Nestle Pakistan undertook several energy saving projects at its factories in collaboration with Avanceon. These included iWater and iBoiler projects at the Nestle Sheikhupura and Kabirwala factories. The projects optimized systems like water, steam and boiler operations and achieved significant energy and cost savings annually within 2-3 year payback periods. Future projects aim to further analyze energy usage and balance utilities to find more savings opportunities across Nestle Pakistan factories.