This document provides a structural analysis and design of the Mesjid Darul Hasanah mosque. It includes an introduction, literature review, data and structural analysis, results and conclusions. The literature review covers loading conditions based on Indonesian standards, including dead, live, wind and earthquake loads. The data and analysis section describes the structural geometry, modeling, load analysis and design of beams, columns and slabs. Results of the structural analysis using ETABS include member forces, deformations, story drift and capacity checks. The conclusions provide a summary of the structural design meeting technical requirements.
Perancangan struktur beton perpustakaan 4 lantaiAfret Nobel
Perancangan struktur beton perpustakaan 4 lantai adalah laporan mengenai perencanaan struktur bangunan bertingkat dengan struktur beton bertulang sebagai struktur utama.
Perancangan struktur beton perpustakaan 4 lantaiAfret Nobel
Perancangan struktur beton perpustakaan 4 lantai adalah laporan mengenai perencanaan struktur bangunan bertingkat dengan struktur beton bertulang sebagai struktur utama.
Struktur kolom komposit adalah struktur kolom yang terdiri dari beton bertulang dan diisi dengan profil baja. Mempunyai keuntungan pengerjaan yang cepat karena biasanya menggunakan balok baja sebagai struktur horizontalnya.
Cara Menghitung Kebutuhan Besi pada Pekerjaan Bore Pile dan Strauss PileAngga Nugraha
ditulis oleh Angga Nugraha, Lulusan Teknik Sipil dan Lingkungan IPB.
Sebuah tulisan mengenai cara menghitung pembesian pada bore pile atau strauss pile terutama untuk bentuk sengkang / begel yang berbentuk spiral
Struktur kolom komposit adalah struktur kolom yang terdiri dari beton bertulang dan diisi dengan profil baja. Mempunyai keuntungan pengerjaan yang cepat karena biasanya menggunakan balok baja sebagai struktur horizontalnya.
Cara Menghitung Kebutuhan Besi pada Pekerjaan Bore Pile dan Strauss PileAngga Nugraha
ditulis oleh Angga Nugraha, Lulusan Teknik Sipil dan Lingkungan IPB.
Sebuah tulisan mengenai cara menghitung pembesian pada bore pile atau strauss pile terutama untuk bentuk sengkang / begel yang berbentuk spiral
Perancangan dinding basement dg bantuan software etabsAfret Nobel
Perancangan dinding basement dg bantuan software etabs. Basement adalah struktur yang terletak di bawah permukaan tanah. Struktur basement menggunakan beton bertulang.
Diagram interaksi kolom beton menggunakan software PCA COLAfret Nobel
Cek kolom dan membuat diagram interaksi kolom beton bertulang menggunakan software PCA COL. Diagram interaksi adalah perpaduan antara kuat tekan dan kuat lentur kolom beton bertulang.
Design of multi storey building resting on single columneSAT Journals
Abstract The aim of the project is to analyze and design of multi-storey building resting on the single column by using different code
provisions. A lay out plan of the proposed building is drawn by using AUTO CADD 2010.The structure consist of ground floor
plus five floors, each floor having the one house .Staircase must be provides separately. The planning is done as per Indian
standard code provisions. The building frames are analyzed using the various text books. Using this so many standard books
analysis of bending moment, shear force, deflection, end moments and foundation reactions are calculated. Detailed structural
drawings for critical and typical R.C.C. members are also drawn. Co-ordinates for all structural members are tabulated for ready
reference.
Keywords: Multi Story Building, Single Column, Staircase.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Desain & analisis struktur mesjid darul hasanah manado 11.06.2016
1. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidiciplinary Consultants
JUNI 2016
MASJID DARUL HASANAH
PREPARED FOR
OWNER
DESIGN & STRUCTURE
ANALYSIS
MASJID DARUL HASANAH
GARIS CIPTA KARSA
ARCHITECTURE CONSULTANT
PREPARED BY
STRUCTURAL CONSULTANT
“Multidisciplinary Consultant”
PT. QIES Nusantara Konsultan
GEDUNG IS PLAZA LT. 5 RUANG 504
JL. PRAMUKA RAYA KAV.150
JAKARTA TIMUR 13120 INDONESIA
TEL : (021) 2961 3933 FAX : (021) 2961 3933 EXT. *81
EMAIL : qiesnusantara@gmail.com
2. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants i
DAFTAR ISI
I. PENDAHULUAN
A. Latar Belakang .................................................................................................... 1
B. Lingkup Pekerjaan ..............................................................................................1
C. Maksud Dan Tujuan ..........................................................................................2
D. Data Acuan ........................................................................................................2
II. TINJAUAN PUSTAKA
A. Pembebanan ..................................................................................................... 3
B. Perencanaan Stuktur Gedung ............................................................................ 8
III. DATA & ANALISIS STRUKTUR
A. Data Geometrik Struktur dan Klasifikasi Material .........................................18
B. Analisis Pembebanan........................................................................................20
C. Pemodelan Struktur ..........................................................................................23
D. Hasil Analisis Struktur ....................................................................................24
E. Hasil Perencanaan ............................................................................................30
IV. KESIMPULAN
A. Kesimpulan .....................................................................................................32
LAMPIRAN
3. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants ii
DAFTAR GAMBAR
Gambar 1. Parameter Percepatan Response Spectrum
Perioda Pendek SNI 1726:2012..............................................................6
Gambar 2. Parameter Percepatan Response Spectrum 1 detik SNI 1726:2012........7
Gambar 3. Diagram Alir Perhitungan Lentur Balok .................................................10
Gambar 4. Diagram Alir Perhitungan Geser Balok...................................................11
Gambar 5. Diagram Alir Perhitungan Torsi Balok ...................................................12
Gambar 6. Diagram Alir Penulangan Kolom ............................................................15
Gambar 7. Tampak Struktur Bangunan ....................................................................18
Gambar 8. Geometrik Struktur Bangunan ................................................................18
Gambar 9. Denah Lantai Satu ...................................................................................20
..........................................................23
Gambar 11. Pemodelan Plat Lantai Dasar.................................................................23
Gambar 12. Pemodelan 3D Struktur Gedung ...........................................................24
Gambar 13. Deformasi Gedung ................................................................................26
Gambar 14. Aksial Diagram .....................................................................................27
Gambar 15. Moment Diagram ..................................................................................27
Gambar 16. Torsion Diagram ...................................................................................28
Gambar 17. Shear Diagram .......................................................................................28
Gambar 18. Momen Slab ..........................................................................................29
Gambar 19. Pengecekan Kapasitas ...........................................................................29
Gambar 10. Respon Spektrum Lokasi Manado
4. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants iii
DAFTAR TABEL
Tabel 1. Besarnya Beban Mati ...................................................................................3
Tabel 2. Besarnya Beban Hidup .................................................................................4
Tabel 3. Hasil Analisis Periode dengan Etabs ..........................................................24
Tabel 4. Nilai Parameter Periode Pendekatan Ct dan x ............................................25
Tabel 5. Perbandingan Hasil Priode Fundamental ....................................................25
Tabel 6. Story Drift Struktur Bangunan ....................................................................26
Tabel 7. Data Perencanaan Balok .............................................................................30
Tabel 8. Data Perencanaan Kolom ............................................................................31
5. Design & Structure Analysis
Mesjid Darul Hasanah
I. PENDAHULUAN
A. Latar Belakang
Struktur bangunan gedung harus dirancang sesuai ketentuan yang ada agar kenyamanan
dan keamanan pemilik dan pengguna gedung terpenuhi, tak terkecuali struktur gedung
yang konstruksi utamanya adalah beton. Konstruksi beton harus dirancang agar
memenuhi efektifitas kenyamanan dan pemanfaatan ruangan agar terpenuhinya
kekuatan yang maksimal dan efisien. Salah satunya Mesjid Darul Hasanah dirancang
dengan konstruksi beton baik plat atap, plat lantai, balok, dan kolom.
B. Lingkup Pekerjaan
Lingkup pekerjaan ini adalah sebagai berikut
1. Melaporkan dalam bentuk pemodelan struktur bangunan eksisting sesuai dengan
kondisi laporan rencana pembangunan gedung
2. Melaporkan hasil analisis dan memeriksa model struktur rencana terhadap
kekuatannya berdasarkan ketentuan peraturan yang berlaku
3. Memberikan hasil rekomendasi dari hasi analisis struktur bangunan rencana yang
ada
1
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants
6. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 2
C. Maksud dan Tujuan
Maksud dan Tujuan dari analisis struktur ini adalah untuk mendapatkan design rencana
yang memenuhi syarat teknis guna memberikan rencana struktur yang baik. Sasaran
dari kegiatan ini adalah mendapatkan rencana struktur yang sesuai kebutuhan.
D. Data Acuan
Data dan standar yang digunakan dalam kegiatan analisis struktur ini adalah:
1. Data bangunan berdasarkan gambar rencana pembangunan gedung
2. SNI 2847 – 2013 (Standar Struktur Beton Indonesia)
3. SNI 1726 – 2012 (Standar Gempa Indonesia)
4. SNI 1727 – 2013 (Standar Pembebanan Indonesia)
5. ACI 318-14 (American Concrete Institute 318)
7. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 3
II. TINJAUAN PUSTAKA
A. Pembebanan
Semua perhitungan pembebanan mengacu pada SNI persyaratan beton struktur untuk
bangunan gedung, SNI 2847:2013/Mod SEI/ASCE 7-02 dan SNI beban minimum
untuk perancangan bangunan gedung dan struktur lain 1727:2013.
1. Beban Mati
Berdasarkan SNI 1727:2013 Beban mati adalah seluruh beban konstruksi bangunan
gedung yang terpasang, termasuk dinding, lantai, atap, plafond, tangga, dinding
partisi tetap, finishing, dan komponen arsitektural dan struktural lainnya serta
peralatan layan. Dalam hal ini dapat berupa:
a. Beban mati akibat berat sendiri
Beban mati didefinisikan sebagai beban yang ditimbulkan oleh elemen-elemen
struktur bangunan; balok, kolom,,dan pelat lantai. Beban ini akan dihitung
secara otomatis oleh program Etabs.
b. Beban mati tambahan
Beban mati tambahan didefinisikan sebagai beban mati yang diakibatkan oleh
berat dari elemen-elemen tambahan atau finishing yang bersifat permanen.
Tabel 1. Besarnya Beban Mati
Beban Mati Besar Beban
Beton Bertulang 2400 kg/m3 (23,544 KN/m3)
Dinding dan Plesteran
Tebal 15 cm
Tebal 10 cm
300 kg/m2 (2,943 KN/m2)
200 kg/m2 (1,962 KN/m2)
8. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 4
Langit-Langit + Penggantung 18 kg/m2 (0,176 KN/m2)
Lantai keramik 24 kg/m2 (0,235 KN/m2)
Spesi Per cm tebal 21 kg/m2 (0,206 KN/m2)
Mekanikal dan Elektrikal 25 kg/m2 (0,245KN/m2)
Sumber : SNI 1727:1989 (disesuaikan)
2. Beban Hidup
Berdasarkan SNI 1727:2013 beban hidup adalah beban yang diakibatkan oleh
pengguna dan penghuni bangunan gedung atau struktur lain yang tidak termasuk
beban konstruksi dan beban lingkungan, seperti beban angin, beban hujan, beban
gempa, beban banjir atau beban mati.
Tabel 2. Besarnya Beban Hidup
Hunian atau Penggunaan Merata Psf (KN/m2
)
Apartement dan Hotel
Ruang Pribadi
Ruang Publik & Koridor
40 (1,92)
100 (4,79)
Sistem Lantai Akses
Ruang Kantor
Ruang Komputer
50 (2,4)
100 (4,79)
Gudang Persenjataan dan Ruang
Latihan
150 (7,18)
Ruang Pertemuan
Kursi tetap
Lobi
Kursi dapat dipindahkan
Panggung pertemuan
Lantai Podium
100 (4,79)
100 (4,79)
100 (4,79)
100 (4,79)
150 (7,18)
9. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 5
Balkon dan Dek 100 (4,79)
Ruang Makan dan Restoran 100 (4,79)
Garasi/Parkir Min 40 (1,92)
Tempat Rekreasi
Tempat bowling, kolam
Ruang Dansa
Gimnasium
75 (3,59)
100 (4,79)
100 (4,79)
Atap
Atap datar, berbubung
Atap untuk Taman
20 (0,96)
100 (4,79)
Gudang
Gudang diatas langit-langit
Gudang Berat
Gudang Ringan
20 (0,96)
250 (11,97)
125 (6,00)
Sumber SNI 1727:2013
3. Beban Angin
Beban angin merupakan beban yang diakibatkan oleh faktor lingkungan yaitu faktor
angin itu sendiri.
a. Menentukan kecepatan angin dasar, V
Kecepatan angin dasar harus ditentukan oleh instansi yang berwenang, namun
dalam perencanaan kecepatan angin harus di rencanakan minimal sebesar 110
mph (49,1744 m/s).
b. Menentukan parameter beban angin kategori eksopousure
Untuk bangunan yang direncanakan menggunakan eksopousure tipe C. Karena
eksopousure C berlaku untuk semua kasus di mana eksopousure B atau D tidak
berlaku.
10. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 6
4. Beban Gempa
Beban gempa adalah semua beban yang bekerja pada bangunan atau bagian
bangunan dari pergerakan tanah akibat gempa itu. Pengaruh gempa pada struktur
ditentukan berdasarkan analisa dinamik, maka yang diartikan dalam beban gempa
itu gaya-gaya di dalam struktur tersebut yang terjadi oleh tanah akibat gempa itu
sendiri. Berdasarkan peta gempa Indonesia SNI 1726-2012, lokasi ini memiliki
respons spektra percepatan pada 0,2 detik, SS = 1,5g (kupang) dan respons spektra
percepatan pada 1 detik, S1 = 0,321g dan rasio redaman kritis = 5%. Kelas situs
adalah SE.
Gambar 1.Parameter Percepatan Response Spectrum Perioda Pendek SNI 1726:2012
11. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 7
Gambar 2 . Parameter Percepatan Response Spectrum 1 detik SNI 1726:2012
5. Kombinasi Pembebanan
Kombinasi pembebanan yang digunakan berdasarkan Peraturan Beban Minimum
Untuk Perancangan Bangunan Gedung SNI 1727:2013 sebagai berikut:
a. 1,4 DL
b. 1,2 DL + 1,6 LL
c. 1,2 DL + 1 LL + 0,5 TLL + 1 WL(X) + 0,3 WL(Y)
d. 1,2 DL + 1 LL + 0,5 TLL + 0,3 WL(Y) + 1 WL (Y)
e. 1,2 DL + 1LL + 1 QL(X) + 0,3 QL(Y)
f. 1,2 DL + 1 LL + 0,3 QL(Y) + 1 QL (Y)
g. 0,9 DL + 1 WL(X) + 0,3 WL(Y)
h. 0,9 DL + 0,3 WL(Y) + 1 WL(Y)
i. 0,9 DL + 1 QL(X) + 0,3 QL(Y)
j. 0,9 DL + 0,3 QL(Y) + 1 QL(Y)
12. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 8
B. Perencanaan Struktur Gedung
1. Balok
Secara umum pra desain tinggi balok direncanakan dengan rumus empiris L/12 -
L/14 (balok konvensional), L/20 – L/24 (balok prategang), L/4 (balok kantilever),
dan lebar balok diambil 1/211 - 2/3H dimana H adalah tinggi balok.
Perhitungan kebutuhan penulangan balok struktur beton menggunakan bantuan
program komputer. Prosedur desain elemen-elemen balok dari struktur terdiri dua
tahap sebagai berikut:
1. Desain tulangan pokok untuk menahan momen lentur
2. Desain tulangan geser (sengkang) untuk menahan gaya geser
a. Komponen lentur
Komponen-komponen lentur harus memenuhi pasal 23.3 (1(1)) sampai dengan
23.3 (1(4)) agar penampangnya terbukti berkinerja baik. Tiap komponen harus
cukup daktail dan cukup efisien mentransfer momen ke kolom. Perlu dicatat
kolom-kolom yang terkena momen dan hanya kena beban aksial terfaktor < Ag
f’c / 10 boleh didesain sebagai komponen lentur.
b. Penulangan Lentur
Syarat momen nominal minimal di sembarang penampang komponen lentur
dinyatakan dalam momen nominal pada muka kolom. Syarat ini menjamin
kekuatan dan dakilitas bila terjadi lateral displacement besar. Persyaratan yang
mengharuskan ada 2 batang tulangan menerus disisi atas maupun bawah balok
dimaksud untuk keperluan pelaksanaan.
13. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 9
c. Sambungan Lewatan
Sambungan lewatan harus diletakkan di luar daerah sendi plastis. Bila dipakai
sambungan lewatan maka sambungan itu harus didesain sebagai sambungan
lewatan tarik dan harus dikekang sebaik-baiknya. Pada sambungan mekanikal
boleh juga dipakai dan harus memenuhi ketentuan pasal 23.2 (6).
d. Tulangan pengekang
Pengekangan yang cukup disyaratkan harus ada di ujung-ujung komponen
lentur yang kemungkinan besar akan terjadi sendi plastis untuk menjamin
kemampuan daktilitasnya, bila kena beban bolak-balik. Tulangan transversal
perlu dipasang pula untuk menahan gaya melintang dan menghindarkan
tulangan memanjang menekuk.
17. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 13
2. Kolom
Kolom beton murni dapat mendukung beban sangat kecil, tetapi kapasitas daya
dukung bebannya akan meningkat cukup besar jika ditambahkan tulangan
longitudinal. Akibat beban tekan, kolom cenderung tidak hanya memendek dalam
arah memanjang tetapi juga mengembang dalam arah lateral. Kapasitas kolom
semacam ini dapat meningkat dengan memberikan kekangan lateral dalam bentuk
sengkang persegi dengan jarak yang berdekatan atau spiral yang membungkus
sekeliling tulangan longitudinal.
Kenyataanya tidak ada kolom yang dibebani secara aksial sempurna. Semua kolom
menerima lentur dan gaya aksial dan dimensinya harus direncanakan untuk
menahan keduanya. Kolom akan melentur akibat momen dan momen tersebut
cenderung menimbulkan tekanan pada satu sisi kolom dan tarikan pada sisi lainnya.
a. Penulangan lentur
Berdasarkan prinsip ” Capacity Design ” di mana kolom harus diberi cukup
kekuatan sehingga kolom-kolom tidak leleh lebih dahulu sebelum balok.
Goyangan lateral memungkinkan terjadinya sendi plastis di ujung-ujung kolom
akan menyebabkan kerusakan berat, karena itu harus dihindarkan. Oleh sebab
itu, kolom-kolm selalu didesain 20 % lebih kuat dari balok-balok di suatu
hubungan balok kolom (HBK).
b. Sambungan Lewatan
Sambungan Lewatan tidak boleh diletakkan di lokasi lo yang kemungkinan
besar akan terjadi pelupasan dan tegangan tinggi tapi harus diletakkan di tengah
tinggi kolom. Sambungan itu harus didesain sebagai sambungan tarik dan harus
18. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 14
dikekang oleh tulangan transversal yang cukup. Sedang sambungan mekanikal
dan las harus sesuai dengan pasal 23.2 (6).
c. Tulangan Transversal
Ujung-ujung kolom perlu cukup pengekangan untuk menjamin daktilitasnya
bila terjadi pembentukan sendi plastis. Ujung-ujung itu perlu juga tulangan
transversal untuk mencegah pertama kegagalan geser sebelum penampang
mencapai kapasitas lentur dan kedua tulangan menekuk (buckling). Peraturan
menentukan jumlah, jarak, dan lokasi dari tulangan transversal ini sehingga
kebutuhan tulangan pengekangan, kuat geser dan tekuk terpenuhi.
19. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 15
Gambar 6. Diagram Alir Penulangan Kolom
3. Pelat
Pelat lantai merupakan sebuah elemen dari bangunan yang biasanya ditumpu oleg
gelagar-gelagar, balok beton bertulang ataupun kolom. Pelat lantai sangat
dipengaruhi oleh momen lentur dan geser yang terjadi. Sisi tarik pada pelat terlentur
ditahan oleh tulangan baja, sedangkan gaya geser pada pelat lantai ditahan oleh
beton yang menyusun pelat lantai itu sendiri. Lentur pada pelat lantai dapat
20. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 16
dibedakan menjadi dua yaitu lentur satu arah, jika perbandingan bentang panjang
dan bentang pendek lebih besar dari 2 (dua), serta lentur dua arah, jika perbandingan
bentang panjang dan bentang pendek lebih kecil sama dengan 2 (dua).
4. Pondasi
Pondasi adalah suatu bagian dari konstruksi bangunan yang berfungsi untuk
menempatkan bangunan dan meneruskan beban yang disalurkan dari struktur atas
ke dalam lapisan tanah yang keras yang dapat memikul beban konstruksi tersebut.
Pondasi secara umum dapat dibagi dalam dua jenis, yaitu pondasi dalam dan
pondasi dangkal. Jenis pondasi yang digunakan pada suatu konstruksi bangunan
dipilih berdasarkan hasil penyelidikan tanah, besarnya beban yang akan bekerja
pada pondasi tersebut, serta biaya dan kemudahan pelaksanaan di lapangan.
Pondasi tapak beton bertulang digunakan pada bangunan bertingkat yang jumlah
tingkatnya tidak terlalu banyak. Daya dukung tanah juga tidak terlalu jelek.
a. Menentukan ukuran pondasi
𝜎ult = 1,3 x c x Nc + q x Nq + 0,4 x B x y’ x Ny
𝜎 = 𝜎ult/SF
𝜎 = P/A
Dimana :
c : kohesi tanah
q : berat tanah di atas bidang
dasar pondasi
y’ : berat jenis tanah jenuh
SF : safety factor
P : beban tidak terfaktor
A : luas penampang
21. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 17
b. Kontrol geser
Vu = 𝜎 x L x G’
𝜙Vc = 𝜙 𝑥
1
6
x √𝑓𝑐′ x b x d
dimana:
Vu : gaya geser
𝜎 : tegangan tanah
G’ : daerah pembebanan
geser satu arah
b : panjang pondasi
d : tebal efektif pondasi
Vc : gaya geser nominal
beton
f’c : kuat tekan beton
c. Menentukan pembesian pondasi
SNI-2847-2012 pasal 17.4.2, momen terfaktor maksimum untuk sebuah
pondasi telapak setempat harus dihitung pada penampang kritis yang terletak
di:
1. Muka kolom, pedestal, atau dinding, untuk pondasi telapak yang
mendukung kolom, pedestal atau dinding beton.
2. Setengah dari jarak yang diukur dari bagian tengah ke tepi dinding, untuk
pondasi telapak yang mendukung dinding pasangan.
3. Setengah dari jarak yang diukur dari muka kolom ke tepi pelat alas baja,
untuk pondasi yang mendukung pelat dasar baja.
22. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 18
III. DATA & ANALISIS STRUKTUR
A. Data Geometrik Struktur & Klasifikasi Material
Bangunan Mesjid Darul Hasanah diperuntukkan sebagai tempat ibadah umat Islam
dengan luas total bangunan 339.57m2
. Adapun ilustrasinya dapat dilihat dalam gambar
dibawah ini.
Gambar 7. Tampak Struktur Bangunan
Gambar 8. Geometrik Struktur Bangunan
23. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 19
Ketinggian bangunan memiliki ketinggian sebesar 6000 mm. Adapun Klasifikasi
Material baik material beton dan baja sebagai berikut;
Mutu Beton
Mutu Beton dalam analisis ini diasumsikan menggunakan K-300 atau f’c 24.9 MPa
untuk kolom dan plat dan balok K-250 atau f’c 20,75 MPa.
Mutu Baja
Mutu Baja yang digunakan dalam analisis perencanaan ini adalah fy 400 MPa untuk
tulangan utama dan fy 240 untuk tulangan sengkang
Struktur dan komponen struktur lainnya harus memiliki kekuatan (Strength), Kekakuan
(Stiffness) dan keteguhan (toughess) yang cukup agar dapat berfungsi selama masa
layannya. Perhitungan analisis struktur eksiting rencana yang ada dilakukan dengan
menggunakan program Etabs Sedangkan perhitungan kapasitas penampang yang ada
dihitung menggunakan Etabs dan dibantu dengan Microsoft Excel.
24. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 20
Gambar 9. Denah Lantai Satu
B. Analisis Pembebanan
o Baban Mati
Beban mati didefinisikan sebagai beban yang ditimbulkan oleh elemen-elemen
struktur bangunan ; balok, kolom, dan pelat lantai dihitung secara otomatis
melalui bantuan program Etabs.
25. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 21
o Beban Mati Tambahan / SIDL
Beban mati tambahan didefinisikan sebagai beban mati yang diakibatkan oleh
berat dari elemen-elemen tambahan atau finishing yang bersifat permanen.
Berdasarkan SNI 1727:2013 elemen struktur sebagai berikut:
Berdasarkan Tabel 1 maka beban mati tambahan yang dibebankan pada pelat
lantai sebagai berikut :
- Beban Keramik = = 0,235 kN/m2
- Beban Spesi Ubin = 3 x 0,206 KN/m2
= 0,618 kN/m2
- Mekanikal Elektrikal = = 0,245 kN/ m2
- Beban Plafon + penggantung = = 0,176 kN/m2
+
1,274 kN/m2
o Beban Hidup
Beban hidup didefinisikan sebagai beban yang sifatnya tidak membebani
struktur secara permanen namun beban yang diakibatkan pengguna bangunan.
Berdasarkan fungsi Gedung ini sebagai Ruang Ibadah . Adapun Penyebaran
bebannya dapat yakni 4,79 KN/m
26. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 22
o Beban Angin
Beban angin merupakan beban yang diakibatkan oleh faktor lingkungan yaitu
faktor angin itu sendiri.
a. Menentukan Kecepatan Angin Dasar, V
Kecepatan angin dasar harus ditentukan oleh instansi yang berwenang,
namun dalam perencanaan kecepatan angin harus di rencanakan minimal
sebesar 110 mph (49,1744 m/s)
b. Menentukan Parameter Beban Angin Kategori Eksopur
Untuk bangunan yang direncanakan menggunakan Eksposur tipe C. karena
Eksposur C berlaku untuk semua kasus di mana Eksposur B atau D tidak
berlaku.
o Beban Gempa
Faktor keutamaan gempa gedung Mesjid Darul Hasanah ini adalah 1,0. Jenis
tanah pada lokasi gedung adalah medium soil.
Adapuan Respon Spektrum dari Lokasi Masjid Darul Hasanah ini Berdasarkan
Analisis Puskim Pekerjaan Umum sebagai berikut:
27. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 23
Gambar 10. Respon Spektrum Lokasi Manado
C. Pemodelan Struktur
Pemodelan ini dilakukan dengan bantuan program Etabs. Masing-masing elemen
struktur dimodelkan berdasarkan data gambar Rencana Masjid Darul Hasanah dengan
material sesuai kondisi Rencana. Adapun hasil pemodelan struktur bangunan ini
sebagai berikut:
Gambar 11. Pemodelan Plat Lantai Dasar
Setelah keseluruhan elemen struktur dimodelkan dan pendefinisian jenis pengekang
didefinisikan (pondasi) maka selanjutnya pemodelan dapat dianalisis lebih lanjut.
Adapun gambar keseluruhan struktur bangunan gedung sebagai berikut:
28. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 24
Gambar 12. Pemodelan 3D Struktur Gedung
D. Hasil Analisis Struktur
1. Hasil Priode Alamiah Struktur Bangunan
Dari hasil pemodelan dengan program Etabs maka didapat periode struktur
bangunan sebagai berikut :
Tabel 3. Hasil Analisis Periode dengan Etabs
Case Mode Period
sec
Frequency
cyc/sec
Circular Frequency
rad/sec
Eigenvalue
rad²/sec²
Modal 1 0,274 3,649 22,9246 525,5361
Modal 2 0,231 4,328 27,1966 739,6572
Modal 3 0,165 6,045 37,9835 1442,7488
Modal 4 0,075 13,406 84,2338 7095,3373
Modal 5 0,062 16,251 102,1052 10425,4731
Modal 6 0,056 17,73 111,404 12410,8463
Modal 7 0,052 19,088 119,9355 14384,5193
Modal 8 0,045 22,421 140,8738 19845,4224
Modal 9 0,044 22,886 143,7962 20677,3494
Modal 10 0,038 26,538 166,7435 27803,3827
Modal 11 0,033 30,575 192,1102 36906,3469
Modal 12 0,033 30,631 192,4604 37040,9971
Dari hasil diatas maka dapat dibandingkan dengan priode fundamental empiris
menurut peraturan SNI 1727:2012 sebagai berikut:
29. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 25
𝑇𝑎 = 𝐶𝑡 . ℎ𝑛 𝑥
Ct = Koefisien (Tabel 4)
X = Koefisien (Tabel 4)
hn = Ketinggian struktur
Tabel 4. Nilai Parameter Periode Pendekatan Ct dan x
Tipe Struktur Ct X
Rangka baja pemikul momen 0,0724 0,8
Rangka beton pemikul momen 0,0466 0,9
Rangka baja dengan brecing eksentris 0,0731 0,75
Rangka baja dengan brecing terkekang
terhadap tekuk
0,0731 0,75
Semua system struktur lainnya 0,0488 0,75
Sumber SNI 1727:2013
Maka hasil priode fundamental yang diizinkan tidak melebih:
𝑇𝑎 = 𝐶𝑡 . ℎ𝑛 𝑥
𝑇𝑎 = 0,0466. 60,9
𝑇𝑎 = 0,233 𝑑𝑒𝑡𝑖𝑘
Dari kedua hasil diatas dapat dibandingkan priode fundamental hasil Etabs 2015
dan peraturan sebagai berikut:
Table 5. Perbandingan Hasil Priode Fundamental
Periode Fundamental
Struktur
Periode Fundamental Ijin Keterangan
0,274 detik 0,274 detik Memenuhi
30. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 26
2. Hasil Deformasi Bangunan Gedung
Gambar 13. Deformasi Gedung
Deformasi maksimum yang terjadi adalah 37,4 mm hal ini masih memenuhi
syarat ijin 40 mm untuk lendutan atau 1/100L (55 mm)
Tabel 6. Story Drift Struktur Bangunan
Story Drift
X Y Z
m m m
Max 0.00098 37.5 41.5 11.871
Min 0.00102 37.5 41.5 11.871
Dari hasil story drift diatas masih memenuhi syarat ijin story drift pada gedung
yakni 2% . maka story ijin maksimal struktur gedung ini adalah 0,08m. Hal ini
menunjukan 0,08m > 0,00102m maka story drift masih memenuhi.
31. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 27
3. Hasil Gaya Dalam Elemen Struktur
a. Gaya Aksial
Gambar 14. Axial Diagram
b. Gaya Momen
Gambar 15. Moment Diagram
32. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 28
c. Gaya Torsi
Gambar 16. Torsion Diagram
d. Gaya Geser
Gambar 17. Shear Diagram
33. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 29
e. Gaya Momen Lantai
Gambar 18. Momen Slab
f. Pengecekan struktur dengan program etabs
Gambar 19. Pengecekan Kapasitas
34. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 30
E. Hasil Analisis Struktur
1. Perencanaan Struktur Balok
Struktur balok yang digunakan pada Mesjid Darul Hasanah ini adalah struktur
beton yakni menggunakan empat tipe dimensi balok
i. 300 x 600
ii. 300 x 500
iii. 200 x 300
iv. 300 x 700
Adapun mutu beton yang harus digunakan adalah K-250. Setelah dilakukan
analisis perencanaan didapatkan hasil resume sebagai berikut:
Tabel 7. Perencanaan Balok
No Section Tipe Kapasitas Kebutuhan Keterangan
1 A 1-2 300 700
M (+) KNm 166,3 117.7015 OK
M (-) KNm 268.1 121.4068 OK
V (KN) 186.15 89.8533 OK
T (KNm) 72,315 21.3956 OK
2 A 2-3 300 700
M (+) KNm 166,3 47.4485 OK
M (-) KNm 268.1 89.5296 OK
V (KN) 186.15 65.0524 OK
T (KNm) 72,315 10.7137 OK
3 A 3-4 300 700
M (+) KNm 166,3 115.5728 OK
M (-) KNm 268.1 117.8215 OK
V (KN) 186.15 87.7045 OK
T (KNm) 72,315 16.2314 OK
35. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 31
2. Perencanaan Struktur Kolom
Struktur kolom yang digunakan pada Mesjid Darul Hasanah ini adalah struktur
beton yakni menggunakan dua tipe dimensi yakni
a. 450 x 450
b. 600 x 600
Adapun mutu beton yang harus digunakan adalah K-300. Setelah dilakukan
analisis perencanaan didapatkan hasil resume sebagai berikut:
Tabel 8. Perencanaan Kolom
No Section Tipe Kapasitas Kebutuhan Keterangan
1 F 1-1 K 450
P (KN) 3455.58 842.832 OK
M (KNM) 228 27.7927 OK
V(KN) 170,05 17.6258 OK
- 0 OK
2 F 1-2 K 450
P (KN) 3455.58 686.4377 OK
M (KNM) 228 61.0197 OK
V(KN) 170,05 38.4767 OK
- 0 OK
3. Perencanaan Pondasi
Perencanaan pondasi harus dilakukan secara maksimal agar keutuhan bangunan
gedung dapat dijaga, setlah dilakukan analisis maka didapat suatu perencanaan
pondasi dengan Pondasi Telapak dengan beberapa tipe terlampir
36. Design & Structure Analysis
Mesjid Darul Hasanah
PT QIES NUSANTARA CONSULTANTS
Multidisciplinary Consultants 32
IV. KESIMPULAN
Setelah dilakukan analisis dan design maka dapat disimpulkan sebagai berikut
1. Material beton yang digunakan adalah mutu beton K-300 untuk struktur kolom
sedangkan balok dan plat menggunakan mutu K-250
2. Material tulangan baja yang digunakan dalam perencanaan adalah fy 400 MPa dan
fy 240 MPa
3. Setelah dilakukan analisis maka didapatkan periode getar alamiah struktur gedung ini
adalah 0,274 detik hal ini masih memenuhi syarat maksimal priode getar yang
diizinkan yakni 0,274 detik. Hal ini menjadi kriteria untuk kekakuan gedung
bangunan, maka struktur bangunan ini sudah memiliki kekakuan yang baik.
4. Dari hasil story drift bangunan ini sudah memenuhi syarat yang ada yakni kurang
dari 0,08 m atau story drift bangunan ini sebesar 0,00102 m. Maka gedung ini
memiliki ketangguhan yang baik.
5. Sedangkan lendutan maksimal yang terjadi bahwa gedung ini hanya memiliki
lendutan 37,4 mm. Hal ini masih dalam kriteria ijin yakni 50 mm.
6. Adapun penampang yang digunakan dalam perencanaan ini adalah
a. Balok
i. 300 x 600
ii. 300 x 500
iii. 200 x 300
iv. 300 x 700
b. Kolom
i. 450 x 450
ii. 600 x 600
c. Plat
Plat yang digunakan dalam perencanaan ini adalah plat beton setebal 150 mm
untuk plat lantai dan 100 untuk plat atap
d. Pondasi
Pondasi yang digunakan dalam perencanaan ini adalah pondasi telapak
59. DENAHRENCANABALOKATAPMESJID
Skala1:125
EST+4.90
B25/50
ELT +3.90
B 15/25
EST+4.85
B25/50
EST+4.85
B25/50
EST +4.85
B 25/50
EST +5.85
B 25/50
EST +5.85
B 25/50 B 25/50
B 25/50
B 25/50
EST +5.85
B 25/50
EST +5.85
B 25/50
EST+5.85
BALOKLINGKAR
EST+5.85
B25/50
EST +4.85
B15/25
EST+4.85
B15/25
ELT+3.90
B15/25
EST +4.85
B15/25
ELT +3.90
B 15/25
ELT+3.90
B15/25
EST+5.85
B25/50
EST+5.85
B25/50
EST +5.85
B 25/50
EST +5.85
B 25/50
EST +5.85
B 25/50
EST+5.85
B25/50
EST+5.85
B25/50
EST+5.85
B25/50
EST+5.85
B25/50
EST+5.85
B25/50B25/50
EST +4.85
B 25/50
EST+4.85
B25/50
EST+4.85
B25/50
2470
600325610325610
134568
490520
2000
490 150402065
A
C
E
F
J
I
B
185
D
490520
2000
490 40 150402065
A
C
E
F
G
H
J
I
B 185
D
2470
12
580335446
4568
164
37
335445165
EST+4.85
B25/50
EST+5.85
EST +5.85
EST +5.85
EST +5.85
EST +4.85
B 15/30
EST +4.85
B 15/30
EST+4.85
B15/30
25/70
BALOKLINGKAR
EST+4.85
B25/50
BALOKLINGKAR
EST+5.85
B25/50
─▲
─▲
─▲─▲
─▲
─▲─▲
─▲─▲
─▲
─▲
─▲
─▲
─▲
─▲─▲─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
─▲
DENAHRENCANA1:125
BALOKATAPMESJID
ST-22
60. DENAHRENCANAPLATDAKMESJID
Skala1:125
J
I
E
C
A
67854321
J
I
F
D
B
H
G
2470
600325610325610
490520
2000
490 150402065 185
490520
2000
490 40 150402065 185
2470
580335446164335445165
PLATDAK
T=10Cm
EST+5.00
PLATDAK
T=15Cm
EST+6.00PLATDAK
T=15Cm
EST+6.00
PLATDAK
T=15Cm
EST+6.00
PLATDAK
T=15Cm
EST+6.00
PLATDAK
T=15Cm
EST+6.00
PLATDAK
T=15Cm
EST+5.00
PLATDAK
T=15Cm
EST+5.00
PLATDAK
T=15Cm
EST+5.00
PLATDAK
T=15Cm
EST+5.00
PLATDAK
T=15Cm
EST+6.00
PLATDAK
T=15Cm
EST+6.00
PLATDAK
T=15Cm
EST+6.00
PLATDAK
T=10Cm
EST+5.00
PLATDAK
T=10Cm
EST+4.00
PLATDAK
T=10Cm
EST+4.00
VOIDVOIDVOID
DENAHRENCANA1:125
PLATDAKMESJID
ST-23
68. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Date
Time
-
Foundation ID :
CODE DESIGN :
Job Title Masjid Nurul Hasannah
Job Number
Engginer 09/06/2016
Approved Job Code
Address Project Manado Revision
Description Project REVIEW ANALYSIS STRUCTURE
GENERAL DATA
TP 1
SNI 2847:2013
Kontruksi Gedung
[c] 2016 Ristanto 1 Kapsitas Struktur Pondasi Telapak II
69. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Soil Data (Data Tanah)
Depth Of Foundations (Kedalaman Pondasi) Df = 2,50 m
Heavy Volume Land (Berat Volume Tanah) g = 17,60 kN/m3
In the Corner Swipe (Sudut Gesek Dalam) f = 22,00
Cohesion (Kohesi) c = 0,30 kPa
Prisoners Konus Average (Tahanan Konus Rerata) qc = 34,00 kg/cm2
Dimensions Fondations (Dimensi Pondasi)
Width Fondations Directions X (Lebar Pondasi Arah X) Bx = 2,00 m
Width Fondations Directions Y (Lebar Pondasi Arah Y) By = 2,00 m
Thick Foundation (Ketebalan Pondasi) h = 0,90 m
Width Column Directions X (Lebar Kolom Arah X) bx = 0,30 m
Width Column Directions Y (Lebar Kolom Arah Y) by = 0,30 m
Position Column (Posisi Kolom) as =
Contruction Materials (Bahan Kontruksi)
Kuat tekan beton, fc' = 25,0 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Berat beton bertulang, gc = 24 kN/m3
Expense Plan (Beban Rencana)
Aksial Load (Gaya Aksial Beban Terfaktor) Pu = 418,000 kN
Moment Direction X (Momen Arah X Beban Terfaktor) Mux = 0,123 kNm
Moment Direction Y (Momen Arah Y Beban Terfaktor) Muy = 2,341 kNm
TERZAGHI And PECK (1943)
Soil Bearing Capacity According Theory Terzaghi (1943)
qu = c * Nc * (1 + 0.3 * B / L) + Df * g * Nq + 0.5 * B * Ng * (1 - 0.2 * B / L)
Data Fondations Foot Plat (Data Fondasi Telapak)
Carrying Capacity of Land (Kapasitas Daya Dukung Tanah)
Kontruksi Gedung
[c] 2016 Ristanto 2 Kapsitas Struktur Pondasi Telapak II
70. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
c = Soil Cohession (kN/m2
) c = 0,30
Df = Depth Fondations (m) Df = 2,50 m
g = Heavy Voulume Land (kN/m3
) g = 17,60 kN/m3
B = Width Fondations (m) B = By = 2,00 m
L = Long fondations (m) L = By = 2,00 m
In the Corner Swipe (Sudut Gesek Dalam) f = 22,00
f = f / 180 * p = 0,383972 rad
a = e
(3*p / 4 - f/2)*tan f
= 2,397429
Kpg = 3 * tan
2
[ 45 + 1/2*( f + 33) ] = 30,17704
Soil Bearing According Theory Of Terzagi
Nc = 1/ tan f * [ a
2
/ (2 * cos
2
(45 + f/2) - 1 ] = 20,272
Nq = a
2
/ [ (2 * cos
2
(45 + f/2) ] = Nc * tan f + 1 = 9,190
Ng = 1/2 * tan f * [ Kpg / cos
2
f - 1 ] = 6,889
Ultimate bearing capacity of the soil by Terzaghi :
qu = c*Nc*(1+0.3*B/L) + Df*g*Nq + 0.5*B*Ng*(1-0.2*B/L) = 417,80 kN/m2
Land carrying capacity qa = qu / 3 = 139,27 kN/m2
MEYERHOF (1956)
Soil bearing capacity according to Meyerhof (1956 )
qa = qc / 33 * [ ( B + 0.3 ) / B ]
2
* Kd
( in kg/cm2
)
With; Kd = 1 + 0.33 * Df / B Must 1.33
qc = Conus detainee average yield on a foundation sondir ( kg/cm2
)
B = Width Fondations (m) B = By = 2,00 m
Df = Depth Fondationts (m) Df = 2,50 m
Kd = 1 + 0.33 * Df / B = 1,4125 > 1.33
Taken, Kd = 1,33
Prisoners Conus average yield on a foundation sondir, qc = 34,00 kg/cm2
qa = qc / 33 * [ ( B + 0.3 ) / B ]
2
* Kd = 1,812 kg/cm2
Kontruksi Gedung
[c] 2016 Ristanto 3 Kapsitas Struktur Pondasi Telapak II
71. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Permit the carrying capacity of the land, qa = 181,22 kN/m2
Soil Bearing Capacity According Theory Terzaghi (1943) qa = 139,27 kN/m2
Soil bearing capacity according to Meyerhof (1956 ) qa = 181,22 kN/m2
Support Soil Bearing oF Use qa = 181,22 kN/m2
Basic Size foot plat (Luas Dasar Telapak) A = Bx * By = 4,0000 m2
Prisoners Moment X (Tahanan Momen X) Wx = 1/6 * By * Bx
2
= 1,3333 m3
Prisoners Moment Y (Tahanan Momen Y) Wy = 1/6 * Bx * By
2
= 1,3333 m3
Soil High Above foot plat (Tinggi Tanah diatas Telapak) z = Df - h = 1,60 m
Pressure Against weight (Tekanan Terhadap Berat) q = h * gc + z * g = 49,760 kN/m2
Eksentrisitas on fondasi :
ex = Mux / Pu = 0,0003 m < Bx / 6 = 0,3333 m (OK)
ey = Muy / Pu = 0,0056 m < By / 6 = 0,3333 m (OK)
Maximum ground voltage that occurs at the base of the foundation :
Tegangan tanah maksimum yang terjadi pada dasar fondasi
qmax = Pu / A + Mux / Wx + Muy / Wy + q = 156,108 kN/m2
qmax < qa SAFE (OK)
Support Capascity of Land Use (Kapasitas Daya Dukung Tanah Yang Dipakai)
Voltage Soil Control (Kontrol Tegangan Tanah)
Kontruksi Gedung
[c] 2016 Ristanto 4 Kapsitas Struktur Pondasi Telapak II
72. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Minimum ground voltage that occurs at the base of the foundation
Tegangan tanah minimum yang terjadi pada dasar fondasi
qmin = Pu / A - Mux / Wx - Muy / Wy + q = 152,412 kN/m2
qmin > 0 Voltage Happend Pull (OK)
Overview Slide Directions X (Tinjauan Geser Arah X)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,075 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,825 m
Distance Field Critical (Jarak Bidang Kritis Telapak)
ax = ( Bx - bx - d ) / 2 = 0,438 m
Soil in Sector Critical Voltage Slide X (Tegangan Tanah pada Bidang Kritis Geser X)
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 155,300 kN/m2
Shear Force Direction X (Gaya Geser Arah X)
Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = 92,701 kN
Field Width Slide X (Lebar Bidang Geser Arah X) b = By = 2000 mm
Effective Thickness footpla (Tebal Efektif Telapak) d = 825 mm
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding direction x (Kuat Geser Telapak Arah X )
Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10
-3
= 4125,000 kN
Force Slide On Foot Plate (Gaya Geser Pada Telapak)
Kontruksi Gedung
[c] 2016 Ristanto 5 Kapsitas Struktur Pondasi Telapak II
73. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3
= 1375,000 kN
Vc = 1 / 3 * √ fc' * b * d * 10-3
= 2750,000 kN
Then Strong Slide (maka, Kuat Geser) Vc = 1375,000 kN
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vc = 1031,250 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vc ≥ Vux
####### > 92,701 SAFE (OK)
Overview Slide Directions Y (Tinjauan Geser Arah Y)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,085 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,815 m
Distance Field Critical (Jarak Bidang Kritis Telapak)
ay = ( By - by - d ) / 2 = 0,443 m
Soil in Sector Critical Voltage Slide Y (Tegangan Tanah pada Bidang Kritis Geser Y)
qy = qmin + (By - ay) / By * (qmax - qmin) = 155,290 kN/m2
Shear Force Direction Y (Gaya Geser Arah Y)
Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = 93,756 kN
Field Width Slide Y (Lebar Bidang Geser Arah Y) b = Bx = 2000 mm
Effective Thickness footpla (Tebal Efektif Telapak) d = 815 mm
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding direction Y (Kuat Geser Telapak Arah Y )
Kontruksi Gedung
[c] 2016 Ristanto 6 Kapsitas Struktur Pondasi Telapak II
74. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10-3
= 4075,000 kN
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3
= 1358,333 kN
Vc = 1 / 3 * √ fc' * b * d * 10
-3
= 2716,667 kN
Then Strong Slide (maka, Kuat Geser) Vc = 1358,333 kN
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vc = 1018,750 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vc ≥ Vux
####### > 93,756 SAFE (OK)
Overview Slide Two Directions (Tinjau Geser Dua Arah)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,085 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,82 m
Slide Area Width X (Lebar Bidang Geser X) cx = bx + 2 * d = 1,115 m
Slide Area Width Y (Lebar Bidang Geser Y) cy = by + 2 * d = 1,115 m
Slide Force Pons Happens (Gaya Geser Pons Yang Terjadi)
Vup = ( Bx * By - cx * cy ) * [ ( qmax + qmin ) / 2 - q ] = 288,083 kN
Slide Area Wide Pons (Luas Geser Pons) Ap = 2 * ( cx + cy ) * d = 3,635 m2
Slide Area Width Pons (Lebar Geser Pons) bp = 2 * ( cx + cy ) = 4,460 m
Kontruksi Gedung
[c] 2016 Ristanto 7 Kapsitas Struktur Pondasi Telapak II
75. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding Pons(Kuat Geser Telapak Pons )
fp = [ 1 + 2 / bc ] * √ fc' / 6 = 2,500 MPa
fp = [ as * d / bp + 2 ] * √ fc' / 12 = 0,833 MPa
fp = 1 / 3 * √ fc' = 1,667 MPa
Then Strong Slide (maka, Kuat Geser) fp = 0,833 MPa
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vnp = f * Ap * fp * 10
3
= 2271,81 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vnp ≥ Vup
####### > 288,083 SAFE (OK)
f * Vnp ≥ Pu
####### > 418,000 SAFE (OK)
Bending Reinforcment Directions X (Tulangan Lentur Arah X)
Distance to the edge of the column to the outside foot plate (Jarak tepi kolom terhadap sisi luar Telapak)
ax = ( Bx - bx ) / 2 = 0,850 m
Voltage ground on the edge of the column (Tegangan tanah pada tepi kolom)
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 154,537 kN/m2
Moments that occur in the foundation plate due to ground voltage
(Momen yang terjadi pada plat fondasi akibat tegangan tanah)
Rainforcment Foot Plat (Penulangan Telapak)
Kontruksi Gedung
[c] 2016 Ristanto 8 Kapsitas Struktur Pondasi Telapak II
76. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Mux = 1/2 * ax
2
* [ qx + 2/3 * ( qmax - qx ) - q ] * By = 76,458 kNm
Width Fondation Plate (Lebar Plat Pondasi) b = By = 2000 mm
Thicnrss foot plat (Tebal Telapak) h = 900 mm
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 75 mm
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 825 mm
Concrete Compressive Strength (Kuat Tekan Beton) fc' = 25 MPa
Strong Yield Reinforcing (Kuat Leleh Baja Tulangan) fy = 390 MPa
Elastic Modulus Steel (Modulus Elastis Baja) Es = 2,00E+05 MPa
Concrate Voltage Distribution Factor (Faktor Distribusi teg) b1 = 0,85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0,028069
Reduction Factor (Faktor Reduksi) f = 0,80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6,624
Mn = Mux / f = 95,573 kNm
Rn = Mn * 10
6
/ ( b * d
2
) = 0,07021
Rn < Rmax (OK)
Ratio Reinforcment (Rasio Tulangan)
r = 0.85 * fc’ / fy * [ 1 - {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0,0002
Ratio Minimum Reinforcment (Rasio Tulangan Minimum) rmin = 0,0025
Ratio Reinforcment (Rasio Tulangan) r = 0,0025
Rainforcment Area (Luas Tulangan) As = r * b * d = 4125,00 mm2
Diameter Reinforcmen (Diameter Tulangan) D 16 mm
Distance Reinforcment (Jarak Tulangan) s = p / 4 * D
2
* b / As = 97 mm
Distence Minimum Rainforcment (Jarak Tulangan Minimum) smax = 200 mm
Distance Reinforcment (Jarak Tulangan) s = 97 mm
Used Reinforcment (Tulangan yang Digunakan) D 16 - 90
Use Area Reinforcment (Luas Tulangan Yang digunakan)
As = p / 4 * D
2
* b / s = 4468,04 mm2
Kontruksi Gedung
[c] 2016 Ristanto 9 Kapsitas Struktur Pondasi Telapak II
77. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Bending Reinforcment Directions Y (Tulangan Lentur Arah Y)
Distance to the edge of the column to the outside foot plate (Jarak tepi kolom terhadap sisi luar Telapak)
ay = ( By - by ) / 2 = 0,850 m
Voltage ground on the edge of the column (Tegangan tanah pada tepi kolom)
qy = qmin + (By - ay) / By * (qmax - qmin) = 154,537 kN/m2
Moments that occur in the foundation plate due to ground voltage
(Momen yang terjadi pada plat fondasi akibat tegangan tanah)
Muy = 1/2 * ay
2
* [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 76,458 kNm
Width Fondation Plate (Lebar Plat Pondasi) b = Bx = 2000 mm
Thicnrss foot plat (Tebal Telapak) h = 900 mm
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 85 mm
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 815 mm
Concrete Compressive Strength (Kuat Tekan Beton) fc' = 25 MPa
Strong Yield Reinforcing (Kuat Leleh Baja Tulangan) fy = 390 MPa
Elastic Modulus Steel (Modulus Elastis Baja) Es = 2,00E+05 MPa
Concrate Voltage Distribution Factor (Faktor Distribusi teg) b1 = 0,85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0,028069
Reduction Factor (Faktor Reduksi) f = 0,80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6,624
Mn = Muy / f = 95,573 kNm
Rn = Mn * 10
6
/ ( b * d
2
) = 0,07194
Rn < Rmax (OK)
Ratio Reinforcment (Rasio Tulangan)
r = 0.85 * fc’ / fy * [ 1 - {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0,0002
Kontruksi Gedung
[c] 2016 Ristanto 10 Kapsitas Struktur Pondasi Telapak II
78. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Ratio Minimum Reinforcment (Rasio Tulangan Minimum) rmin = 0,0025
Ratio Reinforcment (Rasio Tulangan) r = 0,0025
Rainforcment Area (Luas Tulangan) As = r * b * d = 4075,00 mm2
Diameter Reinforcmen (Diameter Tulangan) D 16 mm
Distance Reinforcment (Jarak Tulangan) s = p / 4 * D
2
* b / As = 99 mm
Distence Minimum Rainforcment (Jarak Tulangan Minimum) smax = 200 mm
Distance Reinforcment (Jarak Tulangan) s = 99 mm
Used Reinforcment (Tulangan yang Digunakan) D 16 - 90
Use Area Reinforcment (Luas Tulangan Yang digunakan)
As = p / 4 * D
2
* b / s = 4468,04 mm2
Reinforcment Losses (Tulangan Susut)
Ratio Minimum Reinforcment Losses (Rasio Tulangan Minimum) rsmin = 0,0014
Area Reinforcment Losses Direction X Asx = rsmin* d * Bx = 2310,000 mm2
Area Reinforcment Losses Direction Y Asy = rsmin* d * By = 2282,000 mm2
Diameter Reinforcmen (Diameter Tulangan) 12 mm
Distence Reinforcment Losses Min X sx = p / 4 * 2
* By / Asx = 98 mm
Distence Reinforcment Losses Direction X sx,max = 200 mm
Use Distence Reinforcment Losses Direction X sx = 98 mm
Distence Reinforcment Losses Min Y sy = p / 4 *
2
* Bx / Asy = 99 mm
Distence Reinforcment Losses Direction Y sy,max = 200 mm
Use Distence Reinforcment Losses Direction Y sy = 99 mm
Use Reinforcment Losses X 12 - 90
Use Reinforcment Losses Y 12 - 90
Kontruksi Gedung
[c] 2016 Ristanto 11 Kapsitas Struktur Pondasi Telapak II
79. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Date
Time
-
Foundation ID :
CODE DESIGN :
Job Title Masjid Nurul Hasannah
Job Number
Engginer 09/06/2016
Approved Job Code
Address Project Manado Revision
Description Project REVIEW ANALYSIS STRUCTURE
GENERAL DATA
TP 2
SNI 2847:2013
Kontruksi Gedung
[c] 2016 Ristanto 1 Kapsitas Struktur Pondasi Telapak II
80. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Soil Data (Data Tanah)
Depth Of Foundations (Kedalaman Pondasi) Df = 2,00 m
Heavy Volume Land (Berat Volume Tanah) g = 17,60 kN/m3
In the Corner Swipe (Sudut Gesek Dalam) f = 22,00
Cohesion (Kohesi) c = 0,30 kPa
Prisoners Konus Average (Tahanan Konus Rerata) qc = 34,00 kg/cm2
Dimensions Fondations (Dimensi Pondasi)
Width Fondations Directions X (Lebar Pondasi Arah X) Bx = 1,20 m
Width Fondations Directions Y (Lebar Pondasi Arah Y) By = 1,20 m
Thick Foundation (Ketebalan Pondasi) h = 0,70 m
Width Column Directions X (Lebar Kolom Arah X) bx = 0,30 m
Width Column Directions Y (Lebar Kolom Arah Y) by = 0,30 m
Position Column (Posisi Kolom) as =
Contruction Materials (Bahan Kontruksi)
Kuat tekan beton, fc' = 25,0 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Berat beton bertulang, gc = 24 kN/m3
Expense Plan (Beban Rencana)
Aksial Load (Gaya Aksial Beban Terfaktor) Pu = 224,000 kN
Moment Direction X (Momen Arah X Beban Terfaktor) Mux = 0,123 kNm
Moment Direction Y (Momen Arah Y Beban Terfaktor) Muy = 2,189 kNm
TERZAGHI And PECK (1943)
Soil Bearing Capacity According Theory Terzaghi (1943)
qu = c * Nc * (1 + 0.3 * B / L) + Df * g * Nq + 0.5 * B * Ng * (1 - 0.2 * B / L)
Data Fondations Foot Plat (Data Fondasi Telapak)
Carrying Capacity of Land (Kapasitas Daya Dukung Tanah)
Kontruksi Gedung
[c] 2016 Ristanto 2 Kapsitas Struktur Pondasi Telapak II
81. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
c = Soil Cohession (kN/m2
) c = 0,30
Df = Depth Fondations (m) Df = 2,00 m
g = Heavy Voulume Land (kN/m3
) g = 17,60 kN/m3
B = Width Fondations (m) B = By = 1,20 m
L = Long fondations (m) L = By = 1,20 m
In the Corner Swipe (Sudut Gesek Dalam) f = 22,00
f = f / 180 * p = 0,383972 rad
a = e
(3*p / 4 - f/2)*tan f
= 2,397429
Kpg = 3 * tan
2
[ 45 + 1/2*( f + 33) ] = 30,17704
Soil Bearing According Theory Of Terzagi
Nc = 1/ tan f * [ a
2
/ (2 * cos
2
(45 + f/2) - 1 ] = 20,272
Nq = a
2
/ [ (2 * cos
2
(45 + f/2) ] = Nc * tan f + 1 = 9,190
Ng = 1/2 * tan f * [ Kpg / cos
2
f - 1 ] = 6,889
Ultimate bearing capacity of the soil by Terzaghi :
qu = c*Nc*(1+0.3*B/L) + Df*g*Nq + 0.5*B*Ng*(1-0.2*B/L) = 334,72 kN/m2
Land carrying capacity qa = qu / 3 = 111,57 kN/m2
MEYERHOF (1956)
Soil bearing capacity according to Meyerhof (1956 )
qa = qc / 33 * [ ( B + 0.3 ) / B ]
2
* Kd
( in kg/cm2
)
With; Kd = 1 + 0.33 * Df / B Must 1.33
qc = Conus detainee average yield on a foundation sondir ( kg/cm2
)
B = Width Fondations (m) B = By = 1,20 m
Df = Depth Fondationts (m) Df = 2,00 m
Kd = 1 + 0.33 * Df / B = 1,55 > 1.33
Taken, Kd = 1,33
Prisoners Conus average yield on a foundation sondir, qc = 34,00 kg/cm2
qa = qc / 33 * [ ( B + 0.3 ) / B ]
2
* Kd = 2,141 kg/cm2
Kontruksi Gedung
[c] 2016 Ristanto 3 Kapsitas Struktur Pondasi Telapak II
82. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Permit the carrying capacity of the land, qa = 214,11 kN/m2
Soil Bearing Capacity According Theory Terzaghi (1943) qa = 111,57 kN/m2
Soil bearing capacity according to Meyerhof (1956 ) qa = 214,11 kN/m2
Support Soil Bearing oF Use qa = 214,11 kN/m2
Basic Size foot plat (Luas Dasar Telapak) A = Bx * By = 1,4400 m2
Prisoners Moment X (Tahanan Momen X) Wx = 1/6 * By * Bx
2
= 0,2880 m3
Prisoners Moment Y (Tahanan Momen Y) Wy = 1/6 * Bx * By
2
= 0,2880 m3
Soil High Above foot plat (Tinggi Tanah diatas Telapak) z = Df - h = 1,30 m
Pressure Against weight (Tekanan Terhadap Berat) q = h * gc + z * g = 39,680 kN/m2
Eksentrisitas on fondasi :
ex = Mux / Pu = 0,0005 m < Bx / 6 = 0,2000 m (OK)
ey = Muy / Pu = 0,0098 m < By / 6 = 0,2000 m (OK)
Maximum ground voltage that occurs at the base of the foundation :
Tegangan tanah maksimum yang terjadi pada dasar fondasi
qmax = Pu / A + Mux / Wx + Muy / Wy + q = 203,263 kN/m2
qmax < qa SAFE (OK)
Support Capascity of Land Use (Kapasitas Daya Dukung Tanah Yang Dipakai)
Voltage Soil Control (Kontrol Tegangan Tanah)
Kontruksi Gedung
[c] 2016 Ristanto 4 Kapsitas Struktur Pondasi Telapak II
83. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Minimum ground voltage that occurs at the base of the foundation
Tegangan tanah minimum yang terjadi pada dasar fondasi
qmin = Pu / A - Mux / Wx - Muy / Wy + q = 187,208 kN/m2
qmin > 0 Voltage Happend Pull (OK)
Overview Slide Directions X (Tinjauan Geser Arah X)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,075 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,625 m
Distance Field Critical (Jarak Bidang Kritis Telapak)
ax = ( Bx - bx - d ) / 2 = 0,138 m
Soil in Sector Critical Voltage Slide X (Tegangan Tanah pada Bidang Kritis Geser X)
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 201,424 kN/m2
Shear Force Direction X (Gaya Geser Arah X)
Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = 26,839 kN
Field Width Slide X (Lebar Bidang Geser Arah X) b = By = 1200 mm
Effective Thickness footpla (Tebal Efektif Telapak) d = 625 mm
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding direction x (Kuat Geser Telapak Arah X )
Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10
-3
= 1875,000 kN
Force Slide On Foot Plate (Gaya Geser Pada Telapak)
Kontruksi Gedung
[c] 2016 Ristanto 5 Kapsitas Struktur Pondasi Telapak II
84. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3
= 625,000 kN
Vc = 1 / 3 * √ fc' * b * d * 10-3
= 1250,000 kN
Then Strong Slide (maka, Kuat Geser) Vc = 625,000 kN
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vc = 468,750 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vc ≥ Vux
468,750 > 26,839 SAFE (OK)
Overview Slide Directions Y (Tinjauan Geser Arah Y)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,085 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,615 m
Distance Field Critical (Jarak Bidang Kritis Telapak)
ay = ( By - by - d ) / 2 = 0,143 m
Soil in Sector Critical Voltage Slide Y (Tegangan Tanah pada Bidang Kritis Geser Y)
qy = qmin + (By - ay) / By * (qmax - qmin) = 201,357 kN/m2
Shear Force Direction Y (Gaya Geser Arah Y)
Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = 27,810 kN
Field Width Slide Y (Lebar Bidang Geser Arah Y) b = Bx = 1200 mm
Effective Thickness footpla (Tebal Efektif Telapak) d = 615 mm
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding direction Y (Kuat Geser Telapak Arah Y )
Kontruksi Gedung
[c] 2016 Ristanto 6 Kapsitas Struktur Pondasi Telapak II
85. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10-3
= 1845,000 kN
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3
= 615,000 kN
Vc = 1 / 3 * √ fc' * b * d * 10
-3
= 1230,000 kN
Then Strong Slide (maka, Kuat Geser) Vc = 615,000 kN
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vc = 461,250 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vc ≥ Vux
461,250 > 27,810 SAFE (OK)
Overview Slide Two Directions (Tinjau Geser Dua Arah)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,085 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,62 m
Slide Area Width X (Lebar Bidang Geser X) cx = bx + 2 * d = 0,915 m
Slide Area Width Y (Lebar Bidang Geser Y) cy = by + 2 * d = 0,915 m
Slide Force Pons Happens (Gaya Geser Pons Yang Terjadi)
Vup = ( Bx * By - cx * cy ) * [ ( qmax + qmin ) / 2 - q ] = 93,765 kN
Slide Area Wide Pons (Luas Geser Pons) Ap = 2 * ( cx + cy ) * d = 2,251 m2
Slide Area Width Pons (Lebar Geser Pons) bp = 2 * ( cx + cy ) = 3,660 m
Kontruksi Gedung
[c] 2016 Ristanto 7 Kapsitas Struktur Pondasi Telapak II
86. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding Pons(Kuat Geser Telapak Pons )
fp = [ 1 + 2 / bc ] * √ fc' / 6 = 2,500 MPa
fp = [ as * d / bp + 2 ] * √ fc' / 12 = 0,833 MPa
fp = 1 / 3 * √ fc' = 1,667 MPa
Then Strong Slide (maka, Kuat Geser) fp = 0,833 MPa
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vnp = f * Ap * fp * 10
3
= 1406,81 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vnp ≥ Vup
####### > 93,765 SAFE (OK)
f * Vnp ≥ Pu
####### > 224,000 SAFE (OK)
Bending Reinforcment Directions X (Tulangan Lentur Arah X)
Distance to the edge of the column to the outside foot plate (Jarak tepi kolom terhadap sisi luar Telapak)
ax = ( Bx - bx ) / 2 = 0,450 m
Voltage ground on the edge of the column (Tegangan tanah pada tepi kolom)
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 197,243 kN/m2
Moments that occur in the foundation plate due to ground voltage
(Momen yang terjadi pada plat fondasi akibat tegangan tanah)
Rainforcment Foot Plat (Penulangan Telapak)
Kontruksi Gedung
[c] 2016 Ristanto 8 Kapsitas Struktur Pondasi Telapak II
87. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Mux = 1/2 * ax
2
* [ qx + 2/3 * ( qmax - qx ) - q ] * By = 19,632 kNm
Width Fondation Plate (Lebar Plat Pondasi) b = By = 1200 mm
Thicnrss foot plat (Tebal Telapak) h = 700 mm
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 75 mm
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 625 mm
Concrete Compressive Strength (Kuat Tekan Beton) fc' = 25 MPa
Strong Yield Reinforcing (Kuat Leleh Baja Tulangan) fy = 390 MPa
Elastic Modulus Steel (Modulus Elastis Baja) Es = 2,00E+05 MPa
Concrate Voltage Distribution Factor (Faktor Distribusi teg) b1 = 0,85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0,028069
Reduction Factor (Faktor Reduksi) f = 0,80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6,624
Mn = Mux / f = 24,539 kNm
Rn = Mn * 10
6
/ ( b * d
2
) = 0,05235
Rn < Rmax (OK)
Ratio Reinforcment (Rasio Tulangan)
r = 0.85 * fc’ / fy * [ 1 - {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0,0001
Ratio Minimum Reinforcment (Rasio Tulangan Minimum) rmin = 0,0025
Ratio Reinforcment (Rasio Tulangan) r = 0,0025
Rainforcment Area (Luas Tulangan) As = r * b * d = 1875,00 mm2
Diameter Reinforcmen (Diameter Tulangan) D 16 mm
Distance Reinforcment (Jarak Tulangan) s = p / 4 * D
2
* b / As = 129 mm
Distence Minimum Rainforcment (Jarak Tulangan Minimum) smax = 200 mm
Distance Reinforcment (Jarak Tulangan) s = 129 mm
Used Reinforcment (Tulangan yang Digunakan) D 16 - 120
Use Area Reinforcment (Luas Tulangan Yang digunakan)
As = p / 4 * D
2
* b / s = 2010,62 mm2
Kontruksi Gedung
[c] 2016 Ristanto 9 Kapsitas Struktur Pondasi Telapak II
88. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Bending Reinforcment Directions Y (Tulangan Lentur Arah Y)
Distance to the edge of the column to the outside foot plate (Jarak tepi kolom terhadap sisi luar Telapak)
ay = ( By - by ) / 2 = 0,450 m
Voltage ground on the edge of the column (Tegangan tanah pada tepi kolom)
qy = qmin + (By - ay) / By * (qmax - qmin) = 197,243 kN/m2
Moments that occur in the foundation plate due to ground voltage
(Momen yang terjadi pada plat fondasi akibat tegangan tanah)
Muy = 1/2 * ay
2
* [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 19,632 kNm
Width Fondation Plate (Lebar Plat Pondasi) b = Bx = 1200 mm
Thicnrss foot plat (Tebal Telapak) h = 700 mm
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 85 mm
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 615 mm
Concrete Compressive Strength (Kuat Tekan Beton) fc' = 25 MPa
Strong Yield Reinforcing (Kuat Leleh Baja Tulangan) fy = 390 MPa
Elastic Modulus Steel (Modulus Elastis Baja) Es = 2,00E+05 MPa
Concrate Voltage Distribution Factor (Faktor Distribusi teg) b1 = 0,85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0,028069
Reduction Factor (Faktor Reduksi) f = 0,80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6,624
Mn = Muy / f = 24,539 kNm
Rn = Mn * 10
6
/ ( b * d
2
) = 0,05407
Rn < Rmax (OK)
Ratio Reinforcment (Rasio Tulangan)
r = 0.85 * fc’ / fy * [ 1 - {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0,0001
Kontruksi Gedung
[c] 2016 Ristanto 10 Kapsitas Struktur Pondasi Telapak II
89. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Ratio Minimum Reinforcment (Rasio Tulangan Minimum) rmin = 0,0025
Ratio Reinforcment (Rasio Tulangan) r = 0,0025
Rainforcment Area (Luas Tulangan) As = r * b * d = 1845,00 mm2
Diameter Reinforcmen (Diameter Tulangan) D 16 mm
Distance Reinforcment (Jarak Tulangan) s = p / 4 * D
2
* b / As = 131 mm
Distence Minimum Rainforcment (Jarak Tulangan Minimum) smax = 200 mm
Distance Reinforcment (Jarak Tulangan) s = 131 mm
Used Reinforcment (Tulangan yang Digunakan) D 16 - 130
Use Area Reinforcment (Luas Tulangan Yang digunakan)
As = p / 4 * D
2
* b / s = 1855,96 mm2
Reinforcment Losses (Tulangan Susut)
Ratio Minimum Reinforcment Losses (Rasio Tulangan Minimum) rsmin = 0,0014
Area Reinforcment Losses Direction X Asx = rsmin* d * Bx = 1050,000 mm2
Area Reinforcment Losses Direction Y Asy = rsmin* d * By = 1033,200 mm2
Diameter Reinforcmen (Diameter Tulangan) 12 mm
Distence Reinforcment Losses Min X sx = p / 4 * 2
* By / Asx = 129 mm
Distence Reinforcment Losses Direction X sx,max = 200 mm
Use Distence Reinforcment Losses Direction X sx = 129 mm
Distence Reinforcment Losses Min Y sy = p / 4 *
2
* Bx / Asy = 131 mm
Distence Reinforcment Losses Direction Y sy,max = 200 mm
Use Distence Reinforcment Losses Direction Y sy = 131 mm
Use Reinforcment Losses X 12 - 120
Use Reinforcment Losses Y 12 - 130
Kontruksi Gedung
[c] 2016 Ristanto 11 Kapsitas Struktur Pondasi Telapak II
90. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Date
Time
-
Foundation ID :
CODE DESIGN :
Job Title Masjid Nurul Hasannah
Job Number
Engginer 09/06/2016
Approved Job Code
Address Project Manado Revision
Description Project REVIEW ANALYSIS STRUCTURE
GENERAL DATA
TP3
SNI 2847:2013
Kontruksi Gedung
[c] 2016 Ristanto 1 Kapsitas Struktur Pondasi Telapak II
91. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Soil Data (Data Tanah)
Depth Of Foundations (Kedalaman Pondasi) Df = 2,00 m
Heavy Volume Land (Berat Volume Tanah) g = 17,60 kN/m3
In the Corner Swipe (Sudut Gesek Dalam) f = 22,00
Cohesion (Kohesi) c = 0,30 kPa
Prisoners Konus Average (Tahanan Konus Rerata) qc = 34,00 kg/cm2
Dimensions Fondations (Dimensi Pondasi)
Width Fondations Directions X (Lebar Pondasi Arah X) Bx = 1,50 m
Width Fondations Directions Y (Lebar Pondasi Arah Y) By = 1,50 m
Thick Foundation (Ketebalan Pondasi) h = 0,70 m
Width Column Directions X (Lebar Kolom Arah X) bx = 0,30 m
Width Column Directions Y (Lebar Kolom Arah Y) by = 0,30 m
Position Column (Posisi Kolom) as =
Contruction Materials (Bahan Kontruksi)
Kuat tekan beton, fc' = 25,0 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Berat beton bertulang, gc = 24 kN/m3
Expense Plan (Beban Rencana)
Aksial Load (Gaya Aksial Beban Terfaktor) Pu = 336,000 kN
Moment Direction X (Momen Arah X Beban Terfaktor) Mux = 0,123 kNm
Moment Direction Y (Momen Arah Y Beban Terfaktor) Muy = 3,780 kNm
TERZAGHI And PECK (1943)
Soil Bearing Capacity According Theory Terzaghi (1943)
qu = c * Nc * (1 + 0.3 * B / L) + Df * g * Nq + 0.5 * B * Ng * (1 - 0.2 * B / L)
Data Fondations Foot Plat (Data Fondasi Telapak)
Carrying Capacity of Land (Kapasitas Daya Dukung Tanah)
Kontruksi Gedung
[c] 2016 Ristanto 2 Kapsitas Struktur Pondasi Telapak II
92. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
c = Soil Cohession (kN/m2
) c = 0,30
Df = Depth Fondations (m) Df = 2,00 m
g = Heavy Voulume Land (kN/m3
) g = 17,60 kN/m3
B = Width Fondations (m) B = By = 1,50 m
L = Long fondations (m) L = By = 1,50 m
In the Corner Swipe (Sudut Gesek Dalam) f = 22,00
f = f / 180 * p = 0,383972 rad
a = e
(3*p / 4 - f/2)*tan f
= 2,397429
Kpg = 3 * tan
2
[ 45 + 1/2*( f + 33) ] = 30,17704
Soil Bearing According Theory Of Terzagi
Nc = 1/ tan f * [ a
2
/ (2 * cos
2
(45 + f/2) - 1 ] = 20,272
Nq = a
2
/ [ (2 * cos
2
(45 + f/2) ] = Nc * tan f + 1 = 9,190
Ng = 1/2 * tan f * [ Kpg / cos
2
f - 1 ] = 6,889
Ultimate bearing capacity of the soil by Terzaghi :
qu = c*Nc*(1+0.3*B/L) + Df*g*Nq + 0.5*B*Ng*(1-0.2*B/L) = 311,00 kN/m2
Land carrying capacity qa = qu / 3 = 124,40 kN/m2
MEYERHOF (1956)
Soil bearing capacity according to Meyerhof (1956 )
qa = qc / 33 * [ ( B + 0.3 ) / B ]
2
* Kd
( in kg/cm2
)
With; Kd = 1 + 0.33 * Df / B Must 1.33
qc = Conus detainee average yield on a foundation sondir ( kg/cm2
)
B = Width Fondations (m) B = By = 1,50 m
Df = Depth Fondationts (m) Df = 2,00 m
Kd = 1 + 0.33 * Df / B = 1,44 > 1.33
Taken, Kd = 1,33
Prisoners Conus average yield on a foundation sondir, qc = 34,00 kg/cm2
qa = qc / 33 * [ ( B + 0.3 ) / B ]
2
* Kd = 1,973 kg/cm2
Kontruksi Gedung
[c] 2016 Ristanto 3 Kapsitas Struktur Pondasi Telapak II
93. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Permit the carrying capacity of the land, qa = 197,32 kN/m2
Soil Bearing Capacity According Theory Terzaghi (1943) qa = 124,40 kN/m2
Soil bearing capacity according to Meyerhof (1956 ) qa = 197,32 kN/m2
Support Soil Bearing oF Use qa = 197,32 kN/m2
Basic Size foot plat (Luas Dasar Telapak) A = Bx * By = 2,2500 m2
Prisoners Moment X (Tahanan Momen X) Wx = 1/6 * By * Bx
2
= 0,5625 m3
Prisoners Moment Y (Tahanan Momen Y) Wy = 1/6 * Bx * By
2
= 0,5625 m3
Soil High Above foot plat (Tinggi Tanah diatas Telapak) z = Df - h = 1,30 m
Pressure Against weight (Tekanan Terhadap Berat) q = h * gc + z * g = 39,680 kN/m2
Eksentrisitas on fondasi :
ex = Mux / Pu = 0,0004 m < Bx / 6 = 0,2500 m (OK)
ey = Muy / Pu = 0,0113 m < By / 6 = 0,2500 m (OK)
Maximum ground voltage that occurs at the base of the foundation :
Tegangan tanah maksimum yang terjadi pada dasar fondasi
qmax = Pu / A + Mux / Wx + Muy / Wy + q = 195,952 kN/m2
qmax < qa SAFE (OK)
Support Capascity of Land Use (Kapasitas Daya Dukung Tanah Yang Dipakai)
Voltage Soil Control (Kontrol Tegangan Tanah)
Kontruksi Gedung
[c] 2016 Ristanto 4 Kapsitas Struktur Pondasi Telapak II
94. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Minimum ground voltage that occurs at the base of the foundation
Tegangan tanah minimum yang terjadi pada dasar fondasi
qmin = Pu / A - Mux / Wx - Muy / Wy + q = 182,075 kN/m2
qmin > 0 Voltage Happend Pull (OK)
Overview Slide Directions X (Tinjauan Geser Arah X)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,075 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,625 m
Distance Field Critical (Jarak Bidang Kritis Telapak)
ax = ( Bx - bx - d ) / 2 = 0,288 m
Soil in Sector Critical Voltage Slide X (Tegangan Tanah pada Bidang Kritis Geser X)
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 193,292 kN/m2
Shear Force Direction X (Gaya Geser Arah X)
Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = 66,819 kN
Field Width Slide X (Lebar Bidang Geser Arah X) b = By = 1500 mm
Effective Thickness footpla (Tebal Efektif Telapak) d = 625 mm
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding direction x (Kuat Geser Telapak Arah X )
Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10
-3
= 2343,750 kN
Force Slide On Foot Plate (Gaya Geser Pada Telapak)
Kontruksi Gedung
[c] 2016 Ristanto 5 Kapsitas Struktur Pondasi Telapak II
95. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3
= 781,250 kN
Vc = 1 / 3 * √ fc' * b * d * 10-3
= 1562,500 kN
Then Strong Slide (maka, Kuat Geser) Vc = 781,250 kN
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vc = 585,938 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vc ≥ Vux
585,938 > 66,819 SAFE (OK)
Overview Slide Directions Y (Tinjauan Geser Arah Y)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,085 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,615 m
Distance Field Critical (Jarak Bidang Kritis Telapak)
ay = ( By - by - d ) / 2 = 0,293 m
Soil in Sector Critical Voltage Slide Y (Tegangan Tanah pada Bidang Kritis Geser Y)
qy = qmin + (By - ay) / By * (qmax - qmin) = 193,246 kN/m2
Shear Force Direction Y (Gaya Geser Arah Y)
Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = 67,971 kN
Field Width Slide Y (Lebar Bidang Geser Arah Y) b = Bx = 1500 mm
Effective Thickness footpla (Tebal Efektif Telapak) d = 615 mm
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding direction Y (Kuat Geser Telapak Arah Y )
Kontruksi Gedung
[c] 2016 Ristanto 6 Kapsitas Struktur Pondasi Telapak II
96. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10-3
= 2306,250 kN
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3
= 768,750 kN
Vc = 1 / 3 * √ fc' * b * d * 10
-3
= 1537,500 kN
Then Strong Slide (maka, Kuat Geser) Vc = 768,750 kN
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vc = 576,563 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vc ≥ Vux
576,563 > 67,971 SAFE (OK)
Overview Slide Two Directions (Tinjau Geser Dua Arah)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,085 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,62 m
Slide Area Width X (Lebar Bidang Geser X) cx = bx + 2 * d = 0,915 m
Slide Area Width Y (Lebar Bidang Geser Y) cy = by + 2 * d = 0,915 m
Slide Force Pons Happens (Gaya Geser Pons Yang Terjadi)
Vup = ( Bx * By - cx * cy ) * [ ( qmax + qmin ) / 2 - q ] = 210,974 kN
Slide Area Wide Pons (Luas Geser Pons) Ap = 2 * ( cx + cy ) * d = 2,251 m2
Slide Area Width Pons (Lebar Geser Pons) bp = 2 * ( cx + cy ) = 3,660 m
Kontruksi Gedung
[c] 2016 Ristanto 7 Kapsitas Struktur Pondasi Telapak II
97. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding Pons(Kuat Geser Telapak Pons )
fp = [ 1 + 2 / bc ] * √ fc' / 6 = 2,500 MPa
fp = [ as * d / bp + 2 ] * √ fc' / 12 = 0,833 MPa
fp = 1 / 3 * √ fc' = 1,667 MPa
Then Strong Slide (maka, Kuat Geser) fp = 0,833 MPa
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vnp = f * Ap * fp * 10
3
= 1406,81 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vnp ≥ Vup
####### > 210,974 SAFE (OK)
f * Vnp ≥ Pu
####### > 336,000 SAFE (OK)
Bending Reinforcment Directions X (Tulangan Lentur Arah X)
Distance to the edge of the column to the outside foot plate (Jarak tepi kolom terhadap sisi luar Telapak)
ax = ( Bx - bx ) / 2 = 0,600 m
Voltage ground on the edge of the column (Tegangan tanah pada tepi kolom)
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 190,401 kN/m2
Moments that occur in the foundation plate due to ground voltage
(Momen yang terjadi pada plat fondasi akibat tegangan tanah)
Rainforcment Foot Plat (Penulangan Telapak)
Kontruksi Gedung
[c] 2016 Ristanto 8 Kapsitas Struktur Pondasi Telapak II
98. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Mux = 1/2 * ax
2
* [ qx + 2/3 * ( qmax - qx ) - q ] * By = 41,694 kNm
Width Fondation Plate (Lebar Plat Pondasi) b = By = 1500 mm
Thicnrss foot plat (Tebal Telapak) h = 700 mm
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 75 mm
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 625 mm
Concrete Compressive Strength (Kuat Tekan Beton) fc' = 25 MPa
Strong Yield Reinforcing (Kuat Leleh Baja Tulangan) fy = 390 MPa
Elastic Modulus Steel (Modulus Elastis Baja) Es = 2,00E+05 MPa
Concrate Voltage Distribution Factor (Faktor Distribusi teg) b1 = 0,85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0,028069
Reduction Factor (Faktor Reduksi) f = 0,80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6,624
Mn = Mux / f = 52,117 kNm
Rn = Mn * 10
6
/ ( b * d
2
) = 0,08895
Rn < Rmax (OK)
Ratio Reinforcment (Rasio Tulangan)
r = 0.85 * fc’ / fy * [ 1 - {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0,0002
Ratio Minimum Reinforcment (Rasio Tulangan Minimum) rmin = 0,0025
Ratio Reinforcment (Rasio Tulangan) r = 0,0025
Rainforcment Area (Luas Tulangan) As = r * b * d = 2343,75 mm2
Diameter Reinforcmen (Diameter Tulangan) D 16 mm
Distance Reinforcment (Jarak Tulangan) s = p / 4 * D
2
* b / As = 129 mm
Distence Minimum Rainforcment (Jarak Tulangan Minimum) smax = 200 mm
Distance Reinforcment (Jarak Tulangan) s = 129 mm
Used Reinforcment (Tulangan yang Digunakan) D 16 - 120
Use Area Reinforcment (Luas Tulangan Yang digunakan)
As = p / 4 * D
2
* b / s = 2513,27 mm2
Kontruksi Gedung
[c] 2016 Ristanto 9 Kapsitas Struktur Pondasi Telapak II
99. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Bending Reinforcment Directions Y (Tulangan Lentur Arah Y)
Distance to the edge of the column to the outside foot plate (Jarak tepi kolom terhadap sisi luar Telapak)
ay = ( By - by ) / 2 = 0,600 m
Voltage ground on the edge of the column (Tegangan tanah pada tepi kolom)
qy = qmin + (By - ay) / By * (qmax - qmin) = 190,401 kN/m2
Moments that occur in the foundation plate due to ground voltage
(Momen yang terjadi pada plat fondasi akibat tegangan tanah)
Muy = 1/2 * ay
2
* [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 41,694 kNm
Width Fondation Plate (Lebar Plat Pondasi) b = Bx = 1500 mm
Thicnrss foot plat (Tebal Telapak) h = 700 mm
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 85 mm
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 615 mm
Concrete Compressive Strength (Kuat Tekan Beton) fc' = 25 MPa
Strong Yield Reinforcing (Kuat Leleh Baja Tulangan) fy = 390 MPa
Elastic Modulus Steel (Modulus Elastis Baja) Es = 2,00E+05 MPa
Concrate Voltage Distribution Factor (Faktor Distribusi teg) b1 = 0,85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0,028069
Reduction Factor (Faktor Reduksi) f = 0,80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6,624
Mn = Muy / f = 52,117 kNm
Rn = Mn * 10
6
/ ( b * d
2
) = 0,09186
Rn < Rmax (OK)
Ratio Reinforcment (Rasio Tulangan)
r = 0.85 * fc’ / fy * [ 1 - {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0,0002
Kontruksi Gedung
[c] 2016 Ristanto 10 Kapsitas Struktur Pondasi Telapak II
100. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Ratio Minimum Reinforcment (Rasio Tulangan Minimum) rmin = 0,0025
Ratio Reinforcment (Rasio Tulangan) r = 0,0025
Rainforcment Area (Luas Tulangan) As = r * b * d = 2306,25 mm2
Diameter Reinforcmen (Diameter Tulangan) D 16 mm
Distance Reinforcment (Jarak Tulangan) s = p / 4 * D
2
* b / As = 131 mm
Distence Minimum Rainforcment (Jarak Tulangan Minimum) smax = 200 mm
Distance Reinforcment (Jarak Tulangan) s = 131 mm
Used Reinforcment (Tulangan yang Digunakan) D 16 - 130
Use Area Reinforcment (Luas Tulangan Yang digunakan)
As = p / 4 * D
2
* b / s = 2319,95 mm2
Reinforcment Losses (Tulangan Susut)
Ratio Minimum Reinforcment Losses (Rasio Tulangan Minimum) rsmin = 0,0014
Area Reinforcment Losses Direction X Asx = rsmin* d * Bx = 1312,500 mm2
Area Reinforcment Losses Direction Y Asy = rsmin* d * By = 1291,500 mm2
Diameter Reinforcmen (Diameter Tulangan) 12 mm
Distence Reinforcment Losses Min X sx = p / 4 * 2
* By / Asx = 129 mm
Distence Reinforcment Losses Direction X sx,max = 200 mm
Use Distence Reinforcment Losses Direction X sx = 129 mm
Distence Reinforcment Losses Min Y sy = p / 4 *
2
* Bx / Asy = 131 mm
Distence Reinforcment Losses Direction Y sy,max = 200 mm
Use Distence Reinforcment Losses Direction Y sy = 131 mm
Use Reinforcment Losses X 12 - 120
Use Reinforcment Losses Y 12 - 130
Kontruksi Gedung
[c] 2016 Ristanto 11 Kapsitas Struktur Pondasi Telapak II
101. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Date
Time
-
Foundation ID :
CODE DESIGN : SNI 2847:2013
Approved Job Code
Address Project Manado Revision
Description Project REVIEW ANALYSIS STRUCTURE
GENERAL DATA
TP 4
Job Title Masjid Nurul Hasannah
Job Number
Engginer 09/06/2016
Kontruksi Gedung
[c] 2016 Ristanto 1 Kapsitas Struktur Pondasi Telapak II
102. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Soil Data (Data Tanah)
Depth Of Foundations (Kedalaman Pondasi) Df = 2,00 m
Heavy Volume Land (Berat Volume Tanah) g = 17,60 kN/m3
In the Corner Swipe (Sudut Gesek Dalam) f = 22,00
Cohesion (Kohesi) c = 0,30 kPa
Prisoners Konus Average (Tahanan Konus Rerata) qc = 34,00 kg/cm2
Dimensions Fondations (Dimensi Pondasi)
Width Fondations Directions X (Lebar Pondasi Arah X) Bx = 0,60 m
Width Fondations Directions Y (Lebar Pondasi Arah Y) By = 0,60 m
Thick Foundation (Ketebalan Pondasi) h = 0,70 m
Width Column Directions X (Lebar Kolom Arah X) bx = 0,30 m
Width Column Directions Y (Lebar Kolom Arah Y) by = 0,30 m
Position Column (Posisi Kolom) as =
Contruction Materials (Bahan Kontruksi)
Kuat tekan beton, fc' = 25,0 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Berat beton bertulang, gc = 24 kN/m3
Expense Plan (Beban Rencana)
Aksial Load (Gaya Aksial Beban Terfaktor) Pu = 67,905 kN
Moment Direction X (Momen Arah X Beban Terfaktor) Mux = 0,123 kNm
Moment Direction Y (Momen Arah Y Beban Terfaktor) Muy = 2,123 kNm
TERZAGHI And PECK (1943)
Soil Bearing Capacity According Theory Terzaghi (1943)
qu = c * Nc * (1 + 0.3 * B / L) + Df * g * Nq + 0.5 * B * Ng * (1 - 0.2 * B / L)
Data Fondations Foot Plat (Data Fondasi Telapak)
Carrying Capacity of Land (Kapasitas Daya Dukung Tanah)
Kontruksi Gedung
[c] 2016 Ristanto 2 Kapsitas Struktur Pondasi Telapak II
103. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
c = Soil Cohession (kN/m2
) c = 0,30
Df = Depth Fondations (m) Df = 2,00 m
g = Heavy Voulume Land (kN/m3
) g = 17,60 kN/m3
B = Width Fondations (m) B = By = 0,60 m
L = Long fondations (m) L = By = 0,60 m
In the Corner Swipe (Sudut Gesek Dalam) f = 22,00
f = f / 180 * p = 0,383972 rad
a = e
(3*p / 4 - f/2)*tan f
= 2,397429
Kpg = 3 * tan
2
[ 45 + 1/2*( f + 33) ] = 30,17704
Soil Bearing According Theory Of Terzagi
Nc = 1/ tan f * [ a
2
/ (2 * cos
2
(45 + f/2) - 1 ] = 20,272
Nq = a
2
/ [ (2 * cos
2
(45 + f/2) ] = Nc * tan f + 1 = 9,190
Ng = 1/2 * tan f * [ Kpg / cos
2
f - 1 ] = 6,889
Ultimate bearing capacity of the soil by Terzaghi :
qu = c*Nc*(1+0.3*B/L) + Df*g*Nq + 0.5*B*Ng*(1-0.2*B/L) = 333,06 kN/m2
Land carrying capacity qa = qu / 3 = 111,02 kN/m2
MEYERHOF (1956)
Soil bearing capacity according to Meyerhof (1956 )
qa = qc / 33 * [ ( B + 0.3 ) / B ]
2
* Kd
( in kg/cm2
)
With; Kd = 1 + 0.33 * Df / B Must 1.33
qc = Conus detainee average yield on a foundation sondir ( kg/cm2
)
B = Width Fondations (m) B = By = 0,60 m
Df = Depth Fondationts (m) Df = 2,00 m
Kd = 1 + 0.33 * Df / B = 2,1 > 1.33
Taken, Kd = 1,33
Prisoners Conus average yield on a foundation sondir, qc = 34,00 kg/cm2
qa = qc / 33 * [ ( B + 0.3 ) / B ]
2
* Kd = 3,083 kg/cm2
Kontruksi Gedung
[c] 2016 Ristanto 3 Kapsitas Struktur Pondasi Telapak II
104. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Permit the carrying capacity of the land, qa = 308,32 kN/m2
Soil Bearing Capacity According Theory Terzaghi (1943) qa = 111,02 kN/m2
Soil bearing capacity according to Meyerhof (1956 ) qa = 308,32 kN/m2
Support Soil Bearing oF Use qa = 308,32 kN/m2
Basic Size foot plat (Luas Dasar Telapak) A = Bx * By = 0,3600 m2
Prisoners Moment X (Tahanan Momen X) Wx = 1/6 * By * Bx
2
= 0,0360 m3
Prisoners Moment Y (Tahanan Momen Y) Wy = 1/6 * Bx * By
2
= 0,0360 m3
Soil High Above foot plat (Tinggi Tanah diatas Telapak) z = Df - h = 1,30 m
Pressure Against weight (Tekanan Terhadap Berat) q = h * gc + z * g = 39,680 kN/m2
Eksentrisitas on fondasi :
ex = Mux / Pu = 0,0018 m < Bx / 6 = 0,1000 m (OK)
ey = Muy / Pu = 0,0313 m < By / 6 = 0,1000 m (OK)
Maximum ground voltage that occurs at the base of the foundation :
Tegangan tanah maksimum yang terjadi pada dasar fondasi
qmax = Pu / A + Mux / Wx + Muy / Wy + q = 290,694 kN/m2
qmax < qa SAFE (OK)
Support Capascity of Land Use (Kapasitas Daya Dukung Tanah Yang Dipakai)
Voltage Soil Control (Kontrol Tegangan Tanah)
Kontruksi Gedung
[c] 2016 Ristanto 4 Kapsitas Struktur Pondasi Telapak II
105. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Minimum ground voltage that occurs at the base of the foundation
Tegangan tanah minimum yang terjadi pada dasar fondasi
qmin = Pu / A - Mux / Wx - Muy / Wy + q = 165,916 kN/m2
qmin > 0 Voltage Happend Pull (OK)
Overview Slide Directions X (Tinjauan Geser Arah X)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,075 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,625 m
Distance Field Critical (Jarak Bidang Kritis Telapak)
ax = ( Bx - bx - d ) / 2 = -0,163 m
Soil in Sector Critical Voltage Slide X (Tegangan Tanah pada Bidang Kritis Geser X)
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 324,488 kN/m2
Shear Force Direction X (Gaya Geser Arah X)
Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = -26,121 kN
Field Width Slide X (Lebar Bidang Geser Arah X) b = By = 600 mm
Effective Thickness footpla (Tebal Efektif Telapak) d = 625 mm
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding direction x (Kuat Geser Telapak Arah X )
Vc = [ 1 + 2 / bc ] * √ fc' * b * d / 6 * 10
-3
= 937,500 kN
Force Slide On Foot Plate (Gaya Geser Pada Telapak)
Kontruksi Gedung
[c] 2016 Ristanto 5 Kapsitas Struktur Pondasi Telapak II
106. Masjid Nurul Hasannah STRUKTUR PONDASI TELAPAK
REVIEW ANALISIS STRUCTURE
2016
Vc = [ as * d / b + 2 ] * √ fc' * b * d / 12 * 10-3
= 312,500 kN
Vc = 1 / 3 * √ fc' * b * d * 10-3
= 625,000 kN
Then Strong Slide (maka, Kuat Geser) Vc = 312,500 kN
Reduction Factor (Faktor Reduksi) f = 0,75
Strong Slide (Kuat Geser) f * Vc = 234,375 kN
Conditions to be met (Syarat yang harus dipenuhi)
f * Vc ≥ Vux
234,375 > -26,121 SAFE (OK)
Overview Slide Directions Y (Tinjauan Geser Arah Y)
Distance Center Reinforcment (Jarak Pusat Tulangan) d' = 0,085 m
Effective Thickness foot plat (Tebal efektif Telapak) d = h - d' = 0,615 m
Distance Field Critical (Jarak Bidang Kritis Telapak)
ay = ( By - by - d ) / 2 = -0,158 m
Soil in Sector Critical Voltage Slide Y (Tegangan Tanah pada Bidang Kritis Geser Y)
qy = qmin + (By - ay) / By * (qmax - qmin) = 323,448 kN/m2
Shear Force Direction Y (Gaya Geser Arah Y)
Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = -25,268 kN
Field Width Slide Y (Lebar Bidang Geser Arah Y) b = Bx = 600 mm
Effective Thickness footpla (Tebal Efektif Telapak) d = 615 mm
Ratio Column (Rasio Kolom) bc = bx / by = 1,0000
Strong foot plate sliding direction Y (Kuat Geser Telapak Arah Y )
Kontruksi Gedung
[c] 2016 Ristanto 6 Kapsitas Struktur Pondasi Telapak II