SPAR PLATFORMS
            Group 1
SPAR Applications

• Presently there are 17 SPARs in operation
 ▫ 3 Classic SPARs
 ▫ 13 Truss SPARs
 ▫ ONLY 1 Cell SPAR
• All except the Kikeh Truss SPAR , located off the
  Malaysian coast, can be found in the Gulf of
  Mexico
• SPAR platforms are used in ultra-deep waters
SPAR Applications
SPAR Platforms are commonly used in
 deep water applications for:
 ▫ Drilling
   Mad Dog SPAR
 ▫ Storage
   Brent SPAR


                            ▫ Production
                              • Neptune SPAR
                            ▫ Unmanned
                              • Buoys
SPAR Projects
         Company       Platform              Type    Year Installed

Kerr-McGee         Neptune         Classic          1996

ChevronTexaco      Genesis         Classic          1998

ExxonMobil         Hoover Diana    Classic          2000

Kerr-McGee         Nansen          Truss            2001

Murphy             Medusa          Truss            2002

Kerr-McGee         Boomvang        Truss            2002

bp                 Horn Mountain   Truss            2002

bp                 Holstein        Truss            2003

Kerr-McGee         Gunnison        Truss            2004

bp                 Mad Dog         Truss            2005
SPAR Projects
SPAR Design Considerations
 • All SPAR platforms utilize strakes to reduce vortex induced motions
 • Anodes are commonly found on SPAR hulls to reduce corrosion
 • Different topside decks can be attached to SPARs depending on the
   job. Some of these decks are:
   ▫ A full drilling rig (3,000hp)
   ▫ A workover rig (600-1,000hp)
   ▫ Production equipment
 • The world’s first production SPAR was used in 1996
 • Previously, SPARs had been used as oil
   storage vessels (Brent project)
SPAR Design Considerations
    There are 3 basic designs
•
    for SPAR Platforms

    1. Classic SPAR
    2. Truss SPAR
    3. Cell SPAR

    The different SPAR
•
    designs reflect industry
    innovations

    1. Each design is an
       improvement on an older
       model and offers improved
       functionality at a reduced
       cost
• The world’s first production
                    Classic SPAR, Neptune, was
                    installed in the Gulf of Mexico in




Classic SPAR Platform
                    1996

                  • Oryx Energy developed
                    Neptune, and was later acquired
                    by Kerr-McGee in 1999.

                  • The Classic SPAR hull is
                    basically a cylinder

                  • This cylinder is separated into
                    three main sections:

                        1.   Upper section
                             Compartmentalized and filled
                         •
                             with air to provide the buoyancy
                        2.   Centerwell
                             Flooded with seawater
                         •
                        3. Keel section (“Soft Tank”)
                             Compartmentalized to aid in
                         •
                             transportation . Also contains
                             any field-installed ballast.
Genesis SPAR
               •Genesis was the second Classic SPAR
               ever built
               •Classic SPARs have 4 major
               components: a hull, a mooring
               system, risers, and topside decks.
                    • SPAR designs are inherently
                    stable due to their deep draft hulls.
                    •Dry Tree technology can be
                    utilized on a SPAR platform.
                    •SPAR platforms tend to be 30%
                    cheaper than other options in deep
                    water.
• Truss Platforms were introduced by Kerr-
                        McGee in 2001 when the Nansen was
                        installed in the Gulf of Mexico




Truss SPAR Platform
                      • The Truss SPAR design has 3 main
                        components:

                          1.   Hard Tank
                               Provides most of the in-place buoyancy for
                          •
                               the SPAR.
                          1.   Truss Section
                               Supports the heave plates and provides
                          •
                               separation between the keel tank and hard
                               tank.
                          1.   Keel Tank (“Soft Tank”)
                               Contains the fixed ballast and acts as a
                          •
                               natural hang-off location for export pipelines
                               and flowlines .
Perdido SPAR
•Shell’s most recent Truss SPAR broke the
deepwater record and will be operational in 2010.
•Truss SPARs are characterized by the tubular
members that provide a connection between
the hard tank and the keel.
•The truss system also support to the heave
plates which reduce improve stability
by reducing heave.
• The Cell SPAR was also designed by Kerr-McGee
                 in the Red Hawk project




Cell SPAR Platform
               • Red Hawk was installed in the Gulf of Mexico and
                 made operational in 2004

               • Cell SPARs have several design features
                 including:
                         The Hard Tank is made up of 6 cylindrical tubes that
                     •
                         surround a seventh central tube.

                         Each of these tubes is 20 ft in diameter and contain
                     •
                         variable-ballast tanks and redundant, independent cells

                         The middle hull section is an extension of three of the seven
                     •
                         cylindrical tubes, and serves as a rigid connection between
                         the hard tank and the keel tank.
                         The lower section, or keel, contains the permanent ballast
                     •
Red Hawk SPAR
•First and only Cell SPAR
•The separate tubes
are connected by heave
plates
•Heave plates give the
structure added
stability by reducing
the force transferred
from ocean waves
and current.
SPAR Economics

Classic SPARs
  ▫ The US does not have a facility large enough to construct SPAR hulls.
    Therefore, almost all SPAR hulls have been manufactured overseas ,
    typically in Finland, and then transported to the US, which increases the
    cost of the project.
                          Truss SPARs
                             ▫ The hull of a truss SPAR is smaller, reducing
                               both material cost and the cost of transportation.
                               Also for some truss SPARs, the actual truss
                               system can be made in the US and then mated
                               with the hard tank when it arrives.
                           Cell SPARs
                             ▫ Because of the reduced size of the cylinders,
                               fabrication of cell SPARs can take place in the US,
                               meaning that there is no transportation cost.
SPAR Economics
• SPAR designs are the most economical for ultra-
  deep water.
• By utilizing a mooring system instead of
  permanent legs, SPAR platforms reduce materials
  cost and can be moved to different wells.
• Oryx spent $300 million on
  Neptune, the world’s first
  production SPAR platform.
• Neptune was estimated to
  save Oryx and it’s 50/50
  partner $90 million.
SPAR Construction
                            •Later the two completed halves are
                            brought together




•The Hard Tank of a Truss
SPAR is constructed in
halves




                            •Then the two halves are
                            joined to form the top of the
                            Truss SPAR’s Hard Tank
SPAR Construction
                     • The SPAR hull             •The hull is joined and towed
                     is shipped in               out to the well location.
                     sections that will
                     later be mated
                     together.




•The SPAR hull is then flooded with
seawater and up-ended. Once in
place, the hull is connected to the       •The topsides are then
already installed mooring system.         attached to the SPAR hull.
SPAR construction timeline:
Perdido
•http://www.shell.us/home/content/usa/aboutshell/strategy/major_projects/perdido/tracking/tracking_project_ncb07.html
References
•“Industry Projects.” Offshore Technology. 2009. 21 Apr. 2009 <http://www.offshore-technology.com/projects/>.

• “Offshore: ABS to Class Cell Spar for Kerr-McGee.” Marine Link. 2 Apr. 2003. 19 Apr. 2009
 <http://www.marinelink.com/Story/Offshore:+ABS+to+Class+Cell+Spar+for+Kerr-McGee-11137.html>.

•quot;Perdido Development Project.quot; Shell. 5 Sept. 2008. Shell oil. 20 Apr. 2009
<http://www.shell.us/home/content/usa/aboutshell/strategy/major_projects/perdido/tracking/tracking_project_ncb07.html>.

•“SparTEC.” FloaTEC. 2009. 20 Apr. 2009 <http://www.floatec.com/spar.htm>.

•Ultramarine, Inc. Welcome to Ultramarine. 1996. 24 Apr. 2009 <http://www.ultramarine.com>.

More Related Content

What's hot

Sacs otc 2012
Sacs otc 2012Sacs otc 2012
Sacs otc 2012
HSD Luu
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
Chieu Nguyen
 
FPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdfFPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdf
BnBn25
 
Offshore platform-design
Offshore platform-designOffshore platform-design
Offshore platform-design
Rahul Ranakoti
 
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedInOFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
Khaled Sherif
 

What's hot (20)

Fpso – general overview of conversion & topside process description -abstract
Fpso – general overview of conversion & topside process description -abstractFpso – general overview of conversion & topside process description -abstract
Fpso – general overview of conversion & topside process description -abstract
 
Sacs otc 2012
Sacs otc 2012Sacs otc 2012
Sacs otc 2012
 
Offshore structures
Offshore structuresOffshore structures
Offshore structures
 
Offshore Platforms
Offshore Platforms Offshore Platforms
Offshore Platforms
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production Systems
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
 
Offshore Structure
Offshore StructureOffshore Structure
Offshore Structure
 
FPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdfFPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdf
 
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
An Overview of Design, Analysis, Construction and Installation of Offshore Pe...
 
Type of rig
Type of rigType of rig
Type of rig
 
Offshore structures
Offshore structuresOffshore structures
Offshore structures
 
OFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdfOFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdf
 
Offshore Drilling Rig Equipment
Offshore Drilling Rig EquipmentOffshore Drilling Rig Equipment
Offshore Drilling Rig Equipment
 
Floting Production Storage and Offloading
Floting Production Storage  and OffloadingFloting Production Storage  and Offloading
Floting Production Storage and Offloading
 
Ship Construction - Rudder Theory
Ship Construction - Rudder TheoryShip Construction - Rudder Theory
Ship Construction - Rudder Theory
 
Offshore platform-design
Offshore platform-designOffshore platform-design
Offshore platform-design
 
Jack up
Jack upJack up
Jack up
 
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedInOFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
 

Viewers also liked

Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)
calir2lune
 
Esea marianne juni2010
Esea marianne juni2010Esea marianne juni2010
Esea marianne juni2010
eSeaTV
 
General SeaZip presentation 18-01-2017
General SeaZip presentation 18-01-2017General SeaZip presentation 18-01-2017
General SeaZip presentation 18-01-2017
Jan Reier Arends
 
20120531 Vietnam Offshore maritime V3
20120531 Vietnam Offshore maritime V320120531 Vietnam Offshore maritime V3
20120531 Vietnam Offshore maritime V3
Hai Anh Tran
 

Viewers also liked (18)

Spar Information
Spar InformationSpar Information
Spar Information
 
Spar platforms for power point
Spar platforms for power pointSpar platforms for power point
Spar platforms for power point
 
Spar ppt
Spar pptSpar ppt
Spar ppt
 
Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)Construction of marine and offshore structures(2007)
Construction of marine and offshore structures(2007)
 
spar iso
spar isospar iso
spar iso
 
Spar
SparSpar
Spar
 
Esea marianne juni2010
Esea marianne juni2010Esea marianne juni2010
Esea marianne juni2010
 
Shipping Industry Case Study
Shipping Industry Case StudyShipping Industry Case Study
Shipping Industry Case Study
 
General SeaZip presentation 18-01-2017
General SeaZip presentation 18-01-2017General SeaZip presentation 18-01-2017
General SeaZip presentation 18-01-2017
 
20120531 Vietnam Offshore maritime V3
20120531 Vietnam Offshore maritime V320120531 Vietnam Offshore maritime V3
20120531 Vietnam Offshore maritime V3
 
Hr trends january_2016
Hr trends january_2016Hr trends january_2016
Hr trends january_2016
 
Offshore access gangway
Offshore access gangwayOffshore access gangway
Offshore access gangway
 
Analytical Hierarchy Process applied to maintenance strategy selection for of...
Analytical Hierarchy Process applied to maintenance strategy selection for of...Analytical Hierarchy Process applied to maintenance strategy selection for of...
Analytical Hierarchy Process applied to maintenance strategy selection for of...
 
Folding Shipping Container
Folding Shipping ContainerFolding Shipping Container
Folding Shipping Container
 
Horizontal vertical christmas tree ppt
Horizontal vertical christmas tree pptHorizontal vertical christmas tree ppt
Horizontal vertical christmas tree ppt
 
Offshore part 2
Offshore part 2Offshore part 2
Offshore part 2
 
Presentation on reliance group by shashank
Presentation on reliance group by shashankPresentation on reliance group by shashank
Presentation on reliance group by shashank
 
Innovation Radar: How to track down future developments? (Popper, 2012)
Innovation Radar: How to track down future developments?  (Popper, 2012)Innovation Radar: How to track down future developments?  (Popper, 2012)
Innovation Radar: How to track down future developments? (Popper, 2012)
 

Similar to Spar Platforms

Life and Work of a Naval Architect
Life and Work of a Naval ArchitectLife and Work of a Naval Architect
Life and Work of a Naval Architect
Callum Campbell
 
Dp Workboats, A New Era For Multicats 2
Dp Workboats, A New Era For Multicats 2Dp Workboats, A New Era For Multicats 2
Dp Workboats, A New Era For Multicats 2
Mark van der Star
 
19100309 offshore-platform-design
19100309 offshore-platform-design19100309 offshore-platform-design
19100309 offshore-platform-design
OFFSHORE VN
 
Kayak centre k1 range info
Kayak  centre k1  range infoKayak  centre k1  range info
Kayak centre k1 range info
Laura Tarbuck
 

Similar to Spar Platforms (20)

Multi hull vessels
Multi hull vesselsMulti hull vessels
Multi hull vessels
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptx
 
212790628 fpso
212790628 fpso212790628 fpso
212790628 fpso
 
Mares 2013
Mares  2013Mares  2013
Mares 2013
 
Oil & gas
Oil & gasOil & gas
Oil & gas
 
Offshore platform
Offshore platformOffshore platform
Offshore platform
 
Design of a Pleasure Craft with Catamaran Hull
Design of a Pleasure Craft with Catamaran HullDesign of a Pleasure Craft with Catamaran Hull
Design of a Pleasure Craft with Catamaran Hull
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Catamaran Power Boats
Catamaran Power BoatsCatamaran Power Boats
Catamaran Power Boats
 
Trawler Catamaran
Trawler CatamaranTrawler Catamaran
Trawler Catamaran
 
Lng carrier
Lng carrierLng carrier
Lng carrier
 
Life and Work of a Naval Architect
Life and Work of a Naval ArchitectLife and Work of a Naval Architect
Life and Work of a Naval Architect
 
thyssenkrupp Marine Systems
thyssenkrupp Marine Systemsthyssenkrupp Marine Systems
thyssenkrupp Marine Systems
 
submarine ship
submarine shipsubmarine ship
submarine ship
 
Dp Workboats, A New Era For Multicats 2
Dp Workboats, A New Era For Multicats 2Dp Workboats, A New Era For Multicats 2
Dp Workboats, A New Era For Multicats 2
 
Drillships
DrillshipsDrillships
Drillships
 
19100309 offshore-platform-design
19100309 offshore-platform-design19100309 offshore-platform-design
19100309 offshore-platform-design
 
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
 
Kayak centre k1 range info
Kayak  centre k1  range infoKayak  centre k1  range info
Kayak centre k1 range info
 
Ships_Deck_Fittings.pptx
Ships_Deck_Fittings.pptxShips_Deck_Fittings.pptx
Ships_Deck_Fittings.pptx
 

Recently uploaded

NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 

Recently uploaded (20)

NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
 
sales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumsales plan presentation by mckinsey alum
sales plan presentation by mckinsey alum
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
USA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfUSA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdf
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptx
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptx
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Luxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
Luxury Artificial Plants Dubai | Plants in KSA, UAE | ShajaraLuxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
Luxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
 
India’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdfIndia’s Recommended Women Surgeons to Watch in 2024.pdf
India’s Recommended Women Surgeons to Watch in 2024.pdf
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
Understanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesUnderstanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and Employees
 
IPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceIPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best Service
 
Easy Way to Download and Set Up Gen TDS Software on Your Computer
Easy Way to Download and Set Up Gen TDS Software on Your ComputerEasy Way to Download and Set Up Gen TDS Software on Your Computer
Easy Way to Download and Set Up Gen TDS Software on Your Computer
 

Spar Platforms

  • 1. SPAR PLATFORMS Group 1
  • 2. SPAR Applications • Presently there are 17 SPARs in operation ▫ 3 Classic SPARs ▫ 13 Truss SPARs ▫ ONLY 1 Cell SPAR • All except the Kikeh Truss SPAR , located off the Malaysian coast, can be found in the Gulf of Mexico • SPAR platforms are used in ultra-deep waters
  • 3. SPAR Applications SPAR Platforms are commonly used in deep water applications for: ▫ Drilling  Mad Dog SPAR ▫ Storage  Brent SPAR ▫ Production • Neptune SPAR ▫ Unmanned • Buoys
  • 4. SPAR Projects Company Platform Type Year Installed Kerr-McGee Neptune Classic 1996 ChevronTexaco Genesis Classic 1998 ExxonMobil Hoover Diana Classic 2000 Kerr-McGee Nansen Truss 2001 Murphy Medusa Truss 2002 Kerr-McGee Boomvang Truss 2002 bp Horn Mountain Truss 2002 bp Holstein Truss 2003 Kerr-McGee Gunnison Truss 2004 bp Mad Dog Truss 2005
  • 6. SPAR Design Considerations • All SPAR platforms utilize strakes to reduce vortex induced motions • Anodes are commonly found on SPAR hulls to reduce corrosion • Different topside decks can be attached to SPARs depending on the job. Some of these decks are: ▫ A full drilling rig (3,000hp) ▫ A workover rig (600-1,000hp) ▫ Production equipment • The world’s first production SPAR was used in 1996 • Previously, SPARs had been used as oil storage vessels (Brent project)
  • 7. SPAR Design Considerations There are 3 basic designs • for SPAR Platforms 1. Classic SPAR 2. Truss SPAR 3. Cell SPAR The different SPAR • designs reflect industry innovations 1. Each design is an improvement on an older model and offers improved functionality at a reduced cost
  • 8. • The world’s first production Classic SPAR, Neptune, was installed in the Gulf of Mexico in Classic SPAR Platform 1996 • Oryx Energy developed Neptune, and was later acquired by Kerr-McGee in 1999. • The Classic SPAR hull is basically a cylinder • This cylinder is separated into three main sections: 1. Upper section Compartmentalized and filled • with air to provide the buoyancy 2. Centerwell Flooded with seawater • 3. Keel section (“Soft Tank”) Compartmentalized to aid in • transportation . Also contains any field-installed ballast.
  • 9. Genesis SPAR •Genesis was the second Classic SPAR ever built •Classic SPARs have 4 major components: a hull, a mooring system, risers, and topside decks. • SPAR designs are inherently stable due to their deep draft hulls. •Dry Tree technology can be utilized on a SPAR platform. •SPAR platforms tend to be 30% cheaper than other options in deep water.
  • 10. • Truss Platforms were introduced by Kerr- McGee in 2001 when the Nansen was installed in the Gulf of Mexico Truss SPAR Platform • The Truss SPAR design has 3 main components: 1. Hard Tank Provides most of the in-place buoyancy for • the SPAR. 1. Truss Section Supports the heave plates and provides • separation between the keel tank and hard tank. 1. Keel Tank (“Soft Tank”) Contains the fixed ballast and acts as a • natural hang-off location for export pipelines and flowlines .
  • 11. Perdido SPAR •Shell’s most recent Truss SPAR broke the deepwater record and will be operational in 2010. •Truss SPARs are characterized by the tubular members that provide a connection between the hard tank and the keel. •The truss system also support to the heave plates which reduce improve stability by reducing heave.
  • 12. • The Cell SPAR was also designed by Kerr-McGee in the Red Hawk project Cell SPAR Platform • Red Hawk was installed in the Gulf of Mexico and made operational in 2004 • Cell SPARs have several design features including: The Hard Tank is made up of 6 cylindrical tubes that • surround a seventh central tube. Each of these tubes is 20 ft in diameter and contain • variable-ballast tanks and redundant, independent cells The middle hull section is an extension of three of the seven • cylindrical tubes, and serves as a rigid connection between the hard tank and the keel tank. The lower section, or keel, contains the permanent ballast •
  • 13. Red Hawk SPAR •First and only Cell SPAR •The separate tubes are connected by heave plates •Heave plates give the structure added stability by reducing the force transferred from ocean waves and current.
  • 14. SPAR Economics Classic SPARs ▫ The US does not have a facility large enough to construct SPAR hulls. Therefore, almost all SPAR hulls have been manufactured overseas , typically in Finland, and then transported to the US, which increases the cost of the project. Truss SPARs ▫ The hull of a truss SPAR is smaller, reducing both material cost and the cost of transportation. Also for some truss SPARs, the actual truss system can be made in the US and then mated with the hard tank when it arrives. Cell SPARs ▫ Because of the reduced size of the cylinders, fabrication of cell SPARs can take place in the US, meaning that there is no transportation cost.
  • 15. SPAR Economics • SPAR designs are the most economical for ultra- deep water. • By utilizing a mooring system instead of permanent legs, SPAR platforms reduce materials cost and can be moved to different wells. • Oryx spent $300 million on Neptune, the world’s first production SPAR platform. • Neptune was estimated to save Oryx and it’s 50/50 partner $90 million.
  • 16. SPAR Construction •Later the two completed halves are brought together •The Hard Tank of a Truss SPAR is constructed in halves •Then the two halves are joined to form the top of the Truss SPAR’s Hard Tank
  • 17. SPAR Construction • The SPAR hull •The hull is joined and towed is shipped in out to the well location. sections that will later be mated together. •The SPAR hull is then flooded with seawater and up-ended. Once in place, the hull is connected to the •The topsides are then already installed mooring system. attached to the SPAR hull.
  • 19. References •“Industry Projects.” Offshore Technology. 2009. 21 Apr. 2009 <http://www.offshore-technology.com/projects/>. • “Offshore: ABS to Class Cell Spar for Kerr-McGee.” Marine Link. 2 Apr. 2003. 19 Apr. 2009 <http://www.marinelink.com/Story/Offshore:+ABS+to+Class+Cell+Spar+for+Kerr-McGee-11137.html>. •quot;Perdido Development Project.quot; Shell. 5 Sept. 2008. Shell oil. 20 Apr. 2009 <http://www.shell.us/home/content/usa/aboutshell/strategy/major_projects/perdido/tracking/tracking_project_ncb07.html>. •“SparTEC.” FloaTEC. 2009. 20 Apr. 2009 <http://www.floatec.com/spar.htm>. •Ultramarine, Inc. Welcome to Ultramarine. 1996. 24 Apr. 2009 <http://www.ultramarine.com>.