CENTRAL RAILWAY
Presented by
VIKAS KUMAR
DEN(S)PA (CR)
 Casting of Box.
 Insertion of RH girder with CC Crib.
 Excavation.
 Pushing of box.
 Refilling.
 Removal of RH girder.
 Casting the RCC Boxes as per approved drawing at
calculated bed level.
 Fixing the Anchoring Support/ Lifting Brackets both side of
Box wall as per approved drawing.
 Placing Power pack jacks for Lifting of RCC Box.
 Positioning of Re-railing beams with Roller skate below the
RCC Box
 Finally Box to be pushed using proper pre designed mechanical
arrangement including roller & pushing jacks.
Contd….
SPECIFICATION OF PUSHING EQUIPMENT :-
Size of Box - 6.10m (External)
- 5.00m (Internal)
Length of segment – 10.00m
Weight of segment - 555 MT
No. of Jacks - 8 Nos.
Capacity of each jack – 140 MT (250 stroke)
Traverse jack -65 MT (200 stroke)
Initial lifting given - 480 mm (in stage of 150mm)
No. of holes in jacking point – 4 + 4
Bolt dia for fixing Bracket - 38 mm
Initial preparation time - 2 hrs.
Time of lifting of box - 1 hrs.
Time of fixing channel & roller -1.1/2 hrs.
Time of Pushing - 2 hrs.
LC No. 18
In MRJ-KOP section
1. 200 mm Thick RCC Bed (M-30) To be
prepared to have hard and level surface.
2. Pushing Can Be Started after 48 hrs.
SN DESCRIPTION REMARK
1 Railway CR
2 Division Pune
3 State Maharashtra
4 Name of MP Constituency Hatkanangale
5 Description of work
Elimination of MLC No. 18
at Km.28/2-3 by LHS. on
MRJ-KOP Section.
6 Section Miraj-Kolhapur
7 L.C.No. 18
8 Rly Km 28/2-3
9
When completed
(Month & year)
Aug-23
10 ROB / RUB / SUBWAY RUB
11
Total Cost of Work (Rs. In
Crores)
3.50
SN DESCRIPTION REMARK
12 Execution by Open Line (Railway)
13 Methodology Air pushing
14
Name of
Associated Station
with LATITUDE &
LONGITUDE
Hatkanangale
16° 44' 57.8" N
74° 25' 39.11" E
15 Benefit of
project.
Due to heavy train traffic, the LC gates are
closed, due to which passengers face difficulty in
time management. Provision of Subway will also
improve safety for road users and pedestrians
and reduce traffic congestion, making travel
easier for people using public transport, walking,
cycling or driving. Therefore, elimination of LC
gates by Subway will reduce accidents and
improve the working system of Railways. As per
the instructions of Railway Board, all LC gates
are to be eliminated, which will help in
achieving substantial operational benefits.
1. 200 mm thick RCC Bed (M-30) to be
prepared over 200mm thick soling
to have hard and level surface.
2. Pushing can be started after 48 hrs of concreting.
SN DESCRIPTION REMARK
1 Railway CR
2 Division Pune
3 State Maharashtra
4 Name of MP Constituency Sangli
5 Description of work
Elimination of MLC No. 108
at Km.231/2-3 by LHS. on
PA-MRJ Section.
6 Section Pune-Miraj
7 L.C.No. 108
8 Rly Km 231/2-3
9
When completed
(Month & year)
Aug-23
10 ROB / RUB / SUBWAY RUB
11
Total Cost of Work (Rs. In
Crores)
3.40
SN DESCRIPTION REMARK
12 Execution by Open Line (Railway)
13 Methodology Air pushing
14
Name of Associated
Station with
LATITUDE &
LONGITUDE
Takari
9° 59' 44.2" N,
123° 59' 6.74" E
15 Benefit of project. Due to heavy train traffic, the LC gates are closed, due to
which passengers face difficulty in time management.
Provision of Subway will also improve safety for road users
and pedestrians and reduce traffic congestion, making
travel easier for people using public transport, walking,
cycling or driving. Therefore, elimination of LC gates by
Subway will reduce accidents and improve the working
system of Railways. As per the instructions of Railway
Board, all LC gates are to be eliminated, which will help in
achieving substantial operational benefits.
LC No. 23 at Km 68/4-5 on PA-MRJ section
SN DESCRIPTION REMARK
1 Railway CR
2 Division Pune
3 State Maharashtra
4 Name of MP Constituency Baramati
5 Description of work
Elimination of MLC No.23 at
Km.68/4-5 by LHS. on PA-MRJ
Section.
6 Section Pune-Miraj
7 L.C.No. 23
8 Rly Km 68/4-5
9
When completed
(Month & year)
Oct-23
10 ROB / RUB / SUBWAY RUB
11 Total Cost of Work (Rs. In Crores) 3.10
LC No. 23 at Km 68/4-5 on PA-MRJ section
SN DESCRIPTION REMARK
12 Execution by Open Line (Railway)
13 Methodology Air pushing
14
Name of Associated
Station with LATITUDE
& LONGITUDE
Daundaj
18° 12' 48.92" N,
74° 9' 48.41" E
15 Benefit of project. Due to heavy train traffic, the LC gates are closed, due to
which passengers face difficulty in time management.
Provision of Subway will also improve safety for road users
and pedestrians and reduce traffic congestion, making
travel easier for people using public transport, walking,
cycling or driving. Therefore, elimination of LC gates by
Subway will reduce accidents and improve the working
system of Railways. As per the instructions of Railway
Board, all LC gates are to be eliminated, which will help in
achieving substantial operational benefits.
LC No. 28 at Km 80/4-5 on PA-MRJ section
SN DESCRIPTION REMARK
1 Railway CR
2 Division Pune
3 State Maharashtra
4 Name of MP Constituency Baramati
5 Description of work
Elimination of MLC No.28 at
Km.80/4-5 by LHS. on PA-MRJ
Section.
6 Section PA-MRJ
7 L.C.No. 28
8 Rly Km 80/4-5
9
When completed
(Month & year)
Dec-22
10 ROB / RUB / SUBWAY RUB
11 Total Cost of Work (Rs. In Crores) 2.80
LC No. 28 at Km 80/4-5 on PA-MRJ section
SN DESCRIPTION REMARK
12 Execution by Open Line (Railway)
13 Methodology Air pushing
14
Name of Associated
Station with LATITUDE
& LONGITUDE
VALHA
7° 15' 7.4" N,
41° 40' 6.31" E
15 Benefit of project. Due to heavy train traffic, the LC gates are closed, due to
which passengers face difficulty in time management.
Provision of Subway will also improve safety for road users
and pedestrians and reduce traffic congestion, making
travel easier for people using public transport, walking,
cycling or driving. Therefore, elimination of LC gates by
Subway will reduce accidents and improve the working
system of Railways. As per the instructions of Railway
Board, all LC gates are to be eliminated, which will help in
achieving substantial operational benefits.
REMEDIES:-
 Good quality, firm and levelled
RCC bed to be prepared.
 Box to be lifted
simultaneously from both LH
and RH side.
REMEDIES:-
• Reference pegs to be fixed with respect to
center line of box & RH girder
• Regular checking of longitudinal alignment
to be done
REMEDIES:-
• Concrete shall be dense and properly
compacted
• Entire concrete to be casted in one go
• MS plate of minimum 3mm thickness to be
provided in pockets
1.Method is totally fail safe.
2.Elimination of thrust bed reduces total time
by minimum 45 days.
3.Box can be casted without cutting of bank.
4.Flexibility to cast box during monsoon also since
cutting of bank is not required.
5.Reduction in time required for box pushing
(25-30 day are reduced to 2 days ) .
6.For small boxes total site working time can be
reduced to 5-6 days (Right from insertion of RH
girder to removal of RH girder)
7. Method is more reliable than the thrust bed as
friction is substantially reduced while pushing.
8. This method has all advantages of box pushing
with thrust bed with added advantage of
reduction in time.
9. Box can be casted on both side or one
side depending on site condition.
10.Side shifting of box is easier and less
time consuming.
11. Most versatile and fail safe method.
Thanking you…..

More Related Content

Similar to ENGINEERING PPT BOX PUSHING ON PUNE DIVISION

Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...SUBHAMOY SINGHA ROY
 
Prashant patel
Prashant patelPrashant patel
Prashant patel
PRASHANT KUMAR PATEL
 
Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach
Nishanth Patil
 
Doubling presentation
Doubling  presentationDoubling  presentation
Doubling presentation
Neha Singh
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET Journal
 
TU02 GC1 MD Meeting - 29.08.2022.pptx
TU02 GC1 MD Meeting - 29.08.2022.pptxTU02 GC1 MD Meeting - 29.08.2022.pptx
TU02 GC1 MD Meeting - 29.08.2022.pptx
subhashkumar394373
 
Civil engineering in indian railways spce
Civil engineering in indian railways spceCivil engineering in indian railways spce
Civil engineering in indian railways spce
irkportal
 
central Railway project report
central Railway project report central Railway project report
central Railway project report
akshay ghanwat
 
LOCO TRAINING REPORT
LOCO TRAINING REPORTLOCO TRAINING REPORT
LOCO TRAINING REPORT
Shivam Prajapati
 
Planning track maintenance.ppt
Planning track maintenance.pptPlanning track maintenance.ppt
Planning track maintenance.ppt
AfendiAriff
 
Special Repair of Roads in Patiala City
Special Repair of Roads in Patiala CitySpecial Repair of Roads in Patiala City
Special Repair of Roads in Patiala City
Emaan Sharma
 
Kolkata metro rail via-duct project
Kolkata metro rail via-duct projectKolkata metro rail via-duct project
Kolkata metro rail via-duct projectrajnish singh
 
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
RAKESHPANDEY754083
 
Six week industrial training presentation BY GUPTA TARUN
Six week industrial training presentation BY GUPTA TARUNSix week industrial training presentation BY GUPTA TARUN
Six week industrial training presentation BY GUPTA TARUN
Tarun2222
 
CODSM_Presentation_CRIS_Day.pptx
CODSM_Presentation_CRIS_Day.pptxCODSM_Presentation_CRIS_Day.pptx
CODSM_Presentation_CRIS_Day.pptx
ketanitcell
 
Railwaycarriage ajmer
Railwaycarriage ajmerRailwaycarriage ajmer
Railwaycarriage ajmer
Bhupesh Jangid
 
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
Bharat Badre
 
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
Bharat Badre
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
Rajesh Prasad
 

Similar to ENGINEERING PPT BOX PUSHING ON PUNE DIVISION (20)

Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
 
Prashant patel
Prashant patelPrashant patel
Prashant patel
 
Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach
 
Doubling presentation
Doubling  presentationDoubling  presentation
Doubling presentation
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
TU02 GC1 MD Meeting - 29.08.2022.pptx
TU02 GC1 MD Meeting - 29.08.2022.pptxTU02 GC1 MD Meeting - 29.08.2022.pptx
TU02 GC1 MD Meeting - 29.08.2022.pptx
 
Civil engineering in indian railways spce
Civil engineering in indian railways spceCivil engineering in indian railways spce
Civil engineering in indian railways spce
 
central Railway project report
central Railway project report central Railway project report
central Railway project report
 
LOCO TRAINING REPORT
LOCO TRAINING REPORTLOCO TRAINING REPORT
LOCO TRAINING REPORT
 
Planning track maintenance.ppt
Planning track maintenance.pptPlanning track maintenance.ppt
Planning track maintenance.ppt
 
Special Repair of Roads in Patiala City
Special Repair of Roads in Patiala CitySpecial Repair of Roads in Patiala City
Special Repair of Roads in Patiala City
 
Kolkata metro rail via-duct project
Kolkata metro rail via-duct projectKolkata metro rail via-duct project
Kolkata metro rail via-duct project
 
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
 
Six week industrial training presentation BY GUPTA TARUN
Six week industrial training presentation BY GUPTA TARUNSix week industrial training presentation BY GUPTA TARUN
Six week industrial training presentation BY GUPTA TARUN
 
CODSM_Presentation_CRIS_Day.pptx
CODSM_Presentation_CRIS_Day.pptxCODSM_Presentation_CRIS_Day.pptx
CODSM_Presentation_CRIS_Day.pptx
 
Railwaycarriage ajmer
Railwaycarriage ajmerRailwaycarriage ajmer
Railwaycarriage ajmer
 
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
 
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 

Recently uploaded

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 

Recently uploaded (20)

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 

ENGINEERING PPT BOX PUSHING ON PUNE DIVISION

  • 2.  Casting of Box.  Insertion of RH girder with CC Crib.  Excavation.  Pushing of box.  Refilling.  Removal of RH girder.
  • 3.  Casting the RCC Boxes as per approved drawing at calculated bed level.
  • 4.  Fixing the Anchoring Support/ Lifting Brackets both side of Box wall as per approved drawing.
  • 5.  Placing Power pack jacks for Lifting of RCC Box.
  • 6.  Positioning of Re-railing beams with Roller skate below the RCC Box
  • 7.  Finally Box to be pushed using proper pre designed mechanical arrangement including roller & pushing jacks.
  • 8.
  • 10.
  • 11.
  • 12.
  • 13. SPECIFICATION OF PUSHING EQUIPMENT :-
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22. Size of Box - 6.10m (External) - 5.00m (Internal) Length of segment – 10.00m Weight of segment - 555 MT No. of Jacks - 8 Nos. Capacity of each jack – 140 MT (250 stroke) Traverse jack -65 MT (200 stroke)
  • 23. Initial lifting given - 480 mm (in stage of 150mm) No. of holes in jacking point – 4 + 4 Bolt dia for fixing Bracket - 38 mm Initial preparation time - 2 hrs. Time of lifting of box - 1 hrs. Time of fixing channel & roller -1.1/2 hrs. Time of Pushing - 2 hrs.
  • 24.
  • 25.
  • 26. LC No. 18 In MRJ-KOP section
  • 27. 1. 200 mm Thick RCC Bed (M-30) To be prepared to have hard and level surface. 2. Pushing Can Be Started after 48 hrs.
  • 28. SN DESCRIPTION REMARK 1 Railway CR 2 Division Pune 3 State Maharashtra 4 Name of MP Constituency Hatkanangale 5 Description of work Elimination of MLC No. 18 at Km.28/2-3 by LHS. on MRJ-KOP Section. 6 Section Miraj-Kolhapur 7 L.C.No. 18 8 Rly Km 28/2-3 9 When completed (Month & year) Aug-23 10 ROB / RUB / SUBWAY RUB 11 Total Cost of Work (Rs. In Crores) 3.50
  • 29. SN DESCRIPTION REMARK 12 Execution by Open Line (Railway) 13 Methodology Air pushing 14 Name of Associated Station with LATITUDE & LONGITUDE Hatkanangale 16° 44' 57.8" N 74° 25' 39.11" E 15 Benefit of project. Due to heavy train traffic, the LC gates are closed, due to which passengers face difficulty in time management. Provision of Subway will also improve safety for road users and pedestrians and reduce traffic congestion, making travel easier for people using public transport, walking, cycling or driving. Therefore, elimination of LC gates by Subway will reduce accidents and improve the working system of Railways. As per the instructions of Railway Board, all LC gates are to be eliminated, which will help in achieving substantial operational benefits.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38. 1. 200 mm thick RCC Bed (M-30) to be prepared over 200mm thick soling to have hard and level surface. 2. Pushing can be started after 48 hrs of concreting.
  • 39. SN DESCRIPTION REMARK 1 Railway CR 2 Division Pune 3 State Maharashtra 4 Name of MP Constituency Sangli 5 Description of work Elimination of MLC No. 108 at Km.231/2-3 by LHS. on PA-MRJ Section. 6 Section Pune-Miraj 7 L.C.No. 108 8 Rly Km 231/2-3 9 When completed (Month & year) Aug-23 10 ROB / RUB / SUBWAY RUB 11 Total Cost of Work (Rs. In Crores) 3.40
  • 40. SN DESCRIPTION REMARK 12 Execution by Open Line (Railway) 13 Methodology Air pushing 14 Name of Associated Station with LATITUDE & LONGITUDE Takari 9° 59' 44.2" N, 123° 59' 6.74" E 15 Benefit of project. Due to heavy train traffic, the LC gates are closed, due to which passengers face difficulty in time management. Provision of Subway will also improve safety for road users and pedestrians and reduce traffic congestion, making travel easier for people using public transport, walking, cycling or driving. Therefore, elimination of LC gates by Subway will reduce accidents and improve the working system of Railways. As per the instructions of Railway Board, all LC gates are to be eliminated, which will help in achieving substantial operational benefits.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48. LC No. 23 at Km 68/4-5 on PA-MRJ section SN DESCRIPTION REMARK 1 Railway CR 2 Division Pune 3 State Maharashtra 4 Name of MP Constituency Baramati 5 Description of work Elimination of MLC No.23 at Km.68/4-5 by LHS. on PA-MRJ Section. 6 Section Pune-Miraj 7 L.C.No. 23 8 Rly Km 68/4-5 9 When completed (Month & year) Oct-23 10 ROB / RUB / SUBWAY RUB 11 Total Cost of Work (Rs. In Crores) 3.10
  • 49. LC No. 23 at Km 68/4-5 on PA-MRJ section SN DESCRIPTION REMARK 12 Execution by Open Line (Railway) 13 Methodology Air pushing 14 Name of Associated Station with LATITUDE & LONGITUDE Daundaj 18° 12' 48.92" N, 74° 9' 48.41" E 15 Benefit of project. Due to heavy train traffic, the LC gates are closed, due to which passengers face difficulty in time management. Provision of Subway will also improve safety for road users and pedestrians and reduce traffic congestion, making travel easier for people using public transport, walking, cycling or driving. Therefore, elimination of LC gates by Subway will reduce accidents and improve the working system of Railways. As per the instructions of Railway Board, all LC gates are to be eliminated, which will help in achieving substantial operational benefits.
  • 50.
  • 51. LC No. 28 at Km 80/4-5 on PA-MRJ section SN DESCRIPTION REMARK 1 Railway CR 2 Division Pune 3 State Maharashtra 4 Name of MP Constituency Baramati 5 Description of work Elimination of MLC No.28 at Km.80/4-5 by LHS. on PA-MRJ Section. 6 Section PA-MRJ 7 L.C.No. 28 8 Rly Km 80/4-5 9 When completed (Month & year) Dec-22 10 ROB / RUB / SUBWAY RUB 11 Total Cost of Work (Rs. In Crores) 2.80
  • 52. LC No. 28 at Km 80/4-5 on PA-MRJ section SN DESCRIPTION REMARK 12 Execution by Open Line (Railway) 13 Methodology Air pushing 14 Name of Associated Station with LATITUDE & LONGITUDE VALHA 7° 15' 7.4" N, 41° 40' 6.31" E 15 Benefit of project. Due to heavy train traffic, the LC gates are closed, due to which passengers face difficulty in time management. Provision of Subway will also improve safety for road users and pedestrians and reduce traffic congestion, making travel easier for people using public transport, walking, cycling or driving. Therefore, elimination of LC gates by Subway will reduce accidents and improve the working system of Railways. As per the instructions of Railway Board, all LC gates are to be eliminated, which will help in achieving substantial operational benefits.
  • 53.
  • 54.
  • 55. REMEDIES:-  Good quality, firm and levelled RCC bed to be prepared.  Box to be lifted simultaneously from both LH and RH side.
  • 56. REMEDIES:- • Reference pegs to be fixed with respect to center line of box & RH girder • Regular checking of longitudinal alignment to be done
  • 57. REMEDIES:- • Concrete shall be dense and properly compacted • Entire concrete to be casted in one go • MS plate of minimum 3mm thickness to be provided in pockets
  • 58.
  • 59. 1.Method is totally fail safe. 2.Elimination of thrust bed reduces total time by minimum 45 days. 3.Box can be casted without cutting of bank. 4.Flexibility to cast box during monsoon also since cutting of bank is not required. 5.Reduction in time required for box pushing (25-30 day are reduced to 2 days ) .
  • 60. 6.For small boxes total site working time can be reduced to 5-6 days (Right from insertion of RH girder to removal of RH girder) 7. Method is more reliable than the thrust bed as friction is substantially reduced while pushing. 8. This method has all advantages of box pushing with thrust bed with added advantage of reduction in time.
  • 61. 9. Box can be casted on both side or one side depending on site condition. 10.Side shifting of box is easier and less time consuming. 11. Most versatile and fail safe method.