Presentation about Ircon's SGEDT project in Malaysia.Hitesh Khanna
This presentation was presented in Indian Railway's IPWE Seminar in January 2013 at Chennai. It depicts the innovations and new Technologies (in the context of Indian Railways) adopted on the project, and the various technical issues, and how they were dealt with.
Presentation about Ircon's SGEDT project in Malaysia.Hitesh Khanna
This presentation was presented in Indian Railway's IPWE Seminar in January 2013 at Chennai. It depicts the innovations and new Technologies (in the context of Indian Railways) adopted on the project, and the various technical issues, and how they were dealt with.
Grievance redressal of Hubli railway station : A multistorey approach Nishanth Patil
PROBLEM STATEMENT :
To suggest a viable option for capacity augmentation in Tier-I , Metropolitan and Tier-II Railway stations catering to commuter, non-suburban and freight traffic, considering Hubli Railway Station as Model Station for Design Basis.
SCOPE :
The scope of the proposal can be envisaged to pertain,
yet not be constrained to the following :
To successfully replicate the proposal, in Land-crunched cities, whilst augmenting capacity or relieving congestion;
To serve as an alternative solution to multi-directional , multi-focal travel alignments in transient cities;
To serve as a model for urban planning initiatives.
CONCLUSION :
The financial and technical feasibility of the proposal was measured by comparative study of 8 numbers of schemes, which were prepared by varying the material specifications for the member components.
The project is economically a better alternative in all cases wherever capacity augmentation necessitates the acquisition of land costing INR 4200 / sqft or more (2012-2013).
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...Bharat Badre
rajapeth rob is an bridge in amravti if want soft copy of file with report also write me at akashkolamkar@gmail.com ,,,, iam engineer of project ,, so i will try to explain all points wit h reports ,,, now am a student of engineering so i completelly know need of seminars
i am akash kolamkar ,in my city amravati maharashtra india ,, in my city amravati a biggest bridge structure is going to construct so i have an idea to make it useful for others,,, in this report i will explain all concept with detailed drawing presentation ,, because i am engineer of project with college student if want soft copy of that file with report also so, u can mail me at akashkolamkar@gmail.com
There was a Bridge 2018 Conference on Innovative Technologies of Bridges organised by IIBE at Lucknow. During the conference held on 25.05.18 this paper was presented by Rajesh Prasad, ED Metro RVNL.
There was a Bridge 2018 Conference on Innovative Technologies of Bridges organised by IIBE at Lucknow. During the conference held on 25.05.18 this paper was presented by Rajesh Prasad, ED Metro RVNL.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Grievance redressal of Hubli railway station : A multistorey approach Nishanth Patil
PROBLEM STATEMENT :
To suggest a viable option for capacity augmentation in Tier-I , Metropolitan and Tier-II Railway stations catering to commuter, non-suburban and freight traffic, considering Hubli Railway Station as Model Station for Design Basis.
SCOPE :
The scope of the proposal can be envisaged to pertain,
yet not be constrained to the following :
To successfully replicate the proposal, in Land-crunched cities, whilst augmenting capacity or relieving congestion;
To serve as an alternative solution to multi-directional , multi-focal travel alignments in transient cities;
To serve as a model for urban planning initiatives.
CONCLUSION :
The financial and technical feasibility of the proposal was measured by comparative study of 8 numbers of schemes, which were prepared by varying the material specifications for the member components.
The project is economically a better alternative in all cases wherever capacity augmentation necessitates the acquisition of land costing INR 4200 / sqft or more (2012-2013).
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...Bharat Badre
rajapeth rob is an bridge in amravti if want soft copy of file with report also write me at akashkolamkar@gmail.com ,,,, iam engineer of project ,, so i will try to explain all points wit h reports ,,, now am a student of engineering so i completelly know need of seminars
i am akash kolamkar ,in my city amravati maharashtra india ,, in my city amravati a biggest bridge structure is going to construct so i have an idea to make it useful for others,,, in this report i will explain all concept with detailed drawing presentation ,, because i am engineer of project with college student if want soft copy of that file with report also so, u can mail me at akashkolamkar@gmail.com
There was a Bridge 2018 Conference on Innovative Technologies of Bridges organised by IIBE at Lucknow. During the conference held on 25.05.18 this paper was presented by Rajesh Prasad, ED Metro RVNL.
There was a Bridge 2018 Conference on Innovative Technologies of Bridges organised by IIBE at Lucknow. During the conference held on 25.05.18 this paper was presented by Rajesh Prasad, ED Metro RVNL.
Similar to ENGINEERING PPT BOX PUSHING ON PUNE DIVISION (20)
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
22. Size of Box - 6.10m (External)
- 5.00m (Internal)
Length of segment – 10.00m
Weight of segment - 555 MT
No. of Jacks - 8 Nos.
Capacity of each jack – 140 MT (250 stroke)
Traverse jack -65 MT (200 stroke)
23. Initial lifting given - 480 mm (in stage of 150mm)
No. of holes in jacking point – 4 + 4
Bolt dia for fixing Bracket - 38 mm
Initial preparation time - 2 hrs.
Time of lifting of box - 1 hrs.
Time of fixing channel & roller -1.1/2 hrs.
Time of Pushing - 2 hrs.
27. 1. 200 mm Thick RCC Bed (M-30) To be
prepared to have hard and level surface.
2. Pushing Can Be Started after 48 hrs.
28. SN DESCRIPTION REMARK
1 Railway CR
2 Division Pune
3 State Maharashtra
4 Name of MP Constituency Hatkanangale
5 Description of work
Elimination of MLC No. 18
at Km.28/2-3 by LHS. on
MRJ-KOP Section.
6 Section Miraj-Kolhapur
7 L.C.No. 18
8 Rly Km 28/2-3
9
When completed
(Month & year)
Aug-23
10 ROB / RUB / SUBWAY RUB
11
Total Cost of Work (Rs. In
Crores)
3.50
29. SN DESCRIPTION REMARK
12 Execution by Open Line (Railway)
13 Methodology Air pushing
14
Name of
Associated Station
with LATITUDE &
LONGITUDE
Hatkanangale
16° 44' 57.8" N
74° 25' 39.11" E
15 Benefit of
project.
Due to heavy train traffic, the LC gates are
closed, due to which passengers face difficulty in
time management. Provision of Subway will also
improve safety for road users and pedestrians
and reduce traffic congestion, making travel
easier for people using public transport, walking,
cycling or driving. Therefore, elimination of LC
gates by Subway will reduce accidents and
improve the working system of Railways. As per
the instructions of Railway Board, all LC gates
are to be eliminated, which will help in
achieving substantial operational benefits.
30.
31.
32.
33.
34.
35.
36.
37.
38. 1. 200 mm thick RCC Bed (M-30) to be
prepared over 200mm thick soling
to have hard and level surface.
2. Pushing can be started after 48 hrs of concreting.
39. SN DESCRIPTION REMARK
1 Railway CR
2 Division Pune
3 State Maharashtra
4 Name of MP Constituency Sangli
5 Description of work
Elimination of MLC No. 108
at Km.231/2-3 by LHS. on
PA-MRJ Section.
6 Section Pune-Miraj
7 L.C.No. 108
8 Rly Km 231/2-3
9
When completed
(Month & year)
Aug-23
10 ROB / RUB / SUBWAY RUB
11
Total Cost of Work (Rs. In
Crores)
3.40
40. SN DESCRIPTION REMARK
12 Execution by Open Line (Railway)
13 Methodology Air pushing
14
Name of Associated
Station with
LATITUDE &
LONGITUDE
Takari
9° 59' 44.2" N,
123° 59' 6.74" E
15 Benefit of project. Due to heavy train traffic, the LC gates are closed, due to
which passengers face difficulty in time management.
Provision of Subway will also improve safety for road users
and pedestrians and reduce traffic congestion, making
travel easier for people using public transport, walking,
cycling or driving. Therefore, elimination of LC gates by
Subway will reduce accidents and improve the working
system of Railways. As per the instructions of Railway
Board, all LC gates are to be eliminated, which will help in
achieving substantial operational benefits.
41.
42.
43.
44.
45.
46.
47.
48. LC No. 23 at Km 68/4-5 on PA-MRJ section
SN DESCRIPTION REMARK
1 Railway CR
2 Division Pune
3 State Maharashtra
4 Name of MP Constituency Baramati
5 Description of work
Elimination of MLC No.23 at
Km.68/4-5 by LHS. on PA-MRJ
Section.
6 Section Pune-Miraj
7 L.C.No. 23
8 Rly Km 68/4-5
9
When completed
(Month & year)
Oct-23
10 ROB / RUB / SUBWAY RUB
11 Total Cost of Work (Rs. In Crores) 3.10
49. LC No. 23 at Km 68/4-5 on PA-MRJ section
SN DESCRIPTION REMARK
12 Execution by Open Line (Railway)
13 Methodology Air pushing
14
Name of Associated
Station with LATITUDE
& LONGITUDE
Daundaj
18° 12' 48.92" N,
74° 9' 48.41" E
15 Benefit of project. Due to heavy train traffic, the LC gates are closed, due to
which passengers face difficulty in time management.
Provision of Subway will also improve safety for road users
and pedestrians and reduce traffic congestion, making
travel easier for people using public transport, walking,
cycling or driving. Therefore, elimination of LC gates by
Subway will reduce accidents and improve the working
system of Railways. As per the instructions of Railway
Board, all LC gates are to be eliminated, which will help in
achieving substantial operational benefits.
50.
51. LC No. 28 at Km 80/4-5 on PA-MRJ section
SN DESCRIPTION REMARK
1 Railway CR
2 Division Pune
3 State Maharashtra
4 Name of MP Constituency Baramati
5 Description of work
Elimination of MLC No.28 at
Km.80/4-5 by LHS. on PA-MRJ
Section.
6 Section PA-MRJ
7 L.C.No. 28
8 Rly Km 80/4-5
9
When completed
(Month & year)
Dec-22
10 ROB / RUB / SUBWAY RUB
11 Total Cost of Work (Rs. In Crores) 2.80
52. LC No. 28 at Km 80/4-5 on PA-MRJ section
SN DESCRIPTION REMARK
12 Execution by Open Line (Railway)
13 Methodology Air pushing
14
Name of Associated
Station with LATITUDE
& LONGITUDE
VALHA
7° 15' 7.4" N,
41° 40' 6.31" E
15 Benefit of project. Due to heavy train traffic, the LC gates are closed, due to
which passengers face difficulty in time management.
Provision of Subway will also improve safety for road users
and pedestrians and reduce traffic congestion, making
travel easier for people using public transport, walking,
cycling or driving. Therefore, elimination of LC gates by
Subway will reduce accidents and improve the working
system of Railways. As per the instructions of Railway
Board, all LC gates are to be eliminated, which will help in
achieving substantial operational benefits.
53.
54.
55. REMEDIES:-
Good quality, firm and levelled
RCC bed to be prepared.
Box to be lifted
simultaneously from both LH
and RH side.
56. REMEDIES:-
• Reference pegs to be fixed with respect to
center line of box & RH girder
• Regular checking of longitudinal alignment
to be done
57. REMEDIES:-
• Concrete shall be dense and properly
compacted
• Entire concrete to be casted in one go
• MS plate of minimum 3mm thickness to be
provided in pockets
58.
59. 1.Method is totally fail safe.
2.Elimination of thrust bed reduces total time
by minimum 45 days.
3.Box can be casted without cutting of bank.
4.Flexibility to cast box during monsoon also since
cutting of bank is not required.
5.Reduction in time required for box pushing
(25-30 day are reduced to 2 days ) .
60. 6.For small boxes total site working time can be
reduced to 5-6 days (Right from insertion of RH
girder to removal of RH girder)
7. Method is more reliable than the thrust bed as
friction is substantially reduced while pushing.
8. This method has all advantages of box pushing
with thrust bed with added advantage of
reduction in time.
61. 9. Box can be casted on both side or one
side depending on site condition.
10.Side shifting of box is easier and less
time consuming.
11. Most versatile and fail safe method.