Exploring Service Science
in our current socio-economic environment


 Diem Ho
 Member of the IBM Academy of Technology
 IESS1.0, University of Geneva, February 17-19, 2010
 diem_ho@fr.ibm.com




            IBM EMEA University Relations              © 2002 IBM Corporation
The world is changing

                                             Security
    Environmental
    Concerns

                                                  Complexity
                                               and Instability
Globalization




                                              Energy Supply
Information Explosion                       and Conservation

2       University Relations January 2010           © 2010 IBM Corporation
•-30 billion RFID
    The world today                        tags embedded into
                                           our world
                                           •-1 billion transistors
    INSTRUMENTED                           for each person
                                           on earth


                                                                     by 2011, 2 billion
                                                                     people are expected
    INTERCONNECTED                                                   to connect to the
                                                                     internet



                                           everyday,15
                                           petabytes of
    INTELLIGENT                            information are being
                                           generated, 8x more
                                           than information in all
                                           US libraries

3      University Relations January 2010                                  © 2010 IBM Corporation
Reality in Numbers
                                                          In distributed
        Annual $89B lost                                  computing
      impact of $3.7B lost hrs                    85%     environments, up to
     congested                                            85% of computing
     Roadways $2.3B gallons                               capacity sits idle
      in the US of gas
                                                                         The losses of electrical
                                                          40%-70%        energy due to inefficiency
             Annual consumer product                                     around the world
             and retail sales lost in
     $40B    United States due to supply
             chain inefficiencies
                                                                          70¢ per $1
Lost annually in the US                                                    Spent on
due to healthcare fraud      $100B                                         IT maintenance

         of total port volume
 22%     in North America is
         empty containers                                                  Increase in global water
                                       Worth of produce is wasted          usage since the 90s,
                                                                      6X
                                $11.5B in India because of outdated
                                       post-harvest infrastructure
                                                                           twice the rate of human
                                                                           population growth

 4          University Relations January 2010                                    © 2010 IBM Corporation
It’s all about


                                        Values


                                         and


                              Value Creation

             Cost         Quality Utility      Perception

5   University Relations January 2010                       © 2010 IBM Corporation
Economic Evolution: Value Creation
                                 Driver: getting closer to users
nomad                        agriculture                 goods                  services        ?
                                                                                             integrating
                                            Technical Vitality
    Product complexity                                                                         URGENCY
                                                                                  Client’s needsOF NOW!
                                            New Technologies /
                                                                                           by Integration
h                                                 Products
                                            Knowledge


                                 Acquire                            Create
                                                  Assimilate




                                                                              n
                                 Products




                                                                           tio
                                     Understand




                                                                        ica
                                     business                  Develop values
                                     challenges                                        Services



                                                                     ist
                                                                   ph
                                                                 so
                                             Society/Businesses



                               Products                                  Services
                           IBM EMEA University Relations                                       © 2002 IBM Corporation
                                                                                Service complexity
Value Creation
                                            SHAREHOLDER´S
         by                                 STAKEHOLDER’S
                                                                                                Ultimate Objective
                                                VALUE
     Innnovation




                                            CONSITUTUE
                                            NTS SERVED




                                                                              EFFICIENCY
                                                         REVENUE-




                                                                    SURPLUS
                                             MARKET




                                                          BUDGET


                                                                    BUDGET
                                                                    PROFIT-
                                              SHARE-
                                                                                           Fundamental Indicators
                                                                                           (KPIs)

                                                  MARKET
                                                SINGULARITY


                                                  PRODUCTS &                                               Business
                           CUSTOMER                                             OPERATIONS
                           INTIMACY
                                                   SERVICES
                                                                                EXCELLENCE               Expectation
                                                  LEADERSHIP


                                  REGULATION COMPLIANCE                                                 Government
                                  SOCIAL RESPONSIBILITIES                                                   /Society
                                                                                                        Expectation

                 Cost                 Quality                         Utility              Perception
7       University Relations January 2010                                                               © 2010 IBM Corporation
Service Innovation: Value Creation Matrix
                    Do we have Science in Services?

                  Value          Market           Revenue        Profit      Productivity
Challenges                       Share                                       /Utility

Customers                                             Mass Customization
Products & Services
                                             Facilitation, Simplification, Integration,
                                                Standardization, Differentiation
Market & Competitors
                                             Globalization, Market Singularization
Operations/
                                       Optimization, Automation, Integration,
Processes/ Resources
                                      Organization, Securitization, Virtualization
Governance &                                  Regulation Compliance Optimization
Business Integrity                                    Risk Management
 8       University Relations January 2010                                     © 2010 IBM Corporation
Examples: Smarter City
urbanization: demographic changes
 •2008 was the first year in which more
than half of the world – 3.3 billion– was
                           living in cities

    •by 2050, city dwellers are expected to
          make up 70% of the earth’s total
         population – 6.4 billion out of 9.2
                                   billion–

     •India: every minute for the next 20
    years, 30 people will leave rural India
                           for urban India.
               - They need 500 new cities

      •There will be 1.2 billion cars on the
          road by 2015 (~1 car/6 people)

•95% of the world's cities still dump raw
               sewage into their waters

9           University Relations January 2010   © 2010 IBM Corporation
Examples: Smarter City
service focus & intensive users of information technologies

    Smart Transportation Systems              Public Safety
      - Integrated Fare Management              - Smart Surveillance System
      - Road Usage Charging                       (S3)
      - Traffic Information Management          - Emergency Management
                                                  Integration
                                                - Deep Thunder Micro-Weather
                                                  Forecasting


                                                                    Healthcare
                                                                         - Clinical and Business
                                                                         Transformation
 Energy Management                                                       - Enterprise Health Analytics
   - Network Monitoring & Stability                                      - Clinical Integration
   - Smart Grid – Demand                                                 - Healthcare Infrastructure
     Management
   - Intelligent Building Management
   - Automated Meter Management


                                              Environmental Management
    Water Management                            - City-wide Measurements
      - Water purity monitoring                 - KPI’s                        Telecommunications
      - Water use optimization                  - CO2 Management                 - Fixed and mobile
      - Waste water treatment                   - Scorecards                       operators
 10     optimization Relations January 2010
              University                        - Reporting                            © 2010 IBM Corporation
                                                                                 - Media Broadcasters
Example: smarter supply chain
 Fresh on demand, action against fresh food wastage

         Total wastage: € 3 billion                       Total wastage: € 27+ billion



           Production & Wholesale                       Logistics           Retailers    Out of home




                                                             Others




Source: Johan A Van Staalduinen/Netherlands/IBM

    11              University Relations January 2010                                    © 2010 IBM Corporation
Example: Cloud Computing
  Dynamic Infrastructure for Service Delivery
                                                   IMPROVE SERVICE
                                          Not only ensuring high availability
                                         and quality of existing services, but
                                         also meeting customer expectations              MANAGE RISK
       REDUCE COST                         for real-time, dynamic access to
                                                innovative new services.            Not only addressing today’s
Not just containing operational cost
                                                                                      security, resiliency, and
   and complexity, but achieving
                                                                                    compliance challenges, but
  breakthrough productivity gains
                                                                                     also preparing for the new
through virtualization, optimization,
                                                                                      risks posed by an even
 energy stewardship, and flexible
                                                                                        more connected and
             sourcing.
                                                                                         collaborative world.


                                        Cloud Computing
                                                                                           •Customization
                                                                                           •Efficiency
                                                                                           •Flexibility
         VIRTUALIZATION
                             +          AUTOMATION
                                                          +       STANDARDIZATION
                                                                                    =
                                                                                            Cost
                                                                                           •Availability
                                                                                                   Flexibility
                                                                                           •Resiliency
                                                                                           •Cost Effectiveness
http://www-03.ibm.com/press/us/en/pressrelease/29367.wss                                   •Security & Privacy
  12           University Relations January 2010                                              © 2010 IBM Corporation
Examples of Skills Required
for Service Science                                                                              •Leadership
                                                                                                 •Entrepreneurship
                                                                                                 •Strategy
                                                             MARKET &                            •Critical Thinking/Analysis
                                                            COMPETITORS
                                                                                                 •Macroeconomics


         PRODUCTS &
          SERVICES                              OPERATIONS/PROCESSES/RESOURCES                                  CUSTOMERS



                                                   •Infrastructure           •Processes
      •BI/Data warehousing                                                                               •BI//Data warehousing
                                                    -IT Architecture          - e-Commerce
      •Product/Service Management                                                                        •Behaviour Science
                                                    -IT for Services          - SOA/BPM/ERP/ISC
      •Product/Service Marketing                                                                         •Business Analytics
                                                    -IT Management            - Quality Management
      •R&D Management                                                                                    •Optimization
                                                   •Project Mgt/Consultancy
                                                                          •Human Capacity Mgt
      •Microeconomics                                                                                    •CRM, Marketing
                                                   •Financial Management •Knowledge Mgt
      •Pricing                                                                                           •Sales
      •Innovation and Design                                                                             •Innovation
                                                           GOVERNANCE
                                                        BUSINESS INTEGRITY

                                     •Social Responsibilities        •Business Law/Reg. Compliances          ERP: Enterprise Resource Plannng
BI: Business Intelligence
                                                                     •IT based Risk Management            ISC: Integrated Supply Chain
SOA: Service Oriented Architecture   •Ethics and Values
    13                  University Relations January 2010                                                         © 2010 IBM Corporation
Making our service system
more efficient, better utilized and more responsive

                                     Skills to develop flexible and
                                     dynamic processes modeled
                                       SMARTER
                                   for the new way people buy, live
                                                 & work.


 Skills to take advantage                      Smart Work
                     LE
                                               Smart Work                 Skills to reduce energy costs,
      of the wealth of
                   IB
 information available in
                                                                            drive greater efficiencies,

INSIGHTFUL       NS SUSTAINABLE
      real time from a                 New
                                       New                 Green &
                                                                         respond more quickly by taking

              PO
                                                                            action now on energy, the
 multitude of sources to           Intelligence
                                   Intelligence            Beyond

            ES
                                                                         environment, and sustainability,
  make more intelligent
           R
          choices.
                                                  Dynamic
                                                  Dynamic
                                                                           and develop new portfolio of
                                                                          green services and products.
                                               Infrastructure
                                               Infrastructure
         RESPONSIVE                    Skills to create intelligent
                                 infrastructure that drives down cost,
                                 is secure, and is just as dynamic as
                                     today’s business environment
14         University Relations January 2010                                            © 2010 IBM Corporation
Top Solutions for Smart Work for Smarter Planet
      Agile            Industry business solutions and Industry frameworks
                                                                    Academic Initiative
     Business          Business Model Innovation services (CBMSOMA) Related Smart Work Courseware
                       SOA strategy services
      Model            Smart SOA INsight series
                       Collaboration software and services          •Designing SOA Solutions with the IBM SOA Foundation
                       RFID, sensors, actuators, consulting services•Assessment Assets for Service Oriented Architecture (SW707)
                       Web 2.0 products and service                 •Developing Applications with a Service-Oriented Architecture
 Connected             Consulting services for CRM and SCM          •Getting Started with SOA
                       Collaborative Software Development
 Customers             WebSphere Commerce
                                                                    •Implementation Technologies for Service Oriented Designs
                                                                    •Service Oriented Architecture Design Patterns
                       Mobility & Contact Center Solutions          •The Value of Service Oriented Architecture
                                                                       •Fundamentals of IBM Lotus Domino 8 Application Development
                                                                       •Using IBM Lotus Notes 8 Mail, Calendar, and Contacts
                       Key Agility Indicators
                                                                    •IBM WebSphere Portal v6.0: Administration 1&2
  Dynamic              BPM Suite and consulting services
                                                                    •IBM WebSphere Business Modeler- Process Simulation and
                       WebSphere Business Events
 Business              Component Business Modeling services – (KAIs)
                                                                    Analysis

 Processes             Enterprise Architecture products and services
                                                                    •IBM WebSphere Enterprise Service Bus Implementing an ESB
                                                                       •Using IBM WebSphere Business Modeler, Monitor and Process
                                                                       Server for BPM
                                                                       •IBM WebSphere Commerce V6.0 Hands-on Training for
                       Smart SOA and SOA solution services
                                                                       Developers
                       Application Infrastructure
 Smart SOA             Connectivity and Integration
                                                                       •Programming XML with Java 1.4
                                                                       •Teaching Business Process Management with Innov8
                       SOA Sandbox
                                                                       •Developing Supply Chains to support Service Operations
                                                                       •Introduction to XML and Related Technologies
15
15         University Relations January 2010                                                                    © 2010 IBM Corporation
                                                                       •Teaching Business Process Modeling
Top Solutions for New Intelligence for Smarter Planet
                 Information on Demand
                                                              Academic Initiative
Information      Information Agenda
                                                              Related New Intelligence Courseware
Management       Information Infrastructure


                 Business Intelligence                        •Designing SOA Solutions with the IBM SOA Foundation
                                                              •Information Management Basics
                 Business Event Processing
 Predictive      Analytics Solutions                          •Architecting the Data Warehouse
                                                              •Relational Database Design
 Capability      Telelogic and Cognos
                                                              •Changing Business with Data Insight
                                                              •IBM Informix Dynamic Server Administration
                                                              •SQL & Database basics
                Industry Specific Assets (IA, MRO,            •Teaching Business Process Management with Innov8
 Engaging      Telelogic)                                     •Teaching Business Process Modeling
                CRM, SCM and HR Transformation
 the Value      Sensor and Actuator
                                                              •Introduction to IBM DB2
                                                              •Advanced Data Warehouse Workshop: Multi-Dimensional
   Chain        Information Integration                       Modeling
                                                              •DB2 for z/OS Fundamentals
                 Business Optimization Solutions              •DB2 Family Fundamentals
                 Business Process Management                  •DB2 SQL Workshop
                 Smart SOA                                    •Designing SOA Solutions with the IBM SOA Foundation
 Business        Information On Demand, Information Agenda    •Getting Started with SOA
Optimization     Information Infrastructure SW and Services   •Implementation Technologies for Service Oriented Designs
                                                              •The Value of Service Oriented Architecture
                                                              •IBM WebSphere Business Modeler- Process Simulation and
                                                              Analysis
 16       University Relations January 2010                   •Using IBM WebSphere Business Modeler for BPM
                                                                                             © 2010 IBM Corporation
Top Solutions for Dynamic Infrastructure for Smarter Planet

                                                  Academic Initiative:
                                                  Related Dynamic Infrastructure Courseware
     Reduce          Cloud Computing
      Cost
                     Virtualization               •Foundations in IT Services I and II
                                                  •IBM Tivoli Netcool/Proviso 4.4.3 System Administration and
                     Energy Efficiency            Maintenance
                                                  •IBM Tivoli Asset Management for IT 7.1 Implementation
                                                  •IBM Tivoli Access Manager for Enterprise Single Sign-On Workshop
                     Information Infrastructure   •IBM Tivoli Business Services Manager 4.1 for Implementers
                                                  •IBM Tivoli Composite Appl. Mgr for RTT 6.1 - Install Monitor Deploy
                                                  •IBM Tivoli Composite Application Manager for Response Time 6.2
     Improve         Service Management           Implement and Admin Workshop
                                                  •IBM Tivoli Federated Identity Manager 6.1 - Deployment and
      Service        Asset Management             Administration
                                                  •IBM Tivoli Monitoring 6.2 for Implementers
                                                  •IBM Tivoli Netcool/Impact 4.0 - Administration and Implementation
                     Security Management          •IBM Tivoli Netcool/OMNIbus 7.1 - User
                                                  •IBM Tivoli Netcool/Realtime Active Dashboards 3.0 Fundamentals
                                                  •IBM Tivoli Network Performance Reporting 3.X User
                     Business Resiliency          •IBM Tivoli Provisioning Manager 5.1 - Operations Management
                                                  Workshop
                     Express Mid-Market           •Service Desk Management Using IBM Maximo 6 for IT
                                                  •Work Management in IBM Maximo 6 for Enterprise Asset
     Manage                                       Management

      Risk         Offerings                      •An Introduction to the Mainframe - Large Scale Commercial
                                                  Computing
                                                  •An Introduction to the Mainframe - z/OS Basics
                     Strategic Outsourcing        •Linux on System z
                                                  •Teaching Enterprise Systems

17         University Relations January 2010                                                    © 2010 IBM Corporation
Top Solutions for Green and Beyond for Smarter Planet
                   Data Center Assessment and Design
Finding the        Services                                   Academic Initiative:
  Value in         Green IT                                   Related Green and Beyond Courseware &
   Green           Software for a Greener World               Assets


                   Intelligent Utility Network and Metering
                   Intelligent Transportation
                   Consumer Driven Supply Chain               •An Introduction to Large Scale Commercial Computing
   Smart           Intelligent Oilfields, Manufacturing       •An Introduction to the Mainframe - Networking
                                                              •An Introduction to the Mainframe - z/OS Basics
  Systems          Productivity
                                                              •IBM’s Software for Greener World
                                                              •Lotus Quickr 8.1
                                                              •IBM Content Collector, Filenet
                                                              •Information Agenda for Energy & Utilities
                                                              •IBM Tivoli Usage and Accounting Manager, IBM Tivoli
  Societal         CSR and Sustainability                     Monitoring for Energy Management Accounting
                   Carbon Management                          •Rational Test Lab Manager Managing
 Shifts and        Reputation Management Services             •Lotus Notes, Domino 8.5
                                                              •SmartSOA Sandbox Accelerating
 Corporate         Ethical Supply Chain Monitoring            •IBM FileNet Business Process Manager,
   Social                                                     •IBM FileNet Content Manager
                                                              •Lotus Forms & Lotus Forms Turbo
Responsibilit                                                 •Telelogic System Architect

      y
                          http://www-304.ibm.com/jct01005c/university/scholars/academicinitiative/
 18       University Relations January 2010                                                        © 2010 IBM Corporation
I1



     Skills required for a changing world
     We have
                a smarter planet and
                a service-oriented economy

     We need

                      Skills to Create Values
                                       in recursive
          negative feedback service systems

     19    University Relations January 2010          © 2010 IBM Corporation
Diapositive 19

I1          IBM_USER; 10.09.2009
20   University Relations January 2010   © 2010 IBM Corporation
About the speaker: Dr Diem Ho is Manager of University Relations for IBM Europe, Middle East and
Africa (EMEA).
His mission is to build and manage relationships of mutual value for IBM and the academic community.
Diem’s past research interests covered many disciplines in Science, Technology and
Finance/Economics. He has published widely in physics, mathematics, image processing, remote
sensing, engineering, optimization and finance.
He recently co-edited/authored a special issue of the Computational Economics on Stochastic Process
and Data Analysis published by Springer.
In recent years, he has lectured intensively on Higher Education Reform and is a member of the peer
review teams for the EFMD-EQUIS and EPAS accreditation programs and a member of the EPAS
committee.
He is an associate editor of the journal of Computational Economics and is a member of the IBM
Academy of Technology.
Before assuming his current position, he was an EMEA practice leader with the IBM Management
Technologies Consulting Group, specializing in using Technologies to address Business Challenges in
Banking and Finance sector.
Before joining IBM, Diem was a university professor and he continues to supervise PhD thesis to-date.
Diem obtained two Master degrees and a PhD in Magnetospheric Physics at Stanford University,
California.



21         University Relations January 2010                                         © 2010 IBM Corporation

Diem Ho Exploring Services

  • 1.
    Exploring Service Science inour current socio-economic environment Diem Ho Member of the IBM Academy of Technology IESS1.0, University of Geneva, February 17-19, 2010 diem_ho@fr.ibm.com IBM EMEA University Relations © 2002 IBM Corporation
  • 2.
    The world ischanging Security Environmental Concerns Complexity and Instability Globalization Energy Supply Information Explosion and Conservation 2 University Relations January 2010 © 2010 IBM Corporation
  • 3.
    •-30 billion RFID The world today tags embedded into our world •-1 billion transistors INSTRUMENTED for each person on earth by 2011, 2 billion people are expected INTERCONNECTED to connect to the internet everyday,15 petabytes of INTELLIGENT information are being generated, 8x more than information in all US libraries 3 University Relations January 2010 © 2010 IBM Corporation
  • 4.
    Reality in Numbers In distributed Annual $89B lost computing impact of $3.7B lost hrs 85% environments, up to congested 85% of computing Roadways $2.3B gallons capacity sits idle in the US of gas The losses of electrical 40%-70% energy due to inefficiency Annual consumer product around the world and retail sales lost in $40B United States due to supply chain inefficiencies 70¢ per $1 Lost annually in the US Spent on due to healthcare fraud $100B IT maintenance of total port volume 22% in North America is empty containers Increase in global water Worth of produce is wasted usage since the 90s, 6X $11.5B in India because of outdated post-harvest infrastructure twice the rate of human population growth 4 University Relations January 2010 © 2010 IBM Corporation
  • 5.
    It’s all about Values and Value Creation Cost Quality Utility Perception 5 University Relations January 2010 © 2010 IBM Corporation
  • 6.
    Economic Evolution: ValueCreation Driver: getting closer to users nomad agriculture goods services ? integrating Technical Vitality Product complexity URGENCY Client’s needsOF NOW! New Technologies / by Integration h Products Knowledge Acquire Create Assimilate n Products tio Understand ica business Develop values challenges Services ist ph so Society/Businesses Products Services IBM EMEA University Relations © 2002 IBM Corporation Service complexity
  • 7.
    Value Creation SHAREHOLDER´S by STAKEHOLDER’S Ultimate Objective VALUE Innnovation CONSITUTUE NTS SERVED EFFICIENCY REVENUE- SURPLUS MARKET BUDGET BUDGET PROFIT- SHARE- Fundamental Indicators (KPIs) MARKET SINGULARITY PRODUCTS & Business CUSTOMER OPERATIONS INTIMACY SERVICES EXCELLENCE Expectation LEADERSHIP REGULATION COMPLIANCE Government SOCIAL RESPONSIBILITIES /Society Expectation Cost Quality Utility Perception 7 University Relations January 2010 © 2010 IBM Corporation
  • 8.
    Service Innovation: ValueCreation Matrix Do we have Science in Services? Value Market Revenue Profit Productivity Challenges Share /Utility Customers Mass Customization Products & Services Facilitation, Simplification, Integration, Standardization, Differentiation Market & Competitors Globalization, Market Singularization Operations/ Optimization, Automation, Integration, Processes/ Resources Organization, Securitization, Virtualization Governance & Regulation Compliance Optimization Business Integrity Risk Management 8 University Relations January 2010 © 2010 IBM Corporation
  • 9.
    Examples: Smarter City urbanization:demographic changes •2008 was the first year in which more than half of the world – 3.3 billion– was living in cities •by 2050, city dwellers are expected to make up 70% of the earth’s total population – 6.4 billion out of 9.2 billion– •India: every minute for the next 20 years, 30 people will leave rural India for urban India. - They need 500 new cities •There will be 1.2 billion cars on the road by 2015 (~1 car/6 people) •95% of the world's cities still dump raw sewage into their waters 9 University Relations January 2010 © 2010 IBM Corporation
  • 10.
    Examples: Smarter City servicefocus & intensive users of information technologies Smart Transportation Systems Public Safety - Integrated Fare Management - Smart Surveillance System - Road Usage Charging (S3) - Traffic Information Management - Emergency Management Integration - Deep Thunder Micro-Weather Forecasting Healthcare - Clinical and Business Transformation Energy Management - Enterprise Health Analytics - Network Monitoring & Stability - Clinical Integration - Smart Grid – Demand - Healthcare Infrastructure Management - Intelligent Building Management - Automated Meter Management Environmental Management Water Management - City-wide Measurements - Water purity monitoring - KPI’s Telecommunications - Water use optimization - CO2 Management - Fixed and mobile - Waste water treatment - Scorecards operators 10 optimization Relations January 2010 University - Reporting © 2010 IBM Corporation - Media Broadcasters
  • 11.
    Example: smarter supplychain Fresh on demand, action against fresh food wastage Total wastage: € 3 billion Total wastage: € 27+ billion Production & Wholesale Logistics Retailers Out of home Others Source: Johan A Van Staalduinen/Netherlands/IBM 11 University Relations January 2010 © 2010 IBM Corporation
  • 12.
    Example: Cloud Computing Dynamic Infrastructure for Service Delivery IMPROVE SERVICE Not only ensuring high availability and quality of existing services, but also meeting customer expectations MANAGE RISK REDUCE COST for real-time, dynamic access to innovative new services. Not only addressing today’s Not just containing operational cost security, resiliency, and and complexity, but achieving compliance challenges, but breakthrough productivity gains also preparing for the new through virtualization, optimization, risks posed by an even energy stewardship, and flexible more connected and sourcing. collaborative world. Cloud Computing •Customization •Efficiency •Flexibility VIRTUALIZATION + AUTOMATION + STANDARDIZATION = Cost •Availability Flexibility •Resiliency •Cost Effectiveness http://www-03.ibm.com/press/us/en/pressrelease/29367.wss •Security & Privacy 12 University Relations January 2010 © 2010 IBM Corporation
  • 13.
    Examples of SkillsRequired for Service Science •Leadership •Entrepreneurship •Strategy MARKET & •Critical Thinking/Analysis COMPETITORS •Macroeconomics PRODUCTS & SERVICES OPERATIONS/PROCESSES/RESOURCES CUSTOMERS •Infrastructure •Processes •BI/Data warehousing •BI//Data warehousing -IT Architecture - e-Commerce •Product/Service Management •Behaviour Science -IT for Services - SOA/BPM/ERP/ISC •Product/Service Marketing •Business Analytics -IT Management - Quality Management •R&D Management •Optimization •Project Mgt/Consultancy •Human Capacity Mgt •Microeconomics •CRM, Marketing •Financial Management •Knowledge Mgt •Pricing •Sales •Innovation and Design •Innovation GOVERNANCE BUSINESS INTEGRITY •Social Responsibilities •Business Law/Reg. Compliances ERP: Enterprise Resource Plannng BI: Business Intelligence •IT based Risk Management ISC: Integrated Supply Chain SOA: Service Oriented Architecture •Ethics and Values 13 University Relations January 2010 © 2010 IBM Corporation
  • 14.
    Making our servicesystem more efficient, better utilized and more responsive Skills to develop flexible and dynamic processes modeled SMARTER for the new way people buy, live & work. Skills to take advantage Smart Work LE Smart Work Skills to reduce energy costs, of the wealth of IB information available in drive greater efficiencies, INSIGHTFUL NS SUSTAINABLE real time from a New New Green & respond more quickly by taking PO action now on energy, the multitude of sources to Intelligence Intelligence Beyond ES environment, and sustainability, make more intelligent R choices. Dynamic Dynamic and develop new portfolio of green services and products. Infrastructure Infrastructure RESPONSIVE Skills to create intelligent infrastructure that drives down cost, is secure, and is just as dynamic as today’s business environment 14 University Relations January 2010 © 2010 IBM Corporation
  • 15.
    Top Solutions forSmart Work for Smarter Planet Agile Industry business solutions and Industry frameworks Academic Initiative Business Business Model Innovation services (CBMSOMA) Related Smart Work Courseware SOA strategy services Model Smart SOA INsight series Collaboration software and services •Designing SOA Solutions with the IBM SOA Foundation RFID, sensors, actuators, consulting services•Assessment Assets for Service Oriented Architecture (SW707) Web 2.0 products and service •Developing Applications with a Service-Oriented Architecture Connected Consulting services for CRM and SCM •Getting Started with SOA Collaborative Software Development Customers WebSphere Commerce •Implementation Technologies for Service Oriented Designs •Service Oriented Architecture Design Patterns Mobility & Contact Center Solutions •The Value of Service Oriented Architecture •Fundamentals of IBM Lotus Domino 8 Application Development •Using IBM Lotus Notes 8 Mail, Calendar, and Contacts Key Agility Indicators •IBM WebSphere Portal v6.0: Administration 1&2 Dynamic BPM Suite and consulting services •IBM WebSphere Business Modeler- Process Simulation and WebSphere Business Events Business Component Business Modeling services – (KAIs) Analysis Processes Enterprise Architecture products and services •IBM WebSphere Enterprise Service Bus Implementing an ESB •Using IBM WebSphere Business Modeler, Monitor and Process Server for BPM •IBM WebSphere Commerce V6.0 Hands-on Training for Smart SOA and SOA solution services Developers Application Infrastructure Smart SOA Connectivity and Integration •Programming XML with Java 1.4 •Teaching Business Process Management with Innov8 SOA Sandbox •Developing Supply Chains to support Service Operations •Introduction to XML and Related Technologies 15 15 University Relations January 2010 © 2010 IBM Corporation •Teaching Business Process Modeling
  • 16.
    Top Solutions forNew Intelligence for Smarter Planet Information on Demand Academic Initiative Information Information Agenda Related New Intelligence Courseware Management Information Infrastructure Business Intelligence •Designing SOA Solutions with the IBM SOA Foundation •Information Management Basics Business Event Processing Predictive Analytics Solutions •Architecting the Data Warehouse •Relational Database Design Capability Telelogic and Cognos •Changing Business with Data Insight •IBM Informix Dynamic Server Administration •SQL & Database basics Industry Specific Assets (IA, MRO, •Teaching Business Process Management with Innov8 Engaging Telelogic) •Teaching Business Process Modeling CRM, SCM and HR Transformation the Value Sensor and Actuator •Introduction to IBM DB2 •Advanced Data Warehouse Workshop: Multi-Dimensional Chain Information Integration Modeling •DB2 for z/OS Fundamentals Business Optimization Solutions •DB2 Family Fundamentals Business Process Management •DB2 SQL Workshop Smart SOA •Designing SOA Solutions with the IBM SOA Foundation Business Information On Demand, Information Agenda •Getting Started with SOA Optimization Information Infrastructure SW and Services •Implementation Technologies for Service Oriented Designs •The Value of Service Oriented Architecture •IBM WebSphere Business Modeler- Process Simulation and Analysis 16 University Relations January 2010 •Using IBM WebSphere Business Modeler for BPM © 2010 IBM Corporation
  • 17.
    Top Solutions forDynamic Infrastructure for Smarter Planet Academic Initiative: Related Dynamic Infrastructure Courseware Reduce Cloud Computing Cost Virtualization •Foundations in IT Services I and II •IBM Tivoli Netcool/Proviso 4.4.3 System Administration and Energy Efficiency Maintenance •IBM Tivoli Asset Management for IT 7.1 Implementation •IBM Tivoli Access Manager for Enterprise Single Sign-On Workshop Information Infrastructure •IBM Tivoli Business Services Manager 4.1 for Implementers •IBM Tivoli Composite Appl. Mgr for RTT 6.1 - Install Monitor Deploy •IBM Tivoli Composite Application Manager for Response Time 6.2 Improve Service Management Implement and Admin Workshop •IBM Tivoli Federated Identity Manager 6.1 - Deployment and Service Asset Management Administration •IBM Tivoli Monitoring 6.2 for Implementers •IBM Tivoli Netcool/Impact 4.0 - Administration and Implementation Security Management •IBM Tivoli Netcool/OMNIbus 7.1 - User •IBM Tivoli Netcool/Realtime Active Dashboards 3.0 Fundamentals •IBM Tivoli Network Performance Reporting 3.X User Business Resiliency •IBM Tivoli Provisioning Manager 5.1 - Operations Management Workshop Express Mid-Market •Service Desk Management Using IBM Maximo 6 for IT •Work Management in IBM Maximo 6 for Enterprise Asset Manage Management Risk Offerings •An Introduction to the Mainframe - Large Scale Commercial Computing •An Introduction to the Mainframe - z/OS Basics Strategic Outsourcing •Linux on System z •Teaching Enterprise Systems 17 University Relations January 2010 © 2010 IBM Corporation
  • 18.
    Top Solutions forGreen and Beyond for Smarter Planet Data Center Assessment and Design Finding the Services Academic Initiative: Value in Green IT Related Green and Beyond Courseware & Green Software for a Greener World Assets Intelligent Utility Network and Metering Intelligent Transportation Consumer Driven Supply Chain •An Introduction to Large Scale Commercial Computing Smart Intelligent Oilfields, Manufacturing •An Introduction to the Mainframe - Networking •An Introduction to the Mainframe - z/OS Basics Systems Productivity •IBM’s Software for Greener World •Lotus Quickr 8.1 •IBM Content Collector, Filenet •Information Agenda for Energy & Utilities •IBM Tivoli Usage and Accounting Manager, IBM Tivoli Societal CSR and Sustainability Monitoring for Energy Management Accounting Carbon Management •Rational Test Lab Manager Managing Shifts and Reputation Management Services •Lotus Notes, Domino 8.5 •SmartSOA Sandbox Accelerating Corporate Ethical Supply Chain Monitoring •IBM FileNet Business Process Manager, Social •IBM FileNet Content Manager •Lotus Forms & Lotus Forms Turbo Responsibilit •Telelogic System Architect y http://www-304.ibm.com/jct01005c/university/scholars/academicinitiative/ 18 University Relations January 2010 © 2010 IBM Corporation
  • 19.
    I1 Skills required for a changing world We have a smarter planet and a service-oriented economy We need Skills to Create Values in recursive negative feedback service systems 19 University Relations January 2010 © 2010 IBM Corporation
  • 20.
    Diapositive 19 I1 IBM_USER; 10.09.2009
  • 21.
    20 University Relations January 2010 © 2010 IBM Corporation
  • 22.
    About the speaker:Dr Diem Ho is Manager of University Relations for IBM Europe, Middle East and Africa (EMEA). His mission is to build and manage relationships of mutual value for IBM and the academic community. Diem’s past research interests covered many disciplines in Science, Technology and Finance/Economics. He has published widely in physics, mathematics, image processing, remote sensing, engineering, optimization and finance. He recently co-edited/authored a special issue of the Computational Economics on Stochastic Process and Data Analysis published by Springer. In recent years, he has lectured intensively on Higher Education Reform and is a member of the peer review teams for the EFMD-EQUIS and EPAS accreditation programs and a member of the EPAS committee. He is an associate editor of the journal of Computational Economics and is a member of the IBM Academy of Technology. Before assuming his current position, he was an EMEA practice leader with the IBM Management Technologies Consulting Group, specializing in using Technologies to address Business Challenges in Banking and Finance sector. Before joining IBM, Diem was a university professor and he continues to supervise PhD thesis to-date. Diem obtained two Master degrees and a PhD in Magnetospheric Physics at Stanford University, California. 21 University Relations January 2010 © 2010 IBM Corporation