The document discusses optimizing IT performance during the development phase. It notes that addressing non-functional requirements like availability, capacity, security and continuity is key. The ITIL service delivery processes provide best practices for addressing non-functional requirements throughout the development lifecycle. Specifically, processes like service level management, availability management, capacity management, and information security management provide guidance on identifying and meeting non-functional requirements during planning, design, build, test and deployment phases.
Non functional requirements. do we really care…?OSSCube
Non Functional requirements are an essential part of a project’s success, sometimes it becomes less focused area as everyone tries to make project successful in terms of functionality. This recorded webinar uncovers what can happen if Non Functional requirements are not addressed properly. What are the after impacts? You also learn the importance of Non Functional requirement, their identification, implementation and verification.
Non functional requirements. do we really care…?OSSCube
Non Functional requirements are an essential part of a project’s success, sometimes it becomes less focused area as everyone tries to make project successful in terms of functionality. This recorded webinar uncovers what can happen if Non Functional requirements are not addressed properly. What are the after impacts? You also learn the importance of Non Functional requirement, their identification, implementation and verification.
In systems engineering and software engineering, requirements analysis encompasses those tasks that go into determining the needs or conditions to meet for a new or altered product or project, taking account of the possibly conflicting requirements of the various stakeholders, analyzing, documenting, validating and managing software or system requirements.
Requirements analysis, also called requirements engineering, is the process of determining user expectations for a new or modified product. These features, called requirements, must be quantifiable, relevant and detailed. In software engineering, such requirements are often called functional specifications.
Objectives:
1. To understand the different processes in the realm of ‘Requirements Engineering’.
2. To see the challenges in requirements development and the importance of getting requirements right in an IT project.
3. To understand the different techniques used in different phases and processes of requirements development and management.
This paper describes a framework of non-functional requirements (NFR), based largely on ISO, and then goes on to provide guidance and a methodology for splitting the responsibility of determining each individual NFR between the Solution Architect and the BA.
Resource Management and Professional Services AutomationCA Technologies
Ricoh built a solution leveraging CA Project & Portfolio Management (CA PPM) to drive and make possible Ricoh’s transformation from a product company to a services company. This solution optimizes utilization of resources and ensures the right people get the right, strategic work. Workload is balanced so we get the most productivity out of our teams.
For more information on PPM solutions from CA Technologies, please visit: http://bit.ly/1wEnPhz
In systems engineering and software engineering, requirements analysis encompasses those tasks that go into determining the needs or conditions to meet for a new or altered product or project, taking account of the possibly conflicting requirements of the various stakeholders, analyzing, documenting, validating and managing software or system requirements.
Requirements analysis, also called requirements engineering, is the process of determining user expectations for a new or modified product. These features, called requirements, must be quantifiable, relevant and detailed. In software engineering, such requirements are often called functional specifications.
Objectives:
1. To understand the different processes in the realm of ‘Requirements Engineering’.
2. To see the challenges in requirements development and the importance of getting requirements right in an IT project.
3. To understand the different techniques used in different phases and processes of requirements development and management.
This paper describes a framework of non-functional requirements (NFR), based largely on ISO, and then goes on to provide guidance and a methodology for splitting the responsibility of determining each individual NFR between the Solution Architect and the BA.
Resource Management and Professional Services AutomationCA Technologies
Ricoh built a solution leveraging CA Project & Portfolio Management (CA PPM) to drive and make possible Ricoh’s transformation from a product company to a services company. This solution optimizes utilization of resources and ensures the right people get the right, strategic work. Workload is balanced so we get the most productivity out of our teams.
For more information on PPM solutions from CA Technologies, please visit: http://bit.ly/1wEnPhz
Brighttalk converged infrastructure and it operations management - finalAndrew White
How Converged Infrastructure Will Change IT Operations Management
Over the past decade, Enterprises have leveraged a shared service model to make IT more cost effective. The emergence of “Converged Infrastructure” and “Fabric-Based Infrastructure” will allow IT to offer purpose driven solutions rather than the function driven solutions of the past. To do this, IT will need to evolve towards more modular designs, rely more on open standards, and rethink their approach to management frameworks.
In this session you will learn:
How converged infrastructure is used to create purpose driven solutions
Why new operational challenges are faced as this new approach is used broadly
What changes need to occur to succeed with this new paradigm
A presentation from the NJEDge.Net Faculty Best Practices Showcase in March 2007 on NJIT's pilot program using Moodle as a learning management system and examining the open source and "free" aspects of Moodle and the support needed to implement it on a campus.
This presentation describes what a learning management system is, how can it help corporates and institutions to host and manage learnings and training followed by the features and modules
Leave Management System
Software Requirements Specification Document
This module is a single leave management system that is critical for HR tasks and keeps the record of vital information regarding working hours and leaves. It intelligently adapts to HR policy of the management and allows employees and their line managers to manage leaves and replacements (if required). In this module, Head of Department (HOD) will have permissions to look after data of every faculty member of their department. HOD can approve leave through this application and can view leave information of every individual.
SymSure Loan Portfolio Solution
An Innovative continuous controls monitoring solution that tracks any data or transaction and remediates breaches in internal controls. The ideal soultion to prevente revenue loss.
2010 Software Licensing and Pricing Survey Results and 2011 PredictionsFlexera
2010 Software Licensing and Pricing Survey Results and 2011 Predictions by Amy Konary, Director, Software Pricing and Licensing, IDC
Presented at SoftSummit 2010
Oracle Enterprise Manager, OEM, SOA Management Pack, Business Transaction Management, Java Diagnostics, BPEL PM, OSB, Oracle Service Bus, SOA Governance, SOA Monitoring
IT and Business Alignment - Mapping the Physical, Virtual and Business WorldsNovell
This session will cover integration to PlateSpin Recon for the virtualized environment, integration collecting the physical environment and business data integration into a single view aligning the virtual, physical and business world. This discussion will focus on the methods, mechanics and best practices of federating these data sources into a view, such as a configuration management database (CMDB) as an example, by which to take action. It is intended to cover the technical aspects of the integration capabilities to various database sources marrying application data to the infrastructure providing near real-time views of data from it's source versus solutions that extract, translate and load data into a common repository that now must be maintained. The Novell BSM solution accesses the data in near real-time from the trusted management source providing the most accurate, view of federated data turning it into actionable information.
Verax OSS/BSS Suite is a complete, application-based "OSS/BSS-in-a-box" solution allowing Service Providers to quickly define, provision, monitor and bill services in convergent, multi-play environments, enabling them to start generating revenues in a short time with no integration hassles.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
What is the TDS Return Filing Due Date for FY 2024-25.pdf
Design for non functional requirements
1. Optimized IT Performance: The Key
Levers in the Development Phase
A Presentation - SEPG 2008
Session ID:1329
Date:
Authors:
Subrata Guha , Habeeb Mahaboob
Satyam Computer Services Ltd.
2. Key Takeaways
• Addressing non functional requirements is a key part of software
development
• ITIL Service Delivery processes provide best practice guidance to
address non functional requirements
– Service levels
– Availability
– Capacity
– IT Security
– IT Service Continuity
• Organizations should strive to establish an integrated process model
that will blend best practices
3. Agenda
• To discuss use of ITIL best practices within a typical development
lifecycle to ensure that non functional requirements are addressed
4. The Development Life cycle and
its impact on application performance
Idea and
Idea and Design Build Test Deploy Operate Optimise Retire
Requirements Design Build Test Deploy Operate Optimise Retire
Requirements
-
Points of discussion
Development Lifecycle • How do one decide what
Ensures adherence SLAs are required during the
Project Management to schedule and support phase ?
budget for the • What does one need to do
project during the development
System phase so as to be sure that
Requirements
engineering the SLAs can be achieved
Ensures
Design achievement of once the application is in
business production ?
Build requirements • How does one ensure that
releases stabilize quickly?
Test
5. Issues
• Non functional requirements are as critical as functional requirements
• The non functional requirements are the key to ensure
– The application meets performance requirements
– Is stable
• No guidance exists to identify and address non functional requirements
6. Our learning
• The Service Delivery processes of ITIL provide guidance for addressing
the non functional requirements
• The processes to be considered include
– Service Level Management
– Availability Management
– Capacity Management
– IT Service Continuity Management &
– Information Security Management
• The “PLAN” part of these processes provide guidance on the steps to be
taken to clearly identify non-functional requirements
8. Availability Management Process -Introduction
Business Impact Service Dependency Identification of critical
Analysis used to identify Model used to monitoring points
service availability
requirements
establish component
– Cost of business downtime availability
– Adverse Publicity Transaction Handling
Service 99.99 %
– Business Termination
– Criminal/Civil Penalties
– Delayed Deadlines and
Deliveries
Ins03.bank
Database
RDMS
Branch
– Future Business or Funding
Losses
Application Server Web Server Web Server
– Increased Exposure to Fraud App08.bank.com
Web03.bank.com Web09.bank.com `
Workstation
– Lease Terminations Ws009.bank.com
– Loss of Morale
– Organizational Stress
`
– Union/Contractual
Ins 09.bank
Database
Firewall fw005.bank.com Router Router Workstation
RDMS
Ws10002.bank.com
Requirements Database Server
Db02.bank.com
99.9999 % Availability
Switch sw003.bank.com Monitoring
Corporate Lan
Availability
Availability Planning
Improvement
` `
9. Capacity Management Process -Introduction
Inputs Process Outputs
• Technology Business Capacity Management
• Service levels •Trend, forecast, model, prototype, size
and document future business •Capacity plans
• Business plans requirements •Capacity database
• Business strategy
•Baselines and profiles
• Business
•Thresholds and alarms
requirements
•Capacity reports
• Business volumes
Service Capacity Management •Service level
• Operational
•Monitor, analyze, tune and report on recommendations
schedules service performance, establish baselines •Costing and charging
• Deployment and profiles for use of services, manage recommendations
programs demand for services
•Proactive changes
• Project plans
•Service improvements
• Forward schedule of
•Revised operational
changes
Resource Capacity Management schedules
• Incidents and
•Management, monitor, analyze, run and •Effectiveness reviews
problems
report on the utilization of component, •Audit reports
• Financial plans establish baselines and profiles of use of
• Budgets components
10. Service level Management Process -Introduction
Establish Function
1.
Planning and Setting up SLM
Business
6. 2.
IT
Service Service
Organization
Review catalogue
Internal External
Department Supplier
5.
Measure, 3.
Monitor Draft the SLA
and
Operationalize Report 4. Implement
Negotiate
9
11. IT Service Continuity Management
PROCESS
Change Management Education Testing Review
Testing
Group Plans Risk Implement
and Procedures Reduction Standby Facilities
Create Planning Organization
Project
Strategy
Risk Analysis
Business Impact Analysis
Policy Organization Resources Scope
IT Service Continuity Planning Initiation
Slide adapted from Gartner
12. Generalizing
Business Service IT Resource
Requirements
gathering
Planning
(Designing?)
Monitoring
Database
Model
13. An enhanced development lifecycle will enable control over
eventual application performance
• An enhanced development lifecycle will
enable GSK to ensure application
performance after release
– The software development lifecycle to Requirements
ensure that functional requirements are development
met
– A separate development lifecycle to
ensure non functional requirements
– Availability
Design
– Capacity Non functional
– IT Service Continuity requirements
– Security
Implementation
Support
requirements
Testing
– A support development lifecycle to ensure
support requirements are developed
– Support organization
Release
– Integration with existing support elements ,e.g.
Help desk
14. Overview of process
Requireme
nts Design Code Implement
Gathering
Availability Plan
Business Service Service
Impact Level Dependency
Analysis Agreements Model
Capacity Plan
IT Service
Continuity Plan
Risk
assessment Controls plan
15. Analyze impact of service on business
Define service Establish
business
criticality
Assemble
business /IT
team
Analyze system
Review cost of Classify
down time of service
Identify business business
process supported process
Review other
implications of
Review other
business
services provided
process failure
Establish
Define service business
criticality
16. Service classification
• Service classification is done based on service rating by a team of cross
functional experts
• The team to rate the service on a scale of 1 to 5, with 1 being the lowest and 5
being the highest, on each of the following parameters:
– Strategic factors
– The Revenue impact
– Brand value/Image
– Contractual/Statutory/Legal requirements
– Time criticality
– Operational factors
– No. of Users
– Usage pattern
– Average monthly change frequency
– Dependency on other applications
.
17. IT Service Rating
Strategic Factors On a 1(lowest) – 5(highest) scale -
Loss of Brand Legal/
Business Loss of Time Overall Score
value/ Statutory/
processes Revenue Criticality
Reputation Contractual
BP1 4 4 4 4 4
BP2 4 5 5 4 4.5
BP3 4 3 5 3 3.75
Operational Factors On a 1(lowest) – 5(highest) scale -
Dependency
Business Average monthly Overall Score
No. of Users Usage pattern on other
processes bug frequency
applications
BP1 4 3 5 3 3.75
BP2 4 5 5 4 4.5
BP3 4 4 4 4 4
19. Parameters Description
Name of Service <Write Text>
Description of Service This IT service provides
< Write Text>
Service Manager <Name>
Team Involved in Rating <Names>
< List the business units>
e.g. Academic & Science; Commercial; Professional OR
Identify the business functions supported IIR (Exhibitions, Conferences, PI), Omega, Communispond,Huthwait,Achieve
Global, ESI
<List the business processes>
Marketing (New order booking, order tracking, development payments,
customer records maintenance);
Identify the business processes supported Order Delivery (order design & delivery);
HR related (hiring, salary, incentives,personal records maintenance);
Facility administration (lease admin, payment to vendors); Finance(budget,
accounts, payments, taxes,)
Ratings Justifications
Impact of service outage on business in terms of:
Loss of revenue 2
Loss of brand value 1
Risk Assessment & Business Impact Analysis Legal/Statuatory requirement 1
<Critical Time period for business>
Month ending consolidation
Salary processing 4
Number of users 5
Usage pattern:
<Used by external customers of Informa>
Users base is local/regional/global
Operational factors <Used by external customers of Informa> Users
base is local/regional/global 5
Average monthly RFC frequency 3
System interdependence:
If this service fails the other IT systems are affected e.g. SAP, Coda,marketing 1
Average score on Risk assessment and business impact analysis 2
Average score on Risk assessment and business impact analysis 3.5
Overall score 5.5
Resultant service classification Silver
20. Reach agreement on service performance
• Service window Service Elements Activities
• Critical period
Service Disruption All regular activities for addressing issues on
• Availability Management
service disruption are considered here. This
includes both functional and technical issues which
– MTTR cause disruption to service E.g.: Password not
working, Application/Site not available, Unable to
MTBF upload or download reports due to Performance
• Volumes issues etc.
• Response time Change Control All activities for catering to Requests for
Enhancements/ additional functionalities, bug fixes
etc., are considered here. This includes activities to
validate, approve and review of change requests
Service Request All activities for supporting user requests which may
include requests for Customized reports, user set
Management up, access management etc., are considered here.
This also includes one off kind of activities, and all
those user issues which are not related to service
disruption
Operations Monitoring, Housekeeping, Data management,
tuning etc…
Management
21. Define service dependency model
Transaction Handling
Service
Ins03.bank
Database
RDMS
Branch
Application Server Web Server Web Server
Web03.bank.com Web09.bank.com `
App08.bank.com
Workstation
Ws009.bank.com
`
Ins 09.bank
Database
Firewall fw005.bank.com Router Router Workstation
RDMS
Ws10002.bank.com
Database Server
Db02.bank.com
Switch sw003.bank.com
Corporate Lan
` `
22. Plan to meet availability requirements
Management
Availability
Business
Users / Customers
and Storage, Analysis, Trending…
Availability Monitoring, Data Collection
Business Availability Requirements
options,
Serviceability Gaps and remedial
Identification of Availability /
Design for IT Availability IT Infrastructure
(Av)
Management
Availability
Service
Reliability + Resilience
& (Fault Detection &
Redundancy Auto recovery)
Manage for IT Availability
Management
Availability
Resource
Monitoring + Maintainability /
Serviceability
IT Support
Manual Recovery
Availability Availability
Plan DB
23. Plan to meet capacity requirements
Business Capacity Service Capacity Resource Capacity
Management Management Management
Tuning
Implementation Analysis Capacity
Plan
Monitoring
Identification of Availability / Serviceability Gaps and
remedial options,
Management
Demand
Capacity
Modeling
Application
Sizing DB
Capacity Monitoring, Data Collection and Storage, Analysis,
Trending…
24. Plan to meet disaster recovery requirements
Health Plan Test and
Business Impact Analysis Strategy Selection Creation
Check Maintenance
PHASES
a A B C D E F G I J K L M
Existing Critical Business Target Findings Minimum Minimum Backup Course Prepare Prepare Document Document
Plan business disruption recovery and recovery recovery strategies of action Team Plan Testing Maint
Analysis processes timescales conc. resources resources Proce- Draft Proce- Proce-
(business) (computer) dures dures dures
H
Recovery
locations
Review Points
Slide adapted from PWC Presentation on business continuity
26. A recommended DRAFT process framework
User
Risk Management processes
Business Interface processes User Interface
Development Lifecycle
Project Management Project?
Applications
Infrastructure
System Engineering
Application
Release Monitoring
Support Management (Operations)
Non functional
Support processes
Improvement processes
27. A DRAFT ALC process framework
User
Risk Management processes
Business Interface processes User Interface
Relationship Change Demand Performance
Planning Management Incident
Management Management reporting
Management
Development Lifecycle
Service
Project? Request
Project Management Applications
Management
Infrastructure
System Engg.
Requirements
Application
Design
Non functional Release Monitoring
Build
Management (Operations)
Support Test
Support processes
Configuration Management Supplier Management HR
Improvement processes Problem Management Defect prevention Service improvement
28. ADS is a set of processes delivering outcomes to business
Process group Objective
Business IT Interface •To understand (BU IT or LOB) customer requirements, plans and translate them to
IT actions efficiently, effectively. Includes relationship management, change
management, reporting
Development lifecycle •To deliver business requirements for „change the way business is done‟ solutions
effectively and efficiently. Includes project management and development lifecycle.
Includes design of service
User Interface •To address day to day requirement of users effectively and efficiently. Includes
management request management and incident management
Release management •A control function to ensure protection of the IT environment from unplanned
changes and hence disruptions
Monitoring (Operations) •To proactively monitor and control the IT environment to ensure smooth
functioning
Support processes •To manage supporting infrastructure including other stakeholders ( Infra teams,
vendors) ,human resources, configurations etc. Includes vendor management,
Human resources, configuration (or asset) management
Improvement •To ensure continuous improvement in the way services are rendered. Includes
processes problem (defect) management, service improvement management
Risk Management •To identify and control „risks‟ ( e.g. security, operational) that are faced by the ADS
Includes risk assessment, security policy, controls implementation and audits
29. Process models -Applicability
ISO 27000
ISO 20000
eSCM CS
CMMI
ITIL
CoBIT
PM Bok
Process
Business IT Interface
Development lifecycle
User Interface management
Release management
Monitoring (Operations)
Support processes
Improvement processes
Risk Management
31. Customer Context
• Increasing e-enablement Growth in registered users
– Rapid increase in internet users-
booming stock market
– New products
• Rapid geographic spread 04- 04-
Q1 Q2
04- 04- 05- 05-
No. of users
Q3 Q4
– New branches Period
Q1 Q2
– ATM Network
– Point of Sales presence
3500
• Focus on compliance 3000
2500
– Transparency of operations 2000
1500
– Disastrous audit findings 1000
500
0
04- 04- No. of Nodes
04- 04-
Q1 Q2 05-
Q3 05-
Q4 Q1 Q2
32. Challenges to IT
• Stretched infrastructure Consulting Team
– Inadequate capacity Measure
– Frequent break downs Number of times CIO was
– Increasing time to restore sighted at a programmer
cubicle – (average) 3
times a day
• Increased number of changes
– Changes released without adequate testing – leading to further problems
– Increasing change queues –
– Average wait time for a change increased from 1 to 4 quarters
• Management in the dark
– No performance measures
– Time spend standing behind a programmer
33. IT Response – IT Transformation Project
• Streamline the functioning of the IT Development and Infrastructure
Support Services
• Implement operational standards based on internationally recognized
process improvement benchmarks like BS15000(ITIL)/CMMI/Project
Management frameworks
– Address pain areas of internal stakeholders
– Address issues raised by the external and internal audits.
– Demonstrate its improved process capability to relevant stakeholders
based on relevant international certifications / appraisals
– CMMI
– BS15000
34. Approach used
Process Deployment
Current Future State Definition Support
State Design
Analysis Planning
Assemble best Facilitate
Identify project Gather current deployment
practices
priorities practices planning
model
Review Facilitate IT
Identify teams, Gather system
current
activities requirements Selection /
documents
Modification
Discuss Propose
current state Establish process flow
with project plans Provide training
charts
practitioners
Define
Identify future procedures, Mentor
Consolidate state process guidelines and practitioners
process state flows templates
Facilitate Establish Conduct audits
Incorporate
objective enterprise & report on
review
setting level process implementation
comments
workshop architecture
35. Project milestones
IT Strategic Planning Framework
CMMI Level 4 Assessment
Bridge gaps for CMMI Level 4
CMMI Level 3 Assessment
Bridge gaps for CMMI Level 3
Vendor Management Framework
Application Development Lifecycle Framework
with CMMI Level 2
Project Management Office Framework
Project Management framework
BS 7799 Certification (Optional)
BS 7799 Based Information Security Framework
BS 15000 Certification
Bridge gaps for BS 15000 (BRM,SM)
IT Service Delivery Framework
IT Service Support Framework
Initiative Planning
Future State Design
Future State Visioning Workshop
Current State Study
0 1 2 3
Years
36. Bank IT Function Process Architecture
Management Review14 HRM 15 Program/ITSM Management Office 1
Project Management 1 9
Business –IT Interface
Security Policy Manual
Planning Business
Business
IT Financial Service Level
Relationship
Monitoring Measurement & Mgt Mgt
Mgt
and Control Analysis
7
Helpdesk
3 7
Security 16 Requirements
Assessment Development Users Incident Mgt
IT Quality Manual
Design 4 8
S/W &H/W Access Control Problem Mgt
IT Applications
Infrastructure 16
Build 4
2
User 3 Change Mgt
Testing 5 Acceptance
Release 6
Service Management Plan
Management
Testing
Infrastructure Monitoring 11
Planning 10
Availability Service Level Capacity
16 Service Capacity Availabili
IT Security ITSCM
Risk Assessment
Delivery ty
Planning 16
Planning Planning Planning IT Service Continuity Security
Support Processes
Process Asset Management 14 Quality Management Service Improvement Plan 14
12 13
Configuration Management Supplier Relationship Management
37. References
• Jim Porter “Planning Business Continuity” –IATA Webcast 2002
• Business Continuity Planning –Gartner presentation 2002
• ITIL V2
41. Non-functional Requirements – Verifiable; Measured
•All requirements must be verifiable
– If not „verifiable‟ then there is no indication that these requirements
have been satisfied.
•Some must also be measured.
– Some requirements are measurable, such as response time;
availability time, etc.
– Some may be directly measured; some measured via simulation.
42. Categories of Non-Functional
Requirements
Quality Non-Functional Requirements
• All constrain the design to meet desired quality levels of usability, efficiency,
reliability, maintainability and reusability…
• Response time – particularly important for processes that process a lot of
data or use networks a great deal.
– Requirements might stipulate < two second response.
– Might use a Timing bar indicating progress…
– Response time may be considered a functional requirement for some „real
time systems.
• Throughput – for computationally-intensive applications or for heavy
transaction-oriented systems, the „number of transactions per minute or number
of computations per minute can/must be measured.
• Resource usage – Memory/Bandwidth/CPU Power
43. Categories of Non-Functional
Requirements
Quality Non-Functional Requirements
• Reliability – typically Mean Time Between Failures (MTBF) (number of
failures per week; define „failure.‟)
• Availability – Measures the time application is „up‟ and the period of down
time, when down.
• Recovery from failure – Mean Time To Repair: (MTTR) – critical to
some applications; not so for others; checkpoint restarts; auto-saves, etc. If
you specify the detailed procedure to follow, then this is a functional
requirement.
• Allowances for Reusability – may specify that a certain percentage of
the system must be designed generically to support reusability…
44. Categories of Non-Functional Requirements
Environment and Technology Constraints
• Platform
– What hardware / software the software must be able to work on.
– Normally indicate „least‟ platform
– e.g. Windows 2000; 60 MB free disk space….
• Technology to be used
– Programming language; database system. All individuals are familiar with
these languages / database nuances.
– Reduces need to train people
45. Categories of Non-Functional Requirements
Project Plan and Development Methods
• Development Process/Methodology
– SDLC; RUP; Agile Methods, Scrum; XP, Feature-Oriented
Development, etc.
– Particular approaches to testing (done by separate group;
„Where in chain of command?‟
– References to these must be included; not the details
• Cost and Delivery Dates
– Usually a very important constraint.
– May not be Negotiable (once the project starts)