Explosive Destruction Technology
30 Percent Design Update
May 6, 2014
Presented to:
Chemical Destruction Community
Advisory Board’s Explosive Destruction
Technology Working Group
Presented by:
Jeff Brubaker, ACWA Site Manager
John McArthur, Systems Contractor
Environmental Manager
A Partnership for Safe Chemical Weapons Destruction
Bechtel Parsons Joint Venture team
A Partnership for Safe Chemical Weapons Destruction
3
Agenda
 EDT Facility Layout
 Munitions Processing Steps
 Equipment Layout
 Other Materials
 Questions/Discussion
A Partnership for Safe Chemical Weapons Destruction
EDT Facility Layout
4
A Partnership for Safe Chemical Weapons Destruction
O2SF Outside Operations Support Facility
ESB EDT Support Building
MH Monitoring House
ESM EDT Service Magazine
EEB EDT Enclosure Building
CON Control Room
TOF Treaty Office Facility
5
EDT and OPS Facilities
A Partnership for Safe Chemical Weapons Destruction
6
ESM
ESB
EEB
MH
O2
SF
O2SF
BGCAPP Site Plan / EDT Site Location
A Partnership for Safe Chemical Weapons Destruction
7
TOF
BGCAPP Site Plan / EDT Site Facility
ESM
ESBEEB
MH
A Partnership for Safe Chemical Weapons Destruction
 Function: The purpose of the O2SF will be a primary location for
support functions related to the start and end of daily and shift
activities and routine facility support
 O2SF will consist of the following areas to support the Project:
 7 offices and 12 cubicles
 A Mask Issue, fit and test area
 First Aid Area (with a blood draw area and a small Laboratory for Medical personnel)
 Hazmat/decon Storage Area
 Toxicological Area Protective (TAP) gear storage
 Lunch Room
 Restrooms and Showers
 Locker Areas (with approximately 150 lockers)
 A Cotton Goods Issue Room
 An IT Help Desk and a small Communication Equipment Room
8
O2SF – Facility Design Description
A Partnership for Safe Chemical Weapons Destruction
 Function: The purpose of the ESB is the primary support functions
directly related to the operation of the EDT to support the disposal of
the Mustard agent inventory at Blue Grass Army Depot (BGAD)
 The ESB houses and supports the EDT operational crews and the
direct support crew functions
 ESB will have 6 offices, 10 cubicles, a Conference Room, a TAP
Gear / Tool / Parts Storage Area, a Lunch Room / Crew
briefing/training area, Restrooms, an Electrical Room, a
Communications Room, and a small Custodial Utility Room
 The offices are for general purpose and direct support services use,
and planned to accommodate Plant Management, Engineering,
Automation and personnel that directly support the EDT operations
 It will support approximately 20 people on Day Shift and
approximately 90 people on rotating shift that are part of the
operational crews that work within the EDT Complex
ESB – Facility Design Description
A Partnership for Safe Chemical Weapons Destruction
 A Conference Room will provide space for crew training, turn-
overs, and meetings
 The Lunch Room/Crew Room contains approximately 40
lockers. This area will have a seating area for approximately
27 personnel. This area also serves as a meeting area to be
used for shift turn-over, crew training, meetings and
presentations. It will also contain several computer
workstations for general crew use (e.g. timekeeping, complete
computer based training, complete Read and Sign
requirement, etc.)
 The building’s HVAC system can be shut down to utilize the
ESB as a shelter-in-place facility
 The ESB will not house any Chemical Weapons Convention
(CWC) Treaty personnel
 Adjacent to the ESB is the EDT Control Room (CON)
ESB – Facility Design Description
A Partnership for Safe Chemical Weapons Destruction
 Function: The purpose of the EDT Process Monitoring House
(MH) is a centralized area which contains the air monitoring
equipment and some process monitoring equipment to
support operator safety and verify environmental compliance
during 24/7 processing operations of the EDT Facility.
 The MH consist of a 16 by 36 foot raised structure,
MiniCAMS, DAAMS, CEMS, and other air monitoring
equipment.
11
MH – Facility Design Description
A Partnership for Safe Chemical Weapons Destruction
 Function: The purpose of the ESM will be to hold a reserve of
Mustard munitions to support 24/7 processing operations of the EDT
Facility
 The ESB consist of a 30 by 30 foot Non-Standard Storage Structure
(NSS) with an HVAC unit, a Monitoring Shack, a Bottle Storage Area
with overhead cover, and a 1,000 CFM Filter Unit mounted on a
trailer.
 ESM Capability:
– Maximum explosive capability = 500 pound Net Explosive Weight (NEW) (1,206
projectiles)
– Site Plan Safety Submittal (SPSS) Limit = 1,128 projectiles
 Pallet stacking within the ESM is limited to two high
 The floor is designed with secondary containment and water stops
 The Monitoring Shack contains MiniCAMS and DAAMS to support air
monitoring of the ESM, EONCs, and the 1,000 CFM Filter Unit
12
ESM – Facility Design Description
A Partnership for Safe Chemical Weapons Destruction
13
EONC Transport of Chemical Weapons
A Partnership for Safe Chemical Weapons Destruction
 Function: The purpose of the EEB is to house the SDC and OTS
process equipment
 The EEB consist of a 77 by 120 foot building (approx.)
 The building has an A, B, C, D Agent Areas with a Cascading
Ventilation System and a Munitions Delivery Airlock
 The SDC consist of a:
– Loading Conveyor and Elevator Lift
– Loading Chamber #1 and #2
– The Detonation Chamber (DC)
– A Buffer Tank
– A Scrap Chute, Scrap Cooling Conveyor, Belt Conveyor, and a Scrap
Bin
14
EEB – Facility Design Description
A Partnership for Safe Chemical Weapons Destruction
 The Off-Gas Treatment System (OTS) consist of a:
– Thermal Oxidizer
– Spray Dryer
– Bag House Filter
– Quench
– Acid & Neutral Scrubber
– ID Fans
– Heat Exchanger and Cooler
– A Re-Heater
 The building has a 16,000 CFM IONEX Carbon Filter Unit
 And the OTS has a 4,000 CFM IONEX Carbon Filter Unit
15
EEB – Facility Design Description
A Partnership for Safe Chemical Weapons Destruction
16
EDT Enclosure Building (EEB)
Layout is based
on the Vendor’s
Preliminary
Design and Equipment
Layout Drawings
A Partnership for Safe Chemical Weapons Destruction
17
Airlock
OTS
Gears
Switch
Monitoring
House
4000
IONEX
16000
DC
ChillerScrap
Conveyor
Lift
Feed
Conveyor
THO
Air Tank
Air
Compressors
Layout is based
on the Vendor’s
Preliminary
Design and Equipment
Layout Drawings
BT
EDT Enclosure Building (EEB) Layout
A Partnership for Safe Chemical Weapons Destruction
18
EDT Enclosure Building (EEB)
SDC
OTS
Monitoring
House
Airlock
IONEX
4000
Layout is based
on the Vendor’s
Preliminary
Design and Equipment
Layout Drawings
A Partnership for Safe Chemical Weapons Destruction
Agent
Area
Category
Color
Code
Purpose Areas Included Remarks
A Red Primary Containment of liquid and
vapor agent
Detonation Chamber (DC) and off-gas
piping to the Thermal Oxidizer (THO)
Most negative pressure
B Orange Secondary Containment of vapor
agent
Around the DC, off-gas piping to the
THO, and the THO itself
More negative pressure
C Yellow Tertiary Containment providing an
area under ventilated engineering
controls
Munition Handling and loading areas
within the building and around the
Secondary Containment areas
Slight negative pressure. Will
require both MHE and personnel
air lock(s) from the D area
D Green No containment. Provides weather
protection to EDT equipment and
crew
The outer building No negative pressure on this
structure
THO OTSDCLoading Area
Category D area
Category C area
Filter / Stack
4,000
Vestibule
No Scale is given to any component of this concept drawing
19
Category B area
EEB – Agent Containment Areas
Carbon Filter
16,000
Air is pulled from atmosphere pressure through process areas with progressing decreasing (negative) pressure as
an engineering control measure
A Partnership for Safe Chemical Weapons Destruction
 Function: The purpose of the CON is to serve as the Commend and
Control (C2), and the operational center for EDT Facility.
 The CON consist of a 16 by 20 foot structure.
 Process Equipment include:
– DC HMI stations 1 and 2
– OTS MHI stations 1 and 2
– Dynamic Pressure Sensing Station
– CCTV HMI station with multiple monitors
 The CON will be staffed by:
– Shift Plant Manager (SPM)
– Control Room Operators (CRO) (2 each)
– Operations Support Tech
– Automation Specialist (Day Shift only) 20
EDT CON – Facility Design Description
A Partnership for Safe Chemical Weapons Destruction
 EDT Enclosure Building (EEB)
– On a concrete pad
– Personnel Entry/Exit
– Emergency Exits
– Munition Delivery Airlock
– Scrap Handling Area
 SDC System
– Feed Conveyor
– Lift
– Loading Chamber 1
– Loading Chamber 2
– Detonation Chamber (DC)
– Scrap Conveyor
– Inspection Conveyor
– Belt Conveyor
– Scrap Bin
– Buffer Tank
– Dust Handling System
• Off-Gas Treatment System (OTS)
– Thermal Oxidizer
– Spray Dryer
– Bag House Filter
– Quench
– Acid & Neutral Scrubber
– ID Fans
• IONEX Carbon Filter Units (two)
– OTS Filter Unit
– Building Filter Unit
• Utilities
– Natural Gas
– Electrical
– Water
– Emergency Generator
– Air Compressor
– Hydraulics 21
EDT Equipment Components
A Partnership for Safe Chemical Weapons Destruction
Munitions Processing Steps
22
A Partnership for Safe Chemical Weapons Destruction
23
EDT Munitions Processing Steps
(Based on the Preliminary 30% Design)
BGCA CW
Storage Igloo
Wooden Pallets
Steel Banding
CW Munitions
are un-banded
CW placed in
Staging Area
EDT CW
Service
Magazine
CW placed in
Feed Tray
SDC
CW enters the
Detonation
Chamber
CW moved via
Conveyor /
Elevator
CW moved
through
Air-Locks
SDC
LC1 - 112
LC2 - 114
LFT
104
COV
101
Information Sources: Updated Vendor PFD and P&ID drawings received 18 February 2014.
Disclaimer: The above illustrated Process Steps are based on the general preliminary design information provided.
Equipment abbreviation code and ID number that
relates to those on the PFDs and Mass Balance
A Partnership for Safe Chemical Weapons Destruction
24
EDT Munitions Processing Steps
(Based on the Preliminary 30% Design)
Page 2 of 4
Dust
Metal - Oxide
Volatile / Semi-Volatile
Heavy Metals (Pb, Be, Cr)
Dosing
Station
Dry Salts &
Particulates
Ash
Large Particulates
Spray
Dryer
Bag
House
Filter
Sodium
Bicarbonate
Detonation
Chamber
Buffer
Tank /
Cyclone
Separator
Scrap Metal Recycled to DC
(for 5X treatment)
THO
310
BHF
330
SPD
320
BT
160
Process
Water Tank
Air
Nature Gas
Air
Water
IBC
Air
DC
120
PWT
424
ADS
470 (NaOH)
NAS
480
Bleed Water
Information Sources: Updated Vendor PFD and P&ID drawings received 18 February 2014.
Disclaimer: The above illustrated Process Steps are based on the general information provided.
Scrap Conveyor 2
5X
Scrap Metal
for Recycle
Air
Heater
Emergency Water
Water
Process
Vent
Filter
Dust
Thermal
Oxidizer
Air
PVF
171
PVC
170
Cyclone
A Partnership for Safe Chemical Weapons Destruction
25
EDT Munitions Processing Steps
(Based on the Preliminary 30% Design)
Information Sources: Updated Vendor PFD and P&ID drawings received 18 February 2014.
Disclaimer: The above illustrated Process Steps are based on the general preliminary design information provided.
Quench
Tower
Acid
Scrubber
Neutral
Scrubber
Water
Feed/Recycle loops
Heat
Exchanger
NaOH
AC
366
SEP
367
QUE
340
HX
362
NSC
360
ASC
350
Emergency Water
Tank
Separ
ator
Air
Cooler
EWT
322
BWT
430
Bleed
Water Tank
Condensate
Tank
COT
363
NaOH
Bleed Water
Emergency Water
Dust
Chlorine, Hydrogen chloride
SOx
SOx
Chlorine
Heavy Metals
Heater
AH
370
Air
A Partnership for Safe Chemical Weapons Destruction
26
EDT Munitions Processing Steps
(Based on the Preliminary 30% Design)
Information Sources: Updated Vendor PFD and P&ID drawings received 18 February 2014.
Disclaimer: The above illustrated Process Steps are based on the general preliminary design information provided.
ID Fan
1
ID Fan
2
Pre
Filter
HEPA
Filter
HEPA
Filter
Carbon
Filter
SIC
Carbon
Filter
Filter Bank
(five filter element)
Carbon Filter
Elements
STACK
Monitoring
House
ION
400
IDF1
370
IDF2
371
Exhaust Stack
Laboratory
Monitoring
House
Water Vapor
MiniCAMS
DAAMS
CEMS
CO
O2
ID Fan
Sample
Ports
A Partnership for Safe Chemical Weapons Destruction
Equipment Layout
27
A Partnership for Safe Chemical Weapons Destruction
28
Note: Our Scrap Conveyor
is turned 90 degrees from
the Cool Down Conveyor
Feed
Conveyor
Munitions
Lift
Dust
Collection
Scrap
Bin
Belt
Conveyor
Secondary
Containment
Buffer Tank
EDT Process Equipment Layout
A Partnership for Safe Chemical Weapons Destruction
29
Tilting Cradle
Fragment
Shield
Loading
Chamber 1
Gate 2
Secondary
Containment
Loading
Chamber 2
Gate 1
EDT Process Equipment
A Partnership for Safe Chemical Weapons Destruction
30
Fragment
Liner
Destruction
Chamber
Heating
Elements
DC Empting
Arrangement
Locking RingInsulation
EDT Process Equipment
A Partnership for Safe Chemical Weapons Destruction
31
1
4
3
2
EDT Feeding Cycle
A Partnership for Safe Chemical Weapons Destruction
Air
Heater
32
DC Empting Cycle / Scrap Removal &
Cooling
A Partnership for Safe Chemical Weapons Destruction
33THO QUE ASC
NSC
BHFSPD HXIDF1
IDF2
 Upgraded / Larger THO & OTS
– Limiting Throughput (Pacing Station) for the Anniston unit
 The THO is 98% larger:
– Anniston unit is: 162 ft3
– BGCAPP unit will be: 321 ft3
 The OTS is 75% larger
 Closed Loop Process Water System
OTS - Key Design Elements
A Partnership for Safe Chemical Weapons Destruction
Reverse angle
Spray Dryer Dosing Station
Spray Dryer Waste Drum
Quench Venturi
Bag House Waste Drum
Emergency
Water Tank
Bag House Filter
Spray Dryer
Thermal
Oxidizer
Scrubbers
34
OTS Process Equipment Layout
A Partnership for Safe Chemical Weapons Destruction
35 15B
1S
3 4
2
5 6
15A
98
7 12 13
10
14
11
C/N Host
SP
SP
P
1
P
2
1 EONC Unload
2 Service Magazine
3 Carbon Midbed
4 Fixed Perimeter
5 Perimeter Trailer
6 Perimeter Trailer
7 Air Lock
8 Loading Area
9 Buffer Tank
Enclosure
10 D/C Enclosure
11 Scrap Exit Area
12 HVAC Midbed
13 HVAC Stack
14 OGT Carbon
Midbed
15 OGT Stack A/B
EDT Personnel Safety Monitoring
Locations
A Partnership for Safe Chemical Weapons Destruction
Other Materials
36
A Partnership for Safe Chemical Weapons Destruction
37
• Processing Rates - without Overpack
– M110 155mm H Projectiles
– At Peak and Normal Processing Rates:
• Peak Rate estimated: 6.1 projectiles per hour
• Peak Rate actual: To be determined during the
Factory Acceptance Test (FAT)
• Normal Rate estimated: 4.8 projectiles per hour (81%
availability)
Processing Rates
A Partnership for Safe Chemical Weapons Destruction
Activity Date
EDT CW Operations Jan – Oct 2017
Ramp-Up Period
Full Rate Period
Regulatory Testing
Over-Pack Processing
EDT Closure and Turn-Over Nov 2017 – May 2018
Decontamination
Restoration
De-staffing
System / Facility Turn Over
Main Plant CW Operations (forecasted Start date) Jan 2018
38
EDT Schedule and Key Milestones
A Partnership for Safe Chemical Weapons Destruction
39
• Day Crew arrive at O2SF – Change Out / Draw Mask / Transport to the EDT Complex
• Crew Turn-Over / POD Briefing
• Daily RCRA inspections (AM)
• Verify FPIs and LCOs are completion and approval
• Routine Activities:
Open, complete, and print Feed Sheets
Establish TCEAs – as required (EONC delivery / Munition transfer / EEB processing)
Conduct munitions transfer from the ESM to the EEB Loading Area (twice per shift)
Load Munitions in Feed Trays (twice per shift)
Begin CW Processing - Feed Trays to the SDC
Scrap inspection and removal – as required
Dump Scrap Bin – as required
Daily Operational Report
• Night Crew arrive at O2SF / – Change Out / Draw Mask / Transport to the EDT Complex
• Crew Turn-Over
• Repeat the above Routine Activities
• Munitions Accountability paperwork
• Midnight – Perform a Daily Munition Inventory – develop the COD packet for the prior 24 hrs
• Equipment PM Checks are performed
• Lab Perform equipment challenges (AM)
• Resume CW Processing
Typical EDT Operational Day
A Partnership for Safe Chemical Weapons Destruction
Location: Anniston BGCAPP
Description SDC 1200 CM (Chemical Mobile) SDC 1200 C (Chemical)
Transportable unit Fix Facility unit
CW Net Explosive Wt. (NEW) 2.2 lb HE / 6.61 Propellant TBD (min, 2.2 lb HE / 6.61 Propellant)
Fragment Shield: Tube Shaped (sides only) Bowl Shaped (sides with a bottom)
DC Heater: 3 on the bottom of the DC 3 on the bottom plus additional on sides
Cooling Fan for Locking Ring: None Yes (added to minimize binding at high temps.)
LC1 and LC2 Vents to THO: No Yes
(to minimize/prevent agent migration to the Process Ventilation)
Bypass valve around off-gas No Yes
orifice: (to minimize press in the chamber to minimize agent migration to LC2)
Off-Gas Treatment System (OTS): Has a SDC 1200 sized OTS Has a larger SDC 2000 OTS (75% larger)
Thermal Oxidizer (THO): 162 ft3 321 ft3 (98% larger)
Bleed Water Tank: No Yes (added to support 24/7 operations)
Chiller to remove Condensate: No (collection pump to recycle H2O) Yes (added after the Neutral Scrubber)
Re-Heater after Chiller: None initially – installed later Included
Carbon Filter System: IONEX CD2000 IONEX CD4000
Building Type: Sprung Structure Steel Building
Building HVAC: No - Portable AC unit added Yes
Cascading Ventilation System: Vapor containment only Yes (with Category A, B, C, and D areas)
Number of Mustard Projectiles: 2,737 CW munitions processed Approx. 16,000 munitions to be processed
Agent Types: HD and HT Mustard H Mustard (with solids and heels)
DOT Bottles: None processed Two (2) are planned
40
EDT Unit Differences
(Anniston vs. BGCAPP)
A Partnership for Safe Chemical Weapons Destruction
Questions/Discussion
41

More Related Content

Similar to Explosive Destruction Technology 30 Percent Design Update May 6, 2014

lecture 0.pdf
lecture 0.pdflecture 0.pdf
lecture 0.pdf
MagarsaBedasa1
 
Graded Unit Project Fuel Purification Final Report Online Submission (1)
Graded Unit Project Fuel Purification Final Report Online Submission (1)Graded Unit Project Fuel Purification Final Report Online Submission (1)
Graded Unit Project Fuel Purification Final Report Online Submission (1)
Steven Brady
 
D04551922
D04551922D04551922
D04551922
IOSR-JEN
 
Design HVAC System for Hospital
Design HVAC System for Hospital Design HVAC System for Hospital
Design HVAC System for Hospital
Mohammed Abdulhabeb Ahmed
 
PPT-on-false-air.ppt
PPT-on-false-air.pptPPT-on-false-air.ppt
PPT-on-false-air.ppt
vikramparuthi1
 
Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)
Ashutosh Sachan
 
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
NazrulIslam657555
 
Process design for chemical engineers
Process design for chemical engineersProcess design for chemical engineers
Process design for chemical engineers
Amanda Ribeiro
 
CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11
Emerson Exchange
 
Acetic Acid Process Plant Design
Acetic Acid Process Plant DesignAcetic Acid Process Plant Design
Acetic Acid Process Plant Design
Sinthujan Pushpakaran
 
Oms
OmsOms
Pinnacle sunway services
Pinnacle sunway services Pinnacle sunway services
Pinnacle sunway services
Celine Tan
 
Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...
Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...
Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...
guest083950
 
CO2 EOR Pilot Project
CO2 EOR Pilot ProjectCO2 EOR Pilot Project
CO2 EOR Pilot Project
Ahmed Nour
 
Steam Blow out
Steam Blow outSteam Blow out
FIRE ENGINEERING - Brief introduction (ATNS)
FIRE ENGINEERING - Brief introduction (ATNS)FIRE ENGINEERING - Brief introduction (ATNS)
FIRE ENGINEERING - Brief introduction (ATNS)
Laura Steyn
 
Unit-III Safety in process.pptx
Unit-III Safety in process.pptxUnit-III Safety in process.pptx
Unit-III Safety in process.pptx
TYPPEOnlineLecture
 
Refinery meet
Refinery meet Refinery meet
Refinery meet
rajeshvari
 
Thomas & Betts Kopex - Understanding Hazardous Areas & Specifying Flexible Co...
Thomas & Betts Kopex - Understanding Hazardous Areas & Specifying Flexible Co...Thomas & Betts Kopex - Understanding Hazardous Areas & Specifying Flexible Co...
Thomas & Betts Kopex - Understanding Hazardous Areas & Specifying Flexible Co...
Thorne & Derrick International
 
Thomas & Betts - Hazardous Area Electrical Equipment & Cable Accessories
Thomas & Betts - Hazardous Area Electrical Equipment & Cable AccessoriesThomas & Betts - Hazardous Area Electrical Equipment & Cable Accessories
Thomas & Betts - Hazardous Area Electrical Equipment & Cable Accessories
Thorne & Derrick International
 

Similar to Explosive Destruction Technology 30 Percent Design Update May 6, 2014 (20)

lecture 0.pdf
lecture 0.pdflecture 0.pdf
lecture 0.pdf
 
Graded Unit Project Fuel Purification Final Report Online Submission (1)
Graded Unit Project Fuel Purification Final Report Online Submission (1)Graded Unit Project Fuel Purification Final Report Online Submission (1)
Graded Unit Project Fuel Purification Final Report Online Submission (1)
 
D04551922
D04551922D04551922
D04551922
 
Design HVAC System for Hospital
Design HVAC System for Hospital Design HVAC System for Hospital
Design HVAC System for Hospital
 
PPT-on-false-air.ppt
PPT-on-false-air.pptPPT-on-false-air.ppt
PPT-on-false-air.ppt
 
Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)Standard boiler 500 mwerection manual (boiler auxiliaries)
Standard boiler 500 mwerection manual (boiler auxiliaries)
 
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
 
Process design for chemical engineers
Process design for chemical engineersProcess design for chemical engineers
Process design for chemical engineers
 
CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11
 
Acetic Acid Process Plant Design
Acetic Acid Process Plant DesignAcetic Acid Process Plant Design
Acetic Acid Process Plant Design
 
Oms
OmsOms
Oms
 
Pinnacle sunway services
Pinnacle sunway services Pinnacle sunway services
Pinnacle sunway services
 
Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...
Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...
Practical Implementation Of Renewable Hydrogen & Fuel Cell Installations in t...
 
CO2 EOR Pilot Project
CO2 EOR Pilot ProjectCO2 EOR Pilot Project
CO2 EOR Pilot Project
 
Steam Blow out
Steam Blow outSteam Blow out
Steam Blow out
 
FIRE ENGINEERING - Brief introduction (ATNS)
FIRE ENGINEERING - Brief introduction (ATNS)FIRE ENGINEERING - Brief introduction (ATNS)
FIRE ENGINEERING - Brief introduction (ATNS)
 
Unit-III Safety in process.pptx
Unit-III Safety in process.pptxUnit-III Safety in process.pptx
Unit-III Safety in process.pptx
 
Refinery meet
Refinery meet Refinery meet
Refinery meet
 
Thomas & Betts Kopex - Understanding Hazardous Areas & Specifying Flexible Co...
Thomas & Betts Kopex - Understanding Hazardous Areas & Specifying Flexible Co...Thomas & Betts Kopex - Understanding Hazardous Areas & Specifying Flexible Co...
Thomas & Betts Kopex - Understanding Hazardous Areas & Specifying Flexible Co...
 
Thomas & Betts - Hazardous Area Electrical Equipment & Cable Accessories
Thomas & Betts - Hazardous Area Electrical Equipment & Cable AccessoriesThomas & Betts - Hazardous Area Electrical Equipment & Cable Accessories
Thomas & Betts - Hazardous Area Electrical Equipment & Cable Accessories
 

More from Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)

CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013CAC/CDCAB Vent Recommendation 5 March 2013
Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014Secondary Waste Working Group 12 March 2014
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
 
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
 
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
 
June '13 cdcab
June '13 cdcabJune '13 cdcab
M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013M55 Rocket Separation Operation 11 Dec 2013
2015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 20142015 ACWA Funding 11 June 2014
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
 
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
 
Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
 
BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012BGCAPP Year in Review Dec. 11, 2012
Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
 
Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012Chemical Weapons Convention Update 13 June 2012
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons ConventionOPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
 
CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012CDCAB Working Group Updates 11 December 2012
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)
 

More from Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA) (20)

CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013
 
Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
 
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
 
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
 
June '13 cdcab
June '13 cdcabJune '13 cdcab
June '13 cdcab
 
M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013
 
2015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 20142015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 2014
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
 
Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014
 
BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013
 
BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012
 
Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013
 
Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012
 
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons ConventionOPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
 
CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012
 
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
 

Recently uploaded

一比一原版(utas学位证书)澳洲塔斯马尼亚大学毕业证成绩单一模一样
一比一原版(utas学位证书)澳洲塔斯马尼亚大学毕业证成绩单一模一样一比一原版(utas学位证书)澳洲塔斯马尼亚大学毕业证成绩单一模一样
一比一原版(utas学位证书)澳洲塔斯马尼亚大学毕业证成绩单一模一样
taqyea
 
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
Scribe
 
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdfLecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
tshree896
 
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdfGUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
ProexportColombia1
 
The cost of poor health: What does rising health-related benefit spending mea...
The cost of poor health: What does rising health-related benefit spending mea...The cost of poor health: What does rising health-related benefit spending mea...
The cost of poor health: What does rising health-related benefit spending mea...
ResolutionFoundation
 
History Of Balochistan amazing .pptx / HOB
History Of Balochistan amazing .pptx      / HOBHistory Of Balochistan amazing .pptx      / HOB
History Of Balochistan amazing .pptx / HOB
uzma baloch
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
teeaszt
 
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdfGUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
ProexportColombia1
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
Energy for One World
 
Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034
Congressional Budget Office
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
dj1cx4ex
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
Energy for One World
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
Cheong Man Keong
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
JuanFelipeHerrera4
 
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
afsebu
 
SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...
SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...
SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...
JSchaus & Associates
 
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
vfefek
 
Draft CP-Baggao on Landslide final copyocx
Draft CP-Baggao on Landslide final copyocxDraft CP-Baggao on Landslide final copyocx
Draft CP-Baggao on Landslide final copyocx
DivineLapada
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
Congressional Budget Office
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
Congressional Budget Office
 

Recently uploaded (20)

一比一原版(utas学位证书)澳洲塔斯马尼亚大学毕业证成绩单一模一样
一比一原版(utas学位证书)澳洲塔斯马尼亚大学毕业证成绩单一模一样一比一原版(utas学位证书)澳洲塔斯马尼亚大学毕业证成绩单一模一样
一比一原版(utas学位证书)澳洲塔斯马尼亚大学毕业证成绩单一模一样
 
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
The Power of Community Newsletters: A Case Study from Wolverton and Greenleys...
 
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdfLecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
Lecture 7 Module VII Agriculture Insurance - Support Services (2).pdf
 
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdfGUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
 
The cost of poor health: What does rising health-related benefit spending mea...
The cost of poor health: What does rising health-related benefit spending mea...The cost of poor health: What does rising health-related benefit spending mea...
The cost of poor health: What does rising health-related benefit spending mea...
 
History Of Balochistan amazing .pptx / HOB
History Of Balochistan amazing .pptx      / HOBHistory Of Balochistan amazing .pptx      / HOB
History Of Balochistan amazing .pptx / HOB
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
一比一原版(Adelaide毕业证)阿德莱德大学毕业证如何办理
 
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdfGUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
 
G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024G7 Apulia Leaders Communique, 14th June 2024
G7 Apulia Leaders Communique, 14th June 2024
 
Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034
 
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
在线办理(西班牙UPV毕业证书)瓦伦西亚理工大学毕业证毕业完成信一模一样
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
 
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRISTTRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
TRUE BOOK OF LIFE 1.15 OF TRUE JESUS CHRIST
 
ColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomicsColombiaPresentation.pptx macroeconomics
ColombiaPresentation.pptx macroeconomics
 
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
一比一原版英国阿伯丁大学毕业证(AU毕业证书)学历如何办理
 
SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...
SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...
SPONSORED CONTENT - Palmetier Law - Unleashing Small Business Innovations: A ...
 
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
 
Draft CP-Baggao on Landslide final copyocx
Draft CP-Baggao on Landslide final copyocxDraft CP-Baggao on Landslide final copyocx
Draft CP-Baggao on Landslide final copyocx
 
CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
 
Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021Spending in the 340B Drug Pricing Program, 2010 to 2021
Spending in the 340B Drug Pricing Program, 2010 to 2021
 

Explosive Destruction Technology 30 Percent Design Update May 6, 2014

  • 1. Explosive Destruction Technology 30 Percent Design Update May 6, 2014 Presented to: Chemical Destruction Community Advisory Board’s Explosive Destruction Technology Working Group Presented by: Jeff Brubaker, ACWA Site Manager John McArthur, Systems Contractor Environmental Manager
  • 2. A Partnership for Safe Chemical Weapons Destruction Bechtel Parsons Joint Venture team
  • 3. A Partnership for Safe Chemical Weapons Destruction 3 Agenda  EDT Facility Layout  Munitions Processing Steps  Equipment Layout  Other Materials  Questions/Discussion
  • 4. A Partnership for Safe Chemical Weapons Destruction EDT Facility Layout 4
  • 5. A Partnership for Safe Chemical Weapons Destruction O2SF Outside Operations Support Facility ESB EDT Support Building MH Monitoring House ESM EDT Service Magazine EEB EDT Enclosure Building CON Control Room TOF Treaty Office Facility 5 EDT and OPS Facilities
  • 6. A Partnership for Safe Chemical Weapons Destruction 6 ESM ESB EEB MH O2 SF O2SF BGCAPP Site Plan / EDT Site Location
  • 7. A Partnership for Safe Chemical Weapons Destruction 7 TOF BGCAPP Site Plan / EDT Site Facility ESM ESBEEB MH
  • 8. A Partnership for Safe Chemical Weapons Destruction  Function: The purpose of the O2SF will be a primary location for support functions related to the start and end of daily and shift activities and routine facility support  O2SF will consist of the following areas to support the Project:  7 offices and 12 cubicles  A Mask Issue, fit and test area  First Aid Area (with a blood draw area and a small Laboratory for Medical personnel)  Hazmat/decon Storage Area  Toxicological Area Protective (TAP) gear storage  Lunch Room  Restrooms and Showers  Locker Areas (with approximately 150 lockers)  A Cotton Goods Issue Room  An IT Help Desk and a small Communication Equipment Room 8 O2SF – Facility Design Description
  • 9. A Partnership for Safe Chemical Weapons Destruction  Function: The purpose of the ESB is the primary support functions directly related to the operation of the EDT to support the disposal of the Mustard agent inventory at Blue Grass Army Depot (BGAD)  The ESB houses and supports the EDT operational crews and the direct support crew functions  ESB will have 6 offices, 10 cubicles, a Conference Room, a TAP Gear / Tool / Parts Storage Area, a Lunch Room / Crew briefing/training area, Restrooms, an Electrical Room, a Communications Room, and a small Custodial Utility Room  The offices are for general purpose and direct support services use, and planned to accommodate Plant Management, Engineering, Automation and personnel that directly support the EDT operations  It will support approximately 20 people on Day Shift and approximately 90 people on rotating shift that are part of the operational crews that work within the EDT Complex ESB – Facility Design Description
  • 10. A Partnership for Safe Chemical Weapons Destruction  A Conference Room will provide space for crew training, turn- overs, and meetings  The Lunch Room/Crew Room contains approximately 40 lockers. This area will have a seating area for approximately 27 personnel. This area also serves as a meeting area to be used for shift turn-over, crew training, meetings and presentations. It will also contain several computer workstations for general crew use (e.g. timekeeping, complete computer based training, complete Read and Sign requirement, etc.)  The building’s HVAC system can be shut down to utilize the ESB as a shelter-in-place facility  The ESB will not house any Chemical Weapons Convention (CWC) Treaty personnel  Adjacent to the ESB is the EDT Control Room (CON) ESB – Facility Design Description
  • 11. A Partnership for Safe Chemical Weapons Destruction  Function: The purpose of the EDT Process Monitoring House (MH) is a centralized area which contains the air monitoring equipment and some process monitoring equipment to support operator safety and verify environmental compliance during 24/7 processing operations of the EDT Facility.  The MH consist of a 16 by 36 foot raised structure, MiniCAMS, DAAMS, CEMS, and other air monitoring equipment. 11 MH – Facility Design Description
  • 12. A Partnership for Safe Chemical Weapons Destruction  Function: The purpose of the ESM will be to hold a reserve of Mustard munitions to support 24/7 processing operations of the EDT Facility  The ESB consist of a 30 by 30 foot Non-Standard Storage Structure (NSS) with an HVAC unit, a Monitoring Shack, a Bottle Storage Area with overhead cover, and a 1,000 CFM Filter Unit mounted on a trailer.  ESM Capability: – Maximum explosive capability = 500 pound Net Explosive Weight (NEW) (1,206 projectiles) – Site Plan Safety Submittal (SPSS) Limit = 1,128 projectiles  Pallet stacking within the ESM is limited to two high  The floor is designed with secondary containment and water stops  The Monitoring Shack contains MiniCAMS and DAAMS to support air monitoring of the ESM, EONCs, and the 1,000 CFM Filter Unit 12 ESM – Facility Design Description
  • 13. A Partnership for Safe Chemical Weapons Destruction 13 EONC Transport of Chemical Weapons
  • 14. A Partnership for Safe Chemical Weapons Destruction  Function: The purpose of the EEB is to house the SDC and OTS process equipment  The EEB consist of a 77 by 120 foot building (approx.)  The building has an A, B, C, D Agent Areas with a Cascading Ventilation System and a Munitions Delivery Airlock  The SDC consist of a: – Loading Conveyor and Elevator Lift – Loading Chamber #1 and #2 – The Detonation Chamber (DC) – A Buffer Tank – A Scrap Chute, Scrap Cooling Conveyor, Belt Conveyor, and a Scrap Bin 14 EEB – Facility Design Description
  • 15. A Partnership for Safe Chemical Weapons Destruction  The Off-Gas Treatment System (OTS) consist of a: – Thermal Oxidizer – Spray Dryer – Bag House Filter – Quench – Acid & Neutral Scrubber – ID Fans – Heat Exchanger and Cooler – A Re-Heater  The building has a 16,000 CFM IONEX Carbon Filter Unit  And the OTS has a 4,000 CFM IONEX Carbon Filter Unit 15 EEB – Facility Design Description
  • 16. A Partnership for Safe Chemical Weapons Destruction 16 EDT Enclosure Building (EEB) Layout is based on the Vendor’s Preliminary Design and Equipment Layout Drawings
  • 17. A Partnership for Safe Chemical Weapons Destruction 17 Airlock OTS Gears Switch Monitoring House 4000 IONEX 16000 DC ChillerScrap Conveyor Lift Feed Conveyor THO Air Tank Air Compressors Layout is based on the Vendor’s Preliminary Design and Equipment Layout Drawings BT EDT Enclosure Building (EEB) Layout
  • 18. A Partnership for Safe Chemical Weapons Destruction 18 EDT Enclosure Building (EEB) SDC OTS Monitoring House Airlock IONEX 4000 Layout is based on the Vendor’s Preliminary Design and Equipment Layout Drawings
  • 19. A Partnership for Safe Chemical Weapons Destruction Agent Area Category Color Code Purpose Areas Included Remarks A Red Primary Containment of liquid and vapor agent Detonation Chamber (DC) and off-gas piping to the Thermal Oxidizer (THO) Most negative pressure B Orange Secondary Containment of vapor agent Around the DC, off-gas piping to the THO, and the THO itself More negative pressure C Yellow Tertiary Containment providing an area under ventilated engineering controls Munition Handling and loading areas within the building and around the Secondary Containment areas Slight negative pressure. Will require both MHE and personnel air lock(s) from the D area D Green No containment. Provides weather protection to EDT equipment and crew The outer building No negative pressure on this structure THO OTSDCLoading Area Category D area Category C area Filter / Stack 4,000 Vestibule No Scale is given to any component of this concept drawing 19 Category B area EEB – Agent Containment Areas Carbon Filter 16,000 Air is pulled from atmosphere pressure through process areas with progressing decreasing (negative) pressure as an engineering control measure
  • 20. A Partnership for Safe Chemical Weapons Destruction  Function: The purpose of the CON is to serve as the Commend and Control (C2), and the operational center for EDT Facility.  The CON consist of a 16 by 20 foot structure.  Process Equipment include: – DC HMI stations 1 and 2 – OTS MHI stations 1 and 2 – Dynamic Pressure Sensing Station – CCTV HMI station with multiple monitors  The CON will be staffed by: – Shift Plant Manager (SPM) – Control Room Operators (CRO) (2 each) – Operations Support Tech – Automation Specialist (Day Shift only) 20 EDT CON – Facility Design Description
  • 21. A Partnership for Safe Chemical Weapons Destruction  EDT Enclosure Building (EEB) – On a concrete pad – Personnel Entry/Exit – Emergency Exits – Munition Delivery Airlock – Scrap Handling Area  SDC System – Feed Conveyor – Lift – Loading Chamber 1 – Loading Chamber 2 – Detonation Chamber (DC) – Scrap Conveyor – Inspection Conveyor – Belt Conveyor – Scrap Bin – Buffer Tank – Dust Handling System • Off-Gas Treatment System (OTS) – Thermal Oxidizer – Spray Dryer – Bag House Filter – Quench – Acid & Neutral Scrubber – ID Fans • IONEX Carbon Filter Units (two) – OTS Filter Unit – Building Filter Unit • Utilities – Natural Gas – Electrical – Water – Emergency Generator – Air Compressor – Hydraulics 21 EDT Equipment Components
  • 22. A Partnership for Safe Chemical Weapons Destruction Munitions Processing Steps 22
  • 23. A Partnership for Safe Chemical Weapons Destruction 23 EDT Munitions Processing Steps (Based on the Preliminary 30% Design) BGCA CW Storage Igloo Wooden Pallets Steel Banding CW Munitions are un-banded CW placed in Staging Area EDT CW Service Magazine CW placed in Feed Tray SDC CW enters the Detonation Chamber CW moved via Conveyor / Elevator CW moved through Air-Locks SDC LC1 - 112 LC2 - 114 LFT 104 COV 101 Information Sources: Updated Vendor PFD and P&ID drawings received 18 February 2014. Disclaimer: The above illustrated Process Steps are based on the general preliminary design information provided. Equipment abbreviation code and ID number that relates to those on the PFDs and Mass Balance
  • 24. A Partnership for Safe Chemical Weapons Destruction 24 EDT Munitions Processing Steps (Based on the Preliminary 30% Design) Page 2 of 4 Dust Metal - Oxide Volatile / Semi-Volatile Heavy Metals (Pb, Be, Cr) Dosing Station Dry Salts & Particulates Ash Large Particulates Spray Dryer Bag House Filter Sodium Bicarbonate Detonation Chamber Buffer Tank / Cyclone Separator Scrap Metal Recycled to DC (for 5X treatment) THO 310 BHF 330 SPD 320 BT 160 Process Water Tank Air Nature Gas Air Water IBC Air DC 120 PWT 424 ADS 470 (NaOH) NAS 480 Bleed Water Information Sources: Updated Vendor PFD and P&ID drawings received 18 February 2014. Disclaimer: The above illustrated Process Steps are based on the general information provided. Scrap Conveyor 2 5X Scrap Metal for Recycle Air Heater Emergency Water Water Process Vent Filter Dust Thermal Oxidizer Air PVF 171 PVC 170 Cyclone
  • 25. A Partnership for Safe Chemical Weapons Destruction 25 EDT Munitions Processing Steps (Based on the Preliminary 30% Design) Information Sources: Updated Vendor PFD and P&ID drawings received 18 February 2014. Disclaimer: The above illustrated Process Steps are based on the general preliminary design information provided. Quench Tower Acid Scrubber Neutral Scrubber Water Feed/Recycle loops Heat Exchanger NaOH AC 366 SEP 367 QUE 340 HX 362 NSC 360 ASC 350 Emergency Water Tank Separ ator Air Cooler EWT 322 BWT 430 Bleed Water Tank Condensate Tank COT 363 NaOH Bleed Water Emergency Water Dust Chlorine, Hydrogen chloride SOx SOx Chlorine Heavy Metals Heater AH 370 Air
  • 26. A Partnership for Safe Chemical Weapons Destruction 26 EDT Munitions Processing Steps (Based on the Preliminary 30% Design) Information Sources: Updated Vendor PFD and P&ID drawings received 18 February 2014. Disclaimer: The above illustrated Process Steps are based on the general preliminary design information provided. ID Fan 1 ID Fan 2 Pre Filter HEPA Filter HEPA Filter Carbon Filter SIC Carbon Filter Filter Bank (five filter element) Carbon Filter Elements STACK Monitoring House ION 400 IDF1 370 IDF2 371 Exhaust Stack Laboratory Monitoring House Water Vapor MiniCAMS DAAMS CEMS CO O2 ID Fan Sample Ports
  • 27. A Partnership for Safe Chemical Weapons Destruction Equipment Layout 27
  • 28. A Partnership for Safe Chemical Weapons Destruction 28 Note: Our Scrap Conveyor is turned 90 degrees from the Cool Down Conveyor Feed Conveyor Munitions Lift Dust Collection Scrap Bin Belt Conveyor Secondary Containment Buffer Tank EDT Process Equipment Layout
  • 29. A Partnership for Safe Chemical Weapons Destruction 29 Tilting Cradle Fragment Shield Loading Chamber 1 Gate 2 Secondary Containment Loading Chamber 2 Gate 1 EDT Process Equipment
  • 30. A Partnership for Safe Chemical Weapons Destruction 30 Fragment Liner Destruction Chamber Heating Elements DC Empting Arrangement Locking RingInsulation EDT Process Equipment
  • 31. A Partnership for Safe Chemical Weapons Destruction 31 1 4 3 2 EDT Feeding Cycle
  • 32. A Partnership for Safe Chemical Weapons Destruction Air Heater 32 DC Empting Cycle / Scrap Removal & Cooling
  • 33. A Partnership for Safe Chemical Weapons Destruction 33THO QUE ASC NSC BHFSPD HXIDF1 IDF2  Upgraded / Larger THO & OTS – Limiting Throughput (Pacing Station) for the Anniston unit  The THO is 98% larger: – Anniston unit is: 162 ft3 – BGCAPP unit will be: 321 ft3  The OTS is 75% larger  Closed Loop Process Water System OTS - Key Design Elements
  • 34. A Partnership for Safe Chemical Weapons Destruction Reverse angle Spray Dryer Dosing Station Spray Dryer Waste Drum Quench Venturi Bag House Waste Drum Emergency Water Tank Bag House Filter Spray Dryer Thermal Oxidizer Scrubbers 34 OTS Process Equipment Layout
  • 35. A Partnership for Safe Chemical Weapons Destruction 35 15B 1S 3 4 2 5 6 15A 98 7 12 13 10 14 11 C/N Host SP SP P 1 P 2 1 EONC Unload 2 Service Magazine 3 Carbon Midbed 4 Fixed Perimeter 5 Perimeter Trailer 6 Perimeter Trailer 7 Air Lock 8 Loading Area 9 Buffer Tank Enclosure 10 D/C Enclosure 11 Scrap Exit Area 12 HVAC Midbed 13 HVAC Stack 14 OGT Carbon Midbed 15 OGT Stack A/B EDT Personnel Safety Monitoring Locations
  • 36. A Partnership for Safe Chemical Weapons Destruction Other Materials 36
  • 37. A Partnership for Safe Chemical Weapons Destruction 37 • Processing Rates - without Overpack – M110 155mm H Projectiles – At Peak and Normal Processing Rates: • Peak Rate estimated: 6.1 projectiles per hour • Peak Rate actual: To be determined during the Factory Acceptance Test (FAT) • Normal Rate estimated: 4.8 projectiles per hour (81% availability) Processing Rates
  • 38. A Partnership for Safe Chemical Weapons Destruction Activity Date EDT CW Operations Jan – Oct 2017 Ramp-Up Period Full Rate Period Regulatory Testing Over-Pack Processing EDT Closure and Turn-Over Nov 2017 – May 2018 Decontamination Restoration De-staffing System / Facility Turn Over Main Plant CW Operations (forecasted Start date) Jan 2018 38 EDT Schedule and Key Milestones
  • 39. A Partnership for Safe Chemical Weapons Destruction 39 • Day Crew arrive at O2SF – Change Out / Draw Mask / Transport to the EDT Complex • Crew Turn-Over / POD Briefing • Daily RCRA inspections (AM) • Verify FPIs and LCOs are completion and approval • Routine Activities: Open, complete, and print Feed Sheets Establish TCEAs – as required (EONC delivery / Munition transfer / EEB processing) Conduct munitions transfer from the ESM to the EEB Loading Area (twice per shift) Load Munitions in Feed Trays (twice per shift) Begin CW Processing - Feed Trays to the SDC Scrap inspection and removal – as required Dump Scrap Bin – as required Daily Operational Report • Night Crew arrive at O2SF / – Change Out / Draw Mask / Transport to the EDT Complex • Crew Turn-Over • Repeat the above Routine Activities • Munitions Accountability paperwork • Midnight – Perform a Daily Munition Inventory – develop the COD packet for the prior 24 hrs • Equipment PM Checks are performed • Lab Perform equipment challenges (AM) • Resume CW Processing Typical EDT Operational Day
  • 40. A Partnership for Safe Chemical Weapons Destruction Location: Anniston BGCAPP Description SDC 1200 CM (Chemical Mobile) SDC 1200 C (Chemical) Transportable unit Fix Facility unit CW Net Explosive Wt. (NEW) 2.2 lb HE / 6.61 Propellant TBD (min, 2.2 lb HE / 6.61 Propellant) Fragment Shield: Tube Shaped (sides only) Bowl Shaped (sides with a bottom) DC Heater: 3 on the bottom of the DC 3 on the bottom plus additional on sides Cooling Fan for Locking Ring: None Yes (added to minimize binding at high temps.) LC1 and LC2 Vents to THO: No Yes (to minimize/prevent agent migration to the Process Ventilation) Bypass valve around off-gas No Yes orifice: (to minimize press in the chamber to minimize agent migration to LC2) Off-Gas Treatment System (OTS): Has a SDC 1200 sized OTS Has a larger SDC 2000 OTS (75% larger) Thermal Oxidizer (THO): 162 ft3 321 ft3 (98% larger) Bleed Water Tank: No Yes (added to support 24/7 operations) Chiller to remove Condensate: No (collection pump to recycle H2O) Yes (added after the Neutral Scrubber) Re-Heater after Chiller: None initially – installed later Included Carbon Filter System: IONEX CD2000 IONEX CD4000 Building Type: Sprung Structure Steel Building Building HVAC: No - Portable AC unit added Yes Cascading Ventilation System: Vapor containment only Yes (with Category A, B, C, and D areas) Number of Mustard Projectiles: 2,737 CW munitions processed Approx. 16,000 munitions to be processed Agent Types: HD and HT Mustard H Mustard (with solids and heels) DOT Bottles: None processed Two (2) are planned 40 EDT Unit Differences (Anniston vs. BGCAPP)
  • 41. A Partnership for Safe Chemical Weapons Destruction Questions/Discussion 41