Andy Smith EPA project
April 2019
Next
Andy Smith EPA Project
Project name: Structures Improvements
Project Methodology: DMAIC 6 Sigma
Next
Andy Smith EPA Project
Structures Improvements
DMAIC Methodology
Define
Measure
AnalyseImprove
Control
Summary
Andy Smith EPA Project
Structures Improvements
Define phase
Purpose:
To have the team and it's sponsor reach
agreement on the scope, goals, financial and
performance targets for the project
Examples of good project deliverables:
A project charter including Problem Statement,
business impact, goals, scope, timeline and
defined team
Documentation detailing Customers who are
effected by this project
High Level process maps
Next
Andy Smith EPA Project
Structures Improvements
Define phase
Evidence of Tools utilised in the Define phase:
SIPOC
Minutes of meetings
Problem Statement (including redefinition)
Gant Chart
Project Charter
Andy Smith EPA Project
Structures Improvements
Define phase
Minutes to Structures Improvement Meetings:
Kick Off meeting minutes
May 2018 meeting minutes
June 2018 meeting minutes
September 2018 meeting minutes
November 2018 meeting minutes
Back
Andy Smith EPA Project
Structures Improvements
Define phase
Initial Problem Statement: Structures are not consistently
applying all relevant Health & Safety procedures to their
engineering projects and are not storing all significant project
documentation into Workspace inline with the companies Quality
manual – ISO9001.
These practices need to be measurably improved.
Revised Problem Statement: Structures are not consistently
applying all relevant Health & Safety procedures to their
engineering projects and are not storing all significant project
documentation into Workspace inline with the companies Quality
manual – ISO9001.
A training plan needs to be implemented to ensure consistent use
of Workspace and Health & Safety application to all Structures
projects.
Back
Andy Smith EPA Project
Structures Improvements
Measure Phase
Purpose:
To thoroughly understand the state of the
process and collect reliable data to help expose
underlying causes of problems
Examples of good project deliverables:
Collecting data the represents the process, base
line of the current process, process flow
diagrams and to identify anything that could be
addresses quickly – “quick wins”
Next
Andy Smith EPA Project
Structures Improvements
Measure Phase
Evidence of Tools utilised in the Analyse phase:
Data collection from Preliminary project audit
Agreed list of input and output critical project
documentation
Example of audit sheet utilised for data
collection
Andy Smith EPA Project
Structures Improvements
Measure Phase
Critical project documents agreed:
Designer Risk Assessment: should be stored in
Health & Safety
Method Statements: should be stored in Health
& Safety
Design Completion Statement: - should be
stored in Contract Documents
Schedule of Services - should be stored in Fees
and Appointments - Contract Documents
Invoice Submission Form - should be stored in
Fees and Appointments – Invoice Submission
Forms
Back
Andy Smith EPA Project
Structures Improvements
Analyse Phase
Purpose:
To analyse all collected data from the Measure
phase to pinpoint and verify causes affecting the
key inputs and outputs – “critical to’s”
Examples of good project deliverables:
List of potential causes considered in the
analysis, data charts showing link between
targeted inputs and the critical outputs, route
cause analysis, updated project charter
Next
Andy Smith EPA Project
Structures Improvements
Analyse Phase
Evidence of Tools utilised in the Analyse phase:
Updated project charter
Agree changes to critical documents
Causes of poor quality identified:
• poor or no Workspace training
• little or no understanding of legal obligations
• Inconsistent application of project documentation
controls
• Little or no understanding of quality processes
• No quality control measures were in place
The “as is” position was worse than originally thought.
Andy Smith EPA Project
Structures Improvements
Improve Phase
Purpose:
Learn from the Analyse phase, to generate
solutions and execute a full scale implementation
plan
Examples of good project deliverables:
Identification of a “to be” process, robust and
tested solutions and a process that is stable,
predictable and meets the sponsors
requirements
Next
Andy Smith EPA Project
Structures Improvements
Improve Phase
Evidence of Tools utilised in the Improve phase:
Iterations od auditing documentation
Development/Improvement Plan:
Introduction to Workspace training
Designers Risk Assessment template
Risk Rating Matrix
Risk Assessment Hierarchy
Dynamic Risk Assessment
HSE Risk Assessment
Safety Media Training
Lone Working
5 Steps to Risk Assessment
Training Matrix dashboard
Andy Smith EPA Project
Structures Improvements
Control Phase
Purpose:
To complete all project work and hand off the
improved process to the process owner.
Examples of good project deliverables:
Documented plan to transition improved process
back to owner, shared data collection with
process owner, Training plans, instructions,
training documentation and system for ongoing
monitoring of the process
Next
Andy Smith EPA Project
Structures Improvements
Control Phase
Evidence of Tools utilised in the Define phase:
New Project Auditing Templates
Auditing Log
Non-Conformance reporting
Conformance meetings – Plan and Actions
Reinforcement via Appraisal process
Back
Project Summary
• Rodgers Leask Ltd identified that they wanted to make a significant
business change to the way the engineering departments operated and
for this to have a Quality and Financial benefit to the business
• Andy Smith undertook a project to identify and deliver this change, this
project became his apprenticeship project which has been presented as
part of the EPA process today
• The engineering departments have already changed their processes and
identified best practice is being shared across departments
• Health and Safety have been significantly improved, the risk of future
claims have been significantly mitigated, Workspace is now a tool we can
be proud of and we are in a better position to enter into negotiations to
reduce our PI insurance even further
• The goals of the project have more than been delivered and
expectations for my next project have been raised significantly.
Andy Smith EPA project presentation 4/16/2019 17
Define
Measure
AnalyseImprove
Control

More Related Content

What's hot

13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
Dhamo daran
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
Akash Prasanna
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
Serdar Temiz
 
Project Monitoring And Controlling
Project Monitoring And ControllingProject Monitoring And Controlling
Project Monitoring And Controlling
Tom Milner
 
Monitoring the control
Monitoring the control Monitoring the control
Monitoring the control
north south university
 
Project management plan
Project management planProject management plan
Project management plan
Gerges Fadel
 
Project monitoring lecture 1
Project monitoring lecture 1Project monitoring lecture 1
Project monitoring lecture 1
BECM, RUET, Bangladesh
 
PM-Project Closing-UiTM Project
PM-Project Closing-UiTM ProjectPM-Project Closing-UiTM Project
PM-Project Closing-UiTM Project
TrainingandCoaching Trainer
 
How to close a project
How to close a projectHow to close a project
How to close a project
Emmanuel Mwagomba
 
Steps in project control process
Steps in project control processSteps in project control process
Steps in project control process
Uday Doyal
 
Project Control
Project ControlProject Control
Project Control
Martin Sillaots
 
ACH 216 Lecture 02 (Project Format)
ACH 216 Lecture 02 (Project Format)ACH 216 Lecture 02 (Project Format)
ACH 216 Lecture 02 (Project Format)
Anne Arundel Community College
 
PMP CAPM study guide Scope
PMP CAPM study guide ScopePMP CAPM study guide Scope
PMP CAPM study guide Scope
Ahmed Higazi, PMP CSM
 
Project Management Class ( based on PMBOK) - Day 5
Project Management Class ( based on PMBOK) - Day 5Project Management Class ( based on PMBOK) - Day 5
Project Management Class ( based on PMBOK) - Day 5
Highmark Health
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
ahmad bassiouny
 
Project closing and methods
Project closing and methodsProject closing and methods
Project closing and methods
Barath Babu Kumar
 
Ch4 project management process
Ch4 project management processCh4 project management process
Ch4 project management process
Kittitouch Suteeca
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in construction
Kartikeya Pandey
 
Projrct Monitoring & Controling
Projrct   Monitoring  & ControlingProjrct   Monitoring  & Controling
Projrct Monitoring & Controling
Darshana Viduranga
 
Management Control of Projects
Management Control of ProjectsManagement Control of Projects
Management Control of Projects
E P John
 

What's hot (20)

13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project Monitoring And Controlling
Project Monitoring And ControllingProject Monitoring And Controlling
Project Monitoring And Controlling
 
Monitoring the control
Monitoring the control Monitoring the control
Monitoring the control
 
Project management plan
Project management planProject management plan
Project management plan
 
Project monitoring lecture 1
Project monitoring lecture 1Project monitoring lecture 1
Project monitoring lecture 1
 
PM-Project Closing-UiTM Project
PM-Project Closing-UiTM ProjectPM-Project Closing-UiTM Project
PM-Project Closing-UiTM Project
 
How to close a project
How to close a projectHow to close a project
How to close a project
 
Steps in project control process
Steps in project control processSteps in project control process
Steps in project control process
 
Project Control
Project ControlProject Control
Project Control
 
ACH 216 Lecture 02 (Project Format)
ACH 216 Lecture 02 (Project Format)ACH 216 Lecture 02 (Project Format)
ACH 216 Lecture 02 (Project Format)
 
PMP CAPM study guide Scope
PMP CAPM study guide ScopePMP CAPM study guide Scope
PMP CAPM study guide Scope
 
Project Management Class ( based on PMBOK) - Day 5
Project Management Class ( based on PMBOK) - Day 5Project Management Class ( based on PMBOK) - Day 5
Project Management Class ( based on PMBOK) - Day 5
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
 
Project closing and methods
Project closing and methodsProject closing and methods
Project closing and methods
 
Ch4 project management process
Ch4 project management processCh4 project management process
Ch4 project management process
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in construction
 
Projrct Monitoring & Controling
Projrct   Monitoring  & ControlingProjrct   Monitoring  & Controling
Projrct Monitoring & Controling
 
Management Control of Projects
Management Control of ProjectsManagement Control of Projects
Management Control of Projects
 

Similar to EPA Project - Andy Smith

EPA Presentation - Andy Smith
EPA Presentation - Andy SmithEPA Presentation - Andy Smith
EPA Presentation - Andy Smith
Andy Smith
 
Module 12 Monitoring and Control I
Module 12 Monitoring and Control IModule 12 Monitoring and Control I
Module 12 Monitoring and Control I
Aleem Khan, TOGAF, PMP
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
Kathirvel Ayyaswamy
 
Ch 6 development plan and quality plan
Ch 6 development plan and quality planCh 6 development plan and quality plan
Ch 6 development plan and quality plan
Kittitouch Suteeca
 
Software project management
Software project managementSoftware project management
Software project management
Indu Sharma Bhardwaj
 
Software project management 3
Software project management 3Software project management 3
Software project management 3
Indu Sharma Bhardwaj
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Subodh Kumar
 
271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt
Mohd Zulhairi Mohd Noor
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
Addisu15
 
Tracking and Controlling Technical Documentation Projects
Tracking and Controlling Technical Documentation ProjectsTracking and Controlling Technical Documentation Projects
Tracking and Controlling Technical Documentation Projects
Saiff Solutions, Inc.
 
Intro to Project Management
Intro to Project ManagementIntro to Project Management
Intro to Project Management
Noman Aftab
 
Projects Management
Projects ManagementProjects Management
Projects Management
Nirmal Shah
 
Dulan_Resume_QE
Dulan_Resume_QEDulan_Resume_QE
Dulan_Resume_QE
Robert Dulan
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2
Anand Bobade
 
Testing Junior Management Course v2
Testing Junior Management Course v2Testing Junior Management Course v2
Testing Junior Management Course v2
sharon elgarat
 
PW Final Jun7 2012
PW Final Jun7 2012PW Final Jun7 2012
PW Final Jun7 2012
Ashwin Kumar M N
 
2.11 Milestone Review - Phase 1.ppt
2.11 Milestone Review - Phase 1.ppt2.11 Milestone Review - Phase 1.ppt
2.11 Milestone Review - Phase 1.ppt
AlfredoArturoGranado
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control PlanJavier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
J. García - Verdugo
 
Design of a Prevention, Appraisal and Failure Cost Model
Design of a Prevention, Appraisal and Failure Cost ModelDesign of a Prevention, Appraisal and Failure Cost Model
Design of a Prevention, Appraisal and Failure Cost Model
Tennelli Industries (Pty) Ltd
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
guest90bddb
 

Similar to EPA Project - Andy Smith (20)

EPA Presentation - Andy Smith
EPA Presentation - Andy SmithEPA Presentation - Andy Smith
EPA Presentation - Andy Smith
 
Module 12 Monitoring and Control I
Module 12 Monitoring and Control IModule 12 Monitoring and Control I
Module 12 Monitoring and Control I
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
Ch 6 development plan and quality plan
Ch 6 development plan and quality planCh 6 development plan and quality plan
Ch 6 development plan and quality plan
 
Software project management
Software project managementSoftware project management
Software project management
 
Software project management 3
Software project management 3Software project management 3
Software project management 3
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt271710575-Lecture-14-Project-Monitoring.ppt
271710575-Lecture-14-Project-Monitoring.ppt
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
 
Tracking and Controlling Technical Documentation Projects
Tracking and Controlling Technical Documentation ProjectsTracking and Controlling Technical Documentation Projects
Tracking and Controlling Technical Documentation Projects
 
Intro to Project Management
Intro to Project ManagementIntro to Project Management
Intro to Project Management
 
Projects Management
Projects ManagementProjects Management
Projects Management
 
Dulan_Resume_QE
Dulan_Resume_QEDulan_Resume_QE
Dulan_Resume_QE
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2
 
Testing Junior Management Course v2
Testing Junior Management Course v2Testing Junior Management Course v2
Testing Junior Management Course v2
 
PW Final Jun7 2012
PW Final Jun7 2012PW Final Jun7 2012
PW Final Jun7 2012
 
2.11 Milestone Review - Phase 1.ppt
2.11 Milestone Review - Phase 1.ppt2.11 Milestone Review - Phase 1.ppt
2.11 Milestone Review - Phase 1.ppt
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control PlanJavier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
 
Design of a Prevention, Appraisal and Failure Cost Model
Design of a Prevention, Appraisal and Failure Cost ModelDesign of a Prevention, Appraisal and Failure Cost Model
Design of a Prevention, Appraisal and Failure Cost Model
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
 

Recently uploaded

一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
8p28uk6g
 
Make it or Break it - Insights for achieving Product-market fit .pdf
Make it or Break it - Insights for achieving Product-market fit .pdfMake it or Break it - Insights for achieving Product-market fit .pdf
Make it or Break it - Insights for achieving Product-market fit .pdf
Resonate Digital
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
Muhammad Adil Jamil
 
20240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 202420240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 2024
Matthew Sinclair
 
Resource-mobilization-guide-for-community-based-organizations1.pdf
Resource-mobilization-guide-for-community-based-organizations1.pdfResource-mobilization-guide-for-community-based-organizations1.pdf
Resource-mobilization-guide-for-community-based-organizations1.pdf
FeteneA
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
RoopaTemkar
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
tdt5v4b
 
Risk-Management-presentation for cooperatives
Risk-Management-presentation for cooperativesRisk-Management-presentation for cooperatives
Risk-Management-presentation for cooperatives
bernanbumatay1
 
Comparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile SystemsComparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile Systems
Rob Healy
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
dsnow9802
 
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
GanpatiKumarChoudhar
 
12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
Pierre E. NEIS
 
Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™
Alexey Krivitsky
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
tdt5v4b
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
William (Bill) H. Bender, FCSI
 
Credit-Management seminar for cooperative power point presentation
Credit-Management seminar for cooperative power point presentationCredit-Management seminar for cooperative power point presentation
Credit-Management seminar for cooperative power point presentation
bernanbumatay1
 
Addiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdfAddiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdf
Bill641377
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
Ram V Chary
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
tdt5v4b
 
Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024
stuwilson.co.uk
 

Recently uploaded (20)

一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
 
Make it or Break it - Insights for achieving Product-market fit .pdf
Make it or Break it - Insights for achieving Product-market fit .pdfMake it or Break it - Insights for achieving Product-market fit .pdf
Make it or Break it - Insights for achieving Product-market fit .pdf
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
 
20240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 202420240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 2024
 
Resource-mobilization-guide-for-community-based-organizations1.pdf
Resource-mobilization-guide-for-community-based-organizations1.pdfResource-mobilization-guide-for-community-based-organizations1.pdf
Resource-mobilization-guide-for-community-based-organizations1.pdf
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
 
Risk-Management-presentation for cooperatives
Risk-Management-presentation for cooperativesRisk-Management-presentation for cooperatives
Risk-Management-presentation for cooperatives
 
Comparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile SystemsComparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile Systems
 
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
Colby Hobson: Residential Construction Leader Building a Solid Reputation Thr...
 
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
 
12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
 
Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
 
Credit-Management seminar for cooperative power point presentation
Credit-Management seminar for cooperative power point presentationCredit-Management seminar for cooperative power point presentation
Credit-Management seminar for cooperative power point presentation
 
Addiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdfAddiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdf
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
 
Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024Stuart Wilson the teams I have led - 2024
Stuart Wilson the teams I have led - 2024
 

EPA Project - Andy Smith

  • 1. Andy Smith EPA project April 2019 Next
  • 2. Andy Smith EPA Project Project name: Structures Improvements Project Methodology: DMAIC 6 Sigma Next
  • 3. Andy Smith EPA Project Structures Improvements DMAIC Methodology Define Measure AnalyseImprove Control Summary
  • 4. Andy Smith EPA Project Structures Improvements Define phase Purpose: To have the team and it's sponsor reach agreement on the scope, goals, financial and performance targets for the project Examples of good project deliverables: A project charter including Problem Statement, business impact, goals, scope, timeline and defined team Documentation detailing Customers who are effected by this project High Level process maps Next
  • 5. Andy Smith EPA Project Structures Improvements Define phase Evidence of Tools utilised in the Define phase: SIPOC Minutes of meetings Problem Statement (including redefinition) Gant Chart Project Charter
  • 6. Andy Smith EPA Project Structures Improvements Define phase Minutes to Structures Improvement Meetings: Kick Off meeting minutes May 2018 meeting minutes June 2018 meeting minutes September 2018 meeting minutes November 2018 meeting minutes Back
  • 7. Andy Smith EPA Project Structures Improvements Define phase Initial Problem Statement: Structures are not consistently applying all relevant Health & Safety procedures to their engineering projects and are not storing all significant project documentation into Workspace inline with the companies Quality manual – ISO9001. These practices need to be measurably improved. Revised Problem Statement: Structures are not consistently applying all relevant Health & Safety procedures to their engineering projects and are not storing all significant project documentation into Workspace inline with the companies Quality manual – ISO9001. A training plan needs to be implemented to ensure consistent use of Workspace and Health & Safety application to all Structures projects. Back
  • 8. Andy Smith EPA Project Structures Improvements Measure Phase Purpose: To thoroughly understand the state of the process and collect reliable data to help expose underlying causes of problems Examples of good project deliverables: Collecting data the represents the process, base line of the current process, process flow diagrams and to identify anything that could be addresses quickly – “quick wins” Next
  • 9. Andy Smith EPA Project Structures Improvements Measure Phase Evidence of Tools utilised in the Analyse phase: Data collection from Preliminary project audit Agreed list of input and output critical project documentation Example of audit sheet utilised for data collection
  • 10. Andy Smith EPA Project Structures Improvements Measure Phase Critical project documents agreed: Designer Risk Assessment: should be stored in Health & Safety Method Statements: should be stored in Health & Safety Design Completion Statement: - should be stored in Contract Documents Schedule of Services - should be stored in Fees and Appointments - Contract Documents Invoice Submission Form - should be stored in Fees and Appointments – Invoice Submission Forms Back
  • 11. Andy Smith EPA Project Structures Improvements Analyse Phase Purpose: To analyse all collected data from the Measure phase to pinpoint and verify causes affecting the key inputs and outputs – “critical to’s” Examples of good project deliverables: List of potential causes considered in the analysis, data charts showing link between targeted inputs and the critical outputs, route cause analysis, updated project charter Next
  • 12. Andy Smith EPA Project Structures Improvements Analyse Phase Evidence of Tools utilised in the Analyse phase: Updated project charter Agree changes to critical documents Causes of poor quality identified: • poor or no Workspace training • little or no understanding of legal obligations • Inconsistent application of project documentation controls • Little or no understanding of quality processes • No quality control measures were in place The “as is” position was worse than originally thought.
  • 13. Andy Smith EPA Project Structures Improvements Improve Phase Purpose: Learn from the Analyse phase, to generate solutions and execute a full scale implementation plan Examples of good project deliverables: Identification of a “to be” process, robust and tested solutions and a process that is stable, predictable and meets the sponsors requirements Next
  • 14. Andy Smith EPA Project Structures Improvements Improve Phase Evidence of Tools utilised in the Improve phase: Iterations od auditing documentation Development/Improvement Plan: Introduction to Workspace training Designers Risk Assessment template Risk Rating Matrix Risk Assessment Hierarchy Dynamic Risk Assessment HSE Risk Assessment Safety Media Training Lone Working 5 Steps to Risk Assessment Training Matrix dashboard
  • 15. Andy Smith EPA Project Structures Improvements Control Phase Purpose: To complete all project work and hand off the improved process to the process owner. Examples of good project deliverables: Documented plan to transition improved process back to owner, shared data collection with process owner, Training plans, instructions, training documentation and system for ongoing monitoring of the process Next
  • 16. Andy Smith EPA Project Structures Improvements Control Phase Evidence of Tools utilised in the Define phase: New Project Auditing Templates Auditing Log Non-Conformance reporting Conformance meetings – Plan and Actions Reinforcement via Appraisal process Back
  • 17. Project Summary • Rodgers Leask Ltd identified that they wanted to make a significant business change to the way the engineering departments operated and for this to have a Quality and Financial benefit to the business • Andy Smith undertook a project to identify and deliver this change, this project became his apprenticeship project which has been presented as part of the EPA process today • The engineering departments have already changed their processes and identified best practice is being shared across departments • Health and Safety have been significantly improved, the risk of future claims have been significantly mitigated, Workspace is now a tool we can be proud of and we are in a better position to enter into negotiations to reduce our PI insurance even further • The goals of the project have more than been delivered and expectations for my next project have been raised significantly. Andy Smith EPA project presentation 4/16/2019 17 Define Measure AnalyseImprove Control

Editor's Notes

  1. Read the summary as is. Thank you all for taking the time to listen to me today and I hope you found the presentation informative. That is the end of todays presentation so its thank you and goodbye from me.