Session Themes

     Integrated application systems (ERP, CRM, MES, etc.) provide
      core business support

     The attractiveness and pervasiveness of best practice process
      adoption has raised the bar in achieving marketplace
      differentiation

     The tension between standardized and differentiated
      processes in the manufacturing context creates pivotal strategic
      decision points

     IBM has developed approaches and solutions for achieving
      process innovation and continuous improvement for
      manufacturers in a packaged application environment



2
                                                                  © 2012 IBM Corporation
Agenda


          Shop Floor Automation solutions
          Process challenges
          Packaged application challenges
          IBM BPM for SAP




3
                                             © 2012 IBM Corporation
Manufacturing Execution Systems (MES)
     The MES has become the translation center between
      ERP and the real-time continuous data of plant
      operations
     Controls vendors have developed MES offerings
      – Invensys Operations Management (IOM)
      – Rockwell
      – Siemens
      – Others…
     In recent years, ERP vendors have extended their
      plant floor capabilities
      – ERP vendors have touted the easy integration that their
        MES provides
      – Best-of-breed MES suppliers typically have greater
        functionality
      – SAP, Oracle and even Microsoft have enhanced their MES
        offerings through R&D and acquisitions



4
                                                                  © 2012 IBM Corporation
Business Benefits of MES

     Capability areas:
      – Automated data collection
      – Material control
                                      Greater
      – Product traceability           efficiency, profitability, prod
      – Quality control                uctivity
      – Production reporting          Respond to market
                                       changes both quickly and
     Benefit categories:              correctly and help adopt
      – Data accuracy                  production processes – in
                                       real-time.
      – Reporting timeliness
      – Manual reporting reduction




5
                                                               © 2012 IBM Corporation
Key Strategic Decision Point – Single Vendor or Best of
Breed?




                                    or



    Reduced integration costs and        Typically, better functionality
        improved integration             or functional alignment – but
                                          more integration required

6                                                                 © 2012 IBM Corporation
Most MES Vendors Provide Some Technical Integration Capabilities




…But much technical work remains to connect the ERP environment
 to the MES. An ESB is typically still required.
7                                                       © 2012 IBM Corporation
And Technical Integration is Only Half the Solution


                                                               Finance                     Executive
                                                                                                        Process
                                                               and Ops                     Management   Managers
                                              Account
                                              Administration
                                                                         Risk Management
                                                                         Teams

    Business Integration           Customer
                                   Service




            (Workflow
      Management, Business
       Monitoring, Process
      Automation, Business
      Rules, Complex Event
          Processing)


    Technical Integration
    (ESBs, Adapters, Application
         Integration, B2B)
                                                                                                        Decision
                                                                                                        Managers




8                                                                                                         © 2012 IBM Corporation
Agenda


          Shop Floor Automation solutions
          Process challenges
          Packaged application challenges
          IBM BPM for SAP




9
                                             © 2012 IBM Corporation
Typical Process Problems
                                               Customer
                                               Service    Finance
     Account
                                                          and Ops
     Administration
                                                                          • Incomplete or
                                                            Executive 6     inaccurate workflows
                                      1                     Management
                                                     3                    • Lack of control
                                                                          • Poor performance
                                                                            visibility and insight
                          Invoice
                          Reconciliation                                  • Inability to integrate
                          Teams
                      2                                                     unstructured or ad
                                                                            hoc tasks and
                                                                            communications
                                                                            (ex paper, email or
                                           4                                IM)

       5




10
                                                                                     © 2012 IBM Corporation
Process is a Priority to Clients
     Make business process more efficient
                                                                                                        56%
     Introduce new IT-led products or services for our customers
                                                                                          Process is
                                                                       40%                Priority!
     Get better business intelligence to more employees, faster
                                                                 36%
     Lower IT or business costs
                                                                 36%
     Improve Web operations or customer experience
                                                               34%
     Improve customer service
                                                       26%
     Engage customers in new ways
                                                24%           Process Improvement is the #1
                                                             Priority for CIOs - 5 years in a row
                                                                              Gartner, Inc, “Leading in Times of
                                                                             Transition: The 2010 CIO Agenda”
     Data September 2010 Information Week 500 Survey

11
                                                                                                           © 2012 IBM Corporation
Agenda


          Shop Floor Automation solutions
          Process challenges
          Packaged application challenges
          IBM BPM for SAP




12
                                             © 2012 IBM Corporation
Packaged ERP Applications Deliver Strong Business Value

      Improve alignment of strategies
       and operations
      Improve productivity and insight
      Reduce costs through increased
       flexibility
      Support changing industry
       requirements
      Reduce risk
      Improve financial management and         SAP customers excel by
       corporate governance                    taking advantage of SAP’s
                                                      industry-specific
      Optimize IT spending
                                               knowledge, best practices
      Gain higher ROI faster                 and standardized processes
      Retain top performers                  – all codified into the world’s
                                                     leading integrated
      Give employees new ways to                  application platform.
       access the enterprise information
       required for their daily activities.

13
                                                                       © 2012 IBM Corporation
But Still Far Short of Their Full Potential

     What ERP/MES typically deliver
     value today                      Where they fall short
     Improve operational alignment    Improve strategic alignment

     Improve productivity             Improve insight

     Reduce costs                     Increase flexibility
     Support changing industry
                                      Support differentiated processes
     requirements
     Improve ROI                      Improve ROI faster
     New ways to access enterprise    Provide active real time business
     information                      monitoring
     Optimize IT spending             Optimize business value



14
                                                                     © 2012 IBM Corporation
And Implementation Risks Remain…

      METRIC                                          AVERAGE

      Took longer than expected                            57%

      Total implementation cost exceeds budget             54%

      Failed to realize 50%+ of benefits                   41%

      Failed to realize some benefits                      22%

      Operational disruption at go-live                    40%

      Executives unsatisfied                               32%

      Employees unsatisfied                                39%



                                             Source: Panorama Consulting 2010 ERP Report



15
                                                                                   © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Root Causes of SAP Implementation Issues
                                         Most SAP
                                         implementation
                                                                        …much
                                         documentation is
                                                                  customization
                                         static and does
                                                                        is often
                                         not reflect the
                                                                       required
                                         processes actually
                                         being used




                                          Most SAP
                                          processes rely
                                          on human                   …making it
                                          compliance                   difficult to
                                          with process                migrate to
                                          documentation          future releases
                                          …

          s


16                                                                                    © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 A Typical SAP Process Today
                                                    A high level process blueprint is defined in
                                                    Powerpoint, Visio, SAP Solution Manager or
                                                    a modeling tool, including transactions:

                                                                 VD03 - Display customer
                                                                         master


                                                                   VA01 - Create sales
                                                                          order;


                                                                 VOK0 - Maintain Pricing;


                                                                  CK51N - Create Order
                                                                   BOM Cost Estimate


                                                                 IW21 - Create notification




                                                          The implementation then relies on users to
                                                          read, properly understand and comply with
                                                          documentation by entering the proper
                                                          sequence of transaction codes in SAP.

17                                                                                            © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 With This Approach, How Can You?....
                                                                                 Quickly know the status of key
                             A high level process blueprint is defined in         processes?
                             Powerpoint, Visio, SAP Solution Manager or
                             a modeling tool
                                                                                 Ensure that the process you
                                          VD03 - Display customer
                                                  master                          designed is the process that is being
                                            VA01 - Create sales
                                                                                  executed?
                                                  order;


                                          VOK0 - Maintain Pricing;               Get real-time visibility into where
                                           CK51N - Create Order
                                                                                  workload or other bottlenecks are
                                            BOM Cost Estimate
                                                                                  causing business issues?
                                          IW21 - Create notification
                                                                                 Effectively reroute work to less
                                                                                  experienced workers to reduce
                                   The implementation then relies on users to
                                   read, properly understand and comply with
                                                                                  bottlenecks?
                                   documentation by entering the proper
                                   sequence of transaction codes in SAP.         Know which process changes are
                                                                                  most likely to help improve business
                                                                                  performance?
      Many SAP customers attempt                                                 Quickly rollout SAP process
      to address these issues with                                                changes?
             customization.                                                      Quickly integrate new process
                                                                                  workers into your business?


18                                                                                                              © 2012 IBM Corporation
Agenda


          Shop Floor Automation solutions
          Process challenges
          Packaged application challenges
          IBM BPM for SAP




19
                                             © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

With IBM BPM 8.0

                       The picture IS your process…




                        Analyze. Define. Execute. Monitor. Improve.


                   All in one tool – analysis through execution
                               through improvement
          s


20                                                                    © 2012 IBM Corporation
BPM Brings Order to the Chaos
                                   Finance                     Executive
                                                                            Process    1.
                                                                                       1     Automate workflow &
                                   and Ops                     Management   Managers         decision making
                  Account
                  Administration
                                             Risk Management                           2.
                                                                                       2     Reduce errors and
       Customer
                                             Teams
                                                                                             improve consistency
       Service
                                                                                       3.
                                                                                       3     Standardize resolution
                                                                                             across geographies
                                                                                       4.
                                                                                       4     Leverage existing
                                                                                             systems and data
                                                                                       5
                                                                                       5.    Monitor for business
                                                                                             events and initiate actions
                                                                                       6.
                                                                                       6     Real-time visibility and
                                                                                             process control


                                                                                       Customer Benefits:
                                                                                       •     Huge Reduction in
                                                                                             Manual Work, Errors
                                                                                       •     Faster, More Consistent
                                                                                             Issue Resolution
                                                                            Decision   •     Easier to Manage the
                                                                            Managers         Business
                                                                                       •     Consistent Case Handling




21
                                                                                                    © 2012 IBM Corporation
Two Methods Are Required to Optimize Business Processes

     1.   Packaged Applications                         2.   BPM Tools & SOA
         Improve 100‟s of processes at once                Adapt quickly
                                                            Outpace the competition
         Sunset inflexible legacy systems
                                                            Process visibility across core and
         Catch up to competitors                            other application systems
         Huge multi-year projects                          Smaller, incremental projects



                                    Natural
                                   Tendency
                                                                Natural
                                                               Tendency
                                                                                     BPM
     Process Optimization                                                       Process Optimization
     Approach A                                                                          Approach B


          Non-Differentiating                                                Differentiating
          Business Processes                                               Business Processes


                              Successful organizations will have a balanced
                            I/T Strategy of SOA/BPM and ERP Consolidation
22
                                                                                        © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 IBM BPM V8 Integrates Seamlessly with SAP

                                                                                                                     SD
                                                                                                                                   FI
                                                                                                                  Sales &
                                                                                                                                Financial
                                                                                                                Distribution
                                                                                                                               Accounting


                                                                 Orchestrate SAP                      MM
                                                                                                    Materials                             CO
                                                                    Services                         Mgmt.                             Controlling
                                                                                                                                                        AA
                                                                                           PP                                                          Asset
                                                                                       Production                                                    Accounting
                                                                                        Planning


                                                                               SM
                                                                             Service
                                                                                                      SAP                                                       EC
                                                                                                                                                             Enterprise
                                                                                                                                                             Controlling
                                                                             Mgmt.


                                                                                          QM
                                                                                                   Applications                                         PS
                                                                                                                                                      Project
                                                                                         Quality
                                                                                         Mgmt.                                                        System
                                                                                                       PM
                                                                                                      Plant                                 WF
                                                                                                   Maintenance                             Workflo
                                                                                                                                             w
                                                                                                                   HR             IS
                                                                                                                 Human         Industry
                                                                                                                Resources      Solutions

                                                                   Monitor SAP
                                                                  Business Events


          Download processes              Upload processes to     Retrieve Enterprise
         from Solution Manager             Solution Manager       Service Definitions




          s


23                                                                                                                             © 2012 IBM Corporation
IBM BPM for SAP              IBM Software Group | WebSphere software

 Applying IBM BPM for SAP
                                  Modeling for           Use an iterative, experiential-based approach to
                                 Documentation           accelerate traditional SAP blueprinting

                                                         Mine SAP business events to discover actual
                               Real-Time Monitoring
                                                         processes and act in real time to business challenges
      Increasing Integration




                                                         Interactively guide end users through SAP and E2E
                                 Guided Workflow         process steps to improve productivity, visibility and
                                                         consistency

                               Process Integration       Optimize process steps to improve cycle
                                and Orchestration        time, manageability and visibility of key processes


                                  Inline Decision        Automate complex decision making to reduce
                                    Automation           bottlenecks and improve business outcomes


                                                         Dramatically reduce the cycle time of high volume
                               Process Automation
                                                         processes by reducing/removing human interaction



24                                                                                                          © 2012 IBM Corporation
IBM BPM for SAP     IBM Software Group | WebSphere software

 Applying IBM BPM for SAP
                          Modeling for          Use an iterative, experiential-based approach to
                         Documentation          accelerate traditional SAP blueprinting

                                                Mine SAP business events to discover actual
                  Real-Time Monitoring
                                                processes and act in real time to business challenges


                                                Interactively guide end users through process steps
                        Guided Workflow
                                                to improve productivity, visibility and consistency


                       Process Integration      Optimize process steps to improve cycle time,
                        and Orchestration       manageability and visibility of key processes


                         Inline Decision        Automate complex decision making to reduce
                           Automation           bottlenecks and improve business outcomes


                                                Dramatically reduce the cycle time of high volume
                   Process Automation
                                                processes by reducing/removing human interaction



25                                                                                                 © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 How Most SAP Customers Model Their Processes Today

                                                                  Most SAP customers use
                                                                   general purpose
                                                                   documentation tools such
                                                                   as Office or Visio
                                                                  Some leverage Aris or
                                                                   another documentation-
                                                                   centric modeling tool
                                                                  These tools encourage:
                                                                   – A documentation-centric
                                                                     approach to process
                                                                     management
                                                                   – A waterfall approach filled
                                                                     with risk and multiple delay
                                                                     points
                                                                   – Lengthy „analysis paralysis‟
                                                                     SAP project activities


26                                                                                          © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Traditional SAP Implementation Approach
                                                                  Goal Setting and Scope
                                                                       Management


                                                                    SAP
                                                                  Process            Process
                                                                  Library            Analysis
        Most SAP implementations follow a typical
         waterfall approach
            – Goal setting                                        SAP Process Blueprinting
            – Analysis                                            (Powerpoint, Visio, Excel, Aris)
            – Design
            – Test
                                                                   SAP Solution Manager
            – Deployment
        SAP maintains their process flows in
         Solution Manager, which is used to
         document, but not control, the business                 Configure           Customize
         process

27                                                                                       © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 But with IBM BPM, SAP Processes Can Be Played Back At
 Any Time - Regardless of their definition maturity

                                                          Start by importing SAP or IBM best
                                                           practice libraries
                                                          Playback any process from the design
                                                           environment – regardless of the level of
                                                           detail and completion
                                                          Include real screens, mockups or
                                                           images
                                                          Clarify roles, process steps, flow, KPIs
                                                           and reporting

             Playback                                     Even process skeletons can be
                                                           executed
                                                             – Process execution is logged
                                                             – All process performance parameters are
                                                               visible
                                                             – KPIs are calculated and displayed in real
                                                               time

28                                                                                            © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Design SAP Processes Experientially
                                                                  Playbacks allow each
                                                                   stakeholder to participate
                                                                   DIRECTLY in the blueprinting
                                                                   process
                                                                  The ability to see, feel and
                                                                   touch the process as it‟s
                                                                   executing:
                                                                    – Delivers a richer, superior
                                                                      design experience
                                                                    – Allows a broader range of
                                                                      participants
                                                                    – Allows stakeholders to
                                                                      participate as their schedule
                                                                      permits
                                                                    – Encourages an iterative
                                                                      approach
                                                                    – Decreases the time required
                                                                      to blueprint a process
29                                                                                          © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Playback-Based Iterative SAP Process Blueprinting
      SAP Solution                                      Design, build and refine processes for execution in
                               Model Processes          a single integrated tool set. Optionally store
        Manager
                                                        process definitions in SAP Solution Manager
                                                        Repository.
                                Invoke Screens          Iteratively invoke or design screens as part of the
                                                        process definition exercise

                               Playback Process         Playback modeled processes at any time to
                                                        directly see, feel and touch the real process

                                Monitor Results         Empirically understand how the process can
                                                        meet KPIs and SLAs

                                 Simulate and           Simulate changes without changing the current
                                    Refine              model


                                    Deploy!             Promote the new or changed process into
                                                        production


            Use ‘live’ process execution to design and test SAP business
          processes, then implement your SAP process inside the same tool!
30                                                                                             © 2012 IBM Corporation
IBM BPM for SAP     IBM Software Group | WebSphere software

 Applying IBM BPM for SAP
                          Modeling for          Use an iterative, experiential-based approach to
                         Documentation          accelerate traditional SAP blueprinting

                                                Mine SAP business events to discover actual
                  Real-Time Monitoring
                                                processes and act in real time to business challenges


                                                Interactively guide end users through process steps
                        Guided Workflow
                                                to improve productivity, visibility and consistency


                       Process Integration      Optimize process steps to improve cycle
                        and Orchestration       time, manageability and visibility of key processes


                         Inline Decision        Automate complex decision making to reduce
                           Automation           bottlenecks and improve business outcomes


                                                Dramatically reduce the cycle time of high volume
                   Process Automation
                                                processes by reducing/removing human interaction



31                                                                                                 © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 SAP Process Documentation Is Usually Outdated by Months or Years

                  2008                                                         2012
              SAP process                                                       Probably
              blueprints created                                                Outdated

              SAP design                                                        Probably
              completed                                                         Outdated
              SAP configuration
                                                                             Documentation
              changes                Additional SAP configuration changes
                                                                            Possibly Outdated
              completed
              SAP
                                                                             Documentation
              customization          Additional SAP customization
                                                                            Possibly Outdated
              completed
                                     Ad hoc changes to processes by end       Blueprint Not
                                     users                                      Updated

           Without insight into the ‘real’ SAP processes being used in production,
            it is very difficult to initiate and build an effective process innovation
                         program or to migrate to a newer SAP release.
32                                                                                         © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 IBM Business Monitor Provides Easy to Use SAP Process
 Discovery and Insight
                                                                  View SAP transactions as
                                                                   processes – without process
                                                                   orchestration!
                                                                  Easily create „shadow process‟
                                                                   views of SAP Business Events by
                                                                   associating milestones with
                                                                   changes in business state
                                                                  Completely non-intrusive to SAP –
                                                                   simply turn on the SAP Business
                                                                   Events needed
                                                                  Automatically create a process view
                                                                   of any SAP Business Event(s) to:
           All without disrupting                                   – Understand the actual SAP
          your SAP environment!                                       processes being used in production
          (and no custom coding)                                    – Prepare for process innovation
                                                                    – Detect business challenges as they
                                                                      happen
                                                                    – Fix issues before they become
                                                                      problems

33                                                                                             © 2012 IBM Corporation
IBM Business Monitor - Powerful BAM and Real-Time Reporting for SAP
                                                           Understand up-to-
                                                           minute business
                                      Identify trends,     performance by
                                      forecast events,     monitoring KPIs
                                      make smart
                                      choices




                                                                   Detect, respond
                                                                   rapidly to
                                                                   change



                                      Continuously
                                      improve key
                         Customize    business processes
                         dashboards
                         easily

                                                             Rebalance human
                                                             workload on the fly
                        Leverage
                        mobile
                        devices




34
                                                                      © 2012 IBM Corporation
IBM BPM for SAP     IBM Software Group | WebSphere software

 Applying IBM BPM for SAP
                          Modeling for          Use an iterative, experiential-based approach to
                         Documentation          accelerate traditional SAP blueprinting

                                                Mine SAP business events to discover actual
                  Real-Time Monitoring
                                                processes and act in real time to business challenges


                                                Interactively guide end users through process steps
                        Guided Workflow
                                                to improve productivity, visibility and consistency


                       Process Integration      Optimize process steps to improve cycle
                        and Orchestration       time, manageability and visibility of key processes


                         Inline Decision        Automate complex decision making to reduce
                           Automation           bottlenecks and improve business outcomes


                                                Dramatically reduce the cycle time of high volume
                   Process Automation
                                                processes by reducing/removing human interaction



35                                                                                                 © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 IBM BPM Can Deliver Guided Workflow for SAP
                                                                              Yes
                                                                                    VOK0 -
                                                                                    Maintain
                                                                                    Pricing

                             VD03 - Display       VA01 -
         Select                                                   New pricing
                               customer           Create
        customer                                                   Required?
                                master          sales order

                                                                         No

      SAP Process Flow                                           CK51N - Create
                                                                                        IW21 - Create
       in IBM BPM V8                                             Order BOM Cost
                                                                                         notification
                                                                    Estimate



Transactions (Native SAP
 Screens) Automatically
     Invoked in SAP




         Invoke the correct SAP transaction sequence for each process
       instance, while gaining real time insight into business performance
                             issues and opportunities
36                                                                                               © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 IBM BPM Guided Workflow Improves SAP Value
                                                              Documented processes become
                                                               orchestrated processes
                                                              Improve SAP process:
                                                                 – Visibility
                                                                 – Manageability
                                                                 – Reliability
                                                                 – Consistency
                                                                 – Auditability
                                                                 – Performance
                                                              Detect bottlenecks
                                                              Reroute process instances with
                                                               capacity overload
                                                              Escalate problem processes
                                                              Initiate and track exception
                                                               processes
                                                              Begin continuous process
                                                               improvement
37                                                                                            © 2012 IBM Corporation
IBM BPM for SAP     IBM Software Group | WebSphere software

 Applying IBM BPM for SAP
                          Modeling for          Use an iterative, experiential-based approach to
                         Documentation          accelerate traditional SAP blueprinting

                                                Mine SAP business events to discover actual
                  Real-Time Monitoring
                                                processes and act in real time to business challenges


                                                Interactively guide end users through process steps
                        Guided Workflow
                                                to improve productivity, visibility and consistency


                       Process Integration      Optimize process steps to improve cycle
                        and Orchestration       time, manageability and visibility of key processes


                         Inline Decision        Automate complex decision making to reduce
                           Automation           bottlenecks and improve business outcomes


                                                Dramatically reduce the cycle time of high volume
                   Process Automation
                                                processes by reducing/removing human interaction



38                                                                                                 © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Use IBM BPM V8 to Orchestrate SAP Externally




                                                      Adapter

             Guided Workflow                                               Process
             Management for                                             Orchestration
                  SAP                                   BAPIs        and/or Automation
                                                   Process           with SAP Enterprise
                                                Orchestration              Services
                                              and/or Automation
                                                 with BAPIs

             Express, Standard or             Advanced Only (BPEL)   Advanced Only (BPEL)
              Advanced (BPMN)


39                                                                                   © 2012 IBM Corporation
IBM BPM V8 Orchestrates Complex End-to-End Processes




                           End-to-End Process Choreography

1.   Order is                        3.   Credit check   4.   Customer order     5.   Required        8.    Customer
                  2.   Customer
     received                             and approval        is written and          components            order is
                       records are
     from the web                         are                 confirmed for           and capacity          produced, pic
                       updated with
     site                                 completed           production              are                   ked from
                       order request
                                                                                      determined,           warehouse
                       information
                                                                                      ordered, allo         and
                                                         6.   Production order        cated and             scheduled for
                  9.   Customer                               is completed and        received              shipping
                       order is                               warehoused
                       invoiced

                                                         7.   Customer order
                                                              is approved for
                                                              shipment

     IBM BPM 8.0 helps improve the business performance of both simple and complex
                               mission-critical processes.
40                                                                                                    © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 BPM Enhances the Value of Your SAP Investment
                                                                            SAP with IBM
     Benefit                                                     SAP Only
                                                                               BPM
     Improve alignment of strategies and operations                            
     Improve productivity                                                    
     Improve insight                                                          
     Reduce costs through increased flexibility                              
     Support changing industry requirements                                    
     Optimize IT spending                                                      
     Reduce risk                                                               
     Improve financial management and corporate governance                     
     Gain higher ROI faster                                                   
     Provide immediate access to enterprise information                        
     Give employees new ways to access enterprise
     information
                                                                               

41                                                                             © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Use IBM BPM Throughout Your SAP Life Cycle
            A New SAP
          Implementation


                                 SAP Process Innovation

                            End-to-End Process Integration

                                  Functional Extensions


             SAP Version
              Migration
                                                                              s



             Most SAP Implementations Benefit from IBM BPM at every life
                                    cycle stage
42                                                                  © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Small Sample of IBM BPM SAP Customers




43                                                               © 2012 IBM Corporation
IBM is the proven leader in all aspects of BPM

 Largest Client Base                                                   Unparalleled expertise
 • 5,000 + BPM Clients                                                  & level of investment
 • Gartner ranks IBM #1 in                                             • Over 15 years of industry
   BPM with 24.7% share                                                  leadership
 • IDC ranks IBM #1 with                                               • 100’s of assets
   34.2% market share                                                  • Broadest, Deepest
                                                                         solution portfolio & services
     Strongest Ecosystem
     • 1000+ Business Partners
     • Global Users group


               Broadest and Most Differentiated Software Capabilities
               •   Simplicity for fast deployment and full business user participation
               •   Centralized governance for repeatability and consistency
               •   Visibility and Control to continuously improve business operations
               •   Power through High Scalability, Integrity & Quality of Service
               •   Market Leading process, case, decision and rules capabilities
               •   Best in class exceptions handling and case management
44
                                                                                         © 2012 IBM Corporation
IBM and SAP Partnership - Qualified, Awarded, Proven
  Certified Global SAP Partner
         – Global Service Partner
         – Global Technology Partner
         – Global Cloud Service Partner


  With a record total of 20 awards, IBM has been recognized
   with an SAP Pinnacle Award every year since it's inception




       SAP Award of          2005               2006               2007               2008               2009               2010
     Excellence for IBM 2 awards for IBM   2 awards for IBM   3 awards for IBM   3 awards for IBM   4 awards for IBM   2 awards for IBM



  IBM itself is one of the largest productive SAP users
           – 40,000+ SAP production users, mixed release levels, all on IBM hardware
           – Improved bookings efficiency by 40%
           – Increased labor productivity by 15%
           – Reduced server build cycle times by 30%
45
                                                                                                                       © 2012 IBM Corporation
IBM SAP International Competency Center (ISICC)

     Provide technical pre-sales solution support for SAP applications and technology
     with IBM hardware and software platforms.


                            On-Site Resources                              SAP Sizing Expertise
                              • IBM hardware and                              • Creation and ownership of
                                software brand experts                          worldwide sizing tools and
                              • Technology managers                             processes
                              • Solutions sales                               • Support the IBM Techline
                              • Project managers                                resources

                            Technology                                     Technical Sales Support
                              •   IBM and SAP projects                        • IBM Technical Sales
                              •   Benchmarking/Sizing tests
                                                                              • Business Partners
                              •   Redbooks and whitepapers
                              •   Tools
                                                                            Third level support when
                           • Executive briefings                             necessary

                                  Founded by IBM and SAP in 1993, located at the SAP headquarters in Walldorf, Germany

46
                                                                                                      © 2012 IBM Corporation
Next Step – BPM Discovery Workshop
      A collaborative workshop between the IBM and you to:
       – Determine which areas of business pain and/or opportunity are good fits for
         BPM
       – Identify and prioritize potential BPM pilot projects
       – Select and scope a pilot project (90-120 days)
      What does the IBM team do?
       – Clarify the process improvement pilot project scope
       – Characterize the expected business impact and benefits
       – Assess the high-level implementation effort and solution development
       – Identify and assess potential risks
       – Identify and rank additional projects beyond the pilot project
      How does it work?
       – Delivered onsite through collaborative discovery sessions with process owners
         and key stakeholders
       – Pre-workshop preparation calls provide orientation and workshop planning
       – Preparatory time is also spent gathering and reviewing existing customer
         process documentation
      Typically 2-3 days, conducted free of charge
47
                                                                                    © 2012 IBM Corporation
48
     © 2012 IBM Corporation
IBM Blueworks Live
 Document and Run Processes in the Cloud

  Increase agility by documenting and refining
   processes in a tool that keeps everyone informed
   of important changes
  Make your organization more efficient by
   automating simple processes that run today over
   email - in as little as 90 seconds!
  Improve the way you work by seamlessly
   collaborating across roles, teams and locations.
   Sign up now for a free 30 day trial.
     https://www.blueworkslive.com/signup/trial
  Escape your inbox by automating the 75% of
   processes organizations currently execute as email
   exchanges


     Ensure your documentation keeps up with change while
     maintaining oversight and governance over process improvement

49
                                                                     © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 IBM Uses IBM BPM Technology For Its SAP Implementation
     Blue Harmony is IBM’s next significant step in transformation towards operating effectively as
     a Globally Integrated Enterprise …


                                                                         Blue Harmony incorporates
                                                                            IBM BPM technology
                                             Global Integration
                                             Opportunity to Order
                                                Order to Cash
                                                   Finance


        .. focuses on enterprise process integration
            Integration and standardization across business units and across geographies
            A shift in culture from optimizing units to optimizing the enterprise
            Substantial improvement in ease of doing business for clients and Business Partners
            Radical transformation of process and IT environment simplifies enterprise controls

        ... implements a solution architecture that leverages the best of IBM
        and SAP products – a showcase for IBM BPM capabilities.

50                                                                                        © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 IBM BPM Drives Faster and Better Blueprinting for
 Your SAP Implementation
                                                             „Live‟ playback during all phases of
                                                              process design and rollout

                                                             Reduce blueprinting time and costs

                                                             Deliver agile SAP business
                                                              processes that are easy to change

                                                             Create market-differentiating SAP
                                                              processes

                                                             Position your SAP implementation
                                                              for process orchestration and
                                                              continuous process improvement



                                                             Business users can directly
                                                             drive the SAP blueprinting
                                                             process.
51                                                                                         © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Event-Based Business Monitoring Can Be Used to Uncover the
 „Real‟ SAP Processes

      VD03 - Display customer                   A list of detailed business
              master                           events, describing what was
                                                actually done by the user
        VA01 - Create sales
              order;                          • Customer displayed (VD03)
                                              • Customer changed (VD04)
      VOK0 - Maintain Pricing;                • Sales order created (VA01)
                                              • Sales order modified (VA02)
       CK51N - Create Order                   • Pricing Maintained (V0K0)
        BOM Cost Estimate
                                              • Sales order modified (VA02)
                                              • Notification previewed (IW22)
      IW21 - Create notification                                                 Which could be
                                              • Order BPM cost estimated        analyzed by a data
                                                created (CK51N)
                  +                                                             analyst or process
                                              • Sales order modified (VA02)        specialist to
          Ad hoc or added                     • Customer displayed (VD03)         discovery real
           process steps
                                                                                process structures


       SAP can create and publish the business events needed to discover
                  the actual business processes in production
52                                                                                      © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 But SAP‟s Business Monitoring Approach is Overly Complex




          …And lots of custom coding is required to implement

53                                                               © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 SAP Solution Manager Stores SAP Process Definitions
 But has no process execution capabilities
 Approximately 40% of SAP customers use Solution Manager to store process definitions




          Process definitions
          only – cannot be
          executed




54                                                                          © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Resulting in a High Amount of Costly SAP Customization
                                                                  Top reasons for SAP
                                                                   customization:
                                                                    – Streamline or customize the
                                                                      SAP user interface
                                                                    – Streamline or customize the
                                                                      SAP process flow
                                                                    – Add complementary functionality
                                                                    – Integrate with non-SAP systems
                                                                  SAP provides tooling to
                                                                   accomplish each, but not in the
                                                                   same tool
                                                                  IBM BPM V8 provides all four
                                                                   capabilities in a single tool,
                                                                   driven by the process definition
                                                                  Reducing SAP customization
                                                                   reduces cost and deployment
                                                                   time, while minimizing risks to
                                                                   future SAP updates



55                                                                                        © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 SAP Provides Services That Help Reduce Customization
                                                           public String search(){
                                                           try {
                                                           // Retrieve an instance of the configuration port
                                                           EmployeeBasicDataByEmployeeQueryResponseIn port = service
                                                           .getEmployeeBasicDataByEmployeeQueryResponse_InSoapBinding();
                                                           // specify username and password issued for you via SDN
                                                           // to authenticate to the backend as follows
                                                           javax.xml.ws.BindingProvider bp =
                                                           (javax.xml.ws.BindingProvider) port;
                                                           Map<String, Object> context = bp.getRequestContext();
                                                           context.put("javax.xml.ws.security.auth.username", "username");
                                                           context.put("javax.xml.ws.security.auth.password", "password");
                                                           // Construct the input to be applied to the service call
                                                           EmployeeID employeeID = new EmployeeID();
                                                           employeeID.setValue(this.employeeID);
                                                           EmployeeBasicDataSelectionByEmployee employeeByEmployee =
                                                           new EmployeeBasicDataSelectionByEmployee();
                                                           employeeByEmployee.setEmployeeID(employeeID);
                                                           EmployeeBasicDataByEmployeeQueryMessage input =
                                                           new EmployeeBasicDataByEmployeeQueryMessage();
                                                           input.setEmployeeBasicDataSelectionByEmployee(employeeByEmployee);
                                                           // Invoke the business methods
                                                           EmployeeBasicDataByEmployeeResponseMessage output = port
                                                           .employeeBasicDataByEmployeeQueryResponseIn(input);
                                                           Employee employee = output.getEmployee();
                                                           //Get the response
                                                           this.employeeName = employee.getCommon().getName().getGivenName();
                                                           this.employeeLastname =
                                                           employee.getCommon().getName().getFamilyName();
                                                           this.employeeBirthday = employee.getCommon().getBirthDate();
                                                           this.employeeMaritalStatus =
                                                           employee.getCommon().getMaritalStatusName().getValue();
                                                           return "ok";
                                                           } catch (Exception e) {
                                                           //Clean the object and return an error
                                                           this.employeeID = "";
                                                           this.employeeName = "";
                                                           this.employeeLastname = "";
                                                           this.employeeBirthday = null;
                                                           this.employeeMaritalStatus = "";
                                                           return "error";
                                                           }




          s
                                                   …but no easy way to implement
56                                                                                                                     © 2012 IBM Corporation
IBM Federated Integration Architecture Strategy
Design for flexibility, agility, innovation and ROI

App-centric Integration                                IBM Federated Architecture
                                   Every business strives to be
                Total Cost         unique, resulting in heavy      Total Cost
                                   process customization for
                                   all but a very
SAP                                few, commodity processes
Customizations
                                      Drive down
                                      cost                                SAP
                                                                          Customizations
                                      Improve
                                      responsiveness
                                      to business
                                      requirements
                    SAP      SOA                                    SAP
                                      Achieve greater                          SOA
                                      flexibility

     Business Fit                                   Business Fit
                             Flexibility                                         Flexibility


             Implement SAP in your company’s best interest, not SAP’s.

57
                                                                                © 2012 IBM Corporation
3 Life Cycles of Business Change Management
                                                  Application Changes
                                                                (Months, Years)

          IT                       Release 1.0                                    Release 2.0




                                                        BPM Changes
                                                               (Weeks, Months)
Business Process
     Owners                                             Change in production

     Subject Mater
       Experts
                                                 Operational Decisions

                                  Release 1.1    Release 1.2        Release 1.3   Release 2.0   Release 2.1




                                                  Business Decisions Updates
       : Application up to date                                  (Days, Weeks)
58                                                                                                     © 2012 IBM Corporation
IBM BPM for SAP     IBM Software Group | WebSphere software

 Applying IBM BPM for SAP
                          Modeling for          Use an iterative, experiential-based approach to
                         Documentation          accelerate traditional SAP blueprinting

                                                Mine SAP business events to discover actual
                  Real-Time Monitoring
                                                processes and act in real time to business challenges


                                                Interactively guide end users through process steps
                        Guided Workflow
                                                to improve productivity, visibility and consistency


                       Process Integration      Optimize process steps to improve cycle
                        and Orchestration       time, manageability and visibility of key processes


                         Inline Decision        Automate complex decision making to reduce
                           Automation           bottlenecks and improve business outcomes


                                                Dramatically reduce the cycle time of high volume
                   Process Automation
                                                processes by reducing/removing human interaction



59                                                                                                 © 2012 IBM Corporation
IBM BPM for SAP     IBM Software Group | WebSphere software

 Applying IBM BPM for SAP
                          Modeling for          Use an iterative, experiential-based approach to
                         Documentation          accelerate traditional SAP blueprinting

                                                Mine SAP business events to discover actual
                  Real-Time Monitoring
                                                processes and act in real time to business challenges


                                                Interactively guide end users through process steps
                        Guided Workflow
                                                to improve productivity, visibility and consistency


                       Process Integration      Optimize process steps to improve cycle time,
                        and Orchestration       manageability and visibility of key processes


                         Inline Decision        Automate complex decision making to reduce
                           Automation           bottlenecks and improve business outcomes


                                                Dramatically reduce the cycle time of high volume
                   Process Automation
                                                processes by reducing/removing human interaction



60                                                                                                 © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 The Value of IBM BPM for SAP




               Business performance                        Variability
               Agility                                     Manageability
               Flexibility                                 Auditability
               Visibility                                  Consistency




61                                                                           © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Large US Toy Company Improves SAP Supply Chain Processes to Reduce
 Costs

                                                                               BPM Solution
      Challenge:
       Increase responsiveness with customers and               • Gathers the bill-of-lading information from
        collaboration with suppliers while utilizing               freight forwarders and corresponding invoice
                                                                   data from SAP at the right time
        previous investments in core enterprise
        applications                                             • Automatically prepares and routes all
                                                                   documentation required
                                                                 • Automates the reconciliation process
       Benefits:                                                   required for all US Customs requirements,
        Increased productivity by 250 percent                     updating SAP at each milestone
         without additional resources being put into
         play
        Reduced cycle times by 80 percent, from
         12 days to only two
        Improved overall business efficiency



           IBM BPM reduced dependency on phone calls, e-mails and paper faxes, while
           standardizing communication between employees and vendors with increased
           process visibility
62                                                                                                 © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Examples of IBM‟s Own BPM Projects and Benefits in 2011


                                 Mid-Market Deal Registration – Delivered $18.5M 2012 PTI by reducing deal
                                 registration cycle time with rules-based work-flow automation.
                                 Supply Chain Alerts – Over $2M annual savings for timely notifications when
                                 supply chain disruptions occur.
                                 Pricing estimator for Cross-brand solutions – Reduced pricing proposal
                                 implementation from 14 days to 1 day and deployment to new countries in
      Business Agility
                                 days versus weeks.
         Achieved
                                 GTS Cloud Sales Enablement – Integrated work-flow, rules and monitoring to
                                 reduce partner “register to welcome kit” cycle-time from days to hours.
                                 GMU Geo Location Code Assignment - Geo location code is key enabler of
                                 GMU expansion. Eliminated manual process and enabled GMU reps to update
                                 rules directly and reduced cycle time to update and run rules from several weeks
                                 with many handoffs to just a week for more than 50 countries.

                                 MTS – Increased IBM Client satisfaction through proactive notification of
                                 exposures in clients‟ IT inventory by applying rules derived via analytics. Proof of
                                 value delivered.
                                 Infrastructure Optimization – Reduced cycle time by 75% to complete the
                                 analysis required to migrate from Physical servers to Virtual servers.




63                                                                                                            © 2012 IBM Corporation
IBM BPM for SAP    IBM Software Group | WebSphere software

 IBM Pricing Estimator for Cross-brand solutions
       Problem
       Takes up to 14 days to create proposals for IBM cross-brand solutions. Prices are hard coded, workflow is manual
       and there is dependence on IT teams for business rule changes.
       Solution
       Scalable web based solution using IBM BPM products (ILOG JRules and WLE 7.2) to significantly reduce cycle time
       for end-to-end price quotation and approval process for IBM cross brand solutions. Deployed smart analytics pricing
       estimator to 10 countries and cloud estimator to 32 countries.
       Note: The solution Release cycle was only 12 weeks.
       Business Agility Improvements

                                            Before                                                Current State
                End-to-end process cycle time to create an approved price   Reduced process cycle time to create an approved price quote in 1
                quote took 4 to 14 days                                     day

                Deployment to new countries took 4 weeks                    Deployment to new countries in 1 week

                Dependence on IT resources to make changes to business      Reduced dependency on IT resources. Business teams can
                rules with 2 weeks turn around time                         change business rules in hours.

                Manual price updates with rigid business rules and          Automatic price updates with rapid business rules and
                process implementation                                      process changes with real time KPI monitoring.

                Just-in-time sales promotions were not possible             Just-in-time sales promotions are possible

                Built on Microsoft technology with no auditability          Built with IBM BPM and ODM technologies with auditability



64                                                                                                                              © 2012 IBM Corporation
 BACKUP




65
                © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 So That You Can….




            Orchestrate agile SAP                                   Instead of simply
          s      processes                                       documenting rigid ones

66                                                                                        © 2012 IBM Corporation
IBM BPM for SAP           IBM Software Group | WebSphere software

 How IBM Uses BPM – Some Examples
     Project Name                 Modeling &      Monitoring   Process Execution &   Rules and Pre-     Content &      Project Status
                                  Simulation                   Optimization          built              Collab, Case
                                                                                     Frameworks         Manager
     GBS Services Project        Blueworks Live                BPM 7.5               I-Log J Rule                      Modelling in BWL prior to
                                                                                                                       PC/PD. Agreement to
     On/Off Boarding             U                             I                     I                                 4hrs/wk with Ricardo
                                                                                                                       Olivieri (Aug-Oct)

     Smart Travel                Blueworks Live                WLE                   I-Log J Rule                      POC, Europe
                                 U                             U                     U
     Mid Market Small            Blueworks Live                BPM 7.5                                                 Current focus on
                                                                                                                       process/policy
     Deals Yield                 I                             I                                                       simplifications
                                                                                                                       Enablement follows

     Dubuque GDC ITD             Blueworks Live                BPM 7.5               I-Log J Rule                      J.Brayer forming team to
                                                                                                                       initiate modelling of GDF
                                 I                             I                     I                                 portfolio.
     Current focus is Simple
     Project Set-up

     Contract                    Blueworks Live                                                                        In Measure/Analyze
     Simplification              -R
     GTS Cloud IT                Blueworks Live                                      I-Log J Rule - U                  Phase 1 – process design
                                                                                                                       complete.
     Enablement for              -R
     Growth                                                                                                            Phase 2 - proposal in
                                                                                                                       progress.
     (formerly called GTS        BPM –
     Cloud – Buy to Use)         evaluation +
                                 custom demo
                                 1/12
     Web based Pricing                                         WLE                   i-log J Rule                      Solution deployed for U.S
                                                                                                                       and other countries Sales
     (Smart Analytics)                                         PR                    PR                                teams.

     Total Risk                                                                      i-Log J Rule                      In production- Aug 11
     assesment-Supply                                                                PR
     Chain alerts
     Blue Harmony                WBM 7.0                                                                               Working with BH process
                                                                                                                       owners to identify reports
                                 R                                                                                     v/s real time monitor value
67                                                                                                                          © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

     Your SAP Processes Deserve the Market Leader: IBM




                       The Forrester Wave:                                   The Gartner Magic Quadrant:
                       "Comprehensive Integration Solutions" Wave   “2010 Business Process Management Suites" MQ




     WebSphere Process Server                                                          WebSphere Lombardi
     drives IBM leadership in                                                           Edition drives IBM
     Forrester Wave                                                                  leadership in Gartner MQ

     high performance                                                                               simple to use
     excellent integration                                                                     fast time-to-value
     superior integrity                    s
                                                                                      deep business engagement
68                                                                                                                 © 2012 IBM Corporation
ERP Vendors and MES


      SAP
       – Acquired Lighthammer in 2005 to provide manufacturing intelligence and MES-like
         functionality to its process manufacturing customers.
       – Acquired Visiprise in 2008 to bolster its MES offering to discrete manufacturers.
      Oracle
       – Oracle Manufacturing Execution System for Process Manufacturing as an add-on to its
         Oracle Process Manufacturing System.
       – Oracle Manufacturing Execution System for Discrete Manufacturing (MES for Discrete
      Even as ERP vendors are offering manufacturing support modules, they haven‟t
       attempted to enter the control space.
      MES products from Oracle and SAP are getting very robust
      Third parties don‟t have all the interaction with the ERP that you get with Oracle
       and SAP
      hop floor automation is the next frontier for manufacturing ERP software.




69
                                                                                             © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Modeling Solutions Like ARIS Only Help Deliver Documentation
 Faster




                                      Better than Powerpoint, Visio or Excel
                                      Can be integrated with the SAP Solution Manager
                                       process repository
                                      Models are optimized for analysis, not execution
                                      Virtually impossible to take an analysis model and use it
          s
                                       directly for execution

70                                                                                      © 2012 IBM Corporation
IBM BPM for SAP

     IBM BPM Can Easily Exchange Models with SAP Solution
     Manager



                                      SAP Solution Manager                   IBM Process Designer
                                      Business Process Hierarchy
                          Lev 0                 Project                         Process Application
                          Lev 1           Business Scenario




                                                                   SSI4BPM
                          Lev 2           Business Process                           Process
                          Lev 3             Process Step                      Activity, (Sub-)process,
                                                                                       Service
                                        Implementation Content               SAP Implementation Content
                                         eg. Transactions, Docs




                                      IBM BPM maps its process elements
                                        directly to SAP Solution Manager
                                            constructs and performs
                                             bidirectional exchanges
                                  s
71                                                                                        © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Most SAP Implementations Have Issues Today

      Late Deployments                          Over Budget              Rigid Processes




                               Poor Operational
                                   Visibility                    ROI Targets Not Met




          s


72                                                                                © 2012 IBM Corporation
IBM BPM – An innovative solution to a complex problem
Embrace complexity, adapt quickly and exceed expectations




                     Simplicity                     Power
Simple, easy-to-use modeling using
                                                    Industry standard BPEL orchestration
                   standard BPMN
                                                    Built-in ESB and integration adapters
      Immediate “playback” for rapid
                      collaboration                 Transaction and Process Integrity support
     Process rule engine uses ILOG                  WebSphere Application Server scalability
                      BAL language




                     Visibility                     Governance
        Integrated Business Activity               Single repository of all process assets
                        Monitoring
                                                   “Toolkits” for sharing assets
     Real-time process scoreboards
                                                   Simple snapshot versioning (1-click)
 “Heat maps” show bottlenecks in
                 process model                     Centralized deployment control center (1-click)

73                                                                                 © 2012 IBM Corporation
IBM BPM Overview
 BPM provides innovative tooling to capture, understand, document, collaborate, and
  optimize ANY business process causing the most pain, or needing the most visibility
 BPM projects do not require disruptive multi-year investments
 Create process models that execute the process
 Easily provide business owners with real-time monitoring of any process that has been
  implemented with the tooling



                                    Finance
                                    and Ops
                  Risk Management
                  Teams                Account        Executive
                                                      Management
     PEOPLE                          Administration


       Customer
       Service




                                    RULES

     PROCESS




     SYSTEMS


74
                                                                                © 2012 IBM Corporation
IBM BPM for SAP   IBM Software Group | WebSphere software

 Workflow in the Traditional SAP Implementation
                                                                       VD03 - Display customer
                                                                               master


                                                                         VA01 - Create sales
                                                                                order;


                                                                       VOK0 - Maintain Pricing;


                                                                        CK51N - Create Order
                                                                         BOM Cost Estimate


                                                                      IW21 - Create notification


        Process designers create SAP documentation (paper, Word, HTML, etc.)
        Users are trained in how to use the SAP process documents
        Some users comply with the process as designed, others create their own
        Training time for new users is often lengthy
        Difficult to move users from task to task, even in the same department
        Little to no visibility of backlogs, bottlenecks, poor throughput and other
         process issues
75                                                                                       © 2012 IBM Corporation

Enable process visbility: The Value Proposition for SAP customers

  • 1.
    Shop Floor Automationand Solutions to Enable Process Visibility and Improvement The Value Proposition for SAP Customers Joe Kaczmarek Worldwide Sales Leader, IBM Business Process Management and Operational Decision Management Joe.kaczmarek@us.ibm.com
  • 2.
    Session Themes  Integrated application systems (ERP, CRM, MES, etc.) provide core business support  The attractiveness and pervasiveness of best practice process adoption has raised the bar in achieving marketplace differentiation  The tension between standardized and differentiated processes in the manufacturing context creates pivotal strategic decision points  IBM has developed approaches and solutions for achieving process innovation and continuous improvement for manufacturers in a packaged application environment 2 © 2012 IBM Corporation
  • 3.
    Agenda  Shop Floor Automation solutions  Process challenges  Packaged application challenges  IBM BPM for SAP 3 © 2012 IBM Corporation
  • 4.
    Manufacturing Execution Systems(MES)  The MES has become the translation center between ERP and the real-time continuous data of plant operations  Controls vendors have developed MES offerings – Invensys Operations Management (IOM) – Rockwell – Siemens – Others…  In recent years, ERP vendors have extended their plant floor capabilities – ERP vendors have touted the easy integration that their MES provides – Best-of-breed MES suppliers typically have greater functionality – SAP, Oracle and even Microsoft have enhanced their MES offerings through R&D and acquisitions 4 © 2012 IBM Corporation
  • 5.
    Business Benefits ofMES  Capability areas: – Automated data collection – Material control  Greater – Product traceability efficiency, profitability, prod – Quality control uctivity – Production reporting  Respond to market changes both quickly and  Benefit categories: correctly and help adopt – Data accuracy production processes – in real-time. – Reporting timeliness – Manual reporting reduction 5 © 2012 IBM Corporation
  • 6.
    Key Strategic DecisionPoint – Single Vendor or Best of Breed? or Reduced integration costs and Typically, better functionality improved integration or functional alignment – but more integration required 6 © 2012 IBM Corporation
  • 7.
    Most MES VendorsProvide Some Technical Integration Capabilities …But much technical work remains to connect the ERP environment to the MES. An ESB is typically still required. 7 © 2012 IBM Corporation
  • 8.
    And Technical Integrationis Only Half the Solution Finance Executive Process and Ops Management Managers Account Administration Risk Management Teams Business Integration Customer Service (Workflow Management, Business Monitoring, Process Automation, Business Rules, Complex Event Processing) Technical Integration (ESBs, Adapters, Application Integration, B2B) Decision Managers 8 © 2012 IBM Corporation
  • 9.
    Agenda  Shop Floor Automation solutions  Process challenges  Packaged application challenges  IBM BPM for SAP 9 © 2012 IBM Corporation
  • 10.
    Typical Process Problems Customer Service Finance Account and Ops Administration • Incomplete or Executive 6 inaccurate workflows 1 Management 3 • Lack of control • Poor performance visibility and insight Invoice Reconciliation • Inability to integrate Teams 2 unstructured or ad hoc tasks and communications (ex paper, email or 4 IM) 5 10 © 2012 IBM Corporation
  • 11.
    Process is aPriority to Clients Make business process more efficient 56% Introduce new IT-led products or services for our customers Process is 40% Priority! Get better business intelligence to more employees, faster 36% Lower IT or business costs 36% Improve Web operations or customer experience 34% Improve customer service 26% Engage customers in new ways 24% Process Improvement is the #1 Priority for CIOs - 5 years in a row Gartner, Inc, “Leading in Times of Transition: The 2010 CIO Agenda” Data September 2010 Information Week 500 Survey 11 © 2012 IBM Corporation
  • 12.
    Agenda  Shop Floor Automation solutions  Process challenges  Packaged application challenges  IBM BPM for SAP 12 © 2012 IBM Corporation
  • 13.
    Packaged ERP ApplicationsDeliver Strong Business Value  Improve alignment of strategies and operations  Improve productivity and insight  Reduce costs through increased flexibility  Support changing industry requirements  Reduce risk  Improve financial management and SAP customers excel by corporate governance taking advantage of SAP’s industry-specific  Optimize IT spending knowledge, best practices  Gain higher ROI faster and standardized processes  Retain top performers – all codified into the world’s leading integrated  Give employees new ways to application platform. access the enterprise information required for their daily activities. 13 © 2012 IBM Corporation
  • 14.
    But Still FarShort of Their Full Potential What ERP/MES typically deliver value today Where they fall short Improve operational alignment Improve strategic alignment Improve productivity Improve insight Reduce costs Increase flexibility Support changing industry Support differentiated processes requirements Improve ROI Improve ROI faster New ways to access enterprise Provide active real time business information monitoring Optimize IT spending Optimize business value 14 © 2012 IBM Corporation
  • 15.
    And Implementation RisksRemain… METRIC AVERAGE Took longer than expected 57% Total implementation cost exceeds budget 54% Failed to realize 50%+ of benefits 41% Failed to realize some benefits 22% Operational disruption at go-live 40% Executives unsatisfied 32% Employees unsatisfied 39% Source: Panorama Consulting 2010 ERP Report 15 © 2012 IBM Corporation
  • 16.
    IBM BPM forSAP IBM Software Group | WebSphere software Root Causes of SAP Implementation Issues Most SAP implementation …much documentation is customization static and does is often not reflect the required processes actually being used Most SAP processes rely on human …making it compliance difficult to with process migrate to documentation future releases … s 16 © 2012 IBM Corporation
  • 17.
    IBM BPM forSAP IBM Software Group | WebSphere software A Typical SAP Process Today A high level process blueprint is defined in Powerpoint, Visio, SAP Solution Manager or a modeling tool, including transactions: VD03 - Display customer master VA01 - Create sales order; VOK0 - Maintain Pricing; CK51N - Create Order BOM Cost Estimate IW21 - Create notification The implementation then relies on users to read, properly understand and comply with documentation by entering the proper sequence of transaction codes in SAP. 17 © 2012 IBM Corporation
  • 18.
    IBM BPM forSAP IBM Software Group | WebSphere software With This Approach, How Can You?....  Quickly know the status of key A high level process blueprint is defined in processes? Powerpoint, Visio, SAP Solution Manager or a modeling tool  Ensure that the process you VD03 - Display customer master designed is the process that is being VA01 - Create sales executed? order; VOK0 - Maintain Pricing;  Get real-time visibility into where CK51N - Create Order workload or other bottlenecks are BOM Cost Estimate causing business issues? IW21 - Create notification  Effectively reroute work to less experienced workers to reduce The implementation then relies on users to read, properly understand and comply with bottlenecks? documentation by entering the proper sequence of transaction codes in SAP.  Know which process changes are most likely to help improve business performance? Many SAP customers attempt  Quickly rollout SAP process to address these issues with changes? customization.  Quickly integrate new process workers into your business? 18 © 2012 IBM Corporation
  • 19.
    Agenda  Shop Floor Automation solutions  Process challenges  Packaged application challenges  IBM BPM for SAP 19 © 2012 IBM Corporation
  • 20.
    IBM BPM forSAP IBM Software Group | WebSphere software With IBM BPM 8.0 The picture IS your process… Analyze. Define. Execute. Monitor. Improve. All in one tool – analysis through execution through improvement s 20 © 2012 IBM Corporation
  • 21.
    BPM Brings Orderto the Chaos Finance Executive Process 1. 1 Automate workflow & and Ops Management Managers decision making Account Administration Risk Management 2. 2 Reduce errors and Customer Teams improve consistency Service 3. 3 Standardize resolution across geographies 4. 4 Leverage existing systems and data 5 5. Monitor for business events and initiate actions 6. 6 Real-time visibility and process control Customer Benefits: • Huge Reduction in Manual Work, Errors • Faster, More Consistent Issue Resolution Decision • Easier to Manage the Managers Business • Consistent Case Handling 21 © 2012 IBM Corporation
  • 22.
    Two Methods AreRequired to Optimize Business Processes 1. Packaged Applications 2. BPM Tools & SOA  Improve 100‟s of processes at once  Adapt quickly  Outpace the competition  Sunset inflexible legacy systems  Process visibility across core and  Catch up to competitors other application systems  Huge multi-year projects  Smaller, incremental projects Natural Tendency Natural Tendency BPM Process Optimization Process Optimization Approach A Approach B Non-Differentiating Differentiating Business Processes Business Processes Successful organizations will have a balanced I/T Strategy of SOA/BPM and ERP Consolidation 22 © 2012 IBM Corporation
  • 23.
    IBM BPM forSAP IBM Software Group | WebSphere software IBM BPM V8 Integrates Seamlessly with SAP SD FI Sales & Financial Distribution Accounting Orchestrate SAP MM Materials CO Services Mgmt. Controlling AA PP Asset Production Accounting Planning SM Service SAP EC Enterprise Controlling Mgmt. QM Applications PS Project Quality Mgmt. System PM Plant WF Maintenance Workflo w HR IS Human Industry Resources Solutions Monitor SAP Business Events Download processes Upload processes to Retrieve Enterprise from Solution Manager Solution Manager Service Definitions s 23 © 2012 IBM Corporation
  • 24.
    IBM BPM forSAP IBM Software Group | WebSphere software Applying IBM BPM for SAP Modeling for Use an iterative, experiential-based approach to Documentation accelerate traditional SAP blueprinting Mine SAP business events to discover actual Real-Time Monitoring processes and act in real time to business challenges Increasing Integration Interactively guide end users through SAP and E2E Guided Workflow process steps to improve productivity, visibility and consistency Process Integration Optimize process steps to improve cycle and Orchestration time, manageability and visibility of key processes Inline Decision Automate complex decision making to reduce Automation bottlenecks and improve business outcomes Dramatically reduce the cycle time of high volume Process Automation processes by reducing/removing human interaction 24 © 2012 IBM Corporation
  • 25.
    IBM BPM forSAP IBM Software Group | WebSphere software Applying IBM BPM for SAP Modeling for Use an iterative, experiential-based approach to Documentation accelerate traditional SAP blueprinting Mine SAP business events to discover actual Real-Time Monitoring processes and act in real time to business challenges Interactively guide end users through process steps Guided Workflow to improve productivity, visibility and consistency Process Integration Optimize process steps to improve cycle time, and Orchestration manageability and visibility of key processes Inline Decision Automate complex decision making to reduce Automation bottlenecks and improve business outcomes Dramatically reduce the cycle time of high volume Process Automation processes by reducing/removing human interaction 25 © 2012 IBM Corporation
  • 26.
    IBM BPM forSAP IBM Software Group | WebSphere software How Most SAP Customers Model Their Processes Today  Most SAP customers use general purpose documentation tools such as Office or Visio  Some leverage Aris or another documentation- centric modeling tool  These tools encourage: – A documentation-centric approach to process management – A waterfall approach filled with risk and multiple delay points – Lengthy „analysis paralysis‟ SAP project activities 26 © 2012 IBM Corporation
  • 27.
    IBM BPM forSAP IBM Software Group | WebSphere software Traditional SAP Implementation Approach Goal Setting and Scope Management SAP Process Process Library Analysis  Most SAP implementations follow a typical waterfall approach – Goal setting SAP Process Blueprinting – Analysis (Powerpoint, Visio, Excel, Aris) – Design – Test SAP Solution Manager – Deployment  SAP maintains their process flows in Solution Manager, which is used to document, but not control, the business Configure Customize process 27 © 2012 IBM Corporation
  • 28.
    IBM BPM forSAP IBM Software Group | WebSphere software But with IBM BPM, SAP Processes Can Be Played Back At Any Time - Regardless of their definition maturity  Start by importing SAP or IBM best practice libraries  Playback any process from the design environment – regardless of the level of detail and completion  Include real screens, mockups or images  Clarify roles, process steps, flow, KPIs and reporting Playback  Even process skeletons can be executed – Process execution is logged – All process performance parameters are visible – KPIs are calculated and displayed in real time 28 © 2012 IBM Corporation
  • 29.
    IBM BPM forSAP IBM Software Group | WebSphere software Design SAP Processes Experientially  Playbacks allow each stakeholder to participate DIRECTLY in the blueprinting process  The ability to see, feel and touch the process as it‟s executing: – Delivers a richer, superior design experience – Allows a broader range of participants – Allows stakeholders to participate as their schedule permits – Encourages an iterative approach – Decreases the time required to blueprint a process 29 © 2012 IBM Corporation
  • 30.
    IBM BPM forSAP IBM Software Group | WebSphere software Playback-Based Iterative SAP Process Blueprinting SAP Solution Design, build and refine processes for execution in Model Processes a single integrated tool set. Optionally store Manager process definitions in SAP Solution Manager Repository. Invoke Screens Iteratively invoke or design screens as part of the process definition exercise Playback Process Playback modeled processes at any time to directly see, feel and touch the real process Monitor Results Empirically understand how the process can meet KPIs and SLAs Simulate and Simulate changes without changing the current Refine model Deploy! Promote the new or changed process into production Use ‘live’ process execution to design and test SAP business processes, then implement your SAP process inside the same tool! 30 © 2012 IBM Corporation
  • 31.
    IBM BPM forSAP IBM Software Group | WebSphere software Applying IBM BPM for SAP Modeling for Use an iterative, experiential-based approach to Documentation accelerate traditional SAP blueprinting Mine SAP business events to discover actual Real-Time Monitoring processes and act in real time to business challenges Interactively guide end users through process steps Guided Workflow to improve productivity, visibility and consistency Process Integration Optimize process steps to improve cycle and Orchestration time, manageability and visibility of key processes Inline Decision Automate complex decision making to reduce Automation bottlenecks and improve business outcomes Dramatically reduce the cycle time of high volume Process Automation processes by reducing/removing human interaction 31 © 2012 IBM Corporation
  • 32.
    IBM BPM forSAP IBM Software Group | WebSphere software SAP Process Documentation Is Usually Outdated by Months or Years 2008 2012 SAP process Probably blueprints created Outdated SAP design Probably completed Outdated SAP configuration Documentation changes Additional SAP configuration changes Possibly Outdated completed SAP Documentation customization Additional SAP customization Possibly Outdated completed Ad hoc changes to processes by end Blueprint Not users Updated Without insight into the ‘real’ SAP processes being used in production, it is very difficult to initiate and build an effective process innovation program or to migrate to a newer SAP release. 32 © 2012 IBM Corporation
  • 33.
    IBM BPM forSAP IBM Software Group | WebSphere software IBM Business Monitor Provides Easy to Use SAP Process Discovery and Insight  View SAP transactions as processes – without process orchestration!  Easily create „shadow process‟ views of SAP Business Events by associating milestones with changes in business state  Completely non-intrusive to SAP – simply turn on the SAP Business Events needed  Automatically create a process view of any SAP Business Event(s) to: All without disrupting – Understand the actual SAP your SAP environment! processes being used in production (and no custom coding) – Prepare for process innovation – Detect business challenges as they happen – Fix issues before they become problems 33 © 2012 IBM Corporation
  • 34.
    IBM Business Monitor- Powerful BAM and Real-Time Reporting for SAP Understand up-to- minute business Identify trends, performance by forecast events, monitoring KPIs make smart choices Detect, respond rapidly to change Continuously improve key Customize business processes dashboards easily Rebalance human workload on the fly Leverage mobile devices 34 © 2012 IBM Corporation
  • 35.
    IBM BPM forSAP IBM Software Group | WebSphere software Applying IBM BPM for SAP Modeling for Use an iterative, experiential-based approach to Documentation accelerate traditional SAP blueprinting Mine SAP business events to discover actual Real-Time Monitoring processes and act in real time to business challenges Interactively guide end users through process steps Guided Workflow to improve productivity, visibility and consistency Process Integration Optimize process steps to improve cycle and Orchestration time, manageability and visibility of key processes Inline Decision Automate complex decision making to reduce Automation bottlenecks and improve business outcomes Dramatically reduce the cycle time of high volume Process Automation processes by reducing/removing human interaction 35 © 2012 IBM Corporation
  • 36.
    IBM BPM forSAP IBM Software Group | WebSphere software IBM BPM Can Deliver Guided Workflow for SAP Yes VOK0 - Maintain Pricing VD03 - Display VA01 - Select New pricing customer Create customer Required? master sales order No SAP Process Flow CK51N - Create IW21 - Create in IBM BPM V8 Order BOM Cost notification Estimate Transactions (Native SAP Screens) Automatically Invoked in SAP Invoke the correct SAP transaction sequence for each process instance, while gaining real time insight into business performance issues and opportunities 36 © 2012 IBM Corporation
  • 37.
    IBM BPM forSAP IBM Software Group | WebSphere software IBM BPM Guided Workflow Improves SAP Value  Documented processes become orchestrated processes  Improve SAP process: – Visibility – Manageability – Reliability – Consistency – Auditability – Performance  Detect bottlenecks  Reroute process instances with capacity overload  Escalate problem processes  Initiate and track exception processes  Begin continuous process improvement 37 © 2012 IBM Corporation
  • 38.
    IBM BPM forSAP IBM Software Group | WebSphere software Applying IBM BPM for SAP Modeling for Use an iterative, experiential-based approach to Documentation accelerate traditional SAP blueprinting Mine SAP business events to discover actual Real-Time Monitoring processes and act in real time to business challenges Interactively guide end users through process steps Guided Workflow to improve productivity, visibility and consistency Process Integration Optimize process steps to improve cycle and Orchestration time, manageability and visibility of key processes Inline Decision Automate complex decision making to reduce Automation bottlenecks and improve business outcomes Dramatically reduce the cycle time of high volume Process Automation processes by reducing/removing human interaction 38 © 2012 IBM Corporation
  • 39.
    IBM BPM forSAP IBM Software Group | WebSphere software Use IBM BPM V8 to Orchestrate SAP Externally Adapter Guided Workflow Process Management for Orchestration SAP BAPIs and/or Automation Process with SAP Enterprise Orchestration Services and/or Automation with BAPIs Express, Standard or Advanced Only (BPEL) Advanced Only (BPEL) Advanced (BPMN) 39 © 2012 IBM Corporation
  • 40.
    IBM BPM V8Orchestrates Complex End-to-End Processes End-to-End Process Choreography 1. Order is 3. Credit check 4. Customer order 5. Required 8. Customer 2. Customer received and approval is written and components order is records are from the web are confirmed for and capacity produced, pic updated with site completed production are ked from order request determined, warehouse information ordered, allo and 6. Production order cated and scheduled for 9. Customer is completed and received shipping order is warehoused invoiced 7. Customer order is approved for shipment IBM BPM 8.0 helps improve the business performance of both simple and complex mission-critical processes. 40 © 2012 IBM Corporation
  • 41.
    IBM BPM forSAP IBM Software Group | WebSphere software BPM Enhances the Value of Your SAP Investment SAP with IBM Benefit SAP Only BPM Improve alignment of strategies and operations   Improve productivity   Improve insight   Reduce costs through increased flexibility   Support changing industry requirements   Optimize IT spending   Reduce risk   Improve financial management and corporate governance   Gain higher ROI faster   Provide immediate access to enterprise information   Give employees new ways to access enterprise information   41 © 2012 IBM Corporation
  • 42.
    IBM BPM forSAP IBM Software Group | WebSphere software Use IBM BPM Throughout Your SAP Life Cycle A New SAP Implementation SAP Process Innovation End-to-End Process Integration Functional Extensions SAP Version Migration s Most SAP Implementations Benefit from IBM BPM at every life cycle stage 42 © 2012 IBM Corporation
  • 43.
    IBM BPM forSAP IBM Software Group | WebSphere software Small Sample of IBM BPM SAP Customers 43 © 2012 IBM Corporation
  • 44.
    IBM is theproven leader in all aspects of BPM Largest Client Base Unparalleled expertise • 5,000 + BPM Clients & level of investment • Gartner ranks IBM #1 in • Over 15 years of industry BPM with 24.7% share leadership • IDC ranks IBM #1 with • 100’s of assets 34.2% market share • Broadest, Deepest solution portfolio & services Strongest Ecosystem • 1000+ Business Partners • Global Users group Broadest and Most Differentiated Software Capabilities • Simplicity for fast deployment and full business user participation • Centralized governance for repeatability and consistency • Visibility and Control to continuously improve business operations • Power through High Scalability, Integrity & Quality of Service • Market Leading process, case, decision and rules capabilities • Best in class exceptions handling and case management 44 © 2012 IBM Corporation
  • 45.
    IBM and SAPPartnership - Qualified, Awarded, Proven  Certified Global SAP Partner – Global Service Partner – Global Technology Partner – Global Cloud Service Partner  With a record total of 20 awards, IBM has been recognized with an SAP Pinnacle Award every year since it's inception SAP Award of 2005 2006 2007 2008 2009 2010 Excellence for IBM 2 awards for IBM 2 awards for IBM 3 awards for IBM 3 awards for IBM 4 awards for IBM 2 awards for IBM  IBM itself is one of the largest productive SAP users – 40,000+ SAP production users, mixed release levels, all on IBM hardware – Improved bookings efficiency by 40% – Increased labor productivity by 15% – Reduced server build cycle times by 30% 45 © 2012 IBM Corporation
  • 46.
    IBM SAP InternationalCompetency Center (ISICC) Provide technical pre-sales solution support for SAP applications and technology with IBM hardware and software platforms.  On-Site Resources  SAP Sizing Expertise • IBM hardware and • Creation and ownership of software brand experts worldwide sizing tools and • Technology managers processes • Solutions sales • Support the IBM Techline • Project managers resources  Technology  Technical Sales Support • IBM and SAP projects • IBM Technical Sales • Benchmarking/Sizing tests • Business Partners • Redbooks and whitepapers • Tools  Third level support when • Executive briefings necessary Founded by IBM and SAP in 1993, located at the SAP headquarters in Walldorf, Germany 46 © 2012 IBM Corporation
  • 47.
    Next Step –BPM Discovery Workshop  A collaborative workshop between the IBM and you to: – Determine which areas of business pain and/or opportunity are good fits for BPM – Identify and prioritize potential BPM pilot projects – Select and scope a pilot project (90-120 days)  What does the IBM team do? – Clarify the process improvement pilot project scope – Characterize the expected business impact and benefits – Assess the high-level implementation effort and solution development – Identify and assess potential risks – Identify and rank additional projects beyond the pilot project  How does it work? – Delivered onsite through collaborative discovery sessions with process owners and key stakeholders – Pre-workshop preparation calls provide orientation and workshop planning – Preparatory time is also spent gathering and reviewing existing customer process documentation  Typically 2-3 days, conducted free of charge 47 © 2012 IBM Corporation
  • 48.
    48 © 2012 IBM Corporation
  • 49.
    IBM Blueworks Live Document and Run Processes in the Cloud  Increase agility by documenting and refining processes in a tool that keeps everyone informed of important changes  Make your organization more efficient by automating simple processes that run today over email - in as little as 90 seconds!  Improve the way you work by seamlessly collaborating across roles, teams and locations. Sign up now for a free 30 day trial. https://www.blueworkslive.com/signup/trial  Escape your inbox by automating the 75% of processes organizations currently execute as email exchanges Ensure your documentation keeps up with change while maintaining oversight and governance over process improvement 49 © 2012 IBM Corporation
  • 50.
    IBM BPM forSAP IBM Software Group | WebSphere software IBM Uses IBM BPM Technology For Its SAP Implementation Blue Harmony is IBM’s next significant step in transformation towards operating effectively as a Globally Integrated Enterprise … Blue Harmony incorporates IBM BPM technology Global Integration Opportunity to Order Order to Cash Finance .. focuses on enterprise process integration  Integration and standardization across business units and across geographies  A shift in culture from optimizing units to optimizing the enterprise  Substantial improvement in ease of doing business for clients and Business Partners  Radical transformation of process and IT environment simplifies enterprise controls ... implements a solution architecture that leverages the best of IBM and SAP products – a showcase for IBM BPM capabilities. 50 © 2012 IBM Corporation
  • 51.
    IBM BPM forSAP IBM Software Group | WebSphere software IBM BPM Drives Faster and Better Blueprinting for Your SAP Implementation  „Live‟ playback during all phases of process design and rollout  Reduce blueprinting time and costs  Deliver agile SAP business processes that are easy to change  Create market-differentiating SAP processes  Position your SAP implementation for process orchestration and continuous process improvement Business users can directly drive the SAP blueprinting process. 51 © 2012 IBM Corporation
  • 52.
    IBM BPM forSAP IBM Software Group | WebSphere software Event-Based Business Monitoring Can Be Used to Uncover the „Real‟ SAP Processes VD03 - Display customer A list of detailed business master events, describing what was actually done by the user VA01 - Create sales order; • Customer displayed (VD03) • Customer changed (VD04) VOK0 - Maintain Pricing; • Sales order created (VA01) • Sales order modified (VA02) CK51N - Create Order • Pricing Maintained (V0K0) BOM Cost Estimate • Sales order modified (VA02) • Notification previewed (IW22) IW21 - Create notification Which could be • Order BPM cost estimated analyzed by a data created (CK51N) + analyst or process • Sales order modified (VA02) specialist to Ad hoc or added • Customer displayed (VD03) discovery real process steps process structures SAP can create and publish the business events needed to discover the actual business processes in production 52 © 2012 IBM Corporation
  • 53.
    IBM BPM forSAP IBM Software Group | WebSphere software But SAP‟s Business Monitoring Approach is Overly Complex …And lots of custom coding is required to implement 53 © 2012 IBM Corporation
  • 54.
    IBM BPM forSAP IBM Software Group | WebSphere software SAP Solution Manager Stores SAP Process Definitions But has no process execution capabilities Approximately 40% of SAP customers use Solution Manager to store process definitions Process definitions only – cannot be executed 54 © 2012 IBM Corporation
  • 55.
    IBM BPM forSAP IBM Software Group | WebSphere software Resulting in a High Amount of Costly SAP Customization  Top reasons for SAP customization: – Streamline or customize the SAP user interface – Streamline or customize the SAP process flow – Add complementary functionality – Integrate with non-SAP systems  SAP provides tooling to accomplish each, but not in the same tool  IBM BPM V8 provides all four capabilities in a single tool, driven by the process definition  Reducing SAP customization reduces cost and deployment time, while minimizing risks to future SAP updates 55 © 2012 IBM Corporation
  • 56.
    IBM BPM forSAP IBM Software Group | WebSphere software SAP Provides Services That Help Reduce Customization public String search(){ try { // Retrieve an instance of the configuration port EmployeeBasicDataByEmployeeQueryResponseIn port = service .getEmployeeBasicDataByEmployeeQueryResponse_InSoapBinding(); // specify username and password issued for you via SDN // to authenticate to the backend as follows javax.xml.ws.BindingProvider bp = (javax.xml.ws.BindingProvider) port; Map<String, Object> context = bp.getRequestContext(); context.put("javax.xml.ws.security.auth.username", "username"); context.put("javax.xml.ws.security.auth.password", "password"); // Construct the input to be applied to the service call EmployeeID employeeID = new EmployeeID(); employeeID.setValue(this.employeeID); EmployeeBasicDataSelectionByEmployee employeeByEmployee = new EmployeeBasicDataSelectionByEmployee(); employeeByEmployee.setEmployeeID(employeeID); EmployeeBasicDataByEmployeeQueryMessage input = new EmployeeBasicDataByEmployeeQueryMessage(); input.setEmployeeBasicDataSelectionByEmployee(employeeByEmployee); // Invoke the business methods EmployeeBasicDataByEmployeeResponseMessage output = port .employeeBasicDataByEmployeeQueryResponseIn(input); Employee employee = output.getEmployee(); //Get the response this.employeeName = employee.getCommon().getName().getGivenName(); this.employeeLastname = employee.getCommon().getName().getFamilyName(); this.employeeBirthday = employee.getCommon().getBirthDate(); this.employeeMaritalStatus = employee.getCommon().getMaritalStatusName().getValue(); return "ok"; } catch (Exception e) { //Clean the object and return an error this.employeeID = ""; this.employeeName = ""; this.employeeLastname = ""; this.employeeBirthday = null; this.employeeMaritalStatus = ""; return "error"; } s …but no easy way to implement 56 © 2012 IBM Corporation
  • 57.
    IBM Federated IntegrationArchitecture Strategy Design for flexibility, agility, innovation and ROI App-centric Integration IBM Federated Architecture Every business strives to be Total Cost unique, resulting in heavy Total Cost process customization for all but a very SAP few, commodity processes Customizations Drive down cost SAP Customizations Improve responsiveness to business requirements SAP SOA SAP Achieve greater SOA flexibility Business Fit Business Fit Flexibility Flexibility Implement SAP in your company’s best interest, not SAP’s. 57 © 2012 IBM Corporation
  • 58.
    3 Life Cyclesof Business Change Management Application Changes (Months, Years) IT Release 1.0 Release 2.0 BPM Changes (Weeks, Months) Business Process Owners Change in production Subject Mater Experts Operational Decisions Release 1.1 Release 1.2 Release 1.3 Release 2.0 Release 2.1 Business Decisions Updates : Application up to date (Days, Weeks) 58 © 2012 IBM Corporation
  • 59.
    IBM BPM forSAP IBM Software Group | WebSphere software Applying IBM BPM for SAP Modeling for Use an iterative, experiential-based approach to Documentation accelerate traditional SAP blueprinting Mine SAP business events to discover actual Real-Time Monitoring processes and act in real time to business challenges Interactively guide end users through process steps Guided Workflow to improve productivity, visibility and consistency Process Integration Optimize process steps to improve cycle and Orchestration time, manageability and visibility of key processes Inline Decision Automate complex decision making to reduce Automation bottlenecks and improve business outcomes Dramatically reduce the cycle time of high volume Process Automation processes by reducing/removing human interaction 59 © 2012 IBM Corporation
  • 60.
    IBM BPM forSAP IBM Software Group | WebSphere software Applying IBM BPM for SAP Modeling for Use an iterative, experiential-based approach to Documentation accelerate traditional SAP blueprinting Mine SAP business events to discover actual Real-Time Monitoring processes and act in real time to business challenges Interactively guide end users through process steps Guided Workflow to improve productivity, visibility and consistency Process Integration Optimize process steps to improve cycle time, and Orchestration manageability and visibility of key processes Inline Decision Automate complex decision making to reduce Automation bottlenecks and improve business outcomes Dramatically reduce the cycle time of high volume Process Automation processes by reducing/removing human interaction 60 © 2012 IBM Corporation
  • 61.
    IBM BPM forSAP IBM Software Group | WebSphere software The Value of IBM BPM for SAP  Business performance  Variability  Agility  Manageability  Flexibility  Auditability  Visibility  Consistency 61 © 2012 IBM Corporation
  • 62.
    IBM BPM forSAP IBM Software Group | WebSphere software Large US Toy Company Improves SAP Supply Chain Processes to Reduce Costs BPM Solution Challenge:  Increase responsiveness with customers and • Gathers the bill-of-lading information from collaboration with suppliers while utilizing freight forwarders and corresponding invoice data from SAP at the right time previous investments in core enterprise applications • Automatically prepares and routes all documentation required • Automates the reconciliation process Benefits: required for all US Customs requirements,  Increased productivity by 250 percent updating SAP at each milestone without additional resources being put into play  Reduced cycle times by 80 percent, from 12 days to only two  Improved overall business efficiency IBM BPM reduced dependency on phone calls, e-mails and paper faxes, while standardizing communication between employees and vendors with increased process visibility 62 © 2012 IBM Corporation
  • 63.
    IBM BPM forSAP IBM Software Group | WebSphere software Examples of IBM‟s Own BPM Projects and Benefits in 2011 Mid-Market Deal Registration – Delivered $18.5M 2012 PTI by reducing deal registration cycle time with rules-based work-flow automation. Supply Chain Alerts – Over $2M annual savings for timely notifications when supply chain disruptions occur. Pricing estimator for Cross-brand solutions – Reduced pricing proposal implementation from 14 days to 1 day and deployment to new countries in Business Agility days versus weeks. Achieved GTS Cloud Sales Enablement – Integrated work-flow, rules and monitoring to reduce partner “register to welcome kit” cycle-time from days to hours. GMU Geo Location Code Assignment - Geo location code is key enabler of GMU expansion. Eliminated manual process and enabled GMU reps to update rules directly and reduced cycle time to update and run rules from several weeks with many handoffs to just a week for more than 50 countries. MTS – Increased IBM Client satisfaction through proactive notification of exposures in clients‟ IT inventory by applying rules derived via analytics. Proof of value delivered. Infrastructure Optimization – Reduced cycle time by 75% to complete the analysis required to migrate from Physical servers to Virtual servers. 63 © 2012 IBM Corporation
  • 64.
    IBM BPM forSAP IBM Software Group | WebSphere software IBM Pricing Estimator for Cross-brand solutions Problem Takes up to 14 days to create proposals for IBM cross-brand solutions. Prices are hard coded, workflow is manual and there is dependence on IT teams for business rule changes. Solution Scalable web based solution using IBM BPM products (ILOG JRules and WLE 7.2) to significantly reduce cycle time for end-to-end price quotation and approval process for IBM cross brand solutions. Deployed smart analytics pricing estimator to 10 countries and cloud estimator to 32 countries. Note: The solution Release cycle was only 12 weeks. Business Agility Improvements Before Current State End-to-end process cycle time to create an approved price Reduced process cycle time to create an approved price quote in 1 quote took 4 to 14 days day Deployment to new countries took 4 weeks Deployment to new countries in 1 week Dependence on IT resources to make changes to business Reduced dependency on IT resources. Business teams can rules with 2 weeks turn around time change business rules in hours. Manual price updates with rigid business rules and Automatic price updates with rapid business rules and process implementation process changes with real time KPI monitoring. Just-in-time sales promotions were not possible Just-in-time sales promotions are possible Built on Microsoft technology with no auditability Built with IBM BPM and ODM technologies with auditability 64 © 2012 IBM Corporation
  • 65.
     BACKUP 65 © 2012 IBM Corporation
  • 66.
    IBM BPM forSAP IBM Software Group | WebSphere software So That You Can…. Orchestrate agile SAP Instead of simply s processes documenting rigid ones 66 © 2012 IBM Corporation
  • 67.
    IBM BPM forSAP IBM Software Group | WebSphere software How IBM Uses BPM – Some Examples Project Name Modeling & Monitoring Process Execution & Rules and Pre- Content & Project Status Simulation Optimization built Collab, Case Frameworks Manager GBS Services Project Blueworks Live BPM 7.5 I-Log J Rule Modelling in BWL prior to PC/PD. Agreement to On/Off Boarding U I I 4hrs/wk with Ricardo Olivieri (Aug-Oct) Smart Travel Blueworks Live WLE I-Log J Rule POC, Europe U U U Mid Market Small Blueworks Live BPM 7.5 Current focus on process/policy Deals Yield I I simplifications Enablement follows Dubuque GDC ITD Blueworks Live BPM 7.5 I-Log J Rule J.Brayer forming team to initiate modelling of GDF I I I portfolio. Current focus is Simple Project Set-up Contract Blueworks Live In Measure/Analyze Simplification -R GTS Cloud IT Blueworks Live I-Log J Rule - U Phase 1 – process design complete. Enablement for -R Growth Phase 2 - proposal in progress. (formerly called GTS BPM – Cloud – Buy to Use) evaluation + custom demo 1/12 Web based Pricing WLE i-log J Rule Solution deployed for U.S and other countries Sales (Smart Analytics) PR PR teams. Total Risk i-Log J Rule In production- Aug 11 assesment-Supply PR Chain alerts Blue Harmony WBM 7.0 Working with BH process owners to identify reports R v/s real time monitor value 67 © 2012 IBM Corporation
  • 68.
    IBM BPM forSAP IBM Software Group | WebSphere software Your SAP Processes Deserve the Market Leader: IBM The Forrester Wave: The Gartner Magic Quadrant: "Comprehensive Integration Solutions" Wave “2010 Business Process Management Suites" MQ WebSphere Process Server WebSphere Lombardi drives IBM leadership in Edition drives IBM Forrester Wave leadership in Gartner MQ high performance simple to use excellent integration fast time-to-value superior integrity s deep business engagement 68 © 2012 IBM Corporation
  • 69.
    ERP Vendors andMES  SAP – Acquired Lighthammer in 2005 to provide manufacturing intelligence and MES-like functionality to its process manufacturing customers. – Acquired Visiprise in 2008 to bolster its MES offering to discrete manufacturers.  Oracle – Oracle Manufacturing Execution System for Process Manufacturing as an add-on to its Oracle Process Manufacturing System. – Oracle Manufacturing Execution System for Discrete Manufacturing (MES for Discrete  Even as ERP vendors are offering manufacturing support modules, they haven‟t attempted to enter the control space.  MES products from Oracle and SAP are getting very robust  Third parties don‟t have all the interaction with the ERP that you get with Oracle and SAP  hop floor automation is the next frontier for manufacturing ERP software. 69 © 2012 IBM Corporation
  • 70.
    IBM BPM forSAP IBM Software Group | WebSphere software Modeling Solutions Like ARIS Only Help Deliver Documentation Faster  Better than Powerpoint, Visio or Excel  Can be integrated with the SAP Solution Manager process repository  Models are optimized for analysis, not execution  Virtually impossible to take an analysis model and use it s directly for execution 70 © 2012 IBM Corporation
  • 71.
    IBM BPM forSAP IBM BPM Can Easily Exchange Models with SAP Solution Manager SAP Solution Manager IBM Process Designer Business Process Hierarchy Lev 0 Project Process Application Lev 1 Business Scenario SSI4BPM Lev 2 Business Process Process Lev 3 Process Step Activity, (Sub-)process, Service Implementation Content SAP Implementation Content eg. Transactions, Docs IBM BPM maps its process elements directly to SAP Solution Manager constructs and performs bidirectional exchanges s 71 © 2012 IBM Corporation
  • 72.
    IBM BPM forSAP IBM Software Group | WebSphere software Most SAP Implementations Have Issues Today Late Deployments Over Budget Rigid Processes Poor Operational Visibility ROI Targets Not Met s 72 © 2012 IBM Corporation
  • 73.
    IBM BPM –An innovative solution to a complex problem Embrace complexity, adapt quickly and exceed expectations Simplicity Power Simple, easy-to-use modeling using Industry standard BPEL orchestration standard BPMN Built-in ESB and integration adapters Immediate “playback” for rapid collaboration Transaction and Process Integrity support Process rule engine uses ILOG WebSphere Application Server scalability BAL language Visibility Governance Integrated Business Activity Single repository of all process assets Monitoring “Toolkits” for sharing assets Real-time process scoreboards Simple snapshot versioning (1-click) “Heat maps” show bottlenecks in process model Centralized deployment control center (1-click) 73 © 2012 IBM Corporation
  • 74.
    IBM BPM Overview BPM provides innovative tooling to capture, understand, document, collaborate, and optimize ANY business process causing the most pain, or needing the most visibility  BPM projects do not require disruptive multi-year investments  Create process models that execute the process  Easily provide business owners with real-time monitoring of any process that has been implemented with the tooling Finance and Ops Risk Management Teams Account Executive Management PEOPLE Administration Customer Service RULES PROCESS SYSTEMS 74 © 2012 IBM Corporation
  • 75.
    IBM BPM forSAP IBM Software Group | WebSphere software Workflow in the Traditional SAP Implementation VD03 - Display customer master VA01 - Create sales order; VOK0 - Maintain Pricing; CK51N - Create Order BOM Cost Estimate IW21 - Create notification  Process designers create SAP documentation (paper, Word, HTML, etc.)  Users are trained in how to use the SAP process documents  Some users comply with the process as designed, others create their own  Training time for new users is often lengthy  Difficult to move users from task to task, even in the same department  Little to no visibility of backlogs, bottlenecks, poor throughput and other process issues 75 © 2012 IBM Corporation