Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker Doug Omichinski
Site Project Manager Project Manager
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker Doug Omichinski
Site Project Manager Project Manager
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker
Site Project Manager
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker
Site Project Manager
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker
Site Project Manager
Presented to:
The Chemical Demilitarization Citizens’ Advisory Commission
Presented by:
Mr. Steven Bird
PCAPP EDS Project Leader
Chemical Materials Activity
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker Doug Omichinski
Site Project Manager Project Manager
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker
Site Project Manager
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker
Site Project Manager
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker
Site Project Manager
Presented to:
The Chemical Demilitarization Citizens’ Advisory Commission
Presented by:
Mr. Steven Bird
PCAPP EDS Project Leader
Chemical Materials Activity
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker Doug Omichinski
Site Project Manager Project Manager
Presented to:
Kentucky Chemical Weapons Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board
Presented by:
Tom McKinney
Project Manager, Bechtel Parsons Blue Grass
Presented to:
Kentucky Chemical Weapons Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board
Presented by:
Tom McKinney
Project Manager, Bechtel Parsons Blue Grass
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Kentucky Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker
Site Project Manager
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission/ Chemical Destruction Community Advisory Board Meeting
Presented by:
Jeff Brubaker Tom McKinney
Site Project Manager Project Manager
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission/ Chemical Destruction Community Advisory Board Meeting
Presented by:
Jeff Brubaker
Site Project Manager
Presented to:
Kentucky Chemical Weapons Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board
Presented by:
Tom McKinney
Project Manager, Bechtel Parsons Blue Grass
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Kentucky Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker
Site Project Manager
The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Ky.
The technology selected by the Department of Defense to destroy the Blue Grass chemical weapons stockpile is neutralization followed by supercritical water oxidation (SCWO).
The Assembled Chemical Weapons Alternatives (ACWA) Program, headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.
The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc., and Parsons Infrastructure and Technology Group, along with teaming partners URS Corporation, Battelle Memorial Institute, General Atomics and General Physics, is the systems contractor selected to design, build, systemize, pilot test, operate and close BGCAPP.
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Kentucky Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker
Site Project Manager
The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Ky.
The technology selected by the Department of Defense to destroy the Blue Grass chemical weapons stockpile is neutralization followed by supercritical water oxidation (SCWO).
The Assembled Chemical Weapons Alternatives (ACWA) Program, headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.
The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc., and Parsons Infrastructure and Technology Group, along with teaming partners URS Corporation, Battelle Memorial Institute, General Atomics and General Physics, is the systems contractor selected to design, build, systemize, pilot test, operate and close BGCAPP.
The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Ky.
The technology selected by the Department of Defense to destroy the Blue Grass chemical weapons stockpile is neutralization followed by supercritical water oxidation (SCWO).
The Assembled Chemical Weapons Alternatives (ACWA) Program, headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.
The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc., and Parsons Infrastructure and Technology Group, along with teaming partners URS Corporation, Battelle Memorial Institute, General Atomics and General Physics, is the systems contractor selected to design, build, systemize, pilot test, operate and close BGCAPP.
The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Ky.
The technology selected by the Department of Defense to destroy the Blue Grass chemical weapons stockpile is neutralization followed by supercritical water oxidation (SCWO).
The Assembled Chemical Weapons Alternatives (ACWA) Program, headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.
The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc., and Parsons Infrastructure and Technology Group, along with teaming partners URS Corporation, Battelle Memorial Institute, General Atomics and General Physics, is the systems contractor selected to design, build, systemize, pilot test, operate and close BGCAPP.
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Kentucky Chemical Destruction Community Advisory Board
Presented by:
Anthony Reed
Deputy Site Project Manager
The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Ky.
The technology selected by the Department of Defense to destroy the Blue Grass chemical weapons stockpile is neutralization followed by supercritical water oxidation (SCWO).
The Assembled Chemical Weapons Alternatives (ACWA) Program, headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.
The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc., and Parsons Infrastructure and Technology Group, along with teaming partners URS Corporation, Battelle Memorial Institute, General Atomics and General Physics, is the systems contractor selected to design, build, systemize, pilot test, operate and close BGCAPP.
The Coating Solution - Energy Infrastructure thefortgroup
Our nation’s dependency on water amplifies the need for responsible care and proactive steps towards preservation. Water, potable, gray water and containment systems are made up of physical assets… assets that are constantly aging and deteriorating. The reality is, it’s only a matter of time until more severe (and costly) action will be necessary. Fortunately, something can be done to arrest this process via corrosion mitigation.
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker Doug Omichinski
Site Project Manager Project Manager
Presented to:
Kentucky Chemical Weapons Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board
Presented by:
Tom McKinney
Project Manager, Bechtel Parsons Blue Grass
Presented to:
Kentucky Chemical Weapons Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board
Presented by:
Tom McKinney
Project Manager, Bechtel Parsons Blue Grass
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Kentucky Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker
Site Project Manager
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission/ Chemical Destruction Community Advisory Board Meeting
Presented by:
Jeff Brubaker Tom McKinney
Site Project Manager Project Manager
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission/ Chemical Destruction Community Advisory Board Meeting
Presented by:
Jeff Brubaker
Site Project Manager
Presented to:
Kentucky Chemical Weapons Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board
Presented by:
Tom McKinney
Project Manager, Bechtel Parsons Blue Grass
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Kentucky Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker
Site Project Manager
The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Ky.
The technology selected by the Department of Defense to destroy the Blue Grass chemical weapons stockpile is neutralization followed by supercritical water oxidation (SCWO).
The Assembled Chemical Weapons Alternatives (ACWA) Program, headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.
The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc., and Parsons Infrastructure and Technology Group, along with teaming partners URS Corporation, Battelle Memorial Institute, General Atomics and General Physics, is the systems contractor selected to design, build, systemize, pilot test, operate and close BGCAPP.
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Kentucky Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker
Site Project Manager
The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Ky.
The technology selected by the Department of Defense to destroy the Blue Grass chemical weapons stockpile is neutralization followed by supercritical water oxidation (SCWO).
The Assembled Chemical Weapons Alternatives (ACWA) Program, headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.
The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc., and Parsons Infrastructure and Technology Group, along with teaming partners URS Corporation, Battelle Memorial Institute, General Atomics and General Physics, is the systems contractor selected to design, build, systemize, pilot test, operate and close BGCAPP.
The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Ky.
The technology selected by the Department of Defense to destroy the Blue Grass chemical weapons stockpile is neutralization followed by supercritical water oxidation (SCWO).
The Assembled Chemical Weapons Alternatives (ACWA) Program, headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.
The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc., and Parsons Infrastructure and Technology Group, along with teaming partners URS Corporation, Battelle Memorial Institute, General Atomics and General Physics, is the systems contractor selected to design, build, systemize, pilot test, operate and close BGCAPP.
The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Ky.
The technology selected by the Department of Defense to destroy the Blue Grass chemical weapons stockpile is neutralization followed by supercritical water oxidation (SCWO).
The Assembled Chemical Weapons Alternatives (ACWA) Program, headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.
The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc., and Parsons Infrastructure and Technology Group, along with teaming partners URS Corporation, Battelle Memorial Institute, General Atomics and General Physics, is the systems contractor selected to design, build, systemize, pilot test, operate and close BGCAPP.
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Kentucky Chemical Destruction Community Advisory Board
Presented by:
Anthony Reed
Deputy Site Project Manager
The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Ky.
The technology selected by the Department of Defense to destroy the Blue Grass chemical weapons stockpile is neutralization followed by supercritical water oxidation (SCWO).
The Assembled Chemical Weapons Alternatives (ACWA) Program, headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.
The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc., and Parsons Infrastructure and Technology Group, along with teaming partners URS Corporation, Battelle Memorial Institute, General Atomics and General Physics, is the systems contractor selected to design, build, systemize, pilot test, operate and close BGCAPP.
The Coating Solution - Energy Infrastructure thefortgroup
Our nation’s dependency on water amplifies the need for responsible care and proactive steps towards preservation. Water, potable, gray water and containment systems are made up of physical assets… assets that are constantly aging and deteriorating. The reality is, it’s only a matter of time until more severe (and costly) action will be necessary. Fortunately, something can be done to arrest this process via corrosion mitigation.
Similar to Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, 2014 (20)
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission
and Kentucky Chemical Destruction Community Advisory Board
Presented by:
LTC Christopher Grice
Commander, Blue Grass Chemical Activity
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board
Presented by:
LTC Christopher Grice
Commander, Blue Grass Chemical Activity
Presented to:
Chemical Destruction Community Advisory Board’s Explosive Destruction Technology Working Group
Presented by:
John McArthur, Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP)
Neil Frenzl, BGCAPP
Allison Respess, BGCAPP
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Chemical Destruction Community Advisory Board
Presented by:
Jeff BrubakerSite Project Manager
Allison RespessAssistant Project Manager for Explosive Destruction Technology
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and Chemical Destruction Community Advisory Board
Presented by:
Jeffrey Kiley
Risk Management Directorate
PEO ACWA
More from Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA) (19)
A process server is a authorized person for delivering legal documents, such as summons, complaints, subpoenas, and other court papers, to peoples involved in legal proceedings.
What is the point of small housing associations.pptxPaul Smith
Given the small scale of housing associations and their relative high cost per home what is the point of them and how do we justify their continued existance
Presentation by Jared Jageler, David Adler, Noelia Duchovny, and Evan Herrnstadt, analysts in CBO’s Microeconomic Studies and Health Analysis Divisions, at the Association of Environmental and Resource Economists Summer Conference.
ZGB - The Role of Generative AI in Government transformation.pdfSaeed Al Dhaheri
This keynote was presented during the the 7th edition of the UAE Hackathon 2024. It highlights the role of AI and Generative AI in addressing government transformation to achieve zero government bureaucracy
Many ways to support street children.pptxSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
2024: The FAR - Federal Acquisition Regulations, Part 37
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, 2014
1. Blue Grass Chemical Agent-
Destruction Pilot Plant
Quarterly Update
March 12, 2014
Presented to:
Kentucky Chemical Demilitarization Citizens’ Advisory Commission and
Chemical Destruction Community Advisory Board
Presented by:
Jeff Brubaker Doug Omichinski
Site Project Manager Project Manager
2. A Partnership for Safe Chemical Weapons Destruction
2
Northwestern Corner - Observation Point
1
2
1
3
5
2
6
Hydrolysate Storage Area
Control and Support Building
Munitions Demilitarization Building (MDB) Filter Banks
MDB
Utility Building
Supercritical Water Oxidation Building (not visible in photo)
Laboratory Building (not visible in photo)
7 6
5
4
3
7
4
Blue Grass Chemical Agent-Destruction
Pilot Plant Construction Site (March 2014)
3. A Partnership for Safe Chemical Weapons Destruction
3
Blue Grass Updates
Construction now more than 80 percent
complete
Systemization activities now more than 15
percent complete
Installation of Standby Diesel Generators
Beneficial occupancy of Control and
Support Building
Continued painting of Hydrolysate Storage
Area tanks and start of insulation
Mobilization of Entry Control Facility
subcontractor
Continuing installation of Munitions
Demilitarization Building filter area
ductwork including connection to the
Clean-Air Exhaust Stacks
Placement and energization of back-up
batteries in the Control and Support
Building
A team of project workers place the bottom
half of one of the two Clean-Air Exhaust
Stacks. In operations, these stacks will release
cleaned, filtered and monitored facility air back
to the environment.
4. A Partnership for Safe Chemical Weapons Destruction
Main Processing Facilities
4
Systemization team members inspect electrical panels
inside the Control and Support Building (CSB).
Workers prepare interior walls in the Supercritical
Water Oxidation Processing Building.
An ironworker welds a fragmentation plate inside a
Munitions Demilitarization Building blast proof room.
Electricians install back up battery systems inside the
CSB.
5. A Partnership for Safe Chemical Weapons Destruction
Support Facilities and Infrastructure
5
Hydrolysate Storage Area tank construction is complete
and painting and insulation work is underway.
A utility pipe rack now circumnavigates the Utility
Building as support infrastructure work continues.
Utility Building air handling units and dryers are
installed and ready for systemization activities.
An electrician verifies a “lock-out/tag-out” of an
energized Utility Building system.
6. A Partnership for Safe Chemical Weapons Destruction
6
Safety Performance
12-month rolling rate
Accidents per 200,000 job hours
Occupational Safety and Health Administration
Voluntary Protection Program Star Status site
Lost-time injury rate is 87 percent lower and
recordable injury rate is 61 percent lower
than industry average
As of January 31, 2014, the project has
completed 661,376 hours and 95 days without
a lost-time accident
3.2
1.1
1.26
0.14
Recordable Injuries Lost-Time Injuries
Construction Industry
Bechtel Parsons
7. A Partnership for Safe Chemical Weapons Destruction
Current Project Staffing
7
Total project
employment―1,340
Richmond, Ky.―1,333
― Nonmanual―671
― Craft―669
― Local hires―58 percent
Other locations―7
― San Diego, Calif.
― Columbus, Ohio
― Reston, Va.
There are 669 local union building and construction trades craft workers safely
working at the Blue Grass Chemical Agent-Destruction Pilot Plant.
8. A Partnership for Safe Chemical Weapons Destruction
8
Hiring a Local Workforce
Bechtel Parsons Blue Grass
Workforce in Richmond, Kentucky
Workforce includes manual and non-manual employees
Note 1:
Local: Metropolitan Statistical Areas (MSAs) and the small business advocacy program include the following counties:
Madison, Woodford, Fayette, Scott, Bourbon, Clark, Jessamine and Rockcastle. MSAs are defined by the Bureau of Labor Statistics.
Note 2:
Manual employees are hired through the local Union Hall in Lexington, Kentucky.
Local
58%
Outside of
Kentucky
40%
Rest of Kentucky
2%
9. A Partnership for Safe Chemical Weapons Destruction
9
Valuing a Diverse Workforce
BPBG – Non-Manual Workforce Kentucky Population
Source: U.S. Census Bureau, 2010
Source: U.S. Census Bureau, 2010
Kentucky
Architecture and Engineering
BPBG – Non-Manual Workforce
Caucasian
88%
Minority
12%
Male
79%
Female
21%
10. A Partnership for Safe Chemical Weapons Destruction
10
Moving Forward
Ironworkers install a platform on one of the Supercritical Water
Oxidation reactors using an innovative “spider crane.” This crane
can lift three tons, but also folds down to pass through doorways.
Safety is highly important at the Blue Grass plant. An electrician
prepares warning signs for an upcoming task area.
Munitions Demilitarization Building major electrical, piping and instrumentation
installations
Construction of Supercritical Water Oxidation Processing Building effluent tanks
Utility Building internal systems turned over to systemization personnel and
energized
Start of Entry Control Facility construction
Start of Container Handling Building construction
Start of Medical Facility construction
11. A Partnership for Safe Chemical Weapons Destruction
Questions/Discussion
11
For more information about the Blue Grass Chemical Agent-Destruction Pilot Plant project,
please contact the Blue Grass Chemical Stockpile Outreach Office at (859) 626-8944.