The document reports on a project to double a 10 km stretch of railway line between Shivnagar and Bandhuakalan. It discusses the objectives, methodology, location details, traffic survey results, specifications of work including earthwork, bridges, level crossings, track linking process, and conclusions. The doubling is aimed to ease mounting rail traffic pressure and allow optimal use of maintenance machines by providing an additional track on the busy single line section.
Urban rail transit is an all-encompassing term for various types of local rail systems providing passenger service within and around urban or suburban areas. The set of urban rail systems can be roughly subdivided into the following categories, which sometimes overlap because some systems or lines have aspects of multiple types.
urban railway system
railway transportation system
history of railway transportation
importance of railway transportation
railway transportation in ghana
urban rail transport
role of IRC in transportation development in indiaRAJPREMANI
this is a review paper on "ROLE OF IRC IN TRANSPORTATION DEVELOPMENT IN INDIA" which is publised in IJIRMF ( INTERNATIONAL JOURNAL FOR INNOVATIVE RESEARCH IN MULTIDISCIPLINARY FIELD" PUBLISHED IN OCTOBER 2016 WITH PAPER ID 201610082
Hill road definition, Design Issue of Hill Road, Special Consideration Hill road, Route Selection, Alignment- Hill Road, Engineering Data-Hill Road, Geometric Design- Hill Road, Hair Pin Bends, Hill Road Capacity, Set back Distance, IRC Codes- Hill Road design, IRC Code- Hill road Drainage, Hill road-Protective Works, Hill road- Drainage, Hill road- Maintenance, Hill road- Standard References
Urban rail transit is an all-encompassing term for various types of local rail systems providing passenger service within and around urban or suburban areas. The set of urban rail systems can be roughly subdivided into the following categories, which sometimes overlap because some systems or lines have aspects of multiple types.
urban railway system
railway transportation system
history of railway transportation
importance of railway transportation
railway transportation in ghana
urban rail transport
role of IRC in transportation development in indiaRAJPREMANI
this is a review paper on "ROLE OF IRC IN TRANSPORTATION DEVELOPMENT IN INDIA" which is publised in IJIRMF ( INTERNATIONAL JOURNAL FOR INNOVATIVE RESEARCH IN MULTIDISCIPLINARY FIELD" PUBLISHED IN OCTOBER 2016 WITH PAPER ID 201610082
Hill road definition, Design Issue of Hill Road, Special Consideration Hill road, Route Selection, Alignment- Hill Road, Engineering Data-Hill Road, Geometric Design- Hill Road, Hair Pin Bends, Hill Road Capacity, Set back Distance, IRC Codes- Hill Road design, IRC Code- Hill road Drainage, Hill road-Protective Works, Hill road- Drainage, Hill road- Maintenance, Hill road- Standard References
This ppt presentation may be very useful who wants to present himself on the topic such as steel bridge girders and prestressed concreting and the psc slabs
* DOWNLOAD AND PLAY IT IN MICROSOFT POWERPOINT CAUSE IT CONTAINS ANIMATION AND CAN'T WATCH WITHOUT IT *
Stations and Yards of Railway powerpoint presentation in Transport Engineering.
Presentation on Chenab Bidge.
Indian Railways has undertaken the mega- project of construction of a new railway line in the State of Jammu and Kashmir. The Chenab Bridge is a railway steel and concrete arch bridge under construction between Bakkal and Kauri in the Reasi from Udhampur to Baramulla.
This ppt presentation may be very useful who wants to present himself on the topic such as steel bridge girders and prestressed concreting and the psc slabs
* DOWNLOAD AND PLAY IT IN MICROSOFT POWERPOINT CAUSE IT CONTAINS ANIMATION AND CAN'T WATCH WITHOUT IT *
Stations and Yards of Railway powerpoint presentation in Transport Engineering.
Presentation on Chenab Bidge.
Indian Railways has undertaken the mega- project of construction of a new railway line in the State of Jammu and Kashmir. The Chenab Bridge is a railway steel and concrete arch bridge under construction between Bakkal and Kauri in the Reasi from Udhampur to Baramulla.
Grievance redressal of Hubli railway station : A multistorey approach Nishanth Patil
PROBLEM STATEMENT :
To suggest a viable option for capacity augmentation in Tier-I , Metropolitan and Tier-II Railway stations catering to commuter, non-suburban and freight traffic, considering Hubli Railway Station as Model Station for Design Basis.
SCOPE :
The scope of the proposal can be envisaged to pertain,
yet not be constrained to the following :
To successfully replicate the proposal, in Land-crunched cities, whilst augmenting capacity or relieving congestion;
To serve as an alternative solution to multi-directional , multi-focal travel alignments in transient cities;
To serve as a model for urban planning initiatives.
CONCLUSION :
The financial and technical feasibility of the proposal was measured by comparative study of 8 numbers of schemes, which were prepared by varying the material specifications for the member components.
The project is economically a better alternative in all cases wherever capacity augmentation necessitates the acquisition of land costing INR 4200 / sqft or more (2012-2013).
Innovative solution for crossing larger spaces like railway yardRajesh Prasad
This paper titled Innovative solution for crossing larger spaces like railway yard has been presented in a seminar organised by CEAI at Kolkata on 03.06.2016
7 Most Significant Underground Projects in Asia Today [Infograph]Darwin Jayson Mariano
In this very exclusive report, we’ve compiled the 7 most significant underground projects in Asia today. Find out where are these projects located, what’s the scope, how much has been allocated and what kind of impact it will create to the stakeholders involved. Never have we seen anything quite like it.
Presentation about Ircon's SGEDT project in Malaysia.Hitesh Khanna
This presentation was presented in Indian Railway's IPWE Seminar in January 2013 at Chennai. It depicts the innovations and new Technologies (in the context of Indian Railways) adopted on the project, and the various technical issues, and how they were dealt with.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Doubling presentation
1. PROJECT REPORT
Project Guide
Miss Deepti Gupta
Senior Lecturer
Submitted By
Neha Singh 1212200073
Rakesh Kumar Gupta 1212200083
Zeeshan Ahmed 1212200126
PLANNING OF DOUBLING OF BROAD GAUGE RAILWAY LINE AT
SHIVNAGAR- BANDHUAKALAN (10 KM)
S H R I R A M S WA R O O P M E M O R I A L C O L L E G E O F E N G I N E E R I N G &
M A N A G E M E N T
2. I N T R O D U C T I O N
Doubling of railway line means construction of an additional line. It is
normally done when single line is not in a position to carry the number of
trains required to pass on the section.
The doubling of Utraitia - Sultanpur-Zafrabad project is for diverting
freight traffic from Mughalsarai - Allahabad - New Delhi route so as to
provide room for additional coaching traffic to be introduced in near
future .
The patch doubling from Zafrabad to Shri Krishna Nagar (34 kms),
Sultanpur to Bandhuakalan (09 kms) & Utraitia to Chandraulli (37
kms) has been completed. The balance 148 km stretch is with single
railway track that need to be double.
Specific section of 10 kms length between Shivnagar and Bandhuakalan has
been selected for the project.
3. OBJECTIVE
To eradicate
mounting pressure
of rail traffic.
To get the
optimum benefit
from the modern
maintenance
machines.
To cope up with
the additional
requirement to
traffic. The need to divert
rail traffic from
one route to
another due to
accident /mishap,
or any other
unforeseen reason.
To reduce initial
costs of a line that
is certain to see
heavy traffic in the
future, a line may
be built as single-
track .
4. M E T H O D O L O G Y
SITE &
TRAFFIC
SURVEY
COLLECTION
OF SAMPLES
SPECIFICATION
& DATA
COLLECTION
FROM
RAILWAY
OFFICE
ANALYSING
DATA &
SAMPLES
ESTIMATION
OF
EARTHWORK
5. L O C A T I O N
Bandhuakalan -
Shivnagar Section (12.5
km)
LUCKNOW
UTRAITIA
BAKKAS
ANUPGANJ
RAHMATNAGAR
CHANDRAULLI
TRIVEDIGANJ
HAIDERGARGH
CHAUBISI
AKBARGANJ
SINDHURWA
NIHALGARH
ADHINPUR
MUSAFIRKHANA
SHIVNAGAR
BANDHUAKALAN
SULTANPUR
HARPALGANJ
JAUNPUR
ZAFRABAD
6. P R O C E S S O F D O U B L I N G
Engineering
cum Traffic
Survey
Specification
of work
Land
acquisition
EarthworkBridgesPlate laying
Opening for
goods traffic
&ballasting
Opening line
for passenger
traffic
7. ENGI NEERI NG CUM TRAFFI C SURVEY
T RAF F I C SURV EY DETAI L S
Timings of the train (Hourly
basis)
No. of trains passing
SHIVNAGAR
No. of trains passing
BANDHUAKALAN
BEFORE AFTER BEFORE AFTER
03:00-04:00 0 0 0 0
05:00-06:00 0 2 0 2
06:00-07:00 1 1 2 2
07:00-08:00 1 1 0 0
08:00-09:00 1 4 1 5
10:00-11:00 0 0 0 0
11:00-12:00 0 0 0 2
12:00-13:00 1 1 0 0
13:00-14:00 0 2 0 3
14:00-15:00 0 2 0 1
15:00-16:00 0 2 0 1
16:00-17:00 0 2 0 1
17:00-18:00 0 0 0 2
18:00-19:00 0 3 0 0
19:00-20:00 2 2 2 2
20:00-21:00 0 0 0 0
21:00-22:00 1 1 1 1
23:00-00:00 0 0 0 0
TOTAL 7 23 6 22
8. SPECIFICATION OF WORK
Rail and fastenings
• The permanent way consists of 60 kg (UIC), 90 UTS rails welded into LWR (By
FB(Flush butt welding)/AT(Alumino-Thermit welding) welding with SKV
process) over main line. Loop lines, consist 60 Kg 90 UTS SH rails welded into
LWR (By AT welding with SKV process).
Fish Plates
• 1 M Long new fish plates with six holes of standard type to suit 60
kg rails have been used.
Sleepers and fastenings
• MAIN LINE: PRC sleepers complete with elastic fastenings to M+ 8 (1660 no.
per Km) densities have been used.
• LOOP LINE: PRC sleepers complete with elastic fastenings to M+ 7 (1540 no.
per Km) densities have been used.
9. Guard Rails
Guard rails of 52 Kg rails resting on PSC sleepers have been provided on all major
bridges.
Points and Crossings
All turn out to be negotiated by passenger trains are of 1 in 12 with curved
switches except turn outs laid for sand humps which are of 1 in 8-1/2 laid on
symmetrical split.
60 kg trap points on PSC sleepers have been provided wherever required for the
purpose of isolation in new line.
Ballast
65mm gauge hard stone Machine Crushed ballast with cushion of 350mm on main
line and 250 mm on loop line below the sleeper has been provided under the track
and turn outs with boxing. The newly laid track and turn outs have been thoroughly
packed manually and machine packing will be done before commissioning
SPECIFICATION OF WORK
19. QUANTITY ESTIMATE
BLANKETING MATERIAL
SOIL1.4 m
0.6 m
5.3 m
Existing track
Proposed
double line
Subgrade = 74200 Cubic Meter
Blanketing Material = 10600 Cubic Meter
Ballast = 2800 Cubic Meter
Sleeper =16600 Nos.
20. BRIDGES
48 No. of Bridges
Provided for 25 T loading
1 major bridge & 47 minor
bridges.
Provided as extension of
bridges on existing track
24. L I S T O F L E V E L C R O S S I N G S
SN Level X-ing No. Manned / Unmanned Interlocked/
Non interlocked
Remark
1 82/C Manned Interlocked Traffic
2 83/C Manned Interlocked Traffic
3 84/C Manned Non-interlocked Engineering
4 85/C Manned Non-interlocked Engineering
5 86/C Manned Non-interlocked Engineering
6 87/C Un- Manned Non-interlocked Engineering
7 88/C Un- Manned Non-interlocked Engineering
8 89/C Un- Manned Non-interlocked Engineering
9 90/C Manned Non-interlocked Engineering
11 91/C Un- Manned Non-interlocked Engineering
12 92/C Un- Manned Non-interlocked Engineering
13 93/C Un- Manned Non-interlocked Engineering
14 94/B Manned Interlocked Traffic
15 95/B Manned Interlocked Traffic
25. TEST ON AGGREGATE
STONE AGGREGATE TEST
SN Sample No. Abrasion value Impact value Water
absorption
1 1 16.68% 13.75% 0.296%
2 2 15.90% 13.79% 0.347%
3. AVERAGE 16.29% 13.77% 0.321%
4. MAXIMUM
PERMISSIBLE
VALUE
30% 20% 1%
5. WITHIN
PERMISSIBLE
LIMITSOR NOT?
YES YES YES
26. TEST ON SOI L
TEST ON BURROW SOIL
SN Location of Subgrade
sample
LL PL Dispersive
nature
1 SHIVNAGAR 22.10 6.55 NO
2 BANDHUAKALAN 22.29 6.70 NO
27. PLATE LAYI NG OR TRACK LI NKI NG
Rails, sleepers and other fittings are taken to the
base depot and unloaded
Tracks materials are taken to the rail head and
track linked and packed
Rail head is advanced up to the extent the track
is laid
Dip lorry is used to take rack material to rail head
Rail head goes on advancing till full track is linked
T E L E S C O P I C M E T H O D
29. O P E N I N G F O R G O O D S T R A F F I C A N D B A L L A S T I N G
30. C O N C L U S I O N
Simplified
signaling
system.
Bi-
directional
running .
Enhancement
of line capacity
utilization
Section
capacity
showed
significant
increase
Train delay
reduced.
31. F U T U R E S C O P E
Soil report may be used as a reference for
other civil project near the site of project.
Topographical
survey data
can be used
for similar
projects near
the site for
design of any
other
structure.
The traffic survey cab help in
proper maintenance and future
developments in the concerned
area.
The continuation of this project
will help in understanding the
use of new technologies
employed for this purpose.
32. A D V A N T A G E
It can
manage a
larger
amount of
traffic with
usually twice
the capacity
of single
track.
Faster trains
can overtake
slower ones,
and doubling
can
contribute to
faster
operation of
trains.
It is easy to
maintenance
and
engineering
work
Provision of
alternate
routes would
reduce
Pressure on
existing
network .
Doubling would
help it earn
more revenue
from the
additional
traffic.
33. “Railway is a unique integrator of India.
We must restore the strength of
Indian railways as the back bone of India.”
- Mr. Suresh Prabhu
Railway Minister of India
Thanks