisture proofing of roads.pptx
moisture proofing of roads.pptxmoisture proofing of roads.pptx
moisture proofing of roads.pptx
 
materials of roads.pptx
materials of roads.pptxmaterials of roads.pptx
materials of roads.pptx
 
water proof roads.pptx
water proof roads.pptxwater proof roads.pptx
water proof roads.pptx
 
Roads & Pavements
Roads & PavementsRoads & Pavements
Roads & Pavements
 
Training seminar 4_merged.pdf
Training seminar 4_merged.pdfTraining seminar 4_merged.pdf
Training seminar 4_merged.pdf
 
CONCRETE PPT SA JBP
CONCRETE PPT SA JBPCONCRETE PPT SA JBP
CONCRETE PPT SA JBP
 
Vivek Gupta (CE-4th REC AZAMGARH)
Vivek Gupta (CE-4th REC AZAMGARH)Vivek Gupta (CE-4th REC AZAMGARH)
Vivek Gupta (CE-4th REC AZAMGARH)
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....
 
crri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxcrri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptx
 
Presentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,deptPresentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,dept
 
Road construction pavements flexible rigid
Road construction pavements flexible rigidRoad construction pavements flexible rigid
Road construction pavements flexible rigid
 
CONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSCONSTRUCTION OF ROADS
CONSTRUCTION OF ROADS
 
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
 
Lowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesLowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure services
 
New ppt on road construction
New ppt on road construction New ppt on road construction
New ppt on road construction
 
water bound macadam road
water bound macadam roadwater bound macadam road
water bound macadam road
 
Road-Bed-Construction PPT report- Construction materials and testing
Road-Bed-Construction PPT report- Construction materials and testingRoad-Bed-Construction PPT report- Construction materials and testing
Road-Bed-Construction PPT report- Construction materials and testing
 
Polymer road technology
Polymer road technologyPolymer road technology
Polymer road technology
 
Technology of soil stabilization
Technology of soil stabilizationTechnology of soil stabilization
Technology of soil stabilization
 

Foam Bitumen Presentation

  • 1. Overview of Foam Bitumen Contracts Undertaken in Far North Queensland Craig Gordon – Cairns Office RTA Northern Region 17th March 2010
  • 2. SCOPE • Fundamentals of Foam Bitumen Pavements • Projects Undertaken • Construction Methods Used
  • 3. Foam Bitumen Stabilised Pavements • What is Foam Bitumen Stabilised Pavements. – It is a mixture of gravel, lime or cement, air, water and bitumen – When air, water and bitumen are mixed with each other the mixture expands greater than 10 times its original volume and forms a fine mist or foam – This foam is sprayed into the drum where it coats the fine particles – As the foam collapses most of the water is lost through steam – The residual bitumen then has properties similar to its original state and is well dispersed through the matrix in very small droplets – The bitumen droplets are attracted to and coat the finer particles, forming a uniform matrix that effectively binds the mixture together.
  • 5. Where to Use the Foam Bitumen Process • A pavement that has been repeatedly patched to the extent that pavement repairs are no longer cost effective • A weak granular base overlays a reasonably strong subgrade • Granular base is too thin to consider cementitious binders • Alternative to full depth asphalt in moderate to high trafficked roads • Unfavourable wet cyclic conditions • To complete the rehabilitation quickly to prevent disruption to businesses, residents and public
  • 7. Contracts Undertaken • Within the Peninsula District of North Queensland, a number of Foam Bitumen contracts have been carried out. The majority of these projects have been on the Bruce Highway where the roads have been affected by flood damage. • The district is now also including foam bitumen pavements in new pavements / reconstructed pavements. • Foam Bitumen Pavements appear to be the desired choice for the major highways in the District, Bruce, Palmerston, Captain Cook. • The Cairns Regional Council has also done some minor works with Foam Bitumen Stabilisation. • Mackay Regional Council have also awarded DEW a foam bitumen contract which we are currently undertaking.
  • 8. Contracts Undertaken • Department of Main Roads, Queensland (since November 2008 to current) – Bruce Highway – approximately 2.5km (El Arish) – Bruce Highway – approximately 3.5km (Mourilyan) – Bruce Highway – approximately 3.5km (Cardwell) – Palmerston Highway – approximately 5km – Palmerston Highway – approximately 2km – Palmerston Highway – approximately 0.7km – Palmerston Highway – approximately 3.5km • Other Projects – Mackay Regional Council Flood Damage Package 7 (Various council roads)
  • 9. Foam Bitumen • Basic design of the pavements is to incorporate an overlay, with 2% lime or 1.5% of cement and 3.5% of bitumen. • An overlay is only used when required and generally consists of between 50mm and 100mm of Type 2.1 Gravel. • The use of the overlay was for shape correction and also to increase the quality of the pavement material, ie gradings.
  • 10. Foam Bitumen • Design Considerations employed by Main Roads: – Design period – Design Traffic – Subgrade Material Properties – Pavement Material Properties – Environmental Influences – Construction and Maintenance Procedures – Drainage
  • 11. Benefits and Limitations Benefits: – Increased strength over granular pavement materials – Relatively quick construction method – Lower costs than Reconstruction – Trafficked immediately (in the right conditions) – Can be trafficked without a seal – Decreased susceptibility to moisture during construction. – Can be reworked several days after final trimming without extra binder
  • 12. Benefits and Limitations Limitations: – Requires a suitable grading of fines in the pavement material – Purpose built equipment and experienced operators are required – Cost is greater than cement stabilisation – Not suitable for all pavements (some pavements show low strength gain, slow strength gain an unsuitable grading)
  • 13. Secondary Stabilising Agent and Foaming Agent • Secondary Stabilising Agent: – Usually consists of cement or lime, lime is the preferred option, although cement is cheaper – Specified working time (4 hours) commences upon incorporation, although bitumen is then required to be incorporated within the next 1.5 hours – Incorporated 50mm above the target depth. – Purpose for secondary stabilising agent: • Assist in strength increase • Assist in dispersion of bitumen throughout mix • Improves mix workability • Reduces the plasticity Index
  • 17. Secondary Stabilising Agent and Foaming Agent • Foaming Agent – A proprietary product is used – Used to combat the anti foaming agent that has been put into bitumen for transport reasons – A maximum of 2% by mass should be added – Generally we have found 0.5% is adequate to achieve half life and expansion ratios – Assists in the dispersion of bitumen to coat each particle of the pavement – Essential to be used, as bitumen will naturally foam when hit with water, although the dispersion is still not as adequate without the foaming agent
  • 19.
  • 20. Things to consider with Foamed Bitumen Stabilisation • Safety is paramount when working in any environment, especially under traffic and when using hot bitumen binder • Typical application rates of foam bitumen are between 2-4% bitumen with the addition of a binder i.e. lime or cement, around about the 2% mark • Sufficient pavement testing including testing of the subgrade is crucial when determining mix design and potential for using foam bitumen. Testing can cost approx. $3000 - $4000 per test, although the bitumen savings it could produce are considerable • Sealing rates over foam bitumen pavements are usually reduced by at least 10% compared to normal pavements, common problems are bleeding of seals and potential instability of asphalt layers. • A foaming agent is a must when foaming bitumen
  • 21. Things to consider with Foamed Bitumen Stabilisation • Construction times are very important • Moisture content of the pavement is important, and generally in the range 60-80% of optimum • Experienced construction teams are essential when undertaking foam bitumen • Although method is less susceptible to wet weather than other pavements, work in wet weather should be avoided as moisture can become trapped in lower layers of pavement causing problems with compaction • Allowing traffic on the surface prior to primer sealing is not desirable, as the fines on the surface contain bitumen, which will in turn get stuck to cars.
  • 23. Construction Methods • Plant and Labour Crew – Traffic Control – Project Manager – Supervisor – Wirtgen WR2000 or WR2500 (Foam Bitumen Capabilities) – Additional Mixer if required for pulverisation, cement / lime incorporation – Grader – Loader (If Overlay) – Trucks (If Overlay) – Bitumen Tankers (Capable of attaching to the mixers bar) – Watercarts – Rollers (18t for up to 250mm, 21 tonne up to 300mm) include Pad foot, Smooth Drum and Multi Tyred Rollers – Generally also require 3-4 additional laborers on the ground for Quality Assurance checks and day to day tasks
  • 24. Construction Methods • Methodology – Generally, traffic control is set up to close 1 lane approx 500m in length – Place Overlay – Pulverize pavement – Spreading of lime / cement – Mixing of lime /cement and water – Incorporation of foamed bitumen – Final Trimming of Pavement – Sealing works
  • 25. Production rates • Indicative production rates achieved (daily/10 hr day) on a 250 mm pavement with 50 mm overlay, 8 kg/m2 cement and 18.4 kg /m2 bitumen. • 1200 m2 to 2,400 m2 per day (under one lane traffic). • Production constraints • Supply of materials i.e. gravel, bitumen, powder, aggregates and additives. • Stockpiles sites if required • Traffic • Weather • Machine breakdowns
  • 26. Foam Bitumen Stabilised Pavements. Questions Relating to the Construction Activities.