IEEE 2015-2016 TOPICS (FINAL YEAR)
PUNE HEAD OFFICE:
OFFICE NO: 06, 2nd
Wing, Gangotri Heights, Near to APEX Hospital, Kalewadi Phata, Pune Pin-033
CONTACT: +91-9503522733/+91-9503522638/+91-9049265435/+91-9890704605
Email-ieeeprojectguru@gmail.com / info@ieeeprojectguru.com
Follow us on facebook-www.facebook.com/Ieeeprojectguru
Follow us on Twitter-www.twitter.com/ieeeprojectgur1
Web-www.ieeeprojectguru.com
Download Abstract From: www.ieeeprojectguru.com
1 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
SR.NO PROJECT
CODE
PROJECT NAME DOMAIN YEAR
ADVANCED VLSI DESIGN PROJECTS
1 EMB1 A new reversible design of BCD adder VLSI 2015
2 EMB2 Design and Estimation of delay, power and area for Parallel
prefix adders
VLSI 2015
3 EMB3 Approach to design a compact reversible low power binary
comparator
VLSI 2015
4 EMB4 A Low Power Fault Tolerant Reversible Decoder Using MOS
Transistor
VLSI 2015
5 EMB5 Low power and area efficient carry select adder VLSI 2015
6 EMB6 Architectural level power optimization techniques for
multipliers
VLSI 2015
7 EMB7 Hardware implementation of RFID Mutual Authentication
Protocol.
VLSI 2015
8 EMB8 Verilog modeling of WI-FI MAC Layer for Transmitter VLSI 2015
9 EMB9 FPGA implementation of USB transceiver macro cell
interface with usb2.0 specifications
VLSI 2015
10 EMB10 VHDL implementation of lossless data compression. VLSI 2015
11 EMB11 A vliw vector media compressor with cascaded SIMD
ALU’S.
VLSI 2015
12 EMB12 Design and implementation of blue tooth security using
VHDL.
VLSI 2015
13 EMB13 Design and implementation of APB bridge based on AMBA
4.0
VLSI 2015
14 EMB14 Applying CDMA technique to network-on-chip VLSI 2015
15 EMB15 FPGA Implementation of Scalable Encryption Algorithm. VLSI 2015
16 EMB16 FPGA implementation of SHA-1 algorithm VLSI 2015
17 EMB17 Implementation of the hummingbird cryptographic
Algorithm
VLSI 2015
18 EMB18 Cyclic redundancy check generation using multiple lookup
table algorithms
VLSI 2015
19 EMB19 An on-chip AHB bus tracer with real time compression and
dynamic multi-resolution supports for SOC
VLSI 2015
20 EMB20 Self-immunity technique to improve register file integrity
against soft errors.
VLSI 2015
21 EMB21 Design and simulation of UART serial communication
module based on VHDL.
VLSI 2015
22 EMB22 Optimized Reversible Vedic Multipliers for High Speed Low
Power operations
VLSI 2015
23 EMB23 Radix-8 Booth Encoded modulo multipliers with adoptive
delay for high dynamic range Residue Number System.
VLSI 2015
24 EMB24 Design of high speed hybrid carry select adder VLSI 2015
25 EMB25 Design of characterization of parallel pre-fix adders using
FPGA.
VLSI 2015
26 EMB26 Energy Efficient Code Converters using Reversible Logic
Gates
VLSI 2015
27 EMB27 Reducing the computation time in (short bit-width) two’s
complement multipliers.
VLSI 2015
28 EMB28 A new vlsi architecture of parallel Multiplier Accumulator
Based On Radix-2 Modified Booth Algorithm
VLSI 2015
29 EMB29 The design of high performance barrel integer adder VLSI 2015
30 EMB30 A High Speed Binary Floating Point Multiplier Using Dadda
Algorithm
VLSI 2015
31 EMB31 Detection of Hardware Trojan in SEA Using Path Delay VLSI 2015
Download Abstract From: www.ieeeprojectguru.com
2 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
32 EMB32 Recursive Approach to the Design of a Parallel Self-Timed
Adder
VLSI 2015
33 EMB33 Implementation of vending machine controller VLSI 2015
34 EMB34 Implementation of Traffic Light Controller VLSI 2015
35 EMB35 Implementation of Digital Clock VLSI 2015
36 EMB36 Implementation of Electronic Voting Machine controller VLSI 2015
37 EMB37 Implementation of Universal Asynchronous
receiver/Transmitter
VLSI 2015
38 EMB38 Implementation of Serial Peripheral Interface VLSI 2015
39 EMB39 Implementation of Content Addressable Memory VLSI 2015
40 EMB40 Implementation of 32 bit Cyclic Redundancy Check VLSI 2015
41 EMB41 Implementation of Barrel Shifter VLSI 2015
42 EMB42 Implementation of Round Robin Arbiter VLSI 2015
43 EMB43 Finite state machine based vending machine controller
with auto-billing features
VLSI 2015
44 EMB44 Finite state machine based vending machine controller
with auto-billing features
VLSI 2015
45 EMB45 parallel multiplier accumulator Based on radix-2 Modified
Booth Algorithm by using a VLSI architecture
VLSI 2015
46 EMB46 LUT Optimization for Memory-Based Computation. VLSI 2015
47 EMB47 Optimized implementation of FFT processor for OFDM
systems
VLSI 2015
48 EMB48 Arithmetic & logic unit (ALU) design using reversible
control unit
VLSI 2015
49 EMB49 Design and minimization of reversible circuits for a data
acquisition and storage system
VLSI 2015
50 EMB50 Design & implementation of MAC unit using reversible logic VLSI 2015
51 EMB51 An efficient implementation of floating point multiplier VLSI 2015
52 EMB52 A table-based algorithm for pipelined CRC calculation VLSI 2015
53 EMB53 Parity Preserving Logic based Fault Tolerant Reversible ALU VLSI 2015
54 EMB54 A novel analysis of sequential circuits design using
reversible logic gates
VLSI 2015
55 EMB55 A distinguish between reversible and conventional logic
gates
VLSI 2015
56 EMB56 Modified toffoli gate and its applications in designing
components of reversible arithmetic and logic unit
VLSI 2015
57 EMB57 A new reversible design of BCD adder VLSI 2015
58 EMB58 Fault tolerant variable block carry skip logic (VBCSL) using
parity preserving
VLSI 2015
59 EMB59 Design of a nano metric reversible 4-bit binary counter
with parallel load
VLSI 2015
60 EMB60 Introduction to reversible logic gates & its application VLSI 2015
61 EMB61 Realization of 2:4 reversible decoder and its applications VLSI 2015
62 EMB62 All Optical Reversible Multiplexer Design using Mach-
Zehnder interferometer
VLSI 2015
63 EMB63 Design of Dedicated Reversible Quantum Circuitry for
Square Computation
VLSI 2015
64 EMB64 Energy Efficient Code Converters using Reversible Logic
Gates
VLSI 2015
65 EMB65 Design of Low Logical Cost Conservative Reversible Adders
using Novel PCTG
VLSI 2015
66 EMB66 Contemplation of Synchronous Gray Code Counter and its
Variants using Reversible Logic Gates
VLSI 2015
67 EMB67 An Optimized Design of Binary Comparator Circuit in
Quantum Computing
VLSI 2015
68 EMB68 Area–Delay–Power Efficient Carry-Select Adder VLSI 2015
Download Abstract From: www.ieeeprojectguru.com
3 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
ADVANCED WIRELESS COMMUNICATION SYSTEM
WI-FI / ZIGBEE / BLUETOOTH / RF / IR
2015
69 EMB69 Wireless Data Encryption and Decryption for Secured
Communication using RF
Wireless 2015
70 EMB70 Wireless Electrical Apparatus Control System with Speed
Control of AC motor in a plant using RF communication
Wireless 2015
71 EMB71 Wireless DC Motor Speed and Direction Control using RF
Communication
Wireless 2015
72 EMB72 Wireless Stepper Motor Control using RF Communication Wireless 2015
73 EMB73 Wireless Electronic Notice Board with Multi Point Receivers
using RF Communication System
Wireless 2015
74 EMB74 Wireless Temperature Monitoring on Remote Seven-
segment Display using RF
Wireless 2015
75 EMB75 RF based tsunami detection and remote alert system with
60dB siren
Wireless 2015
76 EMB76 Advanced Low power wireless Electronic Security System
with magnetic and pet immune PIR sensor with auto-dialer
Wireless 2015
77 EMB77 Wireless Stepper Motor Control using IR Communication Wireless 2015
78 EMB78 Wireless DC Motor Speed and Direction Control using IR
(PWM and H-Bridge)
Wireless 2015
79 EMB79 Wireless Electrical Apparatus Control System using IR
communication
Wireless 2015
80 EMB80 Over speed & unauthorized vehicle detection using IR
based speed sensors
Wireless 2015
81 EMB81 Auto speed control of solar car at specified locations like
school zones / hospitals / residential areas
Wireless 2015
82 EMB82 Density based automatic traffic control system in metros Wireless 2015
83 EMB83 Wireless Stepper Motor Control using IR Communication Wireless 2015
84 EMB84 Bluetooth based Robot Control for Metal Detection
Applications
Wireless 2015
85 EMB85 Android based multi Terrain Robot to travel on water
surface, Indoor and outdoor uneven surfaces for defense
applications
Wireless 2015
86 EMB86 ZigBee based Secured Wireless Data transmission and
Reception
Wireless 2015
87 EMB87 ZigBee based Wireless Electronic Notice Board with Multi
Point Receivers
Wireless 2015
88 EMB88 Two-way Wireless Data Messaging System for Rural Areas
using ZigBee Technology
Wireless 2015
89 EMB89 Streetlight Power Cable Monitoring System Based on
Wireless Sensor Networks using ZigBee communication.
Wireless 2015
90 EMB90 ZigBee based wireless remote weather station monitoring
system
Wireless 2015
91 EMB91 Advanced railway track fault detection with remote station
messaging system using ZigBee communication
Wireless 2015
92 EMB92 Wireless Heartbeat Monitoring System Using ZigBee Wireless 2015
93 EMB93 Digital control for home lighting systems with ZigBee
communication
Wireless 2015
94 EMB94 The temperature humidity monitoring system of soil based
on wireless sensor networks
Wireless 2015
95 EMB95 Innovative congestion control system for ambulance using
Zigbee and AT89S52 Microcontroller
Wireless 2015
96 EMB96 Patient health monitoring (Blood pressure, heart beat and
body temperature) with doctor alert reporting using Zigbee
communication
Wireless 2015
Download Abstract From: www.ieeeprojectguru.com
4 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
97 EMB97 Design and Implementation of an Assisted Body Movement
System for Visually Impaired Children using Zigbee
communication and AT89S52 Microcontroller
Wireless 2015
98 EMB98 Advanced Aircraft anti-collision system using Zigbee
communication and AT89S52 Microcontroller
Wireless 2015
ANDROID BASED EMBEDDED PROJECT
99 EMB99 Android based home automation with fan speed control Android 2015
100 EMB100 Android based password based door lock system for
industrial applications
Android 2015
101 EMB101 Android based electronic notice board (16X2 LCD) Android 2015
102 EMB102 Android based digital heart beat rate and temperature
monitoring system
Android 2015
103 EMB103 Android based vehicle tracking system Android 2015
104 EMB104 Woman security assistance system with GPS tracking and
messaging system
Android 2015
105 EMB105 Android based Robotic Arm with Base Rotation, Elbow and
Wrist Motion with a Functional Gripper
Android 2015
106 EMB106 Android based Metal Detecting Robot with Remote Voice
and Image Transmission to assist bomb detection and
rescue team
Android 2015
107 EMB107 Android based hand gesture based robot control using
(mobile inbuilt Micro Electro Mechanical Sensor) MEMS
technology
Android 2015
108 EMB108 Android based RF Controlled Robotic Boat to Travel in
Water with Wireless Video and Voice
Android 2015
109 EMB109 Android based Fire Fighting Robot with high pressure water
sprinkler
Android 2015
110 EMB110 Android based LPG Detecting Robot with wireless Voice
and Image Transmission
Android 2015
111 EMB111 Android Based farmer friendly Agricultural Robot with
motorized shovel control System with automatic seed
dispensing system
Android 2015
112 EMB112 Android Based Pole climbing Robot for surveillance
application with voice and image recording in SD card /
Memory card
Android 2015
113 EMB113 Android based multi Terrain Robot to travel on water
surface, Indoor and outdoor uneven surfaces for defense
applications
Android 2015
114 EMB114 Android based intelligent speech recognition and voice
operated robot
Android 2015
115 EMB115 Android based voice operated robot Android 2015
ANTENNAS / RADAR / SONAR / MICROWAVE /
FIBER-OPTIC COMMUNICATION / POWER LINE
COMMUNICATION PROJECTS (WITH HARDWARE
KIT)
116 EMB116 Mobile Phone Signal Jammer for GSM, CDMA and 3G
Networks with Prescheduled Time Duration (Mobile
Jammer)
Communication 2015
117 EMB117 Implementation of high sensitive GSM signal detector with
audio visual alert indication
Communication 2015
118 EMB118 Industrial appliances control system by decoding dual tone
multi frequency signals on GSM / CDMA network.
Communication 2015
119 EMB119 Radio standard transmission link (RSTL) failure detection
with auto switchover information system
Communication 2015
120 EMB120 Ultrasonic Target Range Estimation using SONAR Communication 2015
Download Abstract From: www.ieeeprojectguru.com
5 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
Technology
121 EMB121 Implementation of model Radar target direction identifier
with remote station alert system
Communication 2015
122 EMB122 Advanced user controlled roof top antenna signal tracking
system using AT89S52 MCU and 10RPM geared DC motor
Communication 2015
123 EMB123 Implementation of model Radar target direction and
distance identifier with remote voice and text alert system
using Zigbee communication
Communication 2015
124 EMB124 Music transmission and reception with high S/N ratio using
fiber optic communication
Communication 2015
125 EMB 125 PC to Microcontroller Secured Data Communication using
Fiber Optic communication
Communication 2015
126 EMB126 Data Transmission and Reception using Power Line
Communication
Communication 2015
127 EMB127 Industrial Electrical Appliances control system using fiber
optic communication
Communication 2015
PROJECTS BASED ON ARDUINO CONTROLLER /
ATMEGA8 / PIC CONTROLLER
128 EMB128 Implementing character LCD Device Driver development on
LPC2148 ARM
Controller 2015
129 EMB129 Ultrasonic Target Range Estimation using SONAR &Arduino Controller 2015
130 EMB130 Ultrasonic Target Range Estimation using SONAR &Arduino Controller 2015
131 EMB131 Arduino Based Industrial appliances control system by
decoding dual tone multi frequency signals on GSM /
CDMA network.
Controller 2015
132 EMB132 Digital Heart beat Rate monitoring system Using Arduino Controller 2015
133 EMB133 Arduino Based PC to Microcontroller Secured Data
Communication using Fiber Optic Communication
Controller 2015
134 EMB134 Implementation of high sensitive GSM signal detector with
audio visual alert Indication using Arduino
Controller 2015
135 EMB135 Monochrome Image Display On GLCD using Arduino Controller 2015
136 EMB136 RFID security access control system Using Arduino Controller 2015
137 EMB137 RFID based electronic passport system for easy governance
Using Arduino
Controller 2015
138 EMB138 RFID based Airport Luggage security scanning system Using
Arduino
Controller 2015
139 EMB139 IR remote Based Human – computer interface mouse
control for PC Using Arduino
Controller 2015
140 EMB140 Petrochemical Level Indicator and Controller for
Automation of cotton purification process in spinning mills
Using Arduino
Controller 2015
141 EMB141 Programmable temperature monitor and controller for
industrial boilers & Ovens using Arduino
Controller 2015
142 EMB142 Arduino Based High sensitive LDR based power saver for
street light
Controller 2015
143 EMB143 Arduino Based Automatic Temperature based Fan Speed
Controller
Controller 2015
144 EMB144 Arduino Based DC Motor speed control using PWM
Technique
Controller 2015
145 EMB145 Arduino Based Real Time Clock based industrial automation
using
Controller 2015
146 EMB146 RTC based Digital Clock with 7-segment Display with 12 /
24 hours Using Arduino
Controller 2015
147 EMB147 Arduino Based Temperature Monitoring and Display on 7-
segment
Controller 2015
Download Abstract From: www.ieeeprojectguru.com
6 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
148 EMB148 Bluetooth based Wireless Device control for Industrial
Automation Using Arduino
Controller 2015
149 EMB149 Design and implementation of maximum power tracking
system by automatic control of solar panel direction
according to the sun direction (Model Sunflower) Using
Arduino
Controller 2015
150 EMB150 Implementation of solar water pump control with four
different time slots for power saving applications Using
Arduino
Controller 2015
151 EMB151 Next generation alternative energy storage application
with super capacitors / ultra-capacitors with voltage
analyzer using Arduino
Controller 2015
152 EMB152 Arduino Based Foot step power generation system for rural
energy application to run AC and DC loads
Controller 2015
153 EMB153 Solar based mobile charger for rural areas (Charge your
mobile anywhere with sunlight) with battery voltage
analyzer using Arduino
Controller 2015
154 EMB154 Solar highway lighting system with auto turn off on day
time with LCD display using Arduino
Controller 2015
155 EMB155 Bluetooth based Robot Control for Metal Detection
Applications Using Arduino
Controller 2015
156 EMB156 Arduino Based Hand wheel chair movement control for the
disabled using (Micro Electro Mechanical Sensor) MEMS
technology
Controller 2015
157 EMB157 RF Controlled Robotic Boat to Travel in Water with
Wireless Video and Voice Using Arduino
Controller 2015
158 EMB158 Arduino Based RF Controlled Fire Fighting Robot with high
pressure water sprinkler
Controller 2015
159 EMB159 Arduino Based Wireless DC Motor Speed & Direction
Control using IR (PWM and H-Bridge)
Controller 2015
160 EMB160 Arduino Based Wireless Electrical Apparatus Control
System using IR communication
Controller 2015
161 EMB161 Digital control for home lighting systems with ZigBee
Communication Using Arduino
Controller 2015
162 EMB162 The temperature humidity monitoring system of soil based
on wireless sensor networks Using Arduino
Controller 2015
163 EMB163 Data transmission and reception from PIC 16F877A MCU to
PC’s hyper terminal using RS232 communication using PIC
microcontroller
Controller 2015
164 EMB164 Petrochemical level indicator and controller for automation
of cotton purification process in spinning mills using PIC
microcontroller
Controller 2015
165 EMB165 Speed and direction control of DC motor using PIC
microcontroller using PWM and H – bridge
Controller 2015
166 EMB166 Real time clock based industrial automation using dallas
RTC and I2C protocol using PIC
Controller 2015
167 EMB167 Temperature monitoring using PIC MCU for industrial
boilers and ovens
Controller 2015
168 EMB168 Stepper motor control using PIC microcontroller for robotic
applications
Controller 2015
169 EMB169 Embedded rigging free electronic voting system with
instant results using PIC microcontroller
Controller 2015
170 EMB170 Password based access control system protocol using PIC
microcontroller
Controller 2015
171 EMB171 Temperature monitoring using PIC MCU for industrial
boilers and ovens
Controller 2015
Download Abstract From: www.ieeeprojectguru.com
7 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
AT89S52 MICROCONTROLLER BASED PROJECTS
172 EMB172 Auto turn off for water pump with four different time slots
for power saving applications
AT89S52 Based 2015
173 EMB173 DC Motor speed control using PWM Technique using
AT89S52 MCU
AT89S52 Based 2015
174 EMB174 Implementation of artificial eye for Intelligent Line
Following Robot application using AT89S52 MCU
AT89S52 Based 2015
175 EMB175 DTMF based Industrial automation and appliances control
system for rural and agriculture applications using AT89S52
MCU
AT89S52 Based 2015
176 EMB176 Stepper motor control using AT89S52 for robotic
applications
AT89S52 Based 2015
177 EMB177 Design and implementation of maximum power tracking
system by automatic control of solar panel direction
accoridng to the sun direction (Model Sunflower)
AT89S52 Based 2015
178 EMB178 Ultra Violet Sterilization System with UV Lamp Failure
Detection and content Volume Monitoring using Magnet
Sensor
AT89S52 Based 2015
179 EMB179 Intelligent car wash system with infrared proximity sensor
triggered conveyor belt arrangement using AT89S52 MCU
AT89S52 Based 2015
180 EMB180 Petrochemical Level Indicator and Controller for
Automation of cotton purification process in spinning mills
using 89S52 MCU
AT89S52 Based 2015
181 EMB181 Programmable temperature monitor and controller for
industrial boilers & ovens using AT89S52 MCU
AT89S52 Based 2015
182 EMB182 High sensitive LDR based power saver for street light
control system
AT89S52 Based 2015
183 EMB183 Automatic Temperature based Fan Speed Controller AT89S52 Based 2015
184 EMB184 Real Time Clock based industrial automation using Dallas
RTC and I2C protocol using AT89S52 MCU
AT89S52 Based 2015
185 EMB185 Implementation of Path clearing assist stick and obstacles
detection safety cap for the blind
AT89S52 Based 2015
186 EMB186 Digital Heart beat Rate monitoring system using AT89C51
MCU
AT89S52 Based 2015
187 EMB187 Automatic medicine reminder with RTC interfacing using
AT89S52 and 16X2 LCD
AT89S52 Based 2015
188 EMB188 Shock proof electrical appliances control system for
physically challenged using AT89S52 MCU
AT89S52 Based 2015
189 EMB189 Advanced patient monitoring system (body temperature &
heart beat) on PC using AT89S52 MCU
AT89S52 Based 2015
190 EMB190 Gesture Controlled Speaking Micro Controller for the deaf
& dumb
AT89S52 Based 2015
191 EMB191 Next Generation Braille System Implementation: Mobile
Communication Device for the Blind
AT89S52 Based 2015
192 EMB192 Embedded Automatic Car Parking System using AT89C51
MCU
AT89S52 Based 2015
193 EMB193 Embedded automatic two gate interlock for toll tax system
using AT89S52 MCU
AT89S52 Based 2015
194 EMB194 Loco-pilot operated voice based station announcement
system for alerting passengers in the train
AT89S52 Based 2015
195 EMB195 Automatic speed control of vehicle at school zones using IR
sensor using AT89S52 MCU
AT89S52 Based 2015
196 EMB196 Vehicle over speed detection with audio buzzer alert
system on highways using AT89S52 MCU
AT89S52 Based 2015
197 EMB197 Density based traffic light system with auto traffic signal AT89S52 Based 2015
Download Abstract From: www.ieeeprojectguru.com
8 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
transition for VIP vehicles / ambulance
198 EMB198 High sensitive IR based Unmanned Railway Gate Control AT89S52 Based 2015
199 EMB199 Super sensitive Industrial Security System with Auto
dialer& 60dB loud siren using AT89S52 MCU
AT89S52 Based 2015
200 EMB200 Embedded Password based Access Control System using
I2C
AT89S52 Based 2015
201 EMB201 Coin operated fortune telling system with dancing LED
effect using AT89S52 MCU
AT89S52 Based 2015
202 EMB202 Embedded Quiz monitoring system with team performance
evaluation using AT89S52 MCU
AT89S52 Based 2015
203 EMB203 Embedded Rigging free Electronic Voting System with
instant results
AT89S52 Based 2015
204 EMB204 Electronic Notice Board with LED Dot Matrix Display and
PS2 key board interfacing for user friendly message entry
AT89S52 Based 2015
205 EMB205 Automatic School Bell with user defined time schedule
using I2C protocol using AT89S52 MCU
AT89S52 Based 2015
206 EMB206 Digital Code converters BCD to Grey / Excess-3 / 7-segment AT89S52 Based 2015
207 EMB207 Embedded concentration tester – Touch Me Not using
AT89S52
AT89S52 Based 2015
208 EMB208 Automatic Dam Gate Control System with Caution Alarm AT89S52 Based 2015
209 EMB209 Electronic Private Automatic Branch Exchange System with
call forward and call pcik up
AT89S52 Based 2015
210 EMB210 RTC based Digital Clock with Seven-segment Display with
12 / 24 hours mode using AT89S52 MCU
AT89S52 Based 2015
211 EMB211 Gold and Silver Rate Display System with EEPROM Data
Back up System using AT89S52 MCU
AT89S52 Based 2015
212 EMB212 Automatic Active Phase selector for single phase load from
three phase supply
AT89S52 Based 2015
213 EMB213 Intelligent automatic podium light control system using
AT89C51 MCU
AT89S52 Based 2015
213 EMB213 Automatic plant irrigation system with dry / wet soil sense
and controlling 230V water pump for agricultural
applications using AT89S52 MCU
AT89S52 Based 2015
214 EMB214 Distance Calculation for underground cable faults AT89S52 Based 2015
215 EMB215 Automatic Room Light control with Visitor Counting for
power saving applications
AT89S52 Based 2015
216 EMB216 Jogger bench using PWM Technique and H-Bridge with
person fall detection & prevent ion
AT89S52 Based 2015
217 EMB217 Jogger bench using PWM Technique and H-Bridge with
person fall detection & prevent ion
AT89S52 Based 2015
218 EMB218 PC based Appliances control in a plant using PCs parallel
port (C-Language)
AT89S52 Based 2015
IEEE 2014 PROJECTS ON DIGITAL IMAGE / SIGNAL
/ AUDIO / SPEECH PROCESSING /
COMMUNICATION / NETWORKING
219 EMB219 Touch screen and wireless communication based personal
assistant for Dumb and illiterate in Airlines
Image/Signal 2015
220 EMB220 Face recognition and facial expression identification using
PCA
Image/Signal 2015
221 EMB221 Expression Invariant Fragmented Face Recognition Image/Signal 2015
222 EMB222 Face recognition using Eigen faces Image/Signal 2015
223 EMB223 Palm print recognition using PCA Image/Signal 2015
224 EMB224 Human Eye Iris Recognition Using Discrete 2d Reverse Bi
orthogonal Wavelet 6.8
Image/Signal 2015
Download Abstract From: www.ieeeprojectguru.com
9 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
225 EMB225 Fingerprint recognition using minutiae-based features Image/Signal 2015
226 EMB226 A New Dynamic Thresholding Based Technique for
Detection of Hard Exudates in Digital Retinal Fundus Image
Image/Signal 2015
227 EMB227 Detection and classification of exudates using k-means
clustering in color retinal images
Image/Signal 2015
228 EMB228 Methods to Enhance Digital Fundus Image for Diabetic
Retinopathy Detection
Image/Signal 2015
229 EMB229 Brain Tumor Detection, Demarcation and Quantification via
MRI
Image/Signal 2015
230 EMB230 Image compression and resizing for retinal implant in
Bionic eye
Image/Signal 2015
231 EMB231 Particle Swarm Optimization (PSO) for image registration Image/Signal 2015
232 EMB232 Automatic retina exudates segmentation without manually
labeled kit
Image/Signal 2015
233 EMB233 Identification of diabetic Maculopathy stages using fundus
images
Image/Signal 2015
234 EMB234 Fast Compressive Tracking Image/Signal 2015
235 EMB235 Image Geo-Localization Based on Multiple Nearest
Neighbor Feature Matching Using Generalized Graphs
Image/Signal 2015
236 EMB236 Robust Object Tracking via Sparse Collaborative
Appearance Model
Image/Signal 2015
237 EMB237 High-Speed Tracking with Kernelized Correlation Filters Image/Signal 2015
238 EMB238 High-Speed Tracking with Kernelized Correlation Filters Image/Signal 2015
239 EMB239 Medical Image Fusion Based on Joint Sparse Method Image/Signal 2015
240 EMB240 Implementation of image fusion algorithm using MATLAB Image/Signal 2015
241 EMB241 Scale-Space SIFT Flow Image/Signal 2015
242 EMB242 A novel algorithm for view and illumination invariant image
matching
Image/Signal 2015
243 EMB243 Horizontal Velocity Estimation Via Downward Looking
Descent Images for Lunar Landing (Using MATLAB)
Image/Signal 2015
244 EMB244 Fuzzy Clustering With a Modified MRF Energy Function for
Change Detection in Synthetic Aperture Radar Images
Image/Signal 2015
245 EMB245 Multi temporal image change detection using Undecimated
discrete wavelet transform and active contours
Image/Signal 2015
246 EMB246 detecting background setting for dynamic scene Image/Signal 2015
247 EMB247 Content-Based Image Retrieval using SIFT for Binary and
Grey scale Images
Image/Signal 2015
248 EMB248 Content based image retrieval using textural features
based on pyramidal structure wavelet transform
Image/Signal 2015
249 EMB249 Color Histogram Features Based Image Classification in
Content-Based Image Retrieval Systems
Image/Signal 2015
250 EMB250 Efficient Quality Analysis Of MRI Image Using Preprocessing
Techniques
Image/Signal 2015
251 EMB251 A new filter for removal of salt and pepper noise Image/Signal 2015
252 EMB252 Removing artefacts from color and Contrast modifications Image/Signal 2015
253 EMB253 An automatic wavelet-based nonlinear image
enhancement technique for aerial imagery
Image/Signal 2015
254 EMB254 A perceptually relevant approach to ringing region
detection
Image/Signal 2015
255 EMB255 Image Inpainting by Kriging Interpolation Technique Image/Signal 2015
256 EMB256 Image Completion Using Efficient Belief Propagation Via
Priority Scheduling and Dynamic Pruning
Image/Signal 2015
257 EMB257 QR Code Watermarking Algorithm based on Wavelet
Transform
Image/Signal 2015
258 EMB258 A Novel Algorithm to Protect the Secret Image through
Image Fusion and Verifying the Dealer and the Secret
Image/Signal 2015
Download Abstract From: www.ieeeprojectguru.com
10 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
Image
259 EMB259 Digital Water marking Using LSB Replacement with Secret
Key Insertion Technique
Image/Signal 2015
260 EMB260 Masking based Data Hiding and Image Authentication
Technique (MDHIAT)
Image/Signal 2015
261 EMB261 Improved BPCS Steganography Based Novel Approach for
Data Embedding
Image/Signal 2015
262 EMB262 Progressive Significance Map and Its Application to Error-
Resilient Image Transmission
Image/Signal 2015
263 EMB263 Weighting low level frame difference features for key
frame extraction using fuzzy comprehensive evaluation and
indirect feedback relevance mechanism
Image/Signal 2015
264 EMB264 Repeating Pattern Extraction Technique (REPET): A Simple
Method For Music/Voice Separation
Image/Signal 2015
265 EMB265 A Wavelet-Based Technique Towards a More Natural
Sounding Synthesized Speech
Image/Signal 2015
266 EMB266 Spectral Subtraction of Noise in Speech Processing
Applications
Image/Signal 2015
267 EMB267 Performance Evolution of Downlink MIMO in LTE
Technology
Image/Signal 2015
268 EMB268 Space-Time Block Coded Spatial Modulation Image/Signal 2015
269 EMB269 Slow adaptive OFDMA systems through chance constrained
programming
Image/Signal 2015
270 EMB270 Fairness-aware radio resource management in downlink
OFDMA cellular relay networks
Image/Signal 2015
271 EMB271 Mobile Element Path Planning for Time-Constrained Data
Gathering in Wireless Sensor Networks
Image/Signal 2015
272 EMB272 Tree-Based Data Broadcast in IEEE 802.15.4 and ZigBee
Network
Image/Signal 2015
273 EMB 273 Real-time communications over cluster-tree sensor
networks with mobile sink behavior
Image/Signal 2015
274 EMB 274 Robust Algorithms for DOA Estimation and Adaptive Beam
forming for Smart Antenna Application
Image/Signal 2015
275 EMB 275 A Full-Rate Full-Diversity 2×2 Space-Time Block Code with
Linear Complexity for the Maximum Likelihood Receiver
Image/Signal 2015
MATLAB IMAGE PROCESSING WITH HARDWARE
MODEL
2015
276 EMB276 Intelligent Robot Motion Control System for Industrial
Monitoring Using Image Processing Techniques
Matlab 2015
277 EMB277 Intelligent Robot Motion Control and Industrial security
system Using Image Processing Techniques
Matlab 2015
278 EMB278 Intelligent Robot Motion Control and Industrial security
system Using Image Processing Techniques
Matlab 2015
279 EMB279 GUI Controlled Robot With MATLAB For Video Using
Microcontroller
Matlab 2015
280 EMB280 Biosensor based driver drowsiness detection to avoid
accidents using Neurosky Mindwave sensor with Matlab
and Microcontroller
Matlab 2015
281 EMB281 Biosensor based robot control using Neurosky Mindwave
sensor with Matlab and Microcontroller
Matlab 2015
282 EMB282 Biosensor based home automation using Neurosky
Mindwave sensor with Matlab and Microcontroller
Matlab 2015
283 EMB283 Biosensor based brain status simulation of the mentally
disordered using Neurosky Mindwave sensor with Matlab
and Microcontroller
Matlab 2015
Download Abstract From: www.ieeeprojectguru.com
11 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
284 EMB284 Mobile Phone–Based Remote Patient Monitoring System
For Management Of Hypertension In Diabetic Patients
Matlab 2015
285 EMB285 Attendance System By Face Recognition Using SIFT
Algorithm And SMS Reporting To Parents Mobile Phone
Matlab 2015
286 EMB286 RFID based face image retrieval system using MATLAB Matlab 2015
287 EMB287 Multi biometric system using Face Recognition By SIFT
Algorithm and RFID with SMS reporting system
Matlab 2015
288 EMB288 Multi biometric system using Face Recognition By SIFT
Algorithm and RFID with SMS reporting system with voice
announcement.
Matlab 2015
289 EMB289 Multi biometric system using Face Recognition By SIFT
Algorithm And RFID using web camera
Matlab 2015
290 EMB290 Industrial security system with Face recognition and
Authentication
Matlab 2015
291 EMB291 Industrial security system with Face recognition and
Authentication with GSM
Matlab 2015
292 EMB292 Testing And Reliability Improvement Of Electronics
Products Manufactured On Printed Circuit Boards By Using
Camera
Matlab 2015
293 EMB293 Intelligent White Board Status Recognition And Erasing
System With Wiper Movement
Matlab 2015
294 EMB294 Efficient Method For Flame Detection And Using Image
Processing With GSM Alert
Matlab 2015
295 EMB295 Designing GUI with ZigBee for spatially distributed
autonomous sensors to monitor physical or environmental
conditions
Matlab 2015
296 EMB296 Implementation of industrial security system with motion
estimation and visual identification
Matlab 2015
297 EMB297 Bomb Detecting And Diffusing Robot using MATLAB and
microcontroller
Matlab 2015
298 EMB298 GUI Controlled Robot using MATLAB and Microcontroller Matlab 2015
299 EMB299 Traffic Sign Recognition For Advanced Driver Assistance
Using Digital Image Processing with speakers
Matlab 2015
300 EMB300 A density based traffic control system using Image
processing
Matlab 2015
301 EMB301 Missing pills classification using MATLAB with
Microcontroller
Matlab 2015
302 EMB302 Shape detection and classification using Hough
transformation and 8051
Matlab 2015
303 EMB 303 Color detection and classification using MATLAB and
Microcontroller
Matlab 2015
MOBILE & SATELLITE COMMUNICATION GSM /
CDMA / DTMF / GPS / 3G / GPRS
304 EMB304 ATM Security with RFID and One Time Password (OTP)
through GSM
Mob Comm. 2015
305 EMB305 Security Integrated system based on wireless access
protocol for industrial applications with SMS alert system
using GSM modem
Mob Comm. 2015
306 EMB306 Design and development of SMS based Car Engine control
system to prevent car theft using GSM modem
Mob Comm. 2015
307 EMB307 Power Theft Detection and Intimation Energy Meter
Information on through SMS with Auto Power Cutoff
Mob Comm. 2015
308 EMB308 Design and development of activation and controlling of
home automation system via SMS through microcontroller
Mob Comm. 2015
309 EMB309 SMS based PWM Speed and Direction control of DC motor Mob Comm. 2015
Download Abstract From: www.ieeeprojectguru.com
12 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
using H-Bridge and GSM
310 EMB310 SMS based Speed control of thread roller’s AC motor in
spinning mills using GSM
Mob Comm. 2015
311 EMB311 Design of an Intelligent SMS based Remote electricity
Metering and billing System
Mob Comm. 2015
312 EMB312 Supervisory control and data acquisition system (SCADA)
using GSM modem
Mob Comm. 2015
313 EMB313 Mobile phone signal jammer for GSM, CDMA and 3G
networks with user selectable prescheduled time duration
(Mobile Jammer)
Mob Comm. 2015
314 EMB314 SMS based Wireless electronic notice board using GSM /
CDMA / 3G mobile phone
Mob Comm. 2015
315 EMB315 Power Theft Detection and Intimation Energy Meter
Information on through SMS with Auto Power Cutoff
Mob Comm. 2015
316 EMB316 Power Theft Detection and Intimation Energy Meter
Information on through SMS with Auto Power Cutoff
Mob Comm. 2015
317 EMB317 Automatic Vehicle Accident Detection and Messaging
System using GSM and GPS
Mob Comm. 2015
318 EMB318 Blind Person Navigation system using GPS & Voice
announcement
Mob Comm. 2015
319 EMB319 Woman security assistance system with GPS tracking and
messaging system
Mob Comm. 2015
PROJECTS BASED ON ARM PROCESSOR ARM7
TDMI -LPC 2148
2015
320 EMB320 Implementing character LCD Device Driver development on
LPC2148 ARM
ARM Based 2015
321 EMB321 Implementation of Data Encryption Standard on
ARM(ARM7TDMI) LPC2148
ARM Based 2015
322 EMB322 Implementation of Serial port device driver using ARM 7
TDMI LPC2148 Controller
ARM Based 2015
323 EMB323 Real time data acquisition using ARM 7 TDMI processor
based LPC2148
ARM Based 2015
324 EMB324 Interfacing of graphical LCD to LPC2148 ARM Based 32-bit
microcontroller
ARM Based 2015
325 EMB325 Implementation of EEPROM Interfacing with I2C protocol
using ARM 7 TDMI
ARM Based 2015
326 EMB326 H-Bridge based DC Motor speed & Direction control using
PWM using ARM 7 LPC2148
ARM Based 2015
327 EMB327 Data transfer between pc and LPC2148 controller using
fiber optical communication
ARM Based 2015
328 EMB328 Anti-Theft Control System Design Using ARM7 ARM Based 2015
329 EMB329 Implementing UC/OS– II Kernel Based RTOS Using ARM7
TDMI (lpc2148) based Controller
ARM Based 2015
330 EMB330 Automatic Dam Gate Control System with Caution Alarm
Using ARM7
ARM Based 2015
331 EMB331 Design And Implementation Of Digital Clock with 16x2 LCD
Using ARM7
ARM Based 2015
332 EMB332 Embedded Rigging free Electronic Voting System with
instant results Using ARM7
ARM Based 2015
333 EMB333 Embedded Quiz monitoring system with team performance
evaluation Using ARM7
ARM Based 2015
334 EMB334 GSM based Remote Industrial appliances control system
using ARM 7 TDMI LPC2148
ARM Based 2015
335 EMB335 GSM based advanced transformer load sharing system
using ARM 7 TDMI LPC2148
ARM Based 2015
Download Abstract From: www.ieeeprojectguru.com
13 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
336 EMB336 GSM based automatic vehicle accident detection with GPS
based location identification and messaging system using
ARM 7 TDMI processor based LPC2148 Controller
ARM Based 2015
337 EMB337 Advanced mobile phone signal jammer for GSM, CDMA and
3G networks with prescheduled time duration using ARM 7
TDMI processor based LPC2148 Controller
ARM Based 2015
338 EMB338 GSM-GPS integration for enhancing public transportation ARM Based 2015
339 EMB339 Remote control of smart household based on DTMF ARM Based 2015
340 EMB340 A bi-directional guard system design of car based on GPS &
GSM
ARM Based 2015
341 EMB341 An artificial landmark design based on mobile robot
localization and navigation
ARM Based 2015
342 EMB342 GSM Based Remote Monitoring Intelligent System Based
on Fingerprint Door Lock using ARM7
ARM Based 2015
343 EMB343 GSM Based Remote Monitoring Intelligent System Based
on Fingerprint Door Lock using ARM7
ARM Based 2015
344 EMB344 GSM Based Train Reservation System using ARM7 ARM Based 2015
345 EMB345 Design of an Intelligent SMS based Remote Metering
System Using ARM7
ARM Based 2015
346 EMB346 GSM Based Greenhouse Remote Monitoring System Using
ARM7
ARM Based 2015
347 EMB347 and messages using ARM7 ARM Based 2015
348 EMB 348 Implementation of High Sensitive GSM Signal Detector with
Audio Visual Alert Indication Using ARM7
ARM Based 2015
349 EMB349 Wireless ATM security with GSM and MEMS Using ARM7 ARM Based 2015
350 EMB350 A smart ZigBee based wireless weather station monitoring
system using ARM 7 TDMI processor based LPC2148
Controller
ARM Based 2015
351 EMB351 Implementation of ZigBee based multipoint secured PC
messaging system ARM 7 TDMI processor based LPC2148
Controller
ARM Based 2015
352 EMB352 REAL-TIME ATOMIZATION OF AGRICULTURAL
ENVIRONMENT FOR SOCIAL MODERNIZATION OF INDIAN
AGRICULTURAL SYSTEM
ARM Based 2015
353 EMB353 Monitoring and alarming system based on ZigBee
Technology
ARM Based 2015
354 EMB354 The Design of Tungsten Mine Environment Monitoring
System Based on Wireless Sensor Networks Using ARM7
ARM Based 2015
355 EMB355 Photovoltaic powered advanced railway track fault
inspection system with remote station alert using
advanced ZigBee communication with ARM 7TDMI based
LPC2148 Microcontroller
ARM Based 2015
356 EMB356 Vehicle Identification Data Monitoring And Verification
System For Traffic And RTO Using Zigbee Technology Based
on ARM7
ARM Based 2015
357 EMB357 Model Radar Implementation, Signal Detection And
Various Frequencies Identification With Remote Station
Alerting System Using ARM7
ARM Based 2015
358 EMB358 Touch Screen Based Wireless Smart Home Automation
System Using ARM7
ARM Based 2015
359 EMB359 Biometric finger print based electronic voting system for
rigging free governance using ARM 7 TDMI processor based
LPC2148 Controller
ARM Based 2015
360 EMB360 Biometric finger print based bank locker system using ARM
7 TDMI processor LPC2148
ARM Based 2015
361 EMB361 Adaptive beat to beat heart rate estimation in Ballisto ARM Based 2015
Download Abstract From: www.ieeeprojectguru.com
14 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
cardiogram
362 EMB362 An RFID-Based System for Pilgrim Management Using
ARM7
ARM Based 2015
363 EMB363 Wireless Patient Health Monitoring System Using ZigBee
,RFID , GSM with wireless automatic doctor alerting
through SMS Using ARM7
ARM Based 2015
364 EMB364 Development of gas leak detection and location system
based on wireless technology
ARM Based 2015
365 EMB365 Industrial Temperature Monitoring and controlling using
ARM 7
ARM Based 2015
366 EMB366 Petrochemical Level Indicator and controller for
automation of Cotton Purification industries using ARM 7
TDMI processor based LPC2148 Controller
ARM Based 2015
367 EMB367 Intelligent LPG / Smoke Detector with Auto dialer using
ARM 7 TDMI LPC2148
ARM Based 2015
368 EMB368 Automatic photovoltaic panel direction control for
maximum power tracking using ARM 7 TDMI processor
based LPC2148 Controller
ARM Based 2015
369 EMB369 Auto turn off for water pump with four different time slots
using ARM 7 LPC2148
ARM Based 2015
370 EMB370 Improved structure of solar tracker with arm7tdmi
LPC2148
ARM Based 2015
371 EMB371 Implementation of Solar Fridge with fast chilling
Applications with temperature Monitoring using ARM7
ARM Based 2015
372 EMB372 Applications of MEMS in robotics and Bio-MEMS ARM Based 2015
373 EMB373 Hazardous gas detecting method applied in coal mine
detection robot
ARM Based 2015
374 EMB374 Research on the method of automatic obstacle avoidance
robot
ARM Based 2015
375 EMB375 The remote control of mobile robot based on embedded
technology
ARM Based 2015
376 EMB376 Hand Gesture Based Wheel Chair Movement Control For
The Disable With MEMS Using PWM Technique
ARM Based 2015
377 EMB377 Robot Navigation System with RFID and Sensors Using
ARM7
ARM Based 2015
378 EMB378 Design of the Smart Vehicle Control System Based on
ARM7
ARM Based 2015
379 EMB379 Mobile operated Water Robot Using ARM7 Based LPC2148 ARM Based 2015
380 EMB380 The Design and Implement of Embedded Remote Control
System in Industrial Pick and Place Robot Based on ARM7
ARM Based 2015
381 EMB381 Advanced artificial eye implementation for detecting
monochrome objects for industrial automation, object
sorting and material separation applications with DC
geared motor fitted conveyer belt arrangement using
ARM7 TDMI based LPC2148
ARM Based 2015
382 EMB382 Multi-Functional Car with Accident Alert Sensor Using
ARM7
ARM Based 2015
383 EMB383 Solar Driven Vehicle With Drunken People Identification
With Auto Ignition Disable Function Using ARM7
ARM Based 2015
PROJECTS BASED ON ARM11 BASED RASPBERRY
PI WITH LINUX ENVIRONMENT
384 EMB384 Android based home automation with fan speed control Raspberry Pi 2015
385 EMB385 Optical Character Recognition system with voice
announcement
Raspberry Pi 2015
386 EMB386 IoT based Home Automation using Email Raspberry Pi 2015
Download Abstract From: www.ieeeprojectguru.com
15 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
387 EMB387 Doorbell notify with image capture and forward through
Email
Raspberry Pi 2015
388 EMB388 Advance Security System with Intruder Image capture and
forward through Email
Raspberry Pi 2015
389 EMB389 Ultrasonic target range estimation by SONAR technology
using ARM11 based Raspberry Pi
Raspberry Pi 2015
390 EMB390 Advanced user controlled roof top antenna signal tracking
system with 10RPM geared DC motor using ARM11 based
Raspberry Pi
Raspberry Pi 2015
391 EMB391 Supersensitive security system with auto dialer (owner will
be alerted by phone call on intrusion, can listen to the
conversation of the thieves on his mobile) using ARM11
based Raspberry Pi
Raspberry Pi 2015
392 EMB392 RF based tsunami detection and remote alert system with
60dB siren using ARM11 based Raspberry Pi
Raspberry Pi 2015
393 EMB393 IR based automatic mirror lamp controller using ARM11
based Raspberry Pi
Raspberry Pi 2015
394 EMB394 High sensitive IR based unmanned railway gate control
using ARM11 based Raspberry Pi
Raspberry Pi 2015
395 EMB395 Automatic speed control of vehicle at school zones using IR
sensor using ARM11 based Raspberry Pi
Raspberry Pi 2015
396 EMB396 IR based automatic mirror lamp controller using ARM11
based Raspberry Pi
Raspberry Pi 2015
397 EMB397 Diamond security system in museums with loud 60dB siren
using ARM11 based Raspberry Pi
Raspberry Pi 2015
398 EMB398 High sensitive LDR based power saver for street light
control system using ARM11 based Raspberry Pi
Raspberry Pi 2015
399 EMB399 Automatic dam gate control system with caution alarm
using ARM11 based Raspberry Pi
Raspberry Pi 2015
400 EMB400 Intelligent automatic podium light control system using
ARM11 based Raspberry Pi
Raspberry Pi 2015
401 EMB401 Automatic plant irrigation system with dry/wet soil sense
and controlling 230V water pump for agricultural
applications using ARM11 based Raspberry Pi
Raspberry Pi 2015
402 EMB402 Shock proof electrical appliances control system for
physically challenged using ARM11 based Raspberry Pi
Raspberry Pi 2015
403 EMB403 RF controlled metal detecting robot with remote voice and
image transmission to assist bomb detection and rescue
team using ARM11 based Raspberry Pi
Raspberry Pi 2015
PROJECTS BASED ON PROGRAMMABLE SYSTEM
ON CHIP -PSOC MIXED SIGNAL ARRAY
404 EMB404 Light intensity based Street light automation using PSoC
Mixed Signal
PSoC Based 2015
405 EMB405 Petrochemical level indicator and controller for automation
of cotton purification industries using PSoC Mixed Signal
Array
PSoC Based 2015
406 EMB406 Industrial boiler temperature monitor with PSoC mixed
signal array
PSoC Based 2015
407 EMB407 Proximity Sensor based intelligent Security system using
PSoC
PSoC Based 2015
408 EMB408 Temperature measurement and control system based on
PSoC Mixed Signal Array
PSoC Based 2015
409 EMB409 Super sensitive Industrial Security System using PSoC
Mixed Signal Array
PSoC Based 2015
410 EMB410 Hazardous gas detecting method applied in coal mine PSoC Based 2015
Download Abstract From: www.ieeeprojectguru.com
16 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
detection robot using PSoC Mixed Signal Array
411 EMB411 RF based Wireless Industrial Device control using PSoC
Mixed Signal Array
PSoC Based 2015
412 EMB412 Development of remote gas monitor system using PSoC
Mixed Signal Array
PSoC Based 2015
413 EMB413 Temperature data logger and display on pc through ZigBee
using PSoC Mixed Signal Array
PSoC Based 2015
414 EMB414 Remote control of smart household based on DTMF using
PSoC Mixed
PSoC Based 2015
415 EMB415 Implementation of UART protocol for PC based
temperature data logger using PSoC mixed signal array
PSoC Based 2015
416 EMB416 Auto turn off water pump with four different time slots
using PSoC Mixed Signal Array
PSoC Based 2015
417 EMB417 Applications of MEMS in robotics using Programmable
System on Chip (PSoC) Mixed Signal Array
PSoC Based 2015
418 EMB418 Automatic Active Phase selector for single phase load from
three phase supply using PSoC Mixed Signal Array
PSoC Based 2015
RFID / BIOMETRICS / FINGER PRINT
419 EMB419 Implementing character LCD Device Driver development on
LPC2148 ARM
RFID Based 2015
420 EMB420 Designing of RFID based Sensor Solution for Packaging
Surveillance Applications
RFID Based 2015
421 EMB421 Using RFID for anti-theft in a Chinese electrical supply
company: A cost-benefit analysis
RFID Based 2015
422 EMB422 Fast identification of the missing tags in a large RFID
system using AT89S52 MCU
RFID Based 2015
423 EMB423 Improving security and usability of low cost RFID tags
improving security and usability of low cost RFID tags
RFID Based 2015
424 EMB424 RFID security access control system RFID Based 2015
425 EMB425 RFID based banking system for secured transaction RFID Based 2015
426 EMB426 RFID based Airport Luggage security scanning system RFID Based 2015
427 EMB427 Unveiling the Potential of RFID-Enabled Intelligent Patient
Management
RFID Based 2015
428 EMB428 RFID based patient information system using AT89S52
Microcontroller
RFID Based 2015
429 EMB429 RFID based prepaid car parking system using AT89S52
Microcontroller
RFID Based 2015
430 EMB430 RFID based Electronic road pricing system using AT89S52
Microcontroller
RFID Based 2015
431 EMB431 RFID based toll tax system using AT89S52 Microcontroller RFID Based 2015
432 EMB432 RFID based toll tax system using AT89S52 Microcontroller RFID Based 2015
433 EMB433 Construction of Central Control Unit for Irrigation water
pumps. Cost effective method to control entire villager’s
water pumps with user level authentication
RFID Based 2015
434 EMB434 RFID based attendance system using AT89S52
Microcontroller
RFID Based 2015
435 EMB435 RFID based electronic passport system for easy governance
using AT89S52 Microcontroller
RFID Based 2015
436 EMB436 RFID based Library Automation System using AT89S52 RFID Based 2015
437 EMB437 RFID based Library Automation System using AT89S52 RFID Based 2015
438 EMB438 Finger print based bank locker system using AT89S52 MCU RFID Based 2015
439 EMB439 Finger print based electronic passport system using
AT89S52 MCU
RFID Based 2015
440 EMB440 Finger print based voting system for rigging-free governing RFID Based 2015
441 EMB441 Finger print based driving license management system RFID Based 2015
Download Abstract From: www.ieeeprojectguru.com
17 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
442 EMB442 Finger print based attendance system using AT89S52 MCU RFID Based 2015
443 EMB443 Finger print based electrical device control system using
AT89S52
RFID Based 2015
444 EMB444 Prepaid coffee dispenser with biometric recharge using
finger print
RFID Based 2015
ROBOTICS / SOLAR ROBOTICS / WIRELESS MEMS
TECHNOLOGY ROBOTICS
445 EMB445 Hand gesture based wheel chair movement control for the
disabled using (Micro Electro Mechanical Sensor) MEMS
technology
Robotics 2015
446 EMB446 Autonomous Guide Cane for blind or visually impaired
travelers using IR
Robotics 2015
447 EMB 447 Head movement controlled car driving system to assist the
physically challenged
Robotics 2015
448 EMB448 RF Based farmer friendly Agricultural Robot with motorized
shovel control System with automatic seed dispensing
system
Robotics 2015
449 EMB449 Intelligent speech recognition and voice operated robot
with wireless voice & video transmission to remote
television
Robotics 2015
450 EMB450 RF Controlled Metal Detecting Robot with Remote Voice
And Image Transmission to assist bomb detection and
rescue team
Robotics 2015
451 EMB451 Hand gesture recognition technology based wireless
surveillance bomb diffusing robot with mobile jamming
technique using MEMS technology
Robotics 2015
452 EMB452 RF Controlled Robotic Boat to Travel in Water with
Wireless Video And Voice
Robotics 2015
453 EMB453 RF Controlled Fire Fighting Robot with high pressure water
sprinkler
Robotics 2015
454 EMB454 Bluetooth based Robot Control for Metal Detection
Applications
Robotics 2015
455 EMB455 DTMF based human less boat control for ocean research
applications
Robotics 2015
456 EMB456 Wireless target recognition and counter attacking robot
with laser gun activation
Robotics 2015
457 EMB457 Pole climbing Robot for surveillance application with voice
and image recording in SD card / Memory card
Robotics 2015
458 EMB458 Search and rescue robot for victims of earthquake and
other natural calamities
Robotics 2015
459 EMB459 Light Search and following robot using AT89S52 MCU Robotics 2015
460 EMB460 RF Controlled multi Terrain Robot to travel on water
surface, Indoor and outdoor uneven surfaces for defense
applications
Robotics 2015
461 EMB461 RF controlled Bomb detection and diffusing solar robot
with wire cutting and gun arrangement
Robotics 2015
462 EMB462 Implementation of artificial eye for Intelligent Line
Following Robot application using AT89S52 MCU
Robotics 2015
463 EMB463 Remote GSM Mobile phone controlled Robotic Arm with
Base Rotation, Elbow and Wrist Motion with a Functional
Gripper
Robotics 2015
464 EMB464 Robotic Arm With Base Rotation, Elbow And Wrist Motion
With A Functional Gripper for pick and place applications
Robotics 2015
465 EMB465 LPG Detecting Robot with wireless Voice And Image
Transmission
Robotics 2015
Download Abstract From: www.ieeeprojectguru.com
18 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
466 EMB466 Intelligent Wall Follower Robot using AT89S52 MCU Robotics 2015
467 EMB467 Mining safety – implementation of RF controlled Robotic
Electronic Nose to detect dangerous gases for alerting
mining workers and engineers for preventive actions.
Robotics 2015
468 EMB468 Automatic Intelligent Industrial Object sorter with
conveyor belt arrangement for color distinguishing and
object count applications
Robotics 2015
469 EMB469 RF Controlled high efficient trash collecting robot capable
of capturing even 40 microns dust particles
Robotics 2015
470 EMB470 Design and development of sailing robot with Pick and
place applications
Robotics 2015
471 EMB471 Develop robotic nose can sense various odors and gases
like methane, carbon monoxide, liquid petroleum gas etc -
more sensitive than human nose)
Robotics 2015
SOLAR / WIND / GREEN HOUSE / RENEWABLE
ENERGY SOURCES
472 EMB472 AC motor speed control using power Triac Energy Based 2015
473 EMB473 Solar based air compressor pump for car bike tire inflate Energy Based 2015
474 EMB474 Solar based high efficient vacuum cleaner capable of
capturing even 40 microns small dust
Energy Based 2015
475 EMB475 Implementation of Solar inverter for home / garden /
street light applications
Energy Based 2015
476 EMB476 Real Time Clock based solar LED street light automation
using Dallas RTC and I2C protocol
Energy Based 2015
477 EMB477 Implementation of solar water pump control with four
different time slots for power saving applications
Energy Based 2015
478 EMB478 Design and implementation of maximum power tracking
system by automatic control of solar panel direction
according to the sun direction (Model Sunflower)
Energy Based 2015
479 EMB479 Solar based E-Uniform for soldiers who work at extreme
high temperature or extreme low temperature
Energy Based 2015
480 EMB480 Farmer friendly Solar based electric fence for rural
agriculture with battery voltage analyzer using AT89S52
MCU
Energy Based 2015
481 EMB481 Solar based mobile charger for rural areas (Charge your
mobile anywhere with sunlight) with battery voltage
analyzer using AT89S52 MCU
Energy Based 2015
482 EMB482 Solar highway lighting system with auto turn off on day
time with LCD display
Energy Based 2015
483 EMB483 Implementation of hi-tech agricultural solar fence security
with soil humidity based automatic irrigation and Voice
Announcement alert on PIR live human detection
Energy Based 2015
484 EMB484 Aerodynamic wind mill with reverse charge protection for
rural power generation applications with battery voltage
analyser using AT89S52 MCU
Energy Based 2015
TOUCH PANEL / GRAPHICAL LCD / SPEECH /
VOICE / HUMAN–MACHINE–INTERFACE
485 EMB485 Touch screen and wireless communication based personal
assistant for Dumb and illiterate in Airlines
Interface Based 2015
486 EMB486 Touch screen based remote controlled robot with remote
voice and image transmission with LPG and metal
detection capabilities
Interface Based 2015
487 EMB487 Touch screen based wireless smart Home Automation Interface Based 2015
Download Abstract From: www.ieeeprojectguru.com
19 Office No: 06, 2
nd
Wing, Gangotri Heights,
Near to APEX Hospital Kalewadi Phata, Pune - 411033.
System using AT89S52 MCU
488 EMB488 Touch screen controlled dimmer light for next generation
apartments
Interface Based 2015
489 EMB489 Intelligent touch panel based menu ordering system for
restaurants using AT89S52 MCU
Interface Based 2015
490 EMB490 Touch screen and EEPROM smart card based ticket booking
system
Interface Based 2015
491 EMB491 Image based password authentication for illiterates with
touchscreen
Interface Based 2015
492 EMB492 MEMS Based Human – computer interface mouse control
for PC with windows media player controller
Interface Based 2015
493 EMB493 RC5 IR remote Based Human – computer interface mouse
control for PC with windows media player controller
Interface Based 2015
494 EMB494 Comprehensive text to speech converter using AT89S52
Microcontroller for the dumb
Interface Based 2015
495 EMB495 User independent voice commands based robot control
with remote voice and image transmission.
Interface Based 2015
496 EMB496 Speech Recognition enabled smart home automation for
the blind and physically challenged
Interface Based 2015
497 EMB497 Voice operated intelligent Elevator Interface Based 2015
498 EMB498 Voice enabled switching device and security system with
auto dialer and 60db loud siren
Interface Based 2015
499 EMB499 User dependent speech Recognition based security access
control system.
Interface Based 2015
500 EM 500 Wireless Speech Recognition enabled smart home
automation for the blind and physically challenged
Interface Based 2015
501 EMB501 PC to Microcontroller Secured Data Communication using
Fiber Optic cable
Interface Based 2015

Embedded 2015

  • 1.
    IEEE 2015-2016 TOPICS(FINAL YEAR) PUNE HEAD OFFICE: OFFICE NO: 06, 2nd Wing, Gangotri Heights, Near to APEX Hospital, Kalewadi Phata, Pune Pin-033 CONTACT: +91-9503522733/+91-9503522638/+91-9049265435/+91-9890704605 Email-ieeeprojectguru@gmail.com / info@ieeeprojectguru.com Follow us on facebook-www.facebook.com/Ieeeprojectguru Follow us on Twitter-www.twitter.com/ieeeprojectgur1 Web-www.ieeeprojectguru.com
  • 2.
    Download Abstract From:www.ieeeprojectguru.com 1 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. SR.NO PROJECT CODE PROJECT NAME DOMAIN YEAR ADVANCED VLSI DESIGN PROJECTS 1 EMB1 A new reversible design of BCD adder VLSI 2015 2 EMB2 Design and Estimation of delay, power and area for Parallel prefix adders VLSI 2015 3 EMB3 Approach to design a compact reversible low power binary comparator VLSI 2015 4 EMB4 A Low Power Fault Tolerant Reversible Decoder Using MOS Transistor VLSI 2015 5 EMB5 Low power and area efficient carry select adder VLSI 2015 6 EMB6 Architectural level power optimization techniques for multipliers VLSI 2015 7 EMB7 Hardware implementation of RFID Mutual Authentication Protocol. VLSI 2015 8 EMB8 Verilog modeling of WI-FI MAC Layer for Transmitter VLSI 2015 9 EMB9 FPGA implementation of USB transceiver macro cell interface with usb2.0 specifications VLSI 2015 10 EMB10 VHDL implementation of lossless data compression. VLSI 2015 11 EMB11 A vliw vector media compressor with cascaded SIMD ALU’S. VLSI 2015 12 EMB12 Design and implementation of blue tooth security using VHDL. VLSI 2015 13 EMB13 Design and implementation of APB bridge based on AMBA 4.0 VLSI 2015 14 EMB14 Applying CDMA technique to network-on-chip VLSI 2015 15 EMB15 FPGA Implementation of Scalable Encryption Algorithm. VLSI 2015 16 EMB16 FPGA implementation of SHA-1 algorithm VLSI 2015 17 EMB17 Implementation of the hummingbird cryptographic Algorithm VLSI 2015 18 EMB18 Cyclic redundancy check generation using multiple lookup table algorithms VLSI 2015 19 EMB19 An on-chip AHB bus tracer with real time compression and dynamic multi-resolution supports for SOC VLSI 2015 20 EMB20 Self-immunity technique to improve register file integrity against soft errors. VLSI 2015 21 EMB21 Design and simulation of UART serial communication module based on VHDL. VLSI 2015 22 EMB22 Optimized Reversible Vedic Multipliers for High Speed Low Power operations VLSI 2015 23 EMB23 Radix-8 Booth Encoded modulo multipliers with adoptive delay for high dynamic range Residue Number System. VLSI 2015 24 EMB24 Design of high speed hybrid carry select adder VLSI 2015 25 EMB25 Design of characterization of parallel pre-fix adders using FPGA. VLSI 2015 26 EMB26 Energy Efficient Code Converters using Reversible Logic Gates VLSI 2015 27 EMB27 Reducing the computation time in (short bit-width) two’s complement multipliers. VLSI 2015 28 EMB28 A new vlsi architecture of parallel Multiplier Accumulator Based On Radix-2 Modified Booth Algorithm VLSI 2015 29 EMB29 The design of high performance barrel integer adder VLSI 2015 30 EMB30 A High Speed Binary Floating Point Multiplier Using Dadda Algorithm VLSI 2015 31 EMB31 Detection of Hardware Trojan in SEA Using Path Delay VLSI 2015
  • 3.
    Download Abstract From:www.ieeeprojectguru.com 2 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. 32 EMB32 Recursive Approach to the Design of a Parallel Self-Timed Adder VLSI 2015 33 EMB33 Implementation of vending machine controller VLSI 2015 34 EMB34 Implementation of Traffic Light Controller VLSI 2015 35 EMB35 Implementation of Digital Clock VLSI 2015 36 EMB36 Implementation of Electronic Voting Machine controller VLSI 2015 37 EMB37 Implementation of Universal Asynchronous receiver/Transmitter VLSI 2015 38 EMB38 Implementation of Serial Peripheral Interface VLSI 2015 39 EMB39 Implementation of Content Addressable Memory VLSI 2015 40 EMB40 Implementation of 32 bit Cyclic Redundancy Check VLSI 2015 41 EMB41 Implementation of Barrel Shifter VLSI 2015 42 EMB42 Implementation of Round Robin Arbiter VLSI 2015 43 EMB43 Finite state machine based vending machine controller with auto-billing features VLSI 2015 44 EMB44 Finite state machine based vending machine controller with auto-billing features VLSI 2015 45 EMB45 parallel multiplier accumulator Based on radix-2 Modified Booth Algorithm by using a VLSI architecture VLSI 2015 46 EMB46 LUT Optimization for Memory-Based Computation. VLSI 2015 47 EMB47 Optimized implementation of FFT processor for OFDM systems VLSI 2015 48 EMB48 Arithmetic & logic unit (ALU) design using reversible control unit VLSI 2015 49 EMB49 Design and minimization of reversible circuits for a data acquisition and storage system VLSI 2015 50 EMB50 Design & implementation of MAC unit using reversible logic VLSI 2015 51 EMB51 An efficient implementation of floating point multiplier VLSI 2015 52 EMB52 A table-based algorithm for pipelined CRC calculation VLSI 2015 53 EMB53 Parity Preserving Logic based Fault Tolerant Reversible ALU VLSI 2015 54 EMB54 A novel analysis of sequential circuits design using reversible logic gates VLSI 2015 55 EMB55 A distinguish between reversible and conventional logic gates VLSI 2015 56 EMB56 Modified toffoli gate and its applications in designing components of reversible arithmetic and logic unit VLSI 2015 57 EMB57 A new reversible design of BCD adder VLSI 2015 58 EMB58 Fault tolerant variable block carry skip logic (VBCSL) using parity preserving VLSI 2015 59 EMB59 Design of a nano metric reversible 4-bit binary counter with parallel load VLSI 2015 60 EMB60 Introduction to reversible logic gates & its application VLSI 2015 61 EMB61 Realization of 2:4 reversible decoder and its applications VLSI 2015 62 EMB62 All Optical Reversible Multiplexer Design using Mach- Zehnder interferometer VLSI 2015 63 EMB63 Design of Dedicated Reversible Quantum Circuitry for Square Computation VLSI 2015 64 EMB64 Energy Efficient Code Converters using Reversible Logic Gates VLSI 2015 65 EMB65 Design of Low Logical Cost Conservative Reversible Adders using Novel PCTG VLSI 2015 66 EMB66 Contemplation of Synchronous Gray Code Counter and its Variants using Reversible Logic Gates VLSI 2015 67 EMB67 An Optimized Design of Binary Comparator Circuit in Quantum Computing VLSI 2015 68 EMB68 Area–Delay–Power Efficient Carry-Select Adder VLSI 2015
  • 4.
    Download Abstract From:www.ieeeprojectguru.com 3 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. ADVANCED WIRELESS COMMUNICATION SYSTEM WI-FI / ZIGBEE / BLUETOOTH / RF / IR 2015 69 EMB69 Wireless Data Encryption and Decryption for Secured Communication using RF Wireless 2015 70 EMB70 Wireless Electrical Apparatus Control System with Speed Control of AC motor in a plant using RF communication Wireless 2015 71 EMB71 Wireless DC Motor Speed and Direction Control using RF Communication Wireless 2015 72 EMB72 Wireless Stepper Motor Control using RF Communication Wireless 2015 73 EMB73 Wireless Electronic Notice Board with Multi Point Receivers using RF Communication System Wireless 2015 74 EMB74 Wireless Temperature Monitoring on Remote Seven- segment Display using RF Wireless 2015 75 EMB75 RF based tsunami detection and remote alert system with 60dB siren Wireless 2015 76 EMB76 Advanced Low power wireless Electronic Security System with magnetic and pet immune PIR sensor with auto-dialer Wireless 2015 77 EMB77 Wireless Stepper Motor Control using IR Communication Wireless 2015 78 EMB78 Wireless DC Motor Speed and Direction Control using IR (PWM and H-Bridge) Wireless 2015 79 EMB79 Wireless Electrical Apparatus Control System using IR communication Wireless 2015 80 EMB80 Over speed & unauthorized vehicle detection using IR based speed sensors Wireless 2015 81 EMB81 Auto speed control of solar car at specified locations like school zones / hospitals / residential areas Wireless 2015 82 EMB82 Density based automatic traffic control system in metros Wireless 2015 83 EMB83 Wireless Stepper Motor Control using IR Communication Wireless 2015 84 EMB84 Bluetooth based Robot Control for Metal Detection Applications Wireless 2015 85 EMB85 Android based multi Terrain Robot to travel on water surface, Indoor and outdoor uneven surfaces for defense applications Wireless 2015 86 EMB86 ZigBee based Secured Wireless Data transmission and Reception Wireless 2015 87 EMB87 ZigBee based Wireless Electronic Notice Board with Multi Point Receivers Wireless 2015 88 EMB88 Two-way Wireless Data Messaging System for Rural Areas using ZigBee Technology Wireless 2015 89 EMB89 Streetlight Power Cable Monitoring System Based on Wireless Sensor Networks using ZigBee communication. Wireless 2015 90 EMB90 ZigBee based wireless remote weather station monitoring system Wireless 2015 91 EMB91 Advanced railway track fault detection with remote station messaging system using ZigBee communication Wireless 2015 92 EMB92 Wireless Heartbeat Monitoring System Using ZigBee Wireless 2015 93 EMB93 Digital control for home lighting systems with ZigBee communication Wireless 2015 94 EMB94 The temperature humidity monitoring system of soil based on wireless sensor networks Wireless 2015 95 EMB95 Innovative congestion control system for ambulance using Zigbee and AT89S52 Microcontroller Wireless 2015 96 EMB96 Patient health monitoring (Blood pressure, heart beat and body temperature) with doctor alert reporting using Zigbee communication Wireless 2015
  • 5.
    Download Abstract From:www.ieeeprojectguru.com 4 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. 97 EMB97 Design and Implementation of an Assisted Body Movement System for Visually Impaired Children using Zigbee communication and AT89S52 Microcontroller Wireless 2015 98 EMB98 Advanced Aircraft anti-collision system using Zigbee communication and AT89S52 Microcontroller Wireless 2015 ANDROID BASED EMBEDDED PROJECT 99 EMB99 Android based home automation with fan speed control Android 2015 100 EMB100 Android based password based door lock system for industrial applications Android 2015 101 EMB101 Android based electronic notice board (16X2 LCD) Android 2015 102 EMB102 Android based digital heart beat rate and temperature monitoring system Android 2015 103 EMB103 Android based vehicle tracking system Android 2015 104 EMB104 Woman security assistance system with GPS tracking and messaging system Android 2015 105 EMB105 Android based Robotic Arm with Base Rotation, Elbow and Wrist Motion with a Functional Gripper Android 2015 106 EMB106 Android based Metal Detecting Robot with Remote Voice and Image Transmission to assist bomb detection and rescue team Android 2015 107 EMB107 Android based hand gesture based robot control using (mobile inbuilt Micro Electro Mechanical Sensor) MEMS technology Android 2015 108 EMB108 Android based RF Controlled Robotic Boat to Travel in Water with Wireless Video and Voice Android 2015 109 EMB109 Android based Fire Fighting Robot with high pressure water sprinkler Android 2015 110 EMB110 Android based LPG Detecting Robot with wireless Voice and Image Transmission Android 2015 111 EMB111 Android Based farmer friendly Agricultural Robot with motorized shovel control System with automatic seed dispensing system Android 2015 112 EMB112 Android Based Pole climbing Robot for surveillance application with voice and image recording in SD card / Memory card Android 2015 113 EMB113 Android based multi Terrain Robot to travel on water surface, Indoor and outdoor uneven surfaces for defense applications Android 2015 114 EMB114 Android based intelligent speech recognition and voice operated robot Android 2015 115 EMB115 Android based voice operated robot Android 2015 ANTENNAS / RADAR / SONAR / MICROWAVE / FIBER-OPTIC COMMUNICATION / POWER LINE COMMUNICATION PROJECTS (WITH HARDWARE KIT) 116 EMB116 Mobile Phone Signal Jammer for GSM, CDMA and 3G Networks with Prescheduled Time Duration (Mobile Jammer) Communication 2015 117 EMB117 Implementation of high sensitive GSM signal detector with audio visual alert indication Communication 2015 118 EMB118 Industrial appliances control system by decoding dual tone multi frequency signals on GSM / CDMA network. Communication 2015 119 EMB119 Radio standard transmission link (RSTL) failure detection with auto switchover information system Communication 2015 120 EMB120 Ultrasonic Target Range Estimation using SONAR Communication 2015
  • 6.
    Download Abstract From:www.ieeeprojectguru.com 5 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. Technology 121 EMB121 Implementation of model Radar target direction identifier with remote station alert system Communication 2015 122 EMB122 Advanced user controlled roof top antenna signal tracking system using AT89S52 MCU and 10RPM geared DC motor Communication 2015 123 EMB123 Implementation of model Radar target direction and distance identifier with remote voice and text alert system using Zigbee communication Communication 2015 124 EMB124 Music transmission and reception with high S/N ratio using fiber optic communication Communication 2015 125 EMB 125 PC to Microcontroller Secured Data Communication using Fiber Optic communication Communication 2015 126 EMB126 Data Transmission and Reception using Power Line Communication Communication 2015 127 EMB127 Industrial Electrical Appliances control system using fiber optic communication Communication 2015 PROJECTS BASED ON ARDUINO CONTROLLER / ATMEGA8 / PIC CONTROLLER 128 EMB128 Implementing character LCD Device Driver development on LPC2148 ARM Controller 2015 129 EMB129 Ultrasonic Target Range Estimation using SONAR &Arduino Controller 2015 130 EMB130 Ultrasonic Target Range Estimation using SONAR &Arduino Controller 2015 131 EMB131 Arduino Based Industrial appliances control system by decoding dual tone multi frequency signals on GSM / CDMA network. Controller 2015 132 EMB132 Digital Heart beat Rate monitoring system Using Arduino Controller 2015 133 EMB133 Arduino Based PC to Microcontroller Secured Data Communication using Fiber Optic Communication Controller 2015 134 EMB134 Implementation of high sensitive GSM signal detector with audio visual alert Indication using Arduino Controller 2015 135 EMB135 Monochrome Image Display On GLCD using Arduino Controller 2015 136 EMB136 RFID security access control system Using Arduino Controller 2015 137 EMB137 RFID based electronic passport system for easy governance Using Arduino Controller 2015 138 EMB138 RFID based Airport Luggage security scanning system Using Arduino Controller 2015 139 EMB139 IR remote Based Human – computer interface mouse control for PC Using Arduino Controller 2015 140 EMB140 Petrochemical Level Indicator and Controller for Automation of cotton purification process in spinning mills Using Arduino Controller 2015 141 EMB141 Programmable temperature monitor and controller for industrial boilers & Ovens using Arduino Controller 2015 142 EMB142 Arduino Based High sensitive LDR based power saver for street light Controller 2015 143 EMB143 Arduino Based Automatic Temperature based Fan Speed Controller Controller 2015 144 EMB144 Arduino Based DC Motor speed control using PWM Technique Controller 2015 145 EMB145 Arduino Based Real Time Clock based industrial automation using Controller 2015 146 EMB146 RTC based Digital Clock with 7-segment Display with 12 / 24 hours Using Arduino Controller 2015 147 EMB147 Arduino Based Temperature Monitoring and Display on 7- segment Controller 2015
  • 7.
    Download Abstract From:www.ieeeprojectguru.com 6 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. 148 EMB148 Bluetooth based Wireless Device control for Industrial Automation Using Arduino Controller 2015 149 EMB149 Design and implementation of maximum power tracking system by automatic control of solar panel direction according to the sun direction (Model Sunflower) Using Arduino Controller 2015 150 EMB150 Implementation of solar water pump control with four different time slots for power saving applications Using Arduino Controller 2015 151 EMB151 Next generation alternative energy storage application with super capacitors / ultra-capacitors with voltage analyzer using Arduino Controller 2015 152 EMB152 Arduino Based Foot step power generation system for rural energy application to run AC and DC loads Controller 2015 153 EMB153 Solar based mobile charger for rural areas (Charge your mobile anywhere with sunlight) with battery voltage analyzer using Arduino Controller 2015 154 EMB154 Solar highway lighting system with auto turn off on day time with LCD display using Arduino Controller 2015 155 EMB155 Bluetooth based Robot Control for Metal Detection Applications Using Arduino Controller 2015 156 EMB156 Arduino Based Hand wheel chair movement control for the disabled using (Micro Electro Mechanical Sensor) MEMS technology Controller 2015 157 EMB157 RF Controlled Robotic Boat to Travel in Water with Wireless Video and Voice Using Arduino Controller 2015 158 EMB158 Arduino Based RF Controlled Fire Fighting Robot with high pressure water sprinkler Controller 2015 159 EMB159 Arduino Based Wireless DC Motor Speed & Direction Control using IR (PWM and H-Bridge) Controller 2015 160 EMB160 Arduino Based Wireless Electrical Apparatus Control System using IR communication Controller 2015 161 EMB161 Digital control for home lighting systems with ZigBee Communication Using Arduino Controller 2015 162 EMB162 The temperature humidity monitoring system of soil based on wireless sensor networks Using Arduino Controller 2015 163 EMB163 Data transmission and reception from PIC 16F877A MCU to PC’s hyper terminal using RS232 communication using PIC microcontroller Controller 2015 164 EMB164 Petrochemical level indicator and controller for automation of cotton purification process in spinning mills using PIC microcontroller Controller 2015 165 EMB165 Speed and direction control of DC motor using PIC microcontroller using PWM and H – bridge Controller 2015 166 EMB166 Real time clock based industrial automation using dallas RTC and I2C protocol using PIC Controller 2015 167 EMB167 Temperature monitoring using PIC MCU for industrial boilers and ovens Controller 2015 168 EMB168 Stepper motor control using PIC microcontroller for robotic applications Controller 2015 169 EMB169 Embedded rigging free electronic voting system with instant results using PIC microcontroller Controller 2015 170 EMB170 Password based access control system protocol using PIC microcontroller Controller 2015 171 EMB171 Temperature monitoring using PIC MCU for industrial boilers and ovens Controller 2015
  • 8.
    Download Abstract From:www.ieeeprojectguru.com 7 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. AT89S52 MICROCONTROLLER BASED PROJECTS 172 EMB172 Auto turn off for water pump with four different time slots for power saving applications AT89S52 Based 2015 173 EMB173 DC Motor speed control using PWM Technique using AT89S52 MCU AT89S52 Based 2015 174 EMB174 Implementation of artificial eye for Intelligent Line Following Robot application using AT89S52 MCU AT89S52 Based 2015 175 EMB175 DTMF based Industrial automation and appliances control system for rural and agriculture applications using AT89S52 MCU AT89S52 Based 2015 176 EMB176 Stepper motor control using AT89S52 for robotic applications AT89S52 Based 2015 177 EMB177 Design and implementation of maximum power tracking system by automatic control of solar panel direction accoridng to the sun direction (Model Sunflower) AT89S52 Based 2015 178 EMB178 Ultra Violet Sterilization System with UV Lamp Failure Detection and content Volume Monitoring using Magnet Sensor AT89S52 Based 2015 179 EMB179 Intelligent car wash system with infrared proximity sensor triggered conveyor belt arrangement using AT89S52 MCU AT89S52 Based 2015 180 EMB180 Petrochemical Level Indicator and Controller for Automation of cotton purification process in spinning mills using 89S52 MCU AT89S52 Based 2015 181 EMB181 Programmable temperature monitor and controller for industrial boilers & ovens using AT89S52 MCU AT89S52 Based 2015 182 EMB182 High sensitive LDR based power saver for street light control system AT89S52 Based 2015 183 EMB183 Automatic Temperature based Fan Speed Controller AT89S52 Based 2015 184 EMB184 Real Time Clock based industrial automation using Dallas RTC and I2C protocol using AT89S52 MCU AT89S52 Based 2015 185 EMB185 Implementation of Path clearing assist stick and obstacles detection safety cap for the blind AT89S52 Based 2015 186 EMB186 Digital Heart beat Rate monitoring system using AT89C51 MCU AT89S52 Based 2015 187 EMB187 Automatic medicine reminder with RTC interfacing using AT89S52 and 16X2 LCD AT89S52 Based 2015 188 EMB188 Shock proof electrical appliances control system for physically challenged using AT89S52 MCU AT89S52 Based 2015 189 EMB189 Advanced patient monitoring system (body temperature & heart beat) on PC using AT89S52 MCU AT89S52 Based 2015 190 EMB190 Gesture Controlled Speaking Micro Controller for the deaf & dumb AT89S52 Based 2015 191 EMB191 Next Generation Braille System Implementation: Mobile Communication Device for the Blind AT89S52 Based 2015 192 EMB192 Embedded Automatic Car Parking System using AT89C51 MCU AT89S52 Based 2015 193 EMB193 Embedded automatic two gate interlock for toll tax system using AT89S52 MCU AT89S52 Based 2015 194 EMB194 Loco-pilot operated voice based station announcement system for alerting passengers in the train AT89S52 Based 2015 195 EMB195 Automatic speed control of vehicle at school zones using IR sensor using AT89S52 MCU AT89S52 Based 2015 196 EMB196 Vehicle over speed detection with audio buzzer alert system on highways using AT89S52 MCU AT89S52 Based 2015 197 EMB197 Density based traffic light system with auto traffic signal AT89S52 Based 2015
  • 9.
    Download Abstract From:www.ieeeprojectguru.com 8 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. transition for VIP vehicles / ambulance 198 EMB198 High sensitive IR based Unmanned Railway Gate Control AT89S52 Based 2015 199 EMB199 Super sensitive Industrial Security System with Auto dialer& 60dB loud siren using AT89S52 MCU AT89S52 Based 2015 200 EMB200 Embedded Password based Access Control System using I2C AT89S52 Based 2015 201 EMB201 Coin operated fortune telling system with dancing LED effect using AT89S52 MCU AT89S52 Based 2015 202 EMB202 Embedded Quiz monitoring system with team performance evaluation using AT89S52 MCU AT89S52 Based 2015 203 EMB203 Embedded Rigging free Electronic Voting System with instant results AT89S52 Based 2015 204 EMB204 Electronic Notice Board with LED Dot Matrix Display and PS2 key board interfacing for user friendly message entry AT89S52 Based 2015 205 EMB205 Automatic School Bell with user defined time schedule using I2C protocol using AT89S52 MCU AT89S52 Based 2015 206 EMB206 Digital Code converters BCD to Grey / Excess-3 / 7-segment AT89S52 Based 2015 207 EMB207 Embedded concentration tester – Touch Me Not using AT89S52 AT89S52 Based 2015 208 EMB208 Automatic Dam Gate Control System with Caution Alarm AT89S52 Based 2015 209 EMB209 Electronic Private Automatic Branch Exchange System with call forward and call pcik up AT89S52 Based 2015 210 EMB210 RTC based Digital Clock with Seven-segment Display with 12 / 24 hours mode using AT89S52 MCU AT89S52 Based 2015 211 EMB211 Gold and Silver Rate Display System with EEPROM Data Back up System using AT89S52 MCU AT89S52 Based 2015 212 EMB212 Automatic Active Phase selector for single phase load from three phase supply AT89S52 Based 2015 213 EMB213 Intelligent automatic podium light control system using AT89C51 MCU AT89S52 Based 2015 213 EMB213 Automatic plant irrigation system with dry / wet soil sense and controlling 230V water pump for agricultural applications using AT89S52 MCU AT89S52 Based 2015 214 EMB214 Distance Calculation for underground cable faults AT89S52 Based 2015 215 EMB215 Automatic Room Light control with Visitor Counting for power saving applications AT89S52 Based 2015 216 EMB216 Jogger bench using PWM Technique and H-Bridge with person fall detection & prevent ion AT89S52 Based 2015 217 EMB217 Jogger bench using PWM Technique and H-Bridge with person fall detection & prevent ion AT89S52 Based 2015 218 EMB218 PC based Appliances control in a plant using PCs parallel port (C-Language) AT89S52 Based 2015 IEEE 2014 PROJECTS ON DIGITAL IMAGE / SIGNAL / AUDIO / SPEECH PROCESSING / COMMUNICATION / NETWORKING 219 EMB219 Touch screen and wireless communication based personal assistant for Dumb and illiterate in Airlines Image/Signal 2015 220 EMB220 Face recognition and facial expression identification using PCA Image/Signal 2015 221 EMB221 Expression Invariant Fragmented Face Recognition Image/Signal 2015 222 EMB222 Face recognition using Eigen faces Image/Signal 2015 223 EMB223 Palm print recognition using PCA Image/Signal 2015 224 EMB224 Human Eye Iris Recognition Using Discrete 2d Reverse Bi orthogonal Wavelet 6.8 Image/Signal 2015
  • 10.
    Download Abstract From:www.ieeeprojectguru.com 9 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. 225 EMB225 Fingerprint recognition using minutiae-based features Image/Signal 2015 226 EMB226 A New Dynamic Thresholding Based Technique for Detection of Hard Exudates in Digital Retinal Fundus Image Image/Signal 2015 227 EMB227 Detection and classification of exudates using k-means clustering in color retinal images Image/Signal 2015 228 EMB228 Methods to Enhance Digital Fundus Image for Diabetic Retinopathy Detection Image/Signal 2015 229 EMB229 Brain Tumor Detection, Demarcation and Quantification via MRI Image/Signal 2015 230 EMB230 Image compression and resizing for retinal implant in Bionic eye Image/Signal 2015 231 EMB231 Particle Swarm Optimization (PSO) for image registration Image/Signal 2015 232 EMB232 Automatic retina exudates segmentation without manually labeled kit Image/Signal 2015 233 EMB233 Identification of diabetic Maculopathy stages using fundus images Image/Signal 2015 234 EMB234 Fast Compressive Tracking Image/Signal 2015 235 EMB235 Image Geo-Localization Based on Multiple Nearest Neighbor Feature Matching Using Generalized Graphs Image/Signal 2015 236 EMB236 Robust Object Tracking via Sparse Collaborative Appearance Model Image/Signal 2015 237 EMB237 High-Speed Tracking with Kernelized Correlation Filters Image/Signal 2015 238 EMB238 High-Speed Tracking with Kernelized Correlation Filters Image/Signal 2015 239 EMB239 Medical Image Fusion Based on Joint Sparse Method Image/Signal 2015 240 EMB240 Implementation of image fusion algorithm using MATLAB Image/Signal 2015 241 EMB241 Scale-Space SIFT Flow Image/Signal 2015 242 EMB242 A novel algorithm for view and illumination invariant image matching Image/Signal 2015 243 EMB243 Horizontal Velocity Estimation Via Downward Looking Descent Images for Lunar Landing (Using MATLAB) Image/Signal 2015 244 EMB244 Fuzzy Clustering With a Modified MRF Energy Function for Change Detection in Synthetic Aperture Radar Images Image/Signal 2015 245 EMB245 Multi temporal image change detection using Undecimated discrete wavelet transform and active contours Image/Signal 2015 246 EMB246 detecting background setting for dynamic scene Image/Signal 2015 247 EMB247 Content-Based Image Retrieval using SIFT for Binary and Grey scale Images Image/Signal 2015 248 EMB248 Content based image retrieval using textural features based on pyramidal structure wavelet transform Image/Signal 2015 249 EMB249 Color Histogram Features Based Image Classification in Content-Based Image Retrieval Systems Image/Signal 2015 250 EMB250 Efficient Quality Analysis Of MRI Image Using Preprocessing Techniques Image/Signal 2015 251 EMB251 A new filter for removal of salt and pepper noise Image/Signal 2015 252 EMB252 Removing artefacts from color and Contrast modifications Image/Signal 2015 253 EMB253 An automatic wavelet-based nonlinear image enhancement technique for aerial imagery Image/Signal 2015 254 EMB254 A perceptually relevant approach to ringing region detection Image/Signal 2015 255 EMB255 Image Inpainting by Kriging Interpolation Technique Image/Signal 2015 256 EMB256 Image Completion Using Efficient Belief Propagation Via Priority Scheduling and Dynamic Pruning Image/Signal 2015 257 EMB257 QR Code Watermarking Algorithm based on Wavelet Transform Image/Signal 2015 258 EMB258 A Novel Algorithm to Protect the Secret Image through Image Fusion and Verifying the Dealer and the Secret Image/Signal 2015
  • 11.
    Download Abstract From:www.ieeeprojectguru.com 10 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. Image 259 EMB259 Digital Water marking Using LSB Replacement with Secret Key Insertion Technique Image/Signal 2015 260 EMB260 Masking based Data Hiding and Image Authentication Technique (MDHIAT) Image/Signal 2015 261 EMB261 Improved BPCS Steganography Based Novel Approach for Data Embedding Image/Signal 2015 262 EMB262 Progressive Significance Map and Its Application to Error- Resilient Image Transmission Image/Signal 2015 263 EMB263 Weighting low level frame difference features for key frame extraction using fuzzy comprehensive evaluation and indirect feedback relevance mechanism Image/Signal 2015 264 EMB264 Repeating Pattern Extraction Technique (REPET): A Simple Method For Music/Voice Separation Image/Signal 2015 265 EMB265 A Wavelet-Based Technique Towards a More Natural Sounding Synthesized Speech Image/Signal 2015 266 EMB266 Spectral Subtraction of Noise in Speech Processing Applications Image/Signal 2015 267 EMB267 Performance Evolution of Downlink MIMO in LTE Technology Image/Signal 2015 268 EMB268 Space-Time Block Coded Spatial Modulation Image/Signal 2015 269 EMB269 Slow adaptive OFDMA systems through chance constrained programming Image/Signal 2015 270 EMB270 Fairness-aware radio resource management in downlink OFDMA cellular relay networks Image/Signal 2015 271 EMB271 Mobile Element Path Planning for Time-Constrained Data Gathering in Wireless Sensor Networks Image/Signal 2015 272 EMB272 Tree-Based Data Broadcast in IEEE 802.15.4 and ZigBee Network Image/Signal 2015 273 EMB 273 Real-time communications over cluster-tree sensor networks with mobile sink behavior Image/Signal 2015 274 EMB 274 Robust Algorithms for DOA Estimation and Adaptive Beam forming for Smart Antenna Application Image/Signal 2015 275 EMB 275 A Full-Rate Full-Diversity 2×2 Space-Time Block Code with Linear Complexity for the Maximum Likelihood Receiver Image/Signal 2015 MATLAB IMAGE PROCESSING WITH HARDWARE MODEL 2015 276 EMB276 Intelligent Robot Motion Control System for Industrial Monitoring Using Image Processing Techniques Matlab 2015 277 EMB277 Intelligent Robot Motion Control and Industrial security system Using Image Processing Techniques Matlab 2015 278 EMB278 Intelligent Robot Motion Control and Industrial security system Using Image Processing Techniques Matlab 2015 279 EMB279 GUI Controlled Robot With MATLAB For Video Using Microcontroller Matlab 2015 280 EMB280 Biosensor based driver drowsiness detection to avoid accidents using Neurosky Mindwave sensor with Matlab and Microcontroller Matlab 2015 281 EMB281 Biosensor based robot control using Neurosky Mindwave sensor with Matlab and Microcontroller Matlab 2015 282 EMB282 Biosensor based home automation using Neurosky Mindwave sensor with Matlab and Microcontroller Matlab 2015 283 EMB283 Biosensor based brain status simulation of the mentally disordered using Neurosky Mindwave sensor with Matlab and Microcontroller Matlab 2015
  • 12.
    Download Abstract From:www.ieeeprojectguru.com 11 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. 284 EMB284 Mobile Phone–Based Remote Patient Monitoring System For Management Of Hypertension In Diabetic Patients Matlab 2015 285 EMB285 Attendance System By Face Recognition Using SIFT Algorithm And SMS Reporting To Parents Mobile Phone Matlab 2015 286 EMB286 RFID based face image retrieval system using MATLAB Matlab 2015 287 EMB287 Multi biometric system using Face Recognition By SIFT Algorithm and RFID with SMS reporting system Matlab 2015 288 EMB288 Multi biometric system using Face Recognition By SIFT Algorithm and RFID with SMS reporting system with voice announcement. Matlab 2015 289 EMB289 Multi biometric system using Face Recognition By SIFT Algorithm And RFID using web camera Matlab 2015 290 EMB290 Industrial security system with Face recognition and Authentication Matlab 2015 291 EMB291 Industrial security system with Face recognition and Authentication with GSM Matlab 2015 292 EMB292 Testing And Reliability Improvement Of Electronics Products Manufactured On Printed Circuit Boards By Using Camera Matlab 2015 293 EMB293 Intelligent White Board Status Recognition And Erasing System With Wiper Movement Matlab 2015 294 EMB294 Efficient Method For Flame Detection And Using Image Processing With GSM Alert Matlab 2015 295 EMB295 Designing GUI with ZigBee for spatially distributed autonomous sensors to monitor physical or environmental conditions Matlab 2015 296 EMB296 Implementation of industrial security system with motion estimation and visual identification Matlab 2015 297 EMB297 Bomb Detecting And Diffusing Robot using MATLAB and microcontroller Matlab 2015 298 EMB298 GUI Controlled Robot using MATLAB and Microcontroller Matlab 2015 299 EMB299 Traffic Sign Recognition For Advanced Driver Assistance Using Digital Image Processing with speakers Matlab 2015 300 EMB300 A density based traffic control system using Image processing Matlab 2015 301 EMB301 Missing pills classification using MATLAB with Microcontroller Matlab 2015 302 EMB302 Shape detection and classification using Hough transformation and 8051 Matlab 2015 303 EMB 303 Color detection and classification using MATLAB and Microcontroller Matlab 2015 MOBILE & SATELLITE COMMUNICATION GSM / CDMA / DTMF / GPS / 3G / GPRS 304 EMB304 ATM Security with RFID and One Time Password (OTP) through GSM Mob Comm. 2015 305 EMB305 Security Integrated system based on wireless access protocol for industrial applications with SMS alert system using GSM modem Mob Comm. 2015 306 EMB306 Design and development of SMS based Car Engine control system to prevent car theft using GSM modem Mob Comm. 2015 307 EMB307 Power Theft Detection and Intimation Energy Meter Information on through SMS with Auto Power Cutoff Mob Comm. 2015 308 EMB308 Design and development of activation and controlling of home automation system via SMS through microcontroller Mob Comm. 2015 309 EMB309 SMS based PWM Speed and Direction control of DC motor Mob Comm. 2015
  • 13.
    Download Abstract From:www.ieeeprojectguru.com 12 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. using H-Bridge and GSM 310 EMB310 SMS based Speed control of thread roller’s AC motor in spinning mills using GSM Mob Comm. 2015 311 EMB311 Design of an Intelligent SMS based Remote electricity Metering and billing System Mob Comm. 2015 312 EMB312 Supervisory control and data acquisition system (SCADA) using GSM modem Mob Comm. 2015 313 EMB313 Mobile phone signal jammer for GSM, CDMA and 3G networks with user selectable prescheduled time duration (Mobile Jammer) Mob Comm. 2015 314 EMB314 SMS based Wireless electronic notice board using GSM / CDMA / 3G mobile phone Mob Comm. 2015 315 EMB315 Power Theft Detection and Intimation Energy Meter Information on through SMS with Auto Power Cutoff Mob Comm. 2015 316 EMB316 Power Theft Detection and Intimation Energy Meter Information on through SMS with Auto Power Cutoff Mob Comm. 2015 317 EMB317 Automatic Vehicle Accident Detection and Messaging System using GSM and GPS Mob Comm. 2015 318 EMB318 Blind Person Navigation system using GPS & Voice announcement Mob Comm. 2015 319 EMB319 Woman security assistance system with GPS tracking and messaging system Mob Comm. 2015 PROJECTS BASED ON ARM PROCESSOR ARM7 TDMI -LPC 2148 2015 320 EMB320 Implementing character LCD Device Driver development on LPC2148 ARM ARM Based 2015 321 EMB321 Implementation of Data Encryption Standard on ARM(ARM7TDMI) LPC2148 ARM Based 2015 322 EMB322 Implementation of Serial port device driver using ARM 7 TDMI LPC2148 Controller ARM Based 2015 323 EMB323 Real time data acquisition using ARM 7 TDMI processor based LPC2148 ARM Based 2015 324 EMB324 Interfacing of graphical LCD to LPC2148 ARM Based 32-bit microcontroller ARM Based 2015 325 EMB325 Implementation of EEPROM Interfacing with I2C protocol using ARM 7 TDMI ARM Based 2015 326 EMB326 H-Bridge based DC Motor speed & Direction control using PWM using ARM 7 LPC2148 ARM Based 2015 327 EMB327 Data transfer between pc and LPC2148 controller using fiber optical communication ARM Based 2015 328 EMB328 Anti-Theft Control System Design Using ARM7 ARM Based 2015 329 EMB329 Implementing UC/OS– II Kernel Based RTOS Using ARM7 TDMI (lpc2148) based Controller ARM Based 2015 330 EMB330 Automatic Dam Gate Control System with Caution Alarm Using ARM7 ARM Based 2015 331 EMB331 Design And Implementation Of Digital Clock with 16x2 LCD Using ARM7 ARM Based 2015 332 EMB332 Embedded Rigging free Electronic Voting System with instant results Using ARM7 ARM Based 2015 333 EMB333 Embedded Quiz monitoring system with team performance evaluation Using ARM7 ARM Based 2015 334 EMB334 GSM based Remote Industrial appliances control system using ARM 7 TDMI LPC2148 ARM Based 2015 335 EMB335 GSM based advanced transformer load sharing system using ARM 7 TDMI LPC2148 ARM Based 2015
  • 14.
    Download Abstract From:www.ieeeprojectguru.com 13 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. 336 EMB336 GSM based automatic vehicle accident detection with GPS based location identification and messaging system using ARM 7 TDMI processor based LPC2148 Controller ARM Based 2015 337 EMB337 Advanced mobile phone signal jammer for GSM, CDMA and 3G networks with prescheduled time duration using ARM 7 TDMI processor based LPC2148 Controller ARM Based 2015 338 EMB338 GSM-GPS integration for enhancing public transportation ARM Based 2015 339 EMB339 Remote control of smart household based on DTMF ARM Based 2015 340 EMB340 A bi-directional guard system design of car based on GPS & GSM ARM Based 2015 341 EMB341 An artificial landmark design based on mobile robot localization and navigation ARM Based 2015 342 EMB342 GSM Based Remote Monitoring Intelligent System Based on Fingerprint Door Lock using ARM7 ARM Based 2015 343 EMB343 GSM Based Remote Monitoring Intelligent System Based on Fingerprint Door Lock using ARM7 ARM Based 2015 344 EMB344 GSM Based Train Reservation System using ARM7 ARM Based 2015 345 EMB345 Design of an Intelligent SMS based Remote Metering System Using ARM7 ARM Based 2015 346 EMB346 GSM Based Greenhouse Remote Monitoring System Using ARM7 ARM Based 2015 347 EMB347 and messages using ARM7 ARM Based 2015 348 EMB 348 Implementation of High Sensitive GSM Signal Detector with Audio Visual Alert Indication Using ARM7 ARM Based 2015 349 EMB349 Wireless ATM security with GSM and MEMS Using ARM7 ARM Based 2015 350 EMB350 A smart ZigBee based wireless weather station monitoring system using ARM 7 TDMI processor based LPC2148 Controller ARM Based 2015 351 EMB351 Implementation of ZigBee based multipoint secured PC messaging system ARM 7 TDMI processor based LPC2148 Controller ARM Based 2015 352 EMB352 REAL-TIME ATOMIZATION OF AGRICULTURAL ENVIRONMENT FOR SOCIAL MODERNIZATION OF INDIAN AGRICULTURAL SYSTEM ARM Based 2015 353 EMB353 Monitoring and alarming system based on ZigBee Technology ARM Based 2015 354 EMB354 The Design of Tungsten Mine Environment Monitoring System Based on Wireless Sensor Networks Using ARM7 ARM Based 2015 355 EMB355 Photovoltaic powered advanced railway track fault inspection system with remote station alert using advanced ZigBee communication with ARM 7TDMI based LPC2148 Microcontroller ARM Based 2015 356 EMB356 Vehicle Identification Data Monitoring And Verification System For Traffic And RTO Using Zigbee Technology Based on ARM7 ARM Based 2015 357 EMB357 Model Radar Implementation, Signal Detection And Various Frequencies Identification With Remote Station Alerting System Using ARM7 ARM Based 2015 358 EMB358 Touch Screen Based Wireless Smart Home Automation System Using ARM7 ARM Based 2015 359 EMB359 Biometric finger print based electronic voting system for rigging free governance using ARM 7 TDMI processor based LPC2148 Controller ARM Based 2015 360 EMB360 Biometric finger print based bank locker system using ARM 7 TDMI processor LPC2148 ARM Based 2015 361 EMB361 Adaptive beat to beat heart rate estimation in Ballisto ARM Based 2015
  • 15.
    Download Abstract From:www.ieeeprojectguru.com 14 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. cardiogram 362 EMB362 An RFID-Based System for Pilgrim Management Using ARM7 ARM Based 2015 363 EMB363 Wireless Patient Health Monitoring System Using ZigBee ,RFID , GSM with wireless automatic doctor alerting through SMS Using ARM7 ARM Based 2015 364 EMB364 Development of gas leak detection and location system based on wireless technology ARM Based 2015 365 EMB365 Industrial Temperature Monitoring and controlling using ARM 7 ARM Based 2015 366 EMB366 Petrochemical Level Indicator and controller for automation of Cotton Purification industries using ARM 7 TDMI processor based LPC2148 Controller ARM Based 2015 367 EMB367 Intelligent LPG / Smoke Detector with Auto dialer using ARM 7 TDMI LPC2148 ARM Based 2015 368 EMB368 Automatic photovoltaic panel direction control for maximum power tracking using ARM 7 TDMI processor based LPC2148 Controller ARM Based 2015 369 EMB369 Auto turn off for water pump with four different time slots using ARM 7 LPC2148 ARM Based 2015 370 EMB370 Improved structure of solar tracker with arm7tdmi LPC2148 ARM Based 2015 371 EMB371 Implementation of Solar Fridge with fast chilling Applications with temperature Monitoring using ARM7 ARM Based 2015 372 EMB372 Applications of MEMS in robotics and Bio-MEMS ARM Based 2015 373 EMB373 Hazardous gas detecting method applied in coal mine detection robot ARM Based 2015 374 EMB374 Research on the method of automatic obstacle avoidance robot ARM Based 2015 375 EMB375 The remote control of mobile robot based on embedded technology ARM Based 2015 376 EMB376 Hand Gesture Based Wheel Chair Movement Control For The Disable With MEMS Using PWM Technique ARM Based 2015 377 EMB377 Robot Navigation System with RFID and Sensors Using ARM7 ARM Based 2015 378 EMB378 Design of the Smart Vehicle Control System Based on ARM7 ARM Based 2015 379 EMB379 Mobile operated Water Robot Using ARM7 Based LPC2148 ARM Based 2015 380 EMB380 The Design and Implement of Embedded Remote Control System in Industrial Pick and Place Robot Based on ARM7 ARM Based 2015 381 EMB381 Advanced artificial eye implementation for detecting monochrome objects for industrial automation, object sorting and material separation applications with DC geared motor fitted conveyer belt arrangement using ARM7 TDMI based LPC2148 ARM Based 2015 382 EMB382 Multi-Functional Car with Accident Alert Sensor Using ARM7 ARM Based 2015 383 EMB383 Solar Driven Vehicle With Drunken People Identification With Auto Ignition Disable Function Using ARM7 ARM Based 2015 PROJECTS BASED ON ARM11 BASED RASPBERRY PI WITH LINUX ENVIRONMENT 384 EMB384 Android based home automation with fan speed control Raspberry Pi 2015 385 EMB385 Optical Character Recognition system with voice announcement Raspberry Pi 2015 386 EMB386 IoT based Home Automation using Email Raspberry Pi 2015
  • 16.
    Download Abstract From:www.ieeeprojectguru.com 15 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. 387 EMB387 Doorbell notify with image capture and forward through Email Raspberry Pi 2015 388 EMB388 Advance Security System with Intruder Image capture and forward through Email Raspberry Pi 2015 389 EMB389 Ultrasonic target range estimation by SONAR technology using ARM11 based Raspberry Pi Raspberry Pi 2015 390 EMB390 Advanced user controlled roof top antenna signal tracking system with 10RPM geared DC motor using ARM11 based Raspberry Pi Raspberry Pi 2015 391 EMB391 Supersensitive security system with auto dialer (owner will be alerted by phone call on intrusion, can listen to the conversation of the thieves on his mobile) using ARM11 based Raspberry Pi Raspberry Pi 2015 392 EMB392 RF based tsunami detection and remote alert system with 60dB siren using ARM11 based Raspberry Pi Raspberry Pi 2015 393 EMB393 IR based automatic mirror lamp controller using ARM11 based Raspberry Pi Raspberry Pi 2015 394 EMB394 High sensitive IR based unmanned railway gate control using ARM11 based Raspberry Pi Raspberry Pi 2015 395 EMB395 Automatic speed control of vehicle at school zones using IR sensor using ARM11 based Raspberry Pi Raspberry Pi 2015 396 EMB396 IR based automatic mirror lamp controller using ARM11 based Raspberry Pi Raspberry Pi 2015 397 EMB397 Diamond security system in museums with loud 60dB siren using ARM11 based Raspberry Pi Raspberry Pi 2015 398 EMB398 High sensitive LDR based power saver for street light control system using ARM11 based Raspberry Pi Raspberry Pi 2015 399 EMB399 Automatic dam gate control system with caution alarm using ARM11 based Raspberry Pi Raspberry Pi 2015 400 EMB400 Intelligent automatic podium light control system using ARM11 based Raspberry Pi Raspberry Pi 2015 401 EMB401 Automatic plant irrigation system with dry/wet soil sense and controlling 230V water pump for agricultural applications using ARM11 based Raspberry Pi Raspberry Pi 2015 402 EMB402 Shock proof electrical appliances control system for physically challenged using ARM11 based Raspberry Pi Raspberry Pi 2015 403 EMB403 RF controlled metal detecting robot with remote voice and image transmission to assist bomb detection and rescue team using ARM11 based Raspberry Pi Raspberry Pi 2015 PROJECTS BASED ON PROGRAMMABLE SYSTEM ON CHIP -PSOC MIXED SIGNAL ARRAY 404 EMB404 Light intensity based Street light automation using PSoC Mixed Signal PSoC Based 2015 405 EMB405 Petrochemical level indicator and controller for automation of cotton purification industries using PSoC Mixed Signal Array PSoC Based 2015 406 EMB406 Industrial boiler temperature monitor with PSoC mixed signal array PSoC Based 2015 407 EMB407 Proximity Sensor based intelligent Security system using PSoC PSoC Based 2015 408 EMB408 Temperature measurement and control system based on PSoC Mixed Signal Array PSoC Based 2015 409 EMB409 Super sensitive Industrial Security System using PSoC Mixed Signal Array PSoC Based 2015 410 EMB410 Hazardous gas detecting method applied in coal mine PSoC Based 2015
  • 17.
    Download Abstract From:www.ieeeprojectguru.com 16 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. detection robot using PSoC Mixed Signal Array 411 EMB411 RF based Wireless Industrial Device control using PSoC Mixed Signal Array PSoC Based 2015 412 EMB412 Development of remote gas monitor system using PSoC Mixed Signal Array PSoC Based 2015 413 EMB413 Temperature data logger and display on pc through ZigBee using PSoC Mixed Signal Array PSoC Based 2015 414 EMB414 Remote control of smart household based on DTMF using PSoC Mixed PSoC Based 2015 415 EMB415 Implementation of UART protocol for PC based temperature data logger using PSoC mixed signal array PSoC Based 2015 416 EMB416 Auto turn off water pump with four different time slots using PSoC Mixed Signal Array PSoC Based 2015 417 EMB417 Applications of MEMS in robotics using Programmable System on Chip (PSoC) Mixed Signal Array PSoC Based 2015 418 EMB418 Automatic Active Phase selector for single phase load from three phase supply using PSoC Mixed Signal Array PSoC Based 2015 RFID / BIOMETRICS / FINGER PRINT 419 EMB419 Implementing character LCD Device Driver development on LPC2148 ARM RFID Based 2015 420 EMB420 Designing of RFID based Sensor Solution for Packaging Surveillance Applications RFID Based 2015 421 EMB421 Using RFID for anti-theft in a Chinese electrical supply company: A cost-benefit analysis RFID Based 2015 422 EMB422 Fast identification of the missing tags in a large RFID system using AT89S52 MCU RFID Based 2015 423 EMB423 Improving security and usability of low cost RFID tags improving security and usability of low cost RFID tags RFID Based 2015 424 EMB424 RFID security access control system RFID Based 2015 425 EMB425 RFID based banking system for secured transaction RFID Based 2015 426 EMB426 RFID based Airport Luggage security scanning system RFID Based 2015 427 EMB427 Unveiling the Potential of RFID-Enabled Intelligent Patient Management RFID Based 2015 428 EMB428 RFID based patient information system using AT89S52 Microcontroller RFID Based 2015 429 EMB429 RFID based prepaid car parking system using AT89S52 Microcontroller RFID Based 2015 430 EMB430 RFID based Electronic road pricing system using AT89S52 Microcontroller RFID Based 2015 431 EMB431 RFID based toll tax system using AT89S52 Microcontroller RFID Based 2015 432 EMB432 RFID based toll tax system using AT89S52 Microcontroller RFID Based 2015 433 EMB433 Construction of Central Control Unit for Irrigation water pumps. Cost effective method to control entire villager’s water pumps with user level authentication RFID Based 2015 434 EMB434 RFID based attendance system using AT89S52 Microcontroller RFID Based 2015 435 EMB435 RFID based electronic passport system for easy governance using AT89S52 Microcontroller RFID Based 2015 436 EMB436 RFID based Library Automation System using AT89S52 RFID Based 2015 437 EMB437 RFID based Library Automation System using AT89S52 RFID Based 2015 438 EMB438 Finger print based bank locker system using AT89S52 MCU RFID Based 2015 439 EMB439 Finger print based electronic passport system using AT89S52 MCU RFID Based 2015 440 EMB440 Finger print based voting system for rigging-free governing RFID Based 2015 441 EMB441 Finger print based driving license management system RFID Based 2015
  • 18.
    Download Abstract From:www.ieeeprojectguru.com 17 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. 442 EMB442 Finger print based attendance system using AT89S52 MCU RFID Based 2015 443 EMB443 Finger print based electrical device control system using AT89S52 RFID Based 2015 444 EMB444 Prepaid coffee dispenser with biometric recharge using finger print RFID Based 2015 ROBOTICS / SOLAR ROBOTICS / WIRELESS MEMS TECHNOLOGY ROBOTICS 445 EMB445 Hand gesture based wheel chair movement control for the disabled using (Micro Electro Mechanical Sensor) MEMS technology Robotics 2015 446 EMB446 Autonomous Guide Cane for blind or visually impaired travelers using IR Robotics 2015 447 EMB 447 Head movement controlled car driving system to assist the physically challenged Robotics 2015 448 EMB448 RF Based farmer friendly Agricultural Robot with motorized shovel control System with automatic seed dispensing system Robotics 2015 449 EMB449 Intelligent speech recognition and voice operated robot with wireless voice & video transmission to remote television Robotics 2015 450 EMB450 RF Controlled Metal Detecting Robot with Remote Voice And Image Transmission to assist bomb detection and rescue team Robotics 2015 451 EMB451 Hand gesture recognition technology based wireless surveillance bomb diffusing robot with mobile jamming technique using MEMS technology Robotics 2015 452 EMB452 RF Controlled Robotic Boat to Travel in Water with Wireless Video And Voice Robotics 2015 453 EMB453 RF Controlled Fire Fighting Robot with high pressure water sprinkler Robotics 2015 454 EMB454 Bluetooth based Robot Control for Metal Detection Applications Robotics 2015 455 EMB455 DTMF based human less boat control for ocean research applications Robotics 2015 456 EMB456 Wireless target recognition and counter attacking robot with laser gun activation Robotics 2015 457 EMB457 Pole climbing Robot for surveillance application with voice and image recording in SD card / Memory card Robotics 2015 458 EMB458 Search and rescue robot for victims of earthquake and other natural calamities Robotics 2015 459 EMB459 Light Search and following robot using AT89S52 MCU Robotics 2015 460 EMB460 RF Controlled multi Terrain Robot to travel on water surface, Indoor and outdoor uneven surfaces for defense applications Robotics 2015 461 EMB461 RF controlled Bomb detection and diffusing solar robot with wire cutting and gun arrangement Robotics 2015 462 EMB462 Implementation of artificial eye for Intelligent Line Following Robot application using AT89S52 MCU Robotics 2015 463 EMB463 Remote GSM Mobile phone controlled Robotic Arm with Base Rotation, Elbow and Wrist Motion with a Functional Gripper Robotics 2015 464 EMB464 Robotic Arm With Base Rotation, Elbow And Wrist Motion With A Functional Gripper for pick and place applications Robotics 2015 465 EMB465 LPG Detecting Robot with wireless Voice And Image Transmission Robotics 2015
  • 19.
    Download Abstract From:www.ieeeprojectguru.com 18 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. 466 EMB466 Intelligent Wall Follower Robot using AT89S52 MCU Robotics 2015 467 EMB467 Mining safety – implementation of RF controlled Robotic Electronic Nose to detect dangerous gases for alerting mining workers and engineers for preventive actions. Robotics 2015 468 EMB468 Automatic Intelligent Industrial Object sorter with conveyor belt arrangement for color distinguishing and object count applications Robotics 2015 469 EMB469 RF Controlled high efficient trash collecting robot capable of capturing even 40 microns dust particles Robotics 2015 470 EMB470 Design and development of sailing robot with Pick and place applications Robotics 2015 471 EMB471 Develop robotic nose can sense various odors and gases like methane, carbon monoxide, liquid petroleum gas etc - more sensitive than human nose) Robotics 2015 SOLAR / WIND / GREEN HOUSE / RENEWABLE ENERGY SOURCES 472 EMB472 AC motor speed control using power Triac Energy Based 2015 473 EMB473 Solar based air compressor pump for car bike tire inflate Energy Based 2015 474 EMB474 Solar based high efficient vacuum cleaner capable of capturing even 40 microns small dust Energy Based 2015 475 EMB475 Implementation of Solar inverter for home / garden / street light applications Energy Based 2015 476 EMB476 Real Time Clock based solar LED street light automation using Dallas RTC and I2C protocol Energy Based 2015 477 EMB477 Implementation of solar water pump control with four different time slots for power saving applications Energy Based 2015 478 EMB478 Design and implementation of maximum power tracking system by automatic control of solar panel direction according to the sun direction (Model Sunflower) Energy Based 2015 479 EMB479 Solar based E-Uniform for soldiers who work at extreme high temperature or extreme low temperature Energy Based 2015 480 EMB480 Farmer friendly Solar based electric fence for rural agriculture with battery voltage analyzer using AT89S52 MCU Energy Based 2015 481 EMB481 Solar based mobile charger for rural areas (Charge your mobile anywhere with sunlight) with battery voltage analyzer using AT89S52 MCU Energy Based 2015 482 EMB482 Solar highway lighting system with auto turn off on day time with LCD display Energy Based 2015 483 EMB483 Implementation of hi-tech agricultural solar fence security with soil humidity based automatic irrigation and Voice Announcement alert on PIR live human detection Energy Based 2015 484 EMB484 Aerodynamic wind mill with reverse charge protection for rural power generation applications with battery voltage analyser using AT89S52 MCU Energy Based 2015 TOUCH PANEL / GRAPHICAL LCD / SPEECH / VOICE / HUMAN–MACHINE–INTERFACE 485 EMB485 Touch screen and wireless communication based personal assistant for Dumb and illiterate in Airlines Interface Based 2015 486 EMB486 Touch screen based remote controlled robot with remote voice and image transmission with LPG and metal detection capabilities Interface Based 2015 487 EMB487 Touch screen based wireless smart Home Automation Interface Based 2015
  • 20.
    Download Abstract From:www.ieeeprojectguru.com 19 Office No: 06, 2 nd Wing, Gangotri Heights, Near to APEX Hospital Kalewadi Phata, Pune - 411033. System using AT89S52 MCU 488 EMB488 Touch screen controlled dimmer light for next generation apartments Interface Based 2015 489 EMB489 Intelligent touch panel based menu ordering system for restaurants using AT89S52 MCU Interface Based 2015 490 EMB490 Touch screen and EEPROM smart card based ticket booking system Interface Based 2015 491 EMB491 Image based password authentication for illiterates with touchscreen Interface Based 2015 492 EMB492 MEMS Based Human – computer interface mouse control for PC with windows media player controller Interface Based 2015 493 EMB493 RC5 IR remote Based Human – computer interface mouse control for PC with windows media player controller Interface Based 2015 494 EMB494 Comprehensive text to speech converter using AT89S52 Microcontroller for the dumb Interface Based 2015 495 EMB495 User independent voice commands based robot control with remote voice and image transmission. Interface Based 2015 496 EMB496 Speech Recognition enabled smart home automation for the blind and physically challenged Interface Based 2015 497 EMB497 Voice operated intelligent Elevator Interface Based 2015 498 EMB498 Voice enabled switching device and security system with auto dialer and 60db loud siren Interface Based 2015 499 EMB499 User dependent speech Recognition based security access control system. Interface Based 2015 500 EM 500 Wireless Speech Recognition enabled smart home automation for the blind and physically challenged Interface Based 2015 501 EMB501 PC to Microcontroller Secured Data Communication using Fiber Optic cable Interface Based 2015