The Tysons Boulevard & Galleria Drive Pedestrian Access Improvements project eliminated a dual right turn movement from Tyson’s Blvd onto Galleria Dr. and replaced it with a single turn movement into the existing acceleration lane. The project also included removal of existing pavement and portions of medians, full depth pavement, mill and overlay, new pedestrian signals, pavement markings and signing, sidewalk and drainage improvements.