SlideShare a Scribd company logo
A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Dolley Madison Sidewalk
Chain Bridge Road to Kurtz Road
Contract No. CN17304122
Task Order No. 48
Project No. 5G25-060-015
Dranesville District
Tax Map No. 30-2
December 7, 2018
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Dolley Madison Sidewalk:
Chain Bridge Rd to Kurtz Rd
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Project Site
Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd
Tax Map No. 30-2
Project Details
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Description:
The Dolley Madison Sidewalk: Chain Bridge Road to Kurtz Road was substantially completed on
November 20, 2018. The project included 345 LF concrete sidewalk, pedestrian ramps, curb
and gutter, modification of existing median, pavement marking & signage, pavement mill and
overlay and other associated work.
Project Overview:
• Project Delivery: Annual Contract
• Contract: Unit Price
Project Team:
• Contractor
• Ashburn Contracting Corporation
• Fairfax County
• Department of Transportation – Shahla Zahirieh
• Utilities Design and Construction Division - Sanjala Bajracharya
• Project Inspector, UDCD – Jim Cooper
• Land Survey Branch, UDCD – Cody Harp-Taylor
Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd
Installation of Sidewalk and Curb & Gutter Concrete Forming
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd
Installation of Concrete Sidewalk
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd
Soil Retention Mat (Jute Mesh)
Before After
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Dolley Madison Sidewalk:
Chain Bridge Rd to Kurtz Rd
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/publicworks
Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Matthew Kaiser, Public Information Officer
703-324-8455, TTY 711
Matthew.kaiser@fairfaxcounty.gov

More Related Content

What's hot

CV Carol Grimsey 2015
CV Carol Grimsey 2015CV Carol Grimsey 2015
CV Carol Grimsey 2015
Carol Grimsey
 
Dbe sept 6 presentation final on 09 05-13
Dbe sept 6 presentation final on 09 05-13Dbe sept 6 presentation final on 09 05-13
Dbe sept 6 presentation final on 09 05-13
Danni Eickenhorst
 

What's hot (16)

Route 50 sidewalk - South Street to Aspen Lane
Route 50 sidewalk - South Street to Aspen LaneRoute 50 sidewalk - South Street to Aspen Lane
Route 50 sidewalk - South Street to Aspen Lane
 
Hunter Village Drive Shoulder Improvements
Hunter Village Drive Shoulder ImprovementsHunter Village Drive Shoulder Improvements
Hunter Village Drive Shoulder Improvements
 
Substantial Completion - HMSAMS-Innovation Center to Arrowbrook Trail
Substantial Completion - HMSAMS-Innovation Center to Arrowbrook TrailSubstantial Completion - HMSAMS-Innovation Center to Arrowbrook Trail
Substantial Completion - HMSAMS-Innovation Center to Arrowbrook Trail
 
Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021Scotts Run Trail to McLean Metro Station January 2021
Scotts Run Trail to McLean Metro Station January 2021
 
UDistrict Rezone Presentation - PLUZ Committee 9/20/2016
UDistrict Rezone Presentation - PLUZ Committee 9/20/2016UDistrict Rezone Presentation - PLUZ Committee 9/20/2016
UDistrict Rezone Presentation - PLUZ Committee 9/20/2016
 
Roswell - 2nd Public Meeting
Roswell - 2nd Public MeetingRoswell - 2nd Public Meeting
Roswell - 2nd Public Meeting
 
Route 7 Sidewalk under Route 123, North and South Side
Route 7 Sidewalk under Route 123, North and South SideRoute 7 Sidewalk under Route 123, North and South Side
Route 7 Sidewalk under Route 123, North and South Side
 
Georgetown Pike Walkway Phase III
Georgetown Pike Walkway Phase IIIGeorgetown Pike Walkway Phase III
Georgetown Pike Walkway Phase III
 
CV Carol Grimsey 2015
CV Carol Grimsey 2015CV Carol Grimsey 2015
CV Carol Grimsey 2015
 
Street Name Changes in Midtown Area
Street Name Changes in Midtown AreaStreet Name Changes in Midtown Area
Street Name Changes in Midtown Area
 
C3 Improving Project Delivery Through Communications
C3   Improving Project Delivery Through CommunicationsC3   Improving Project Delivery Through Communications
C3 Improving Project Delivery Through Communications
 
Lee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III WideningLee Highway, U.S. Route 29 Phase III Widening
Lee Highway, U.S. Route 29 Phase III Widening
 
State and Local Road Project Updates: Part 1
State and Local Road Project Updates: Part 1State and Local Road Project Updates: Part 1
State and Local Road Project Updates: Part 1
 
fwwPP.PPT
fwwPP.PPTfwwPP.PPT
fwwPP.PPT
 
SMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell AvenueSMART STEP Project: SE 8th Street & Brickell Avenue
SMART STEP Project: SE 8th Street & Brickell Avenue
 
Dbe sept 6 presentation final on 09 05-13
Dbe sept 6 presentation final on 09 05-13Dbe sept 6 presentation final on 09 05-13
Dbe sept 6 presentation final on 09 05-13
 

Similar to Dolley Madison Sidewalk - Chain Bridge Road to Kurtz Road

Similar to Dolley Madison Sidewalk - Chain Bridge Road to Kurtz Road (20)

Elm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian ImprovementsElm Street at Dolley Madison Boulevard Pedestrian Improvements
Elm Street at Dolley Madison Boulevard Pedestrian Improvements
 
Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020
 
Sunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
Sunrise Valley Drive from Hitchcock Drive to Colts Neck DriveSunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
Sunrise Valley Drive from Hitchcock Drive to Colts Neck Drive
 
Tysons Boulevard and Galleria Drive Pedestrian Access Improvements
Tysons Boulevard and Galleria Drive Pedestrian Access ImprovementsTysons Boulevard and Galleria Drive Pedestrian Access Improvements
Tysons Boulevard and Galleria Drive Pedestrian Access Improvements
 
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview RoadIntersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
 
Chain Bridge Road Walkway
Chain Bridge Road WalkwayChain Bridge Road Walkway
Chain Bridge Road Walkway
 
Parcher Avenue Pedestrian Access Improvement
Parcher Avenue Pedestrian Access ImprovementParcher Avenue Pedestrian Access Improvement
Parcher Avenue Pedestrian Access Improvement
 
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020 Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
Sunrise Valley Dr. from Glade Dr. to Reston Parkway Sidewalk July 2020
 
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy CircleSunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
Sunrise Valley Dr. Sidewalk Improvements -River Birch Rd. to Legacy Circle
 
Workhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County TrailWorkhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County Trail
 
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Vesper St. Shared Use Path
Vesper St. Shared Use PathVesper St. Shared Use Path
Vesper St. Shared Use Path
 
Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020
 
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
 
Chichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane WalkwayChichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane Walkway
 
Route 50 Sidewalk - Patrick Henry to Olin Dr.
Route 50 Sidewalk - Patrick Henry to Olin Dr.Route 50 Sidewalk - Patrick Henry to Olin Dr.
Route 50 Sidewalk - Patrick Henry to Olin Dr.
 
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk ImprovementsBraddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
 

More from Fairfax County

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
ehbuaw
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
enbam
 
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
aveka1
 
Advancing Impact Measurement | Public Good App House
Advancing Impact Measurement | Public Good App HouseAdvancing Impact Measurement | Public Good App House
Advancing Impact Measurement | Public Good App House
TechSoup
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
enbam
 

Recently uploaded (20)

Honeycomb for The Hive Design Inspirations
Honeycomb for The Hive Design InspirationsHoneycomb for The Hive Design Inspirations
Honeycomb for The Hive Design Inspirations
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
Item # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance ReviewItem # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance Review
 
CrossWalksInspirations for Brockville***
CrossWalksInspirations for Brockville***CrossWalksInspirations for Brockville***
CrossWalksInspirations for Brockville***
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
CourseHero 9KLDFSKJKSJDFKSDKFJSDKSLFJKSJL
CourseHero 9KLDFSKJKSJDFKSDKFJSDKSLFJKSJLCourseHero 9KLDFSKJKSJDFKSDKFJSDKSLFJKSJL
CourseHero 9KLDFSKJKSJDFKSDKFJSDKSLFJKSJL
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
The MEL Toolkit Launch Webinar Presentation
The MEL Toolkit Launch Webinar PresentationThe MEL Toolkit Launch Webinar Presentation
The MEL Toolkit Launch Webinar Presentation
 
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926FPPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
 
Hub Design Inspiration Graphics May 24 2024.pdf
Hub Design Inspiration Graphics May 24 2024.pdfHub Design Inspiration Graphics May 24 2024.pdf
Hub Design Inspiration Graphics May 24 2024.pdf
 
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
一比一原版(SUT毕业证)斯威本科技大学毕业证成绩单
 
Advancing Impact Measurement | Public Good App House
Advancing Impact Measurement | Public Good App HouseAdvancing Impact Measurement | Public Good App House
Advancing Impact Measurement | Public Good App House
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stop
 
How to Save a Place: How to Fund Your Preservation Project
How to Save a Place: How to Fund Your Preservation ProjectHow to Save a Place: How to Fund Your Preservation Project
How to Save a Place: How to Fund Your Preservation Project
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 

Dolley Madison Sidewalk - Chain Bridge Road to Kurtz Road

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Dolley Madison Sidewalk Chain Bridge Road to Kurtz Road Contract No. CN17304122 Task Order No. 48 Project No. 5G25-060-015 Dranesville District Tax Map No. 30-2 December 7, 2018
  • 2. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd
  • 3. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Project Site Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd Tax Map No. 30-2
  • 4. Project Details Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Description: The Dolley Madison Sidewalk: Chain Bridge Road to Kurtz Road was substantially completed on November 20, 2018. The project included 345 LF concrete sidewalk, pedestrian ramps, curb and gutter, modification of existing median, pavement marking & signage, pavement mill and overlay and other associated work. Project Overview: • Project Delivery: Annual Contract • Contract: Unit Price Project Team: • Contractor • Ashburn Contracting Corporation • Fairfax County • Department of Transportation – Shahla Zahirieh • Utilities Design and Construction Division - Sanjala Bajracharya • Project Inspector, UDCD – Jim Cooper • Land Survey Branch, UDCD – Cody Harp-Taylor Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd
  • 5. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd Installation of Sidewalk and Curb & Gutter Concrete Forming
  • 6. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd Installation of Concrete Sidewalk
  • 7. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd Soil Retention Mat (Jute Mesh)
  • 8. Before After Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd
  • 9. Additional Information For additional Information, please call www.fairfaxcounty.gov/publicworks Dolley Madison Sidewalk: Chain Bridge Rd to Kurtz Rd Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Matthew Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.kaiser@fairfaxcounty.gov