SlideShare a Scribd company logo
PROJECT REPORT
Project Guide
Miss Deepti Gupta
Senior Lecturer
Submitted By
Neha Singh 1212200073
Rakesh Kumar Gupta 1212200083
Zeeshan Ahmed 1212200126
PLANNING OF DOUBLING OF BROAD GAUGE RAILWAY LINE AT
SHIVNAGAR- BANDHUAKALAN (10 KM)
S H R I R A M S WA R O O P M E M O R I A L C O L L E G E O F E N G I N E E R I N G &
M A N A G E M E N T
I N T R O D U C T I O N
Doubling of railway line means construction of an additional line. It is
normally done when single line is not in a position to carry the number of
trains required to pass on the section.
The doubling of Utraitia - Sultanpur-Zafrabad project is for diverting
freight traffic from Mughalsarai - Allahabad - New Delhi route so as to
provide room for additional coaching traffic to be introduced in near
future .
The patch doubling from Zafrabad to Shri Krishna Nagar (34 kms),
Sultanpur to Bandhuakalan (09 kms) & Utraitia to Chandraulli (37
kms) has been completed. The balance 148 km stretch is with single
railway track that need to be double.
Specific section of 10 kms length between Shivnagar and Bandhuakalan has
been selected for the project.
OBJECTIVE
To eradicate
mounting pressure
of rail traffic.
To get the
optimum benefit
from the modern
maintenance
machines.
To cope up with
the additional
requirement to
traffic. The need to divert
rail traffic from
one route to
another due to
accident /mishap,
or any other
unforeseen reason.
To reduce initial
costs of a line that
is certain to see
heavy traffic in the
future, a line may
be built as single-
track .
M E T H O D O L O G Y
SITE &
TRAFFIC
SURVEY
COLLECTION
OF SAMPLES
SPECIFICATION
& DATA
COLLECTION
FROM
RAILWAY
OFFICE
ANALYSING
DATA &
SAMPLES
ESTIMATION
OF
EARTHWORK
L O C A T I O N
Bandhuakalan -
Shivnagar Section (12.5
km)
LUCKNOW
UTRAITIA
BAKKAS
ANUPGANJ
RAHMATNAGAR
CHANDRAULLI
TRIVEDIGANJ
HAIDERGARGH
CHAUBISI
AKBARGANJ
SINDHURWA
NIHALGARH
ADHINPUR
MUSAFIRKHANA
SHIVNAGAR
BANDHUAKALAN
SULTANPUR
HARPALGANJ
JAUNPUR
ZAFRABAD
P R O C E S S O F D O U B L I N G
Engineering
cum Traffic
Survey
Specification
of work
Land
acquisition
EarthworkBridgesPlate laying
Opening for
goods traffic
&ballasting
Opening line
for passenger
traffic
ENGI NEERI NG CUM TRAFFI C SURVEY
T RAF F I C SURV EY DETAI L S
Timings of the train (Hourly
basis)
No. of trains passing
SHIVNAGAR
No. of trains passing
BANDHUAKALAN
BEFORE AFTER BEFORE AFTER
03:00-04:00 0 0 0 0
05:00-06:00 0 2 0 2
06:00-07:00 1 1 2 2
07:00-08:00 1 1 0 0
08:00-09:00 1 4 1 5
10:00-11:00 0 0 0 0
11:00-12:00 0 0 0 2
12:00-13:00 1 1 0 0
13:00-14:00 0 2 0 3
14:00-15:00 0 2 0 1
15:00-16:00 0 2 0 1
16:00-17:00 0 2 0 1
17:00-18:00 0 0 0 2
18:00-19:00 0 3 0 0
19:00-20:00 2 2 2 2
20:00-21:00 0 0 0 0
21:00-22:00 1 1 1 1
23:00-00:00 0 0 0 0
TOTAL 7 23 6 22
SPECIFICATION OF WORK
Rail and fastenings
• The permanent way consists of 60 kg (UIC), 90 UTS rails welded into LWR (By
FB(Flush butt welding)/AT(Alumino-Thermit welding) welding with SKV
process) over main line. Loop lines, consist 60 Kg 90 UTS SH rails welded into
LWR (By AT welding with SKV process).
Fish Plates
• 1 M Long new fish plates with six holes of standard type to suit 60
kg rails have been used.
Sleepers and fastenings
• MAIN LINE: PRC sleepers complete with elastic fastenings to M+ 8 (1660 no.
per Km) densities have been used.
• LOOP LINE: PRC sleepers complete with elastic fastenings to M+ 7 (1540 no.
per Km) densities have been used.
Guard Rails
Guard rails of 52 Kg rails resting on PSC sleepers have been provided on all major
bridges.
Points and Crossings
All turn out to be negotiated by passenger trains are of 1 in 12 with curved
switches except turn outs laid for sand humps which are of 1 in 8-1/2 laid on
symmetrical split.
60 kg trap points on PSC sleepers have been provided wherever required for the
purpose of isolation in new line.
Ballast
65mm gauge hard stone Machine Crushed ballast with cushion of 350mm on main
line and 250 mm on loop line below the sleeper has been provided under the track
and turn outs with boxing. The newly laid track and turn outs have been thoroughly
packed manually and machine packing will be done before commissioning
SPECIFICATION OF WORK
EARTHWORK AND FORMATION
CROSS SECTION PROFILE
QUANTITY ESTIMATE
BLANKETING MATERIAL
SOIL1.4 m
0.6 m
5.3 m
Existing track
Proposed
double line
Subgrade = 74200 Cubic Meter
Blanketing Material = 10600 Cubic Meter
Ballast = 2800 Cubic Meter
Sleeper =16600 Nos.
BRIDGES
48 No. of Bridges
Provided for 25 T loading
1 major bridge & 47 minor
bridges.
Provided as extension of
bridges on existing track
LEVEL CROSSINGS
Total 15 level
Crossings
8 Manned Level
Crossings
7 Unmanned Level
Crossings
L I S T O F L E V E L C R O S S I N G S
SN Level X-ing No. Manned / Unmanned Interlocked/
Non interlocked
Remark
1 82/C Manned Interlocked Traffic
2 83/C Manned Interlocked Traffic
3 84/C Manned Non-interlocked Engineering
4 85/C Manned Non-interlocked Engineering
5 86/C Manned Non-interlocked Engineering
6 87/C Un- Manned Non-interlocked Engineering
7 88/C Un- Manned Non-interlocked Engineering
8 89/C Un- Manned Non-interlocked Engineering
9 90/C Manned Non-interlocked Engineering
11 91/C Un- Manned Non-interlocked Engineering
12 92/C Un- Manned Non-interlocked Engineering
13 93/C Un- Manned Non-interlocked Engineering
14 94/B Manned Interlocked Traffic
15 95/B Manned Interlocked Traffic
TEST ON AGGREGATE
STONE AGGREGATE TEST
SN Sample No. Abrasion value Impact value Water
absorption
1 1 16.68% 13.75% 0.296%
2 2 15.90% 13.79% 0.347%
3. AVERAGE 16.29% 13.77% 0.321%
4. MAXIMUM
PERMISSIBLE
VALUE
30% 20% 1%
5. WITHIN
PERMISSIBLE
LIMITSOR NOT?
YES YES YES
TEST ON SOI L
TEST ON BURROW SOIL
SN Location of Subgrade
sample
LL PL Dispersive
nature
1 SHIVNAGAR 22.10 6.55 NO
2 BANDHUAKALAN 22.29 6.70 NO
PLATE LAYI NG OR TRACK LI NKI NG
Rails, sleepers and other fittings are taken to the
base depot and unloaded
Tracks materials are taken to the rail head and
track linked and packed
Rail head is advanced up to the extent the track
is laid
Dip lorry is used to take rack material to rail head
Rail head goes on advancing till full track is linked
T E L E S C O P I C M E T H O D
Unloading
of materials
Linking of
track
Packing of
track
Ballasting
of track
O P E N I N G F O R G O O D S T R A F F I C A N D B A L L A S T I N G
C O N C L U S I O N
Simplified
signaling
system.
Bi-
directional
running .
Enhancement
of line capacity
utilization
Section
capacity
showed
significant
increase
Train delay
reduced.
F U T U R E S C O P E
Soil report may be used as a reference for
other civil project near the site of project.
Topographical
survey data
can be used
for similar
projects near
the site for
design of any
other
structure.
The traffic survey cab help in
proper maintenance and future
developments in the concerned
area.
The continuation of this project
will help in understanding the
use of new technologies
employed for this purpose.
A D V A N T A G E
It can
manage a
larger
amount of
traffic with
usually twice
the capacity
of single
track.
Faster trains
can overtake
slower ones,
and doubling
can
contribute to
faster
operation of
trains.
It is easy to
maintenance
and
engineering
work
Provision of
alternate
routes would
reduce
Pressure on
existing
network .
Doubling would
help it earn
more revenue
from the
additional
traffic.
“Railway is a unique integrator of India.
We must restore the strength of
Indian railways as the back bone of India.”
- Mr. Suresh Prabhu
Railway Minister of India
Thanks

More Related Content

What's hot

Indian railway
Indian railwayIndian railway
Indian railway
RanjitKumar Sahu
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)
sharda university
 
STEEL BRIDGE GIRDERS & PSC BRIDGE SLABS
STEEL BRIDGE GIRDERS & PSC BRIDGE SLABSSTEEL BRIDGE GIRDERS & PSC BRIDGE SLABS
STEEL BRIDGE GIRDERS & PSC BRIDGE SLABS
Al Hakam Khan
 
History of roads
History of roadsHistory of roads
History of roads
karthick s
 
Bharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadakBharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadak
ANIKETBAMBOLE1
 
Cross section of road
Cross section of roadCross section of road
Cross section of road
Ghanashyam Prajapati
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
Latif Hyder Wadho
 
History of road in Nepal
History of road in NepalHistory of road in Nepal
History of road in Nepal
pnbastola
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
Arbaz Kazi
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
Souvik Mondal
 
Innovations in Public Transportation
Innovations in Public TransportationInnovations in Public Transportation
Innovations in Public Transportation
shrikrishna kesharwani
 
Estimation of bridges and automations copy
Estimation of bridges and automations   copyEstimation of bridges and automations   copy
Estimation of bridges and automations copy
kjanand
 
Case study bridge construction upto pier and road construction
Case study   bridge construction upto pier and road constructionCase study   bridge construction upto pier and road construction
Case study bridge construction upto pier and road construction
Satish Kambaliya
 
Types of rural roads and network planning
Types of rural roads and network planningTypes of rural roads and network planning
Types of rural roads and network planning
vijay reddy
 
Presentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanPresentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir Khan
Aamir Rajput Khan
 
Railway engineering part2
Railway engineering part2Railway engineering part2
Railway engineering part2
GARRE RAVI KUMAR
 
PPT On High Speed Railways
PPT On High Speed RailwaysPPT On High Speed Railways
PPT On High Speed Railways
Nabh Agrawal
 
project management.pptx
project management.pptxproject management.pptx
project management.pptx
Shree Bhargava and Associate
 
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
Hossam Shafiq I
 

What's hot (20)

Indian railway
Indian railwayIndian railway
Indian railway
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)
 
STEEL BRIDGE GIRDERS & PSC BRIDGE SLABS
STEEL BRIDGE GIRDERS & PSC BRIDGE SLABSSTEEL BRIDGE GIRDERS & PSC BRIDGE SLABS
STEEL BRIDGE GIRDERS & PSC BRIDGE SLABS
 
History of roads
History of roadsHistory of roads
History of roads
 
Performance studies on reclaimed asphalt SMA 2014
Performance studies on reclaimed asphalt SMA 2014Performance studies on reclaimed asphalt SMA 2014
Performance studies on reclaimed asphalt SMA 2014
 
Bharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadakBharat mala project and pradhan mantri gram sadak
Bharat mala project and pradhan mantri gram sadak
 
Cross section of road
Cross section of roadCross section of road
Cross section of road
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
 
History of road in Nepal
History of road in NepalHistory of road in Nepal
History of road in Nepal
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 
Stations and Yards of Railway
Stations and Yards of RailwayStations and Yards of Railway
Stations and Yards of Railway
 
Innovations in Public Transportation
Innovations in Public TransportationInnovations in Public Transportation
Innovations in Public Transportation
 
Estimation of bridges and automations copy
Estimation of bridges and automations   copyEstimation of bridges and automations   copy
Estimation of bridges and automations copy
 
Case study bridge construction upto pier and road construction
Case study   bridge construction upto pier and road constructionCase study   bridge construction upto pier and road construction
Case study bridge construction upto pier and road construction
 
Types of rural roads and network planning
Types of rural roads and network planningTypes of rural roads and network planning
Types of rural roads and network planning
 
Presentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanPresentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir Khan
 
Railway engineering part2
Railway engineering part2Railway engineering part2
Railway engineering part2
 
PPT On High Speed Railways
PPT On High Speed RailwaysPPT On High Speed Railways
PPT On High Speed Railways
 
project management.pptx
project management.pptxproject management.pptx
project management.pptx
 
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
 

Similar to Doubling presentation

The poster
The posterThe poster
The poster
Neha Singh
 
Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress report
Neha Singh
 
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
RAKESHPANDEY754083
 
Lahore orange line train project
Lahore orange line train projectLahore orange line train project
Lahore orange line train project
Qurat1255
 
ENGINEERING PPT BOX PUSHING ON PUNE DIVISION
ENGINEERING PPT BOX PUSHING ON PUNE DIVISIONENGINEERING PPT BOX PUSHING ON PUNE DIVISION
ENGINEERING PPT BOX PUSHING ON PUNE DIVISION
bridgelc
 
Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach
Nishanth Patil
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)
Saksham Bhutani
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
Anush verma
 
Design of expressway
Design of expresswayDesign of expressway
Design of expressway
SujitkumarMahto
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yard
Rajesh Prasad
 
Tunnels infographic
Tunnels infographicTunnels infographic
Tunnels infographicIQPC Asia
 
Civil engineering in indian railways spce
Civil engineering in indian railways spceCivil engineering in indian railways spce
Civil engineering in indian railways spce
irkportal
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
SolidWorks Freelance
 
R.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdfR.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdf
MohamedShehlanShafee1
 
7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]
Darwin Jayson Mariano
 
TRANSPORTATION ENGINEERING railway track gauge
TRANSPORTATION ENGINEERING railway track gaugeTRANSPORTATION ENGINEERING railway track gauge
TRANSPORTATION ENGINEERING railway track gauge
Jangid Devendra
 
Presentation about Ircon's SGEDT project in Malaysia.
Presentation about Ircon's SGEDT project in Malaysia.Presentation about Ircon's SGEDT project in Malaysia.
Presentation about Ircon's SGEDT project in Malaysia.
Hitesh Khanna
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET Journal
 
10 infrastructure projects in india(Chenab bridge)
10 infrastructure  projects in india(Chenab bridge)10 infrastructure  projects in india(Chenab bridge)
10 infrastructure projects in india(Chenab bridge)
Kartik Modi
 

Similar to Doubling presentation (20)

The poster
The posterThe poster
The poster
 
Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress report
 
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
 
Lahore orange line train project
Lahore orange line train projectLahore orange line train project
Lahore orange line train project
 
ENGINEERING PPT BOX PUSHING ON PUNE DIVISION
ENGINEERING PPT BOX PUSHING ON PUNE DIVISIONENGINEERING PPT BOX PUSHING ON PUNE DIVISION
ENGINEERING PPT BOX PUSHING ON PUNE DIVISION
 
Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)
 
Bridge report
Bridge reportBridge report
Bridge report
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
Design of expressway
Design of expresswayDesign of expressway
Design of expressway
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yard
 
Tunnels infographic
Tunnels infographicTunnels infographic
Tunnels infographic
 
Civil engineering in indian railways spce
Civil engineering in indian railways spceCivil engineering in indian railways spce
Civil engineering in indian railways spce
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
R.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdfR.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdf
 
7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]
 
TRANSPORTATION ENGINEERING railway track gauge
TRANSPORTATION ENGINEERING railway track gaugeTRANSPORTATION ENGINEERING railway track gauge
TRANSPORTATION ENGINEERING railway track gauge
 
Presentation about Ircon's SGEDT project in Malaysia.
Presentation about Ircon's SGEDT project in Malaysia.Presentation about Ircon's SGEDT project in Malaysia.
Presentation about Ircon's SGEDT project in Malaysia.
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
10 infrastructure projects in india(Chenab bridge)
10 infrastructure  projects in india(Chenab bridge)10 infrastructure  projects in india(Chenab bridge)
10 infrastructure projects in india(Chenab bridge)
 

Recently uploaded

Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 

Recently uploaded (20)

Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 

Doubling presentation

  • 1. PROJECT REPORT Project Guide Miss Deepti Gupta Senior Lecturer Submitted By Neha Singh 1212200073 Rakesh Kumar Gupta 1212200083 Zeeshan Ahmed 1212200126 PLANNING OF DOUBLING OF BROAD GAUGE RAILWAY LINE AT SHIVNAGAR- BANDHUAKALAN (10 KM) S H R I R A M S WA R O O P M E M O R I A L C O L L E G E O F E N G I N E E R I N G & M A N A G E M E N T
  • 2. I N T R O D U C T I O N Doubling of railway line means construction of an additional line. It is normally done when single line is not in a position to carry the number of trains required to pass on the section. The doubling of Utraitia - Sultanpur-Zafrabad project is for diverting freight traffic from Mughalsarai - Allahabad - New Delhi route so as to provide room for additional coaching traffic to be introduced in near future . The patch doubling from Zafrabad to Shri Krishna Nagar (34 kms), Sultanpur to Bandhuakalan (09 kms) & Utraitia to Chandraulli (37 kms) has been completed. The balance 148 km stretch is with single railway track that need to be double. Specific section of 10 kms length between Shivnagar and Bandhuakalan has been selected for the project.
  • 3. OBJECTIVE To eradicate mounting pressure of rail traffic. To get the optimum benefit from the modern maintenance machines. To cope up with the additional requirement to traffic. The need to divert rail traffic from one route to another due to accident /mishap, or any other unforeseen reason. To reduce initial costs of a line that is certain to see heavy traffic in the future, a line may be built as single- track .
  • 4. M E T H O D O L O G Y SITE & TRAFFIC SURVEY COLLECTION OF SAMPLES SPECIFICATION & DATA COLLECTION FROM RAILWAY OFFICE ANALYSING DATA & SAMPLES ESTIMATION OF EARTHWORK
  • 5. L O C A T I O N Bandhuakalan - Shivnagar Section (12.5 km) LUCKNOW UTRAITIA BAKKAS ANUPGANJ RAHMATNAGAR CHANDRAULLI TRIVEDIGANJ HAIDERGARGH CHAUBISI AKBARGANJ SINDHURWA NIHALGARH ADHINPUR MUSAFIRKHANA SHIVNAGAR BANDHUAKALAN SULTANPUR HARPALGANJ JAUNPUR ZAFRABAD
  • 6. P R O C E S S O F D O U B L I N G Engineering cum Traffic Survey Specification of work Land acquisition EarthworkBridgesPlate laying Opening for goods traffic &ballasting Opening line for passenger traffic
  • 7. ENGI NEERI NG CUM TRAFFI C SURVEY T RAF F I C SURV EY DETAI L S Timings of the train (Hourly basis) No. of trains passing SHIVNAGAR No. of trains passing BANDHUAKALAN BEFORE AFTER BEFORE AFTER 03:00-04:00 0 0 0 0 05:00-06:00 0 2 0 2 06:00-07:00 1 1 2 2 07:00-08:00 1 1 0 0 08:00-09:00 1 4 1 5 10:00-11:00 0 0 0 0 11:00-12:00 0 0 0 2 12:00-13:00 1 1 0 0 13:00-14:00 0 2 0 3 14:00-15:00 0 2 0 1 15:00-16:00 0 2 0 1 16:00-17:00 0 2 0 1 17:00-18:00 0 0 0 2 18:00-19:00 0 3 0 0 19:00-20:00 2 2 2 2 20:00-21:00 0 0 0 0 21:00-22:00 1 1 1 1 23:00-00:00 0 0 0 0 TOTAL 7 23 6 22
  • 8. SPECIFICATION OF WORK Rail and fastenings • The permanent way consists of 60 kg (UIC), 90 UTS rails welded into LWR (By FB(Flush butt welding)/AT(Alumino-Thermit welding) welding with SKV process) over main line. Loop lines, consist 60 Kg 90 UTS SH rails welded into LWR (By AT welding with SKV process). Fish Plates • 1 M Long new fish plates with six holes of standard type to suit 60 kg rails have been used. Sleepers and fastenings • MAIN LINE: PRC sleepers complete with elastic fastenings to M+ 8 (1660 no. per Km) densities have been used. • LOOP LINE: PRC sleepers complete with elastic fastenings to M+ 7 (1540 no. per Km) densities have been used.
  • 9. Guard Rails Guard rails of 52 Kg rails resting on PSC sleepers have been provided on all major bridges. Points and Crossings All turn out to be negotiated by passenger trains are of 1 in 12 with curved switches except turn outs laid for sand humps which are of 1 in 8-1/2 laid on symmetrical split. 60 kg trap points on PSC sleepers have been provided wherever required for the purpose of isolation in new line. Ballast 65mm gauge hard stone Machine Crushed ballast with cushion of 350mm on main line and 250 mm on loop line below the sleeper has been provided under the track and turn outs with boxing. The newly laid track and turn outs have been thoroughly packed manually and machine packing will be done before commissioning SPECIFICATION OF WORK
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 19. QUANTITY ESTIMATE BLANKETING MATERIAL SOIL1.4 m 0.6 m 5.3 m Existing track Proposed double line Subgrade = 74200 Cubic Meter Blanketing Material = 10600 Cubic Meter Ballast = 2800 Cubic Meter Sleeper =16600 Nos.
  • 20. BRIDGES 48 No. of Bridges Provided for 25 T loading 1 major bridge & 47 minor bridges. Provided as extension of bridges on existing track
  • 21.
  • 22.
  • 23. LEVEL CROSSINGS Total 15 level Crossings 8 Manned Level Crossings 7 Unmanned Level Crossings
  • 24. L I S T O F L E V E L C R O S S I N G S SN Level X-ing No. Manned / Unmanned Interlocked/ Non interlocked Remark 1 82/C Manned Interlocked Traffic 2 83/C Manned Interlocked Traffic 3 84/C Manned Non-interlocked Engineering 4 85/C Manned Non-interlocked Engineering 5 86/C Manned Non-interlocked Engineering 6 87/C Un- Manned Non-interlocked Engineering 7 88/C Un- Manned Non-interlocked Engineering 8 89/C Un- Manned Non-interlocked Engineering 9 90/C Manned Non-interlocked Engineering 11 91/C Un- Manned Non-interlocked Engineering 12 92/C Un- Manned Non-interlocked Engineering 13 93/C Un- Manned Non-interlocked Engineering 14 94/B Manned Interlocked Traffic 15 95/B Manned Interlocked Traffic
  • 25. TEST ON AGGREGATE STONE AGGREGATE TEST SN Sample No. Abrasion value Impact value Water absorption 1 1 16.68% 13.75% 0.296% 2 2 15.90% 13.79% 0.347% 3. AVERAGE 16.29% 13.77% 0.321% 4. MAXIMUM PERMISSIBLE VALUE 30% 20% 1% 5. WITHIN PERMISSIBLE LIMITSOR NOT? YES YES YES
  • 26. TEST ON SOI L TEST ON BURROW SOIL SN Location of Subgrade sample LL PL Dispersive nature 1 SHIVNAGAR 22.10 6.55 NO 2 BANDHUAKALAN 22.29 6.70 NO
  • 27. PLATE LAYI NG OR TRACK LI NKI NG Rails, sleepers and other fittings are taken to the base depot and unloaded Tracks materials are taken to the rail head and track linked and packed Rail head is advanced up to the extent the track is laid Dip lorry is used to take rack material to rail head Rail head goes on advancing till full track is linked T E L E S C O P I C M E T H O D
  • 28. Unloading of materials Linking of track Packing of track Ballasting of track
  • 29. O P E N I N G F O R G O O D S T R A F F I C A N D B A L L A S T I N G
  • 30. C O N C L U S I O N Simplified signaling system. Bi- directional running . Enhancement of line capacity utilization Section capacity showed significant increase Train delay reduced.
  • 31. F U T U R E S C O P E Soil report may be used as a reference for other civil project near the site of project. Topographical survey data can be used for similar projects near the site for design of any other structure. The traffic survey cab help in proper maintenance and future developments in the concerned area. The continuation of this project will help in understanding the use of new technologies employed for this purpose.
  • 32. A D V A N T A G E It can manage a larger amount of traffic with usually twice the capacity of single track. Faster trains can overtake slower ones, and doubling can contribute to faster operation of trains. It is easy to maintenance and engineering work Provision of alternate routes would reduce Pressure on existing network . Doubling would help it earn more revenue from the additional traffic.
  • 33. “Railway is a unique integrator of India. We must restore the strength of Indian railways as the back bone of India.” - Mr. Suresh Prabhu Railway Minister of India Thanks