1. Monthly Cycle Count 2. Inventory > 12 Months Analysis for Provision Standard Operating Procedures
SOP – Monthly Cycle Count (1/4) Time Line – No. of Working Days Purchase Stores In charge Manufacturing (OSP) Analysis 7 Finance /Stores In Charge Stock Corrections in System 9 Stores In charge Manufacturing (OSP) Report Out – Send Mail to Materials In- charge, Finance 8 Manufacturing Purchase (OSP)  Stores In charge Compilation of Data 6 Manufacturing, Purchase (OSP) Stores In Charge Cycle Counting 5 Stores In charge Release Lists to Individuals for Cycle Counting with CC to Finance 4 Finance Stores In charge Use 80:20 Rule and Identify Parts for Cycle Counting and Send Mail to Finance 3 Stores In charge Convert to Excel and Sort it Based on Value 2 -- Stores In charge Down Load Sub Inventory Report from Oracle 1 Support Responsibility Process Step Nos. 9 9 8 8 Month Close 0 9 10 7 7 6 5 6 4 3 5 2 1,2,3,4 Step Nos. 1 Days
SOP – Monthly Cycle Count (2/4) Locations and Value of Stock Top 51%  to 80% Items by Value Even Months 100% Year End Stores In charge Stores Customer Support FG Fly Jac Manufacturing & Purchase Floor + OSP Pondy Stores In Charge Stores (GEK + GEC) Manufacturing & Purchase OSP (GEK + GEC) Manufacturing Floor (GEK + GEC) E City Comps Stores In Charge Stores ( Main + Busbar + Mechanical) Manufacturing Top 50% Items by Value Floor E City Responsibility Odd Months Locations Org.
SOP – Monthly Cycle Count (3/4) Format for Stock Discrepancy Approval
SOP – Monthly Cycle Count (3/4) Report Out Format Variance Approval Threshold Variance up to 1 Lacs Materials In charge Variance Up to 5 Lacs Director Operations Variance 5 Lacs and above CEO Note – If Any repeat Stock Variance Observed for any Part then these are to be reported separately along with detailed analysis and BOM Verification Data E City Comps Floor E City Comps OSP E City Comps Stores Pondy Floor Pondy Stores Fly Jac FG Others BOM Issues Accounting Issues Variance Analysis %age of Variance Stock Not traceable Remarks E City Floor E City Stores Cycle Count Value Cycle Count No. of Lines Total Vari-ance in Lacs Value in Lacs No. of Line Items Location
SOP – Greater Than 12 Months Stock Analysis Time Line – No. of Working Days Frequency – Once in Three Months for Month end Inventories of Feb, May, Aug & Nov Purchase Stores In charge Based on Category report out the Summary Report Out  1. Pondy 2. Ecity Comps RM 3. Ecity Comps FG 4. Ecity  3 APO Template  - Greater than 12 Months Stock Analysis Part No.  Description  - Input From All Inventory Value Report Total Available O/H Qty Inventory Qty (SS+1/2 MOQ)  - Input from Segmentation File Stocking Requirement (ABC Category), Min Max for FG Excess to Inventory Std. Qty  - Auto generated Based on Formula Std. Unit Cost  - Input from All Inventory Value Report Projected Annual Usage  - Input from Consumption Data, FG – Input from past 12 Months Sales Required to Service Inventory Qty  - In put from Open Order’s in Oracle (Qty required to service Orders)  Note : All Other fields are calculated automatically Note: NPI is not Considered as Slow Moving For the first year of Introduction Oracle Source of Data / Template 2 Sales Stores In charge ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],1 Support Responsibility Process Step Nos. 3 5 4 Month Close 0 3 2 2 1 Step Nos. 1 Days

More Related Content

What's hot

Material requirement planning
  Material requirement planning  Material requirement planning
Material requirement planning
braydenmarco
 
Mm overview
Mm overviewMm overview
Mm overviewspalroay
 
SAP MM PP Material requirement planning
SAP MM PP Material requirement planning SAP MM PP Material requirement planning
SAP MM PP Material requirement planning
Lokesh Modem
 
Material Requisite Planning
Material Requisite PlanningMaterial Requisite Planning
Material Requisite Planningajithsrc
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationDelwin Arikatt
 
Demand Driven Production Management
Demand Driven Production ManagementDemand Driven Production Management
Demand Driven Production Management
ecoservity
 
MRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPMRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPTom Matys
 
Mrp structure
Mrp structureMrp structure
Mrp structure
Amit Verma
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
Dipesh Pandey
 
Demand Driven Production Management from Ecoservity
Demand Driven Production Management from EcoservityDemand Driven Production Management from Ecoservity
Demand Driven Production Management from Ecoservity
ecoservity
 
203 eo qandtqm
203 eo qandtqm203 eo qandtqm
203 eo qandtqmbtecexpert
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
Suryakumar Thangarasu
 
Conversion cycle
Conversion cycleConversion cycle
Conversion cycle
Zoey Zungit
 
Con2012 jordan analyze_your_production_costs
Con2012 jordan analyze_your_production_costsCon2012 jordan analyze_your_production_costs
Con2012 jordan analyze_your_production_costs
aadamserpcorp
 
Solar sytem
Solar sytemSolar sytem
Solar sytem
ahmernabeel
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)
Ravimohan Rajmohan
 
Input to MRP
Input to MRPInput to MRP
Input to MRP
Shivji Dangar
 
Material Requirement planning (factors,inputs,outputs,benifits)
Material Requirement planning  (factors,inputs,outputs,benifits)Material Requirement planning  (factors,inputs,outputs,benifits)
Material Requirement planning (factors,inputs,outputs,benifits)
razinbabaria786
 

What's hot (20)

Material requirement planning
  Material requirement planning  Material requirement planning
Material requirement planning
 
Mm overview
Mm overviewMm overview
Mm overview
 
SAP MM PP Material requirement planning
SAP MM PP Material requirement planning SAP MM PP Material requirement planning
SAP MM PP Material requirement planning
 
Material Requisite Planning
Material Requisite PlanningMaterial Requisite Planning
Material Requisite Planning
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Demand Driven Production Management
Demand Driven Production ManagementDemand Driven Production Management
Demand Driven Production Management
 
MRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPMRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERP
 
Mrp structure
Mrp structureMrp structure
Mrp structure
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
 
Demand Driven Production Management from Ecoservity
Demand Driven Production Management from EcoservityDemand Driven Production Management from Ecoservity
Demand Driven Production Management from Ecoservity
 
Bhushan U Pagere_Mahindra Sona
Bhushan U Pagere_Mahindra SonaBhushan U Pagere_Mahindra Sona
Bhushan U Pagere_Mahindra Sona
 
203 eo qandtqm
203 eo qandtqm203 eo qandtqm
203 eo qandtqm
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
 
Conversion cycle
Conversion cycleConversion cycle
Conversion cycle
 
Con2012 jordan analyze_your_production_costs
Con2012 jordan analyze_your_production_costsCon2012 jordan analyze_your_production_costs
Con2012 jordan analyze_your_production_costs
 
Solar sytem
Solar sytemSolar sytem
Solar sytem
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)
 
Input to MRP
Input to MRPInput to MRP
Input to MRP
 
Material Requirement planning (factors,inputs,outputs,benifits)
Material Requirement planning  (factors,inputs,outputs,benifits)Material Requirement planning  (factors,inputs,outputs,benifits)
Material Requirement planning (factors,inputs,outputs,benifits)
 
MRP+1.pptx
MRP+1.pptxMRP+1.pptx
MRP+1.pptx
 

Similar to D:\Gopi\Note\Stocks\So Ps

SAP Production Planning
SAP Production PlanningSAP Production Planning
SAP Production Planning
Rupesh Brahmankar
 
New Charts Architectures (2)
New Charts Architectures (2)New Charts Architectures (2)
New Charts Architectures (2)guestf73e68
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)Mostafa Ewees
 
Section iii mis - formats
Section iii   mis - formatsSection iii   mis - formats
Section iii mis - formats
spandane
 
eSheets Presentation
eSheets PresentationeSheets Presentation
eSheets PresentationLee Taylor
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
Babasab Patil
 
Increase CAT Spare Parts Inventory turn (ITR) V2.0
Increase CAT Spare Parts Inventory turn (ITR) V2.0Increase CAT Spare Parts Inventory turn (ITR) V2.0
Increase CAT Spare Parts Inventory turn (ITR) V2.0Krishnendu Chakraborty
 
Intelligent Process Management & Visualization Technologies
Intelligent Process Management & Visualization TechnologiesIntelligent Process Management & Visualization Technologies
Intelligent Process Management & Visualization Technologies
Dafna Levy
 
Spectrum erp productoverview
Spectrum erp productoverviewSpectrum erp productoverview
Spectrum erp productoverview
Mauly Chandra
 
Kcf bp-project-module
Kcf bp-project-moduleKcf bp-project-module
Kcf bp-project-moduleEsh_Crystal
 
ERP Solution for MSMEs by Sumeet Mayor.pdf
ERP Solution for MSMEs by Sumeet Mayor.pdfERP Solution for MSMEs by Sumeet Mayor.pdf
ERP Solution for MSMEs by Sumeet Mayor.pdf
Sumeet Mayor
 
Cubot bi for oracle
Cubot bi for oracleCubot bi for oracle
Cubot bi for oracle
Yadu Balehosur
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookella
muralikrishnanookella
 
Every Angle value for food & beverage businesses running SAP
Every Angle value for food & beverage businesses running SAPEvery Angle value for food & beverage businesses running SAP
Every Angle value for food & beverage businesses running SAP
Every Angle US
 
MWR12GlobalReleaseLearnings
MWR12GlobalReleaseLearningsMWR12GlobalReleaseLearnings
MWR12GlobalReleaseLearningsMark White
 
Pragmatic Approach to Data Science
Pragmatic Approach to Data SciencePragmatic Approach to Data Science
Pragmatic Approach to Data Science
Kanchana Weerasinghe
 
Fei It Alignement With With Business V2
Fei It Alignement With With Business V2Fei It Alignement With With Business V2
Fei It Alignement With With Business V2Dr.Adel Ghannam
 
Core Planning Improvement Project
Core Planning Improvement ProjectCore Planning Improvement Project
Core Planning Improvement ProjectAbhishek Kumar
 

Similar to D:\Gopi\Note\Stocks\So Ps (20)

ERPPPT
ERPPPTERPPPT
ERPPPT
 
SAP Production Planning
SAP Production PlanningSAP Production Planning
SAP Production Planning
 
New Charts Architectures (2)
New Charts Architectures (2)New Charts Architectures (2)
New Charts Architectures (2)
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
Section iii mis - formats
Section iii   mis - formatsSection iii   mis - formats
Section iii mis - formats
 
eSheets Presentation
eSheets PresentationeSheets Presentation
eSheets Presentation
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
Increase CAT Spare Parts Inventory turn (ITR) V2.0
Increase CAT Spare Parts Inventory turn (ITR) V2.0Increase CAT Spare Parts Inventory turn (ITR) V2.0
Increase CAT Spare Parts Inventory turn (ITR) V2.0
 
Intelligent Process Management & Visualization Technologies
Intelligent Process Management & Visualization TechnologiesIntelligent Process Management & Visualization Technologies
Intelligent Process Management & Visualization Technologies
 
Spectrum erp productoverview
Spectrum erp productoverviewSpectrum erp productoverview
Spectrum erp productoverview
 
Kcf bp-project-module
Kcf bp-project-moduleKcf bp-project-module
Kcf bp-project-module
 
ERP Solution for MSMEs by Sumeet Mayor.pdf
ERP Solution for MSMEs by Sumeet Mayor.pdfERP Solution for MSMEs by Sumeet Mayor.pdf
ERP Solution for MSMEs by Sumeet Mayor.pdf
 
Cubot bi for oracle
Cubot bi for oracleCubot bi for oracle
Cubot bi for oracle
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookella
 
Every Angle value for food & beverage businesses running SAP
Every Angle value for food & beverage businesses running SAPEvery Angle value for food & beverage businesses running SAP
Every Angle value for food & beverage businesses running SAP
 
Heizer 14
Heizer 14Heizer 14
Heizer 14
 
MWR12GlobalReleaseLearnings
MWR12GlobalReleaseLearningsMWR12GlobalReleaseLearnings
MWR12GlobalReleaseLearnings
 
Pragmatic Approach to Data Science
Pragmatic Approach to Data SciencePragmatic Approach to Data Science
Pragmatic Approach to Data Science
 
Fei It Alignement With With Business V2
Fei It Alignement With With Business V2Fei It Alignement With With Business V2
Fei It Alignement With With Business V2
 
Core Planning Improvement Project
Core Planning Improvement ProjectCore Planning Improvement Project
Core Planning Improvement Project
 

D:\Gopi\Note\Stocks\So Ps

  • 1. 1. Monthly Cycle Count 2. Inventory > 12 Months Analysis for Provision Standard Operating Procedures
  • 2. SOP – Monthly Cycle Count (1/4) Time Line – No. of Working Days Purchase Stores In charge Manufacturing (OSP) Analysis 7 Finance /Stores In Charge Stock Corrections in System 9 Stores In charge Manufacturing (OSP) Report Out – Send Mail to Materials In- charge, Finance 8 Manufacturing Purchase (OSP) Stores In charge Compilation of Data 6 Manufacturing, Purchase (OSP) Stores In Charge Cycle Counting 5 Stores In charge Release Lists to Individuals for Cycle Counting with CC to Finance 4 Finance Stores In charge Use 80:20 Rule and Identify Parts for Cycle Counting and Send Mail to Finance 3 Stores In charge Convert to Excel and Sort it Based on Value 2 -- Stores In charge Down Load Sub Inventory Report from Oracle 1 Support Responsibility Process Step Nos. 9 9 8 8 Month Close 0 9 10 7 7 6 5 6 4 3 5 2 1,2,3,4 Step Nos. 1 Days
  • 3. SOP – Monthly Cycle Count (2/4) Locations and Value of Stock Top 51% to 80% Items by Value Even Months 100% Year End Stores In charge Stores Customer Support FG Fly Jac Manufacturing & Purchase Floor + OSP Pondy Stores In Charge Stores (GEK + GEC) Manufacturing & Purchase OSP (GEK + GEC) Manufacturing Floor (GEK + GEC) E City Comps Stores In Charge Stores ( Main + Busbar + Mechanical) Manufacturing Top 50% Items by Value Floor E City Responsibility Odd Months Locations Org.
  • 4. SOP – Monthly Cycle Count (3/4) Format for Stock Discrepancy Approval
  • 5. SOP – Monthly Cycle Count (3/4) Report Out Format Variance Approval Threshold Variance up to 1 Lacs Materials In charge Variance Up to 5 Lacs Director Operations Variance 5 Lacs and above CEO Note – If Any repeat Stock Variance Observed for any Part then these are to be reported separately along with detailed analysis and BOM Verification Data E City Comps Floor E City Comps OSP E City Comps Stores Pondy Floor Pondy Stores Fly Jac FG Others BOM Issues Accounting Issues Variance Analysis %age of Variance Stock Not traceable Remarks E City Floor E City Stores Cycle Count Value Cycle Count No. of Lines Total Vari-ance in Lacs Value in Lacs No. of Line Items Location
  • 6.