Synchronization panels synchronize one or more generator breakers either manually or automatically. They are used to meet power system requirements and provide multiplexing solutions. Paralleling generators involves electrically coupling them to increase total capacity and allows load transfer without interruption. It requires that the generators have the same voltage, frequency, and phase before connecting. Synchronization can be checked manually with lamps or instruments, or automatically with a synchronization relay.