This document summarizes a system for controlling the speed and position of a train using GPS. The system includes modules on the train and at a railway control board (RBC) section. On the train, GPS is used to determine the current position and speed, which is sent to the RBC via Zigbee wireless transmission. At the RBC, the train's position and speed are displayed. The system can also automatically control the speed of the train and activate level crossing gates based on the train's position. The goal is to help avoid accidents by monitoring the train's location and speed in real-time.