Melanie Swan
Purdue University
melanie@BlockchainStudies.org
Deep Learning Explained
The future of Artificial Intelligence and Smart Networks
Scientech
Indianapolis IN, May 6, 2019
Slides: http://slideshare.net/LaBlogga
Image credit: NVIDIA
6 May 2019
Deep Learning 1
Melanie Swan, Technology Theorist
 Philosophy Department, Purdue University,
Indiana, USA
 Founder, Institute for Blockchain Studies
 Singularity University Instructor; Institute for Ethics and
Emerging Technology Affiliate Scholar; EDGE
Essayist; FQXi Advisor
Traditional Markets Background
Economics and Financial
Theory Leadership
New Economies research group
Source: http://www.melanieswan.com, http://blockchainstudies.org/NSNE.pdf, http://blockchainstudies.org/Metaphilosophy_CFP.pdf
https://www.facebook.com/groups/NewEconomies
6 May 2019
Deep Learning
Deep Learning Smart Network Thesis
2
(1) Deep learning (machine learning) is one of the
latest and most important Artificial Intelligence
technologies.
This is in the bigger context that
(2) Humanity is embarked on a Digital
Transformation Journey, evolving into a
Computation-harnessing Society with Smart
Network Technologies
(Smart networks: autonomous computing networks such as
deep learning nets, blockchains, and UAV fleets)
Source: Swan, M., and dos Santos, R.P. In prep. Smart Network Field Theory: The Technophysics of Blockchain and Deep Learning.
https://www.researchgate.net/publication/328051668_Smart_Network_Field_Theory_The_Technophysics_of_Blockchain_and_Deep_Learning
6 May 2019
Deep Learning
Agenda
 Digital Transformation Journey
 Artificial Intelligence
 Deep Learning
 Definition
 How does it work?
 Technical details
 Applications
 Near-term
 Future
 Conclusion
 Research and Risks
3
Image Source: http://www.opennn.net
6 May 2019
Deep Learning
Digital Transformation Journey
 Digital transformation: digitizing information and processes
 $3.8 trillion global IT spend 2019 (Gartner)
 $3.9 trillion global business value derived from AI in 2022
 $1.3 trillion Digital Transformation Technologies (IDC)
 $77.6 billion spend on AI systems in 2022
4
Source: https://www.gartner.com/en/newsroom/press-releases/2019-01-28-gartner-says-global-it-spending-to-reach--3-8-trillio,
https://www.idc.com/getdoc.jsp?containerId=prUS43381817
 Digital transformation
 Technology used to
make existing work more
efficient, now technology
is transforming the work
itself
 Blockchain, IoT, AI,
Cloud technologies
6 May 2019
Deep Learning
Philosophy of Economic Theory
Future of the Digital Economy
5
Digital InfrastructurePhysical Infrastructure
Digital
Networks
• Natural Resources
• Electricity
• Data
• Communications
Intelligent
Networks
Transportation
Networks
• Blockchain
• Deep Learning
Smart Infrastructure
Traditional
Economy
Digital Economy
1700-1970 1970-2015 2015-2050
Phase 1 Phase 2
Now
IntelligenceDigitization
6 May 2019
Deep Learning
Philosophy of Economic Theory
Longer-term Economic Futures
6
Traditional
Economy
Digital
Economy
CRISPR
Bioprinting
Cellular Therapies
Natural resources
Electricity
Manufacturing
Atoms Bits Cells Energy
Social Networks
Apps
Payments
Now
Biological
Economy
Space
Economy
Phase 1 Phase 2
IntelligenceDigitization
1700-1970 1970-2015 2015-2050 2020-2080 2025-2100
Value
Mining
Settlement
Exploration
Blockchain
Deep Learning
6 May 2019
Deep Learning
 Exascale supercomputing 2021e
 Exabyte global data volume 2020e: 40 EB
 Scientific, governmental, corporate, and personal
Big Data ≠ Smart Data
Sources: http://www.oyster-ims.com/media/resources/dealing-information-growth-dark-data-six-practical-steps/,
https://www.theverge.com/2019/3/18/18271328/supercomputer-build-date-exascale-intel-argonne-national-laboratory-energy
7
Only 6% data protected, only
42% companies say they know
how to extract meaningful
insights from the data available
to them (Oxford Economics
Workforce 2020)
6 May 2019
Deep Learning
Why do we need Learning Technologies?
8
 Big data is not smart data (i.e. usable)
 New data science methods needed for data growth,
older learning algorithms under-performing
Source: http://blog.algorithmia.com/introduction-to-deep-learning-2016
6 May 2019
Deep Learning
Agenda
 Digital Transformation Journey
 Artificial Intelligence
 Deep Learning
 Definition
 How does it work?
 Technical details
 Applications
 Near-term
 Future
 Conclusion
 Research and Risks
9
Image Source: http://www.opennn.net
6 May 2019
Deep Learning
Artificial Intelligence (AI) Argument
 Artificial intelligence is using
computers to do cognitive work
(physical or mental) that usually
requires a human
 Deep Learning/Machine Learning
is the biggest area in AI
10
Source: Swan, M. Philosophy of Deep Learning Networks: Reality Automation Modules.
Ke Jie vs. AlphaGo AI Go player, Future of
Go Summit, Wuzhen China, May 2017
6 May 2019
Deep Learning
Progression in AI Learning Machines
11
Single-purpose AI:
Hard-coded rules
Multi-purpose AI:
Algorithm detects rules,
reusable template
Question-answering AI:
Natural-language processing
Deep Learning prototypeHard-coded AI machine Deep Learning machine
Deep Blue, 1997 Watson, 2011 AlphaGo, 2016
6 May 2019
Deep Learning 12
Conceptual Definition:
Deep learning is a computer program that can
identify what something is
Technical Definition:
Deep learning is a class of machine learning
algorithms in the form of a neural network that
uses a cascade of layers of processing units to
extract features from data sets in order to make
predictive guesses about new data
Source: Extending Jann LeCun, http://spectrum.ieee.org/automaton/robotics/artificial-intelligence/facebook-ai-director-yann-lecun-
on-deep-learning
What is Deep Learning?
6 May 2019
Deep Learning
How are AI and Deep Learning related?
13
Source: Machine Learning Guide, 9. Deep Learning
 Artificial intelligence:
 Using computers to do cognitive work
that usually requires a human
 Machine learning:
 Computers with the capability to learn
using patterns and inference as
opposed to explicit instructions
 Neural network:
 A computer system modeled on the
human brain and nervous system
 Deep learning:
 Program that can recognize objects
Deep
Learning
Neural Nets
Machine Learning
Artificial Intelligence
Computer Science
Within the Computer Science
discipline, in the field of Artificial
Intelligence, Deep Learning is a
class of Machine Learning
algorithms, that are in the form
of a Neural Network
6 May 2019
Deep Learning
What is a Neural Net?
14
 Intuition: create an Artificial Neural Network to solve
problems in the same way as the human brain
6 May 2019
Deep Learning
Technophysics and Statistical Mechanics
Deep Learning is inspired by Physics
15
 Sigmoid function suggested as a model for neurons,
per statistical mechanical behavior (Cowan, 1972)
 Stationary solutions for dynamic models (asymmetric
weights create an oscillator to model neuron signaling)
 Hopfield Neural Network: content-addressable
memory system with binary threshold nodes,
converges to a local minimum (Hopfield, 1982)
 Can use statistical mechanics (Ising model of
ferromagnetism) for neurons
 Restricted Boltzmann Machine (Hinton, 1983)
 Statistical mechanics and condensed matter: Boltzmann
distribution, free energy, Gibbs sampling, renormalization;
stochastic processing units with binary output
Source: https://www.quora.com/Is-deep-learning-related-to-statistical-physics-particularly-network-science
6 May 2019
Deep Learning
Agenda
 Digital Transformation Journey
 Artificial Intelligence
 Deep Learning
 Definition
 How does it work?
 Technical details
 Applications
 Near-term
 Future
 Conclusion
 Research and Risks
16
Image Source: http://www.opennn.net
6 May 2019
Deep Learning
Why is it called “Deep” Learning?
 Hidden layers of processing (2-20 intermediary layers)
 “Deep” networks (3+ layers) versus “shallow” (1-2 layers)
 Basic deep learning network: 5 layers; GoogleNet: 22 layers
17
Sandwich Architecture:
visible Input and Output layers
with hidden processing layers
GoogleNet:
22 layers
6 May 2019
Deep Learning
Why Deep “Learning”?
 System is “dumb” (i.e. mechanistic)
 “Learns” by having big data (lots of input examples), and making
trial-and-error guesses to adjust weights to find key features
 Creates a predictive system to identity new examples
 Usual AI argument: big enough data is what makes a
difference (“simple” algorithms run over large data sets)
18
Input: Big Data (e.g.;
many examples)
Method: Trial-and-error
guesses to adjust node weights
Output: system identifies
new examples
6 May 2019
Deep Learning
Sample task: is that a Car?
 Create an image recognition system that determines
which features are relevant (at increasingly higher levels
of abstraction) and correctly identifies new examples
19
Source: Jann LeCun, http://www.pamitc.org/cvpr15/files/lecun-20150610-cvpr-keynote.pdf
6 May 2019
Deep Learning
Two classes of Learning Systems
Supervised and Unsupervised Learning
 Supervised
 Classify labeled data
 Unsupervised
 Find patterns in
unlabeled data
20
Source: https://www.slideshare.net/ThomasDaSilvaPaula/an-introduction-to-machine-learning-and-a-little-bit-of-deep-learning
6 May 2019
Deep Learning
Early success in Supervised Learning (2011)
 YouTube: user-classified data
perfect for Supervised Learning
21
Source: Google Brain: Le, QV, Dean, Jeff, Ng, Andrew, et al. 2012. Building high-level features using large scale unsupervised
learning. https://arxiv.org/abs/1112.6209
6 May 2019
Deep Learning
2 main kinds of Deep Learning neural nets
22
Source: Yann LeCun, CVPR 2015 keynote (Computer Vision ), "What's wrong with Deep Learning" http://t.co/nPFlPZzMEJ
 Convolutional Neural Nets
 Image recognition
 Convolve: roll up to higher
levels of abstraction to identify
feature sets
 Recurrent Neural Nets
 Speech, text, audio recognition
 Recur: iterate over sequential
inputs with a memory function
 LSTM (Long Short-Term
Memory) remembers
sequences and avoids
gradient vanishing
6 May 2019
Deep Learning
Image Recognition and Computer Vision
23
Source: Quoc Le, https://arxiv.org/abs/1112.6209; Yann LeCun, NIPS 2016,
https://drive.google.com/file/d/0BxKBnD5y2M8NREZod0tVdW5FLTQ/view
Marv Minsky, 1966
“summer project”
Jeff Hawkins, 2004, Hierarchical
Temporal Memory (HTM)
Quoc Le, 2011, Google
Brain cat recognition
Convolutional net for autonomous driving, http://cs231n.github.io/convolutional-networks
History
Current state of
the art - 2019
6 May 2019
Deep Learning
Image Classification
24
Source: https://cs.stanford.edu/people/karpathy/deepimagesent/?hn
 Human-level image recognition and captioning
6 May 2019
Deep Learning
Image Understanding
25
Source: https://cs.stanford.edu/people/karpathy/deepimagesent/?hn
 “Understanding” is the system’s three-step process
 Image -> internal representation -> text
 Labels “tennis racket” = concepts
 Machine learning: Kantian-level object recognition, not Hegelian
6 May 2019
Deep Learning
Famous Image Nets
 Image recognition (<10% error rate)
 AlexNet (2012) - 5 layers
 Error rate 15.3% versus 26.2%
 VGGNet (2018) - 19 CNN layers
 GoogleNet (2019) - 22 CNN layers
 BatchNorm (between Conv and Pooling)
 Microsoft ResNet (2015) - diverse layers
26
Sources: https://towardsdatascience.com/an-overview-of-resnet-and-its-variants-5281e2f56035,
https://medium.com/coinmonks/paper-review-of-vggnet-1st-runner-up-of-ilsvlc-2014-image-classification-d02355543a11
6 May 2019
Deep Learning
Speed and size of Deep Learning nets?
 Google Deep Brain cat recognition, 2011
 1 bn connections, 10 mn images (200x200 pixel),
1,000 machines (16,000 cores), 3 days
 State of the art, 2016-2019
 NVIDIA facial recognition, 100 million images, 10
layers, 1 bn parameters, 30 exaflops, 30 GPU days
 Google Net, 11.2 bn parameter system
 Lawrence Livermore Lab, 15 bn parameter system
 Digital Reasoning, “cognitive computing” (Nashville
TN), 160 bn parameters, trains on three multi-core
computers overnight
27
Parameters: variables that determine the network structure
Sources:,https://futurism.com/biggest-neural-network-ever-pushes-ai-deep-learning, Digital Reasoning paper:
https://arxiv.org/pdf/1506.02338v3.pdf
6 May 2019
Deep Learning
Agenda
 Digital Transformation Journey
 Artificial Intelligence
 Deep Learning
 Definition
 How does it work?
 Technical details
 Applications
 Near-term
 Future
 Conclusion
 Research and Risks
28
Image Source: http://www.opennn.net
6 May 2019
Deep Learning
Problem: correctly recognize “apple”
29
Source: Michael A. Nielsen, Neural Networks and Deep Learning
6 May 2019
Deep Learning
Modular Processing Units
30
Source: http://deeplearning.stanford.edu/tutorial
1. Input 2. Hidden layers 3. Output
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
 Unit: processing unit, logit (logistic
regression unit), perceptron, artificial neuron
6 May 2019
Deep Learning
Image Recognition
Digitize Input Data into Vectors
31
Source: Quoc V. Le, A Tutorial on Deep Learning, Part 1: Nonlinear Classifiers and The Backpropagation Algorithm, 2015, Google
Brain, https://cs.stanford.edu/~quocle/tutorial1.pdf
6 May 2019
Deep Learning
Image Recognition
Log features and trial-and-error test
32
1. Input 2. Hidden layers 3. Output
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Source: http://deeplearning.stanford.edu/tutorial; MNIST dataset: http://yann.lecun.com/exdb/mnist
 Mathematical methods used to update the weights
 Linear algebra: matrix multiplications of input vectors
 Statistics: logistic regression units (Y/N (0,1)), probability weighting
and updating, inference for outcome prediction
 Calculus: optimization (minimization), gradient descent in back-
propagation to avoid local minima with saddle points
Feed-forward pass (0,1)
1.5
Backward pass to update probabilities per correct guess
.5.5
.5.5.5
1
10
.75
.25
Inference
Guess
Actual
Feature 1
Feature 2
Feature 3
6 May 2019
Deep Learning
Image Recognition
Levels of Abstraction Object Recognition
33
Source: Jann LeCun, http://www.pamitc.org/cvpr15/files/lecun-20150610-cvpr-keynote.pdf
 Layer 1: Log all features (line, edge, unit of sound)
 Layer 2: Identify more complicated features (jaw line,
corner, combination of speech sounds)
 Layer 3+: Push features to higher levels of abstraction
until full objects can be recognized
6 May 2019
Deep Learning
Image Recognition
Higher Abstractions of Feature Recognition
34
Source: https://adeshpande3.github.io/The-9-Deep-Learning-Papers-You-Need-To-Know-About.html
6 May 2019
Deep Learning
Example: NVIDIA Facial Recognition
35
Source: NVIDIA
 First hidden layer extracts all possible low-level features
from data (lines, edges, contours); next layers abstract
into more complex features of possible relevance
6 May 2019
Deep Learning
Deep Learning
36
Source: Quoc V. Le et al, Building high-level features using large scale unsupervised learning, 2011, https://arxiv.org/abs/1112.6209
6 May 2019
Deep Learning
Speech, Text, Audio Recognition
Sequence-to-sequence Recognition + LSTM
37
Source: Andrew Ng
 LSTM: Long Short Term Memory
 Technophysics technique: each subsequent layer remembers
data for twice as long (fractal-type model)
 The “grocery store” not the “grocery church”
6 May 2019
Deep Learning
Agenda
 Digital Transformation Journey
 Artificial Intelligence
 Deep Learning
 Definition
 How does it work?
 Technical details
 Applications
 Near-term
 Future
 Conclusion
 Research and Risks
38
Image Source: http://www.opennn.net
6 May 2019
Deep Learning
 Logistic regression, Lego-like structure of layers of
processing units, and finding the minimum of the curve
3 Key Technical Aspects of Deep Learning
39
Reduce combinatoric
dimensionality
Core processing unit
(input-processing-output)
Levers: weights and bias
Squash values into
Sigmoidal S-curve
-Binary values (Y/N, 0/1)
-Probability values (0 to 1)
-Tanh values 9(-1) to 1)
Loss FunctionPerceptron StructureSigmoid Function
“Dumb” system learns by
adjusting parameters and
checking against outcome
Loss function
optimizes efficiency
of solution
Non-linear curve
(logistic regression)
means manipulability
What
Why
6 May 2019
Deep Learning
1. Regression
Linear Regression
40
House price vs. Size (square feet)
y=mx+b
House price
Size (square feet)
Source: https://www.statcrunch.com/5.0/viewreport.php?reportid=5647
 Regression: how does one variable relate to another
6 May 2019
Deep Learning
Logistic Regression
41
Source: http://www.simafore.com/blog/bid/99443/Understand-3-critical-steps-in-developing-logistic-regression-models
6 May 2019
Deep Learning
Logistic Regression
42
 Higher-order mathematical
formulation
 Sigmoid function
 S-shaped and bounded
 Maps the whole real axis into a finite
interval (0-1)
 Non-linear
 Can fit probability
 Can apply optimization techniques
 Deep Learning classification
predictions are in the form of a
probability value
Source: https://www.quora.com/Logistic-Regression-Why-sigmoid-function
Sigmoid Function
Unit Step Function
6 May 2019
Deep Learning
Sigmoid function: Taleb
43
Source: Swan, M. (2019). Blockchain Theory of Programmable Risk: Black Swan Smart Contracts. In Blockchain Economics: Implications
of Distributed Ledgers - Markets, communications networks, and algorithmic reality. London: World Scientific.
 Thesis: mapping a phenomenon to an
s-curve curve (“convexify” it), means
its risk may be controlled
 Antifragility = convexity = risk-manageable
 Fragility = concavity
 Non-linear dose response in medicine
suggests treatment optimality
 U-shaped, j-shaped curves in hormesis
(biphasic response); Bell’s theorem
6 May 2019
Deep Learning
Regression (summary)
 Logistic regression
 Predict binary outcomes:
 Perceptron (0 or 1)
 Predict probabilities:
 Sigmoid Neuron (values 0-1)
 Tanh Hyperbolic Tangent
Neuron (values (-1)-1)
44
Logistic Regression (Sigmoid function)
(0-1) or Tanh ((-1)-1)
Linear Regression
 Linear regression
 Predict continuous set
of values (house prices)
6 May 2019
Deep Learning
2. Lego-like layers of processing units
Deep Learning Architecture
45
Source: Michael A. Nielsen, Neural Networks and Deep Learning
Modular Processing Units
6 May 2019
Deep Learning
More complicated in actual use
 Convolutional neural net scale-up for
number recognition
 Example data: MNIST dataset
 http://yann.lecun.com/exdb/mnist
46
Source: http://www.kdnuggets.com/2016/04/deep-learning-vs-svm-random-forest.html
6 May 2019
Deep Learning
Node Structure: Computation Graph
47
Edge
(input value)
Architecture
Node
(operation)
Edge
(input value)
Edge
(output value)
Example 1
3
4
Add
??
Example 2
3
4
Multiply
??
6 May 2019
Deep Learning
Basic node with Weights and Bias
48
Edge
Input value = 4
Edge
Input value = 16
Edge
Output value = 20
Node
Operation =
Add
Input Values have
Weights w
Nodes have a
Bias bw1* x1
w2*x2
N+b
.25*4=1
.75*16=12
13+2 15
Input Processing Output Variable Weights and
Biases
 Basic node structure is fixed: input-processing-output
 Weight and bias are variable parameters that are
adjusted as the system iterates and “learns”
Source: http://neuralnetworksanddeeplearning.com/chap1.html
Mimics NAND gate
Basic Node Structure (fixed) Basic Node with Weights and Bias (variable)
6 May 2019
Deep Learning
Image Recognition
Log features and trial-and-error test
49
1. Input 2. Hidden layers 3. Output
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Source: http://deeplearning.stanford.edu/tutorial; MNIST dataset: http://yann.lecun.com/exdb/mnist
 Mathematical methods used to update the weights
 Linear algebra: matrix multiplications of input vectors
 Statistics: logistic regression units (Y/N (0,1)), probability weighting
and updating, inference for outcome prediction
 Calculus: optimization (minimization), gradient descent in back-
propagation to avoid local minima with saddle points
Feed-forward pass (0,1)
1.5
Backward pass to update probabilities per correct guess
.5.5
.5.5.5
1
10
.75
.25
Inference
Guess
Actual
Feature 1
Feature 2
Feature 3
6 May 2019
Deep Learning
Actual: same structure, more complicated
50
6 May 2019
Deep Learning 51
Source: https://medium.com/@karpathy/software-2-0-a64152b37c35
Same structure, more complicated values
6 May 2019
Deep Learning
Neural net: massive scale-up of nodes
52
Source: http://neuralnetworksanddeeplearning.com/chap1.html
6 May 2019
Deep Learning
Same Structure
53
6 May 2019
Deep Learning
How does the neural net actually “learn”?
 Vary the weights
and biases to see if
a better outcome is
obtained
 Repeat until the net
correctly classifies
the data
54
Source: http://neuralnetworksanddeeplearning.com/chap2.html
 Structural system based on cascading layers of
neurons with variable parameters: weight and bias
6 May 2019
Deep Learning
3. Loss function optimization
Backpropagation
 Problem: Combinatorial complexity
 Inefficient to test all possible parameter variations
 Solution: Backpropagation (1986 Nature paper)
 Optimization method used to calculate the error
contribution of each neuron after a batch of data is
processed
55
Source: http://neuralnetworksanddeeplearning.com/chap2.html
6 May 2019
Deep Learning
Backpropagation of errors
1. Calculate the total error
2. Calculate the contribution to the error at each step
going backwards
 Variety of Error Calculation methods: Mean Square Error
(MSE), sum of squared errors of prediction (SSE), Cross-
Entropy (Softmax), Softplus
 Goal: identify which feature solutions have a higher
power of potential accuracy
56
6 May 2019
Deep Learning
Backpropagation
 Heart of Deep Learning
 Backpropagation: algorithm dynamically calculates
the gradient (derivative) of the loss function with
respect to the weights in a network to find the
minimum and optimize the function from there
 Algorithms optimize the performance of the network by
adjusting the weights, e.g.; in the gradient descent algorithm
 Error and gradient are computed for each node
 Intermediate errors transmitted backwards through the
network (backpropagation)
 Objective: optimize the weights so the network can
learn how to correctly map arbitrary inputs to outputs
57
Source: http://briandolhansky.com/blog/2013/9/27/artificial-neural-networks-backpropagation-part-4,
https://mattmazur.com/2015/03/17/a-step-by-step-backpropagation-example/
6 May 2019
Deep Learning
Gradient Descent
 Gradient: derivative to find the minimum of a function
 Gradient descent: optimization algorithm to find the
biggest errors (minima) most quickly
 Error = MSE, log loss, cross-entropy; e.g.; least correct
predictions to correctly identify data
 Technophysics methods: spin glass, simulated
annealing
58
Source: http://briandolhansky.com/blog/2013/9/27/artificial-neural-networks-backpropagation-part-4
6 May 2019
Deep Learning
 Optimization Technique
 Mathematical tool used in statistics, finance, decision
theory, biological modeling, computational neuroscience
 State as non-linear equation to optimize
 Minimize loss or cost
 Maximize reward, utility, profit, or fitness
 Loss function links instance of an event to its cost
 Accident (event) means $1,000 damage on average (cost)
 5 cm height (event) confers 5% fitness advantage (reward)
 Deep learning: system feedback loop
 Apply cost penalty for incorrect classifications in training
 Methods: CNN (classification): cross-entropy; RNN
(regression): MSE
Loss Function
59
Laplace
6 May 2019
Deep Learning
Known problems: Overfitting
 Regularization
 Introduce additional information
such as a lambda parameter in the
cost function (to update the theta
parameters in the gradient descent
algorithm)
 Dropout: prevent complex
adaptations on training data by
dropping out units (both hidden and
visible)
 Test new datasets
60
6 May 2019
Deep Learning
Agenda
 Digital Transformation Journey
 Artificial Intelligence
 Deep Learning
 Definition
 How does it work?
 Technical details
 Applications
 Near-term
 Future
 Conclusion
 Research and Risks
61
Image Source: http://www.opennn.net
6 May 2019
Deep Learning
Applications: Cats to Cancer to Cognition
62
Source: Yann LeCun, CVPR 2015 keynote (Computer Vision ), "What's wrong with Deep Learning" http://t.co/nPFlPZzMEJ
Computational imaging: Machine learning for 3D microscopy
https://www.nature.com/nature/journal/v523/n7561/full/523416a.html
6 May 2019
Deep Learning
Radiology: Tumor Image Recognition
63
Source: https://www.nature.com/articles/srep24454
 Computer-Aided
Diagnosis with
Deep Learning
 Breast tissue
lesions in images
 Pulmonary nodules
in CT Scans
6 May 2019
Deep Learning
Melanoma Image Recognition
64
Source: Nature volume542, pages115–118 (02 February 2017
http://www.nature.com/nature/journal/v542/n7639/full/nature21056.html
2017
6 May 2019
Deep Learning
Melanoma Classification
65
Source: https://www.techemergence.com/machine-learning-medical-diagnostics-4-current-applications/
 Diagnose skin cancer using deep learning CNNs
 Algorithm trained to detect skin cancer (melanoma)
using 130,000 images of skin lesions representing over
2,000 different diseases
6 May 2019
Deep Learning
DIY Image Recognition: use Contrast
66
Source: https://developer.clarifai.com/modelshttps://developer.clarifai.com/models
How many orange pixels?
Apple or Orange? Melanoma risk or healthy skin?
Degree of contrast in photo colors?
6 May 2019
Deep Learning
Deep Learning and Genomics: RNNs
 Large classes of hypothesized but unknown correlations
 Genotype-phenotype disease linkage unknown
 Computer-identifiable patterns in genomic data
 RNN: textual analysis; CNN: genome symmetry
67
Source: http://ieeexplore.ieee.org/document/7347331
6 May 2019
Deep Learning
AI Medical Diagnosis
 Earlier stage diagnosis, personalized, world health clinic
 Smartphone-based diagnostic tools with AI for optical
detection and EVA (enhanced visual assessment)
68
Source: https://spectrum.ieee.org/biomedical/devices/ai-medicine-comes-to-africas-rural-clinics
6 May 2019
Deep Learning
Deep Learning World Clinic
 WHO estimates 400 million people without
access to essential health services
 6% in extreme poverty due to healthcare costs
 Next leapfrog technology: Deep Learning
 Last-mile build out of brick-and-mortar clinics
does not make sense in era of digital medicine
 Medical diagnosis via image recognition, natural
language processing symptoms description
 Convergence Solution: Digital Health Wallet
 Deep Learning medical diagnosis + Blockchain-
based EMRs (electronic medical records)
 Empowerment Effect: Deep learning = “tool I
use,” not hierarchically “doctor-administered”
69
Source: http://www.who.int/mediacentre/news/releases/2015/uhc-report/en/
Digital Health Wallet:
Deep Learning diagnosis
Blockchain-based EMRs
6 May 2019
Deep Learning
Deep Learning and the Brain
70
6 May 2019
Deep Learning
 Deep learning neural networks are inspired by the
structure of the cerebral cortex
 The processing unit, perceptron, artificial neuron is the
mathematical representation of a biological neuron
 In the cerebral cortex, there can be several layers of
interconnected perceptrons
71
Deep Qualia machine? General purpose AI
Mutual inspiration of neurological and computing research
6 May 2019
Deep Learning
Brain is hierarchically organized
 Visual cortex is hierarchical with intermediate layers
 The ventral (recognition) pathway in the visual cortex has multiple
stages: Retina - LGN - V1 - V2 - V4 - PIT – AIT
 Human brain simulation projects
 Swiss Blue Brain project, European Human Brain Project
72
Source: Jann LeCun, http://www.pamitc.org/cvpr15/files/lecun-20150610-cvpr-keynote.pdf
6 May 2019
Deep Learning
Agenda
 Digital Transformation Journey
 Artificial Intelligence
 Deep Learning
 Definition
 How does it work?
 Technical details
 Applications
 Near-term
 Future
 Conclusion
 Research and Risks
73
Image Source: http://www.opennn.net
6 May 2019
Deep Learning 74
the farther future: better horse is a car.
new technology.
better horse “horseless carriage” => car
6 May 2019
Deep Learning
Autonomous Driving
 Deep Learning
 Identify what things are
 CNNs: core element of machine
vision systems
 Scenario-based decision-making
75
6 May 2019
Deep Learning
The Very Small
Deep Learning in Cells
 On-board pacemaker data security,
software updates, patient monitoring
 Medical nanorobotics for cell repair
 Deep Learning: identify what things are
(diagnosis)
 Blockchain: secure automation technology
 Bio-cryptoeconomics: secure automation
of medical nanorobotics for cell repair
 Medical nanorobotics as coming-onboard
repair platform for the human body
 High number of agents and “transactions”
 Identification and automation is obvious
76
Sources: Swan, M. Blockchain Thinking: The Brain as a DAC (Decentralized Autonomous Corporation)., IEEE 2015; 34(4): 41-52 , Swan,
M. Forthcoming. Technophysics, Smart Health Networks, and the Bio-cryptoeconomy: Quantized Fungible Global Health Care Equivalency
Units for Health and Well-being. In Boehm, F. Ed., Nanotechnology, Nanomedicine, and AI. Boca Raton FL: CRC Press
6 May 2019
Deep Learning
The Very Small
Human Brain/Cloud Interface
77
Sources: Martins, Swan, Freitas Jr., et. al. 2019. Human Brain/Cloud Interface. Front. Neurosci.
6 May 2019
Deep Learning
The Very Large
Deep Learning in Space
 Satellite networks
 Automated space
construction bots/agents
 Deep Learning: identify
what things are
(classification)
 Blockchain: secure
automation technology
 Applications: asteroid
mining, terraforming,
radiation-monitoring,
space-based solar power,
debris tracking net
78
6 May 2019
Deep Learning
Quantum Machine Learning
79
 Quantum Computing: assign an amplitude (not a
probability) for possible states of the world
 Amplitudes can interfere destructively and cancel out,
be complex numbers, not sum to 1
 Feynman: “QM boils down to the minus signs”
 QC: a device that maintains a state that is a
superposition for every configuration of bits
 Turn amplitude into probabilities (event probability is
the squared absolute value of its amplitude)
 Challenge: obtain speed advantage by exploiting
amplitudes, need to choreograph a pattern of
interference (not measure random configurations)
Sources: Scott Aaronson; and Biamonte, Lloyd, et al. (2017). Quantum machine learning. Nature. 549:195–202.
6 May 2019
Deep Learning
Agenda
 Digital Transformation Journey
 Artificial Intelligence
 Deep Learning
 Definition
 How does it work?
 Technical details
 Applications
 Near-term
 Future
 Conclusion
 Research and Risks
80
Image Source: http://www.opennn.net
6 May 2019
Deep Learning
Research Topics
 Layer depth vs. height: (1x9, 3x3, etc.); L1/2 slow-downs
 Dark knowledge: data compression, compress dark
(unseen) knowledge into a single summary model
 Adversarial networks: two networks, adversary network
generates false data and discriminator network identifies
 Reinforcement networks: goal-oriented algorithm for
system to attain a complex objective over many steps
81
Source: http://cs231n.github.io/convolutional-networks, https://arxiv.org/abs/1605.09304,
https://www.iro.umontreal.ca/~bengioy/talks/LondonParisMeetup_15April2015.pdf
6 May 2019
Deep Learning
Research Topics
82
Sources: Devlin et al. 2018. BERT: Pre-training of Deep Bidirectional Transformers for Language Understanding,
http://prog3.com/sbdm/blog/zouxy09/article/details/8781396
 Language representation models
 BERT (Bidirectional Encoder
Representations from Transformers)
 Deep Belief Network
 Connections between layers not units
 Find initial weighting guesses for units
as system pre-processing step
 Deep Boltzmann Machine
 Stochastic recurrent neural network
 Internal representations of learning
 Represent and solve combinatoric
problems
Deep
Boltzmann
Machine
Deep
Belief
Network
6 May 2019
Deep Learning
Google Deep Dream net
 Deep dream generated images
 Not random pasting of dog snouts
 System synthesizes every pixel in
context, and determines good places
for dog snouts
83
Source: Georges Seurat, Un dimanche après-midi à l'Île de la Grande Jatte, 1884-1886;
http://web.cs.hacettepe.edu.tr/~aykut/classes/spring2016/bil722; Google DeepDream uses algorithmic pareidolia (seeing an image
when none is present) to create a dream-like hallucinogenic appearance
6 May 2019
Deep Learning
Hardware and Software Innovation
84
6 May 2019
Deep Learning
Hardware advance
TPU and GPU clusters
 Chip design and cloud data center
architecture
 GPU chips (graphics processing unit): 3D
graphics cards for fast matrix multiplication
 Google TPU chip (tensor processing unit):
flow through matrix multiplications without
storing interim values in memory (AlphaGo)
 Chip design advances
 Google Cloud TPUs: ML accelerators for
TensorFlow; TPU 3.0 pod (8x more
powerful, up to 100 petaflops (2018))
 NVIDIA DGX-1 integrated deep learning
system (Eight Tesla P100 GPU
accelerators)
85
Google TPU
Cloud and
Chip
Source: http://www.techradar.com/news/computing-components/processors/google-s-tensor-processing-unit-explained-this-is-what-
the-future-of-computing-looks-like-1326915
NVIDIA DGX-1
6 May 2019
Deep Learning
Software advance
What is TensorFlow?
86
Source: https://www.youtube.com/watch?v=uHaKOFPpphU
Python code invoking TensorFlowTensorBoard (TensorFlow) visualization
Computation graph Design in TensorFlow
 “Tensor” = multidimensional arrays used in NN operations
 “Flow” directly through tensor operations (matrix multiplications)
without needing to store intermediate values in memory
Google’s open-source
machine learning library
6 May 2019
Deep Learning
Network advance
Edge Device-based Machine Learning
 Surveillance camera, USB and
Browser-based Machine Learning
 Intel: Movidius Visual Processing
Unit (VPU): USB ML for IOT
 Security cameras, industrial
equipment, robots, drones
 Apple: ML acquisition Turi (Dato)
 Browser-based Deep Learning
 ConvNetJS; TensorFire
 Javascript library to run Deep
Learning nets in a browser
 Smart Network in a browser
 JavaScript Deep Learning
 Blockchain EtherWallets
87
Source: http://cs.stanford.edu/people/karpathy/convnetjs/, http://www.infoworld.com/article/3212884/machine-learning/machine-learning-
comes-to-your-browser-via-javascript.html
6 May 2019
Deep Learning
Risks and Limitations of Deep Learning
88
 Complicated conceptually and technically
 Skilled workforce
 Limited solution
 So far, restricted to a specific range of applications (supervised
learning for image and text recognition)
 Plateau: cheap hardware and already-labeled data sets; need
to model complex network science relationships between data
 Non-generalizable intelligence
 AlphaGo learns each arcade game from scratch
 How does the “black box” system work?
 Claim: no “learning,” just a clever mapping of the input data
vector space to output solution vector space
Source: Battaglia et al. 2018. Relational inductive biases, deep learning, and graph networks. arXiv:1806.01261.
2018
6 May 2019
Deep Learning
Conclusion
• Deep learning is not merely an
AI technique or a software
program, but a new class of
smart network information
technology that is changing the
concept of the modern
technology project by offering
real-time engagement with
reality
• Deep learning is a data
automation method that
replaces hard-coded software
with a capacity, in the form of a
learning network that is trained
to perform a task
89
Conclusion
 Deep learning is an AI
software technology for
identifying objects
 Applications: healthcare,
autonomous driving, robotics
 Deep learning is a new class
of smart network information
technology that is replacing
hard-coded software with a
capacity, in the form of a
learning network that is
trained to perform a task
6 May 2019
Deep Learning
Deep Learning Smart Network Thesis
90
(1) Deep learning (machine learning) is one of the
latest and most important Artificial Intelligence
technologies.
This is in the bigger context that
(2) Humanity is embarked on a Digital
Transformation Journey, evolving into a
Computation-harnessing Society with Smart
Network Technologies
(Smart networks: autonomous computing networks such as
deep learning nets, blockchains, and UAV fleets)
Source: Swan, M., and dos Santos, R.P. In prep. Smart Network Field Theory: The Technophysics of Blockchain and Deep Learning.
https://www.researchgate.net/publication/328051668_Smart_Network_Field_Theory_The_Technophysics_of_Blockchain_and_Deep_Learning
6 May 2019
Deep Learning
Possibility space of Intelligence
91
Sources: http://hplusmagazine.com/2015/09/02/the-space-of-mind-designs-and-the-human-mental-model/,
https://www.nature.com/articles/s41586-019-1138-y
 Machine intelligence as its own species
6 May 2019
Deep Learning
Smart networks
 The network is the computer
92
Source: https://towardsdatascience.com/a-weird-introduction-to-deep-learning-7828803693b0
Computing networks
2015+
Computer networking
1970-1980
Computer networks
1990-2010
6 May 2019
Deep Learning
 Neural Networks and Deep Learning, Michael Nielsen,
http://neuralnetworksanddeeplearning.com/
 Deep Learning, Ian Goodfellow, Yoshua Bengio, Aaron
Courville, http://www.deeplearningbook.org/Machine learning and deep neural nets
 Machine Learning Guide podcast, Tyler Renelle,
http://ocdevel.com/podcasts/machine-learning
 notMNIST dataset http://yaroslavvb.blogspot.com/2011/09/notmnist-dataset.html
 Metacademy; Fast.ai; Keras.io
Resources
93
Distill (visual ML journal)
http://distill.pubSource: http://cs231n.stanford.edu
https://www.deeplearning.ai/
6 May 2019
Deep Learning
Deep Learning frameworks and libraries
94
Source: http://www.infoworld.com/article/3163525/analytics/review-the-best-frameworks-for-machine-learning-and-deep-
learning.html#tk.ifw-ifwsb
Source: https://www.nvidia.com/en-us/deep-learning-ai/industries
Future of AI and Smart Networks
Melanie Swan
Purdue University
melanie@BlockchainStudies.org
Deep Learning Explained
The future of Artificial Intelligence and Smart Networks
Scientech
Indianapolis IN, May 6, 2019
Slides: http://slideshare.net/LaBlogga
Image credit: NVIDIA
Thank You! Questions?
6 May 2019
Deep Learning
Technophysics Research Program:
Application of physics principles to technology
97
Econophysics
Biophysics • Disease causality: role of cellular dysfunction and environmental degradation
• Concentration limits in short and long range inter-cellular signaling
• Boltzmann distribution and diffusion limits in RNAi and SiRNA delivery
• Path integrals extend point calculations in dynamical systems
• General (not only specialized) Schrödinger for Black Scholes option pricing
• Quantum game theory (greater than fixed sum options), Quantum finance
Smart Networks
(intelligent self-operating networks)
Technologies Tools
• Smart network
field theory
• Optimal control
theory
• Blockchain
• Deep Learning
• UAV, HFT, RTB, IoT
• Satellite, nanorobot
Steam
Light and
ElectromagneticsMechanics Information
21c20c18-19c16-17c
Scientific Paradigms Computational Complexity, Black
Holes, and Quantum Gravity
(Aaronson, Susskind, Zenil)
General Topics
Quantum Computation
• Apply renormalization group to system
criticality and phase transition detection
(Aygun, Goldenfeld) and extend tensor
network renormalization (Evenbly, Vidal)
• Unifying principles: same probability
functions used for spin glasses (statistical
physics), error-correcting (LDPC) codes
(information theory), and randomized
algorithms (computer science) (Mézard)
• Define relationships between statistical
physics and information theory: generalized
temperature and Fisher information, partition
functions and free energy, and Gibbs’
inequality and entropy (Merhav)
• Apply complexity theory to blockchain and deep
learning (dos Santos)
• Apply spin glass models to blockchain and deep
learning (LeCun, Auffinger, Stein)
• Apply deep learning to particle physics (Radovic)
Research Topics
Data Science Method: Science Modules
Technophysics The application of physics principles to the study of technology
(particularly statistical physics and information theory for the control of complex networks)
6 May 2019
Deep Learning
Deep Learning Timeline
98
Source: F. Vazquez, https://towardsdatascience.com/a-weird-introduction-to-deep-learning-7828803693b0
6 May 2019
Deep Learning
What is a Neural Net?
99
 Structure: input-processing-output
 Mimic neuronal signal firing structure of brain with
computational processing units
Source: https://www.slideshare.net/ThomasDaSilvaPaula/an-introduction-to-machine-learning-and-a-little-bit-of-deep-learning,
http://cs231n.github.io/convolutional-networks/
6 May 2019
Deep Learning
Deep Learning vocabulary
What do these terms mean?
 Deep Learning, Machine Learning, Artificial Intelligence
 Perceptron, Artificial Neuron, Logit
 Deep Belief Net, Artificial Neural Net, Boltzmann Machine
 Google DeepDream, Google Brain, Google DeepMind
 Supervised and Unsupervised Learning
 Convolutional Neural Nets
 Recurrent NN & LSTM (Long Short Term Memory)
 Activation Function ReLU (Rectified Linear Unit)
 Deep Learning libraries and frameworks
 TensorFlow, Caffe, Theano, Torch, DL4J
 Backpropagation, gradient descent, loss function
100

Deep Learning Explained: The future of Artificial Intelligence and Smart Networks

  • 1.
    Melanie Swan Purdue University melanie@BlockchainStudies.org DeepLearning Explained The future of Artificial Intelligence and Smart Networks Scientech Indianapolis IN, May 6, 2019 Slides: http://slideshare.net/LaBlogga Image credit: NVIDIA
  • 2.
    6 May 2019 DeepLearning 1 Melanie Swan, Technology Theorist  Philosophy Department, Purdue University, Indiana, USA  Founder, Institute for Blockchain Studies  Singularity University Instructor; Institute for Ethics and Emerging Technology Affiliate Scholar; EDGE Essayist; FQXi Advisor Traditional Markets Background Economics and Financial Theory Leadership New Economies research group Source: http://www.melanieswan.com, http://blockchainstudies.org/NSNE.pdf, http://blockchainstudies.org/Metaphilosophy_CFP.pdf https://www.facebook.com/groups/NewEconomies
  • 3.
    6 May 2019 DeepLearning Deep Learning Smart Network Thesis 2 (1) Deep learning (machine learning) is one of the latest and most important Artificial Intelligence technologies. This is in the bigger context that (2) Humanity is embarked on a Digital Transformation Journey, evolving into a Computation-harnessing Society with Smart Network Technologies (Smart networks: autonomous computing networks such as deep learning nets, blockchains, and UAV fleets) Source: Swan, M., and dos Santos, R.P. In prep. Smart Network Field Theory: The Technophysics of Blockchain and Deep Learning. https://www.researchgate.net/publication/328051668_Smart_Network_Field_Theory_The_Technophysics_of_Blockchain_and_Deep_Learning
  • 4.
    6 May 2019 DeepLearning Agenda  Digital Transformation Journey  Artificial Intelligence  Deep Learning  Definition  How does it work?  Technical details  Applications  Near-term  Future  Conclusion  Research and Risks 3 Image Source: http://www.opennn.net
  • 5.
    6 May 2019 DeepLearning Digital Transformation Journey  Digital transformation: digitizing information and processes  $3.8 trillion global IT spend 2019 (Gartner)  $3.9 trillion global business value derived from AI in 2022  $1.3 trillion Digital Transformation Technologies (IDC)  $77.6 billion spend on AI systems in 2022 4 Source: https://www.gartner.com/en/newsroom/press-releases/2019-01-28-gartner-says-global-it-spending-to-reach--3-8-trillio, https://www.idc.com/getdoc.jsp?containerId=prUS43381817  Digital transformation  Technology used to make existing work more efficient, now technology is transforming the work itself  Blockchain, IoT, AI, Cloud technologies
  • 6.
    6 May 2019 DeepLearning Philosophy of Economic Theory Future of the Digital Economy 5 Digital InfrastructurePhysical Infrastructure Digital Networks • Natural Resources • Electricity • Data • Communications Intelligent Networks Transportation Networks • Blockchain • Deep Learning Smart Infrastructure Traditional Economy Digital Economy 1700-1970 1970-2015 2015-2050 Phase 1 Phase 2 Now IntelligenceDigitization
  • 7.
    6 May 2019 DeepLearning Philosophy of Economic Theory Longer-term Economic Futures 6 Traditional Economy Digital Economy CRISPR Bioprinting Cellular Therapies Natural resources Electricity Manufacturing Atoms Bits Cells Energy Social Networks Apps Payments Now Biological Economy Space Economy Phase 1 Phase 2 IntelligenceDigitization 1700-1970 1970-2015 2015-2050 2020-2080 2025-2100 Value Mining Settlement Exploration Blockchain Deep Learning
  • 8.
    6 May 2019 DeepLearning  Exascale supercomputing 2021e  Exabyte global data volume 2020e: 40 EB  Scientific, governmental, corporate, and personal Big Data ≠ Smart Data Sources: http://www.oyster-ims.com/media/resources/dealing-information-growth-dark-data-six-practical-steps/, https://www.theverge.com/2019/3/18/18271328/supercomputer-build-date-exascale-intel-argonne-national-laboratory-energy 7 Only 6% data protected, only 42% companies say they know how to extract meaningful insights from the data available to them (Oxford Economics Workforce 2020)
  • 9.
    6 May 2019 DeepLearning Why do we need Learning Technologies? 8  Big data is not smart data (i.e. usable)  New data science methods needed for data growth, older learning algorithms under-performing Source: http://blog.algorithmia.com/introduction-to-deep-learning-2016
  • 10.
    6 May 2019 DeepLearning Agenda  Digital Transformation Journey  Artificial Intelligence  Deep Learning  Definition  How does it work?  Technical details  Applications  Near-term  Future  Conclusion  Research and Risks 9 Image Source: http://www.opennn.net
  • 11.
    6 May 2019 DeepLearning Artificial Intelligence (AI) Argument  Artificial intelligence is using computers to do cognitive work (physical or mental) that usually requires a human  Deep Learning/Machine Learning is the biggest area in AI 10 Source: Swan, M. Philosophy of Deep Learning Networks: Reality Automation Modules. Ke Jie vs. AlphaGo AI Go player, Future of Go Summit, Wuzhen China, May 2017
  • 12.
    6 May 2019 DeepLearning Progression in AI Learning Machines 11 Single-purpose AI: Hard-coded rules Multi-purpose AI: Algorithm detects rules, reusable template Question-answering AI: Natural-language processing Deep Learning prototypeHard-coded AI machine Deep Learning machine Deep Blue, 1997 Watson, 2011 AlphaGo, 2016
  • 13.
    6 May 2019 DeepLearning 12 Conceptual Definition: Deep learning is a computer program that can identify what something is Technical Definition: Deep learning is a class of machine learning algorithms in the form of a neural network that uses a cascade of layers of processing units to extract features from data sets in order to make predictive guesses about new data Source: Extending Jann LeCun, http://spectrum.ieee.org/automaton/robotics/artificial-intelligence/facebook-ai-director-yann-lecun- on-deep-learning What is Deep Learning?
  • 14.
    6 May 2019 DeepLearning How are AI and Deep Learning related? 13 Source: Machine Learning Guide, 9. Deep Learning  Artificial intelligence:  Using computers to do cognitive work that usually requires a human  Machine learning:  Computers with the capability to learn using patterns and inference as opposed to explicit instructions  Neural network:  A computer system modeled on the human brain and nervous system  Deep learning:  Program that can recognize objects Deep Learning Neural Nets Machine Learning Artificial Intelligence Computer Science Within the Computer Science discipline, in the field of Artificial Intelligence, Deep Learning is a class of Machine Learning algorithms, that are in the form of a Neural Network
  • 15.
    6 May 2019 DeepLearning What is a Neural Net? 14  Intuition: create an Artificial Neural Network to solve problems in the same way as the human brain
  • 16.
    6 May 2019 DeepLearning Technophysics and Statistical Mechanics Deep Learning is inspired by Physics 15  Sigmoid function suggested as a model for neurons, per statistical mechanical behavior (Cowan, 1972)  Stationary solutions for dynamic models (asymmetric weights create an oscillator to model neuron signaling)  Hopfield Neural Network: content-addressable memory system with binary threshold nodes, converges to a local minimum (Hopfield, 1982)  Can use statistical mechanics (Ising model of ferromagnetism) for neurons  Restricted Boltzmann Machine (Hinton, 1983)  Statistical mechanics and condensed matter: Boltzmann distribution, free energy, Gibbs sampling, renormalization; stochastic processing units with binary output Source: https://www.quora.com/Is-deep-learning-related-to-statistical-physics-particularly-network-science
  • 17.
    6 May 2019 DeepLearning Agenda  Digital Transformation Journey  Artificial Intelligence  Deep Learning  Definition  How does it work?  Technical details  Applications  Near-term  Future  Conclusion  Research and Risks 16 Image Source: http://www.opennn.net
  • 18.
    6 May 2019 DeepLearning Why is it called “Deep” Learning?  Hidden layers of processing (2-20 intermediary layers)  “Deep” networks (3+ layers) versus “shallow” (1-2 layers)  Basic deep learning network: 5 layers; GoogleNet: 22 layers 17 Sandwich Architecture: visible Input and Output layers with hidden processing layers GoogleNet: 22 layers
  • 19.
    6 May 2019 DeepLearning Why Deep “Learning”?  System is “dumb” (i.e. mechanistic)  “Learns” by having big data (lots of input examples), and making trial-and-error guesses to adjust weights to find key features  Creates a predictive system to identity new examples  Usual AI argument: big enough data is what makes a difference (“simple” algorithms run over large data sets) 18 Input: Big Data (e.g.; many examples) Method: Trial-and-error guesses to adjust node weights Output: system identifies new examples
  • 20.
    6 May 2019 DeepLearning Sample task: is that a Car?  Create an image recognition system that determines which features are relevant (at increasingly higher levels of abstraction) and correctly identifies new examples 19 Source: Jann LeCun, http://www.pamitc.org/cvpr15/files/lecun-20150610-cvpr-keynote.pdf
  • 21.
    6 May 2019 DeepLearning Two classes of Learning Systems Supervised and Unsupervised Learning  Supervised  Classify labeled data  Unsupervised  Find patterns in unlabeled data 20 Source: https://www.slideshare.net/ThomasDaSilvaPaula/an-introduction-to-machine-learning-and-a-little-bit-of-deep-learning
  • 22.
    6 May 2019 DeepLearning Early success in Supervised Learning (2011)  YouTube: user-classified data perfect for Supervised Learning 21 Source: Google Brain: Le, QV, Dean, Jeff, Ng, Andrew, et al. 2012. Building high-level features using large scale unsupervised learning. https://arxiv.org/abs/1112.6209
  • 23.
    6 May 2019 DeepLearning 2 main kinds of Deep Learning neural nets 22 Source: Yann LeCun, CVPR 2015 keynote (Computer Vision ), "What's wrong with Deep Learning" http://t.co/nPFlPZzMEJ  Convolutional Neural Nets  Image recognition  Convolve: roll up to higher levels of abstraction to identify feature sets  Recurrent Neural Nets  Speech, text, audio recognition  Recur: iterate over sequential inputs with a memory function  LSTM (Long Short-Term Memory) remembers sequences and avoids gradient vanishing
  • 24.
    6 May 2019 DeepLearning Image Recognition and Computer Vision 23 Source: Quoc Le, https://arxiv.org/abs/1112.6209; Yann LeCun, NIPS 2016, https://drive.google.com/file/d/0BxKBnD5y2M8NREZod0tVdW5FLTQ/view Marv Minsky, 1966 “summer project” Jeff Hawkins, 2004, Hierarchical Temporal Memory (HTM) Quoc Le, 2011, Google Brain cat recognition Convolutional net for autonomous driving, http://cs231n.github.io/convolutional-networks History Current state of the art - 2019
  • 25.
    6 May 2019 DeepLearning Image Classification 24 Source: https://cs.stanford.edu/people/karpathy/deepimagesent/?hn  Human-level image recognition and captioning
  • 26.
    6 May 2019 DeepLearning Image Understanding 25 Source: https://cs.stanford.edu/people/karpathy/deepimagesent/?hn  “Understanding” is the system’s three-step process  Image -> internal representation -> text  Labels “tennis racket” = concepts  Machine learning: Kantian-level object recognition, not Hegelian
  • 27.
    6 May 2019 DeepLearning Famous Image Nets  Image recognition (<10% error rate)  AlexNet (2012) - 5 layers  Error rate 15.3% versus 26.2%  VGGNet (2018) - 19 CNN layers  GoogleNet (2019) - 22 CNN layers  BatchNorm (between Conv and Pooling)  Microsoft ResNet (2015) - diverse layers 26 Sources: https://towardsdatascience.com/an-overview-of-resnet-and-its-variants-5281e2f56035, https://medium.com/coinmonks/paper-review-of-vggnet-1st-runner-up-of-ilsvlc-2014-image-classification-d02355543a11
  • 28.
    6 May 2019 DeepLearning Speed and size of Deep Learning nets?  Google Deep Brain cat recognition, 2011  1 bn connections, 10 mn images (200x200 pixel), 1,000 machines (16,000 cores), 3 days  State of the art, 2016-2019  NVIDIA facial recognition, 100 million images, 10 layers, 1 bn parameters, 30 exaflops, 30 GPU days  Google Net, 11.2 bn parameter system  Lawrence Livermore Lab, 15 bn parameter system  Digital Reasoning, “cognitive computing” (Nashville TN), 160 bn parameters, trains on three multi-core computers overnight 27 Parameters: variables that determine the network structure Sources:,https://futurism.com/biggest-neural-network-ever-pushes-ai-deep-learning, Digital Reasoning paper: https://arxiv.org/pdf/1506.02338v3.pdf
  • 29.
    6 May 2019 DeepLearning Agenda  Digital Transformation Journey  Artificial Intelligence  Deep Learning  Definition  How does it work?  Technical details  Applications  Near-term  Future  Conclusion  Research and Risks 28 Image Source: http://www.opennn.net
  • 30.
    6 May 2019 DeepLearning Problem: correctly recognize “apple” 29 Source: Michael A. Nielsen, Neural Networks and Deep Learning
  • 31.
    6 May 2019 DeepLearning Modular Processing Units 30 Source: http://deeplearning.stanford.edu/tutorial 1. Input 2. Hidden layers 3. Output X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X  Unit: processing unit, logit (logistic regression unit), perceptron, artificial neuron
  • 32.
    6 May 2019 DeepLearning Image Recognition Digitize Input Data into Vectors 31 Source: Quoc V. Le, A Tutorial on Deep Learning, Part 1: Nonlinear Classifiers and The Backpropagation Algorithm, 2015, Google Brain, https://cs.stanford.edu/~quocle/tutorial1.pdf
  • 33.
    6 May 2019 DeepLearning Image Recognition Log features and trial-and-error test 32 1. Input 2. Hidden layers 3. Output X X X X X X X X X X X X X X X Source: http://deeplearning.stanford.edu/tutorial; MNIST dataset: http://yann.lecun.com/exdb/mnist  Mathematical methods used to update the weights  Linear algebra: matrix multiplications of input vectors  Statistics: logistic regression units (Y/N (0,1)), probability weighting and updating, inference for outcome prediction  Calculus: optimization (minimization), gradient descent in back- propagation to avoid local minima with saddle points Feed-forward pass (0,1) 1.5 Backward pass to update probabilities per correct guess .5.5 .5.5.5 1 10 .75 .25 Inference Guess Actual Feature 1 Feature 2 Feature 3
  • 34.
    6 May 2019 DeepLearning Image Recognition Levels of Abstraction Object Recognition 33 Source: Jann LeCun, http://www.pamitc.org/cvpr15/files/lecun-20150610-cvpr-keynote.pdf  Layer 1: Log all features (line, edge, unit of sound)  Layer 2: Identify more complicated features (jaw line, corner, combination of speech sounds)  Layer 3+: Push features to higher levels of abstraction until full objects can be recognized
  • 35.
    6 May 2019 DeepLearning Image Recognition Higher Abstractions of Feature Recognition 34 Source: https://adeshpande3.github.io/The-9-Deep-Learning-Papers-You-Need-To-Know-About.html
  • 36.
    6 May 2019 DeepLearning Example: NVIDIA Facial Recognition 35 Source: NVIDIA  First hidden layer extracts all possible low-level features from data (lines, edges, contours); next layers abstract into more complex features of possible relevance
  • 37.
    6 May 2019 DeepLearning Deep Learning 36 Source: Quoc V. Le et al, Building high-level features using large scale unsupervised learning, 2011, https://arxiv.org/abs/1112.6209
  • 38.
    6 May 2019 DeepLearning Speech, Text, Audio Recognition Sequence-to-sequence Recognition + LSTM 37 Source: Andrew Ng  LSTM: Long Short Term Memory  Technophysics technique: each subsequent layer remembers data for twice as long (fractal-type model)  The “grocery store” not the “grocery church”
  • 39.
    6 May 2019 DeepLearning Agenda  Digital Transformation Journey  Artificial Intelligence  Deep Learning  Definition  How does it work?  Technical details  Applications  Near-term  Future  Conclusion  Research and Risks 38 Image Source: http://www.opennn.net
  • 40.
    6 May 2019 DeepLearning  Logistic regression, Lego-like structure of layers of processing units, and finding the minimum of the curve 3 Key Technical Aspects of Deep Learning 39 Reduce combinatoric dimensionality Core processing unit (input-processing-output) Levers: weights and bias Squash values into Sigmoidal S-curve -Binary values (Y/N, 0/1) -Probability values (0 to 1) -Tanh values 9(-1) to 1) Loss FunctionPerceptron StructureSigmoid Function “Dumb” system learns by adjusting parameters and checking against outcome Loss function optimizes efficiency of solution Non-linear curve (logistic regression) means manipulability What Why
  • 41.
    6 May 2019 DeepLearning 1. Regression Linear Regression 40 House price vs. Size (square feet) y=mx+b House price Size (square feet) Source: https://www.statcrunch.com/5.0/viewreport.php?reportid=5647  Regression: how does one variable relate to another
  • 42.
    6 May 2019 DeepLearning Logistic Regression 41 Source: http://www.simafore.com/blog/bid/99443/Understand-3-critical-steps-in-developing-logistic-regression-models
  • 43.
    6 May 2019 DeepLearning Logistic Regression 42  Higher-order mathematical formulation  Sigmoid function  S-shaped and bounded  Maps the whole real axis into a finite interval (0-1)  Non-linear  Can fit probability  Can apply optimization techniques  Deep Learning classification predictions are in the form of a probability value Source: https://www.quora.com/Logistic-Regression-Why-sigmoid-function Sigmoid Function Unit Step Function
  • 44.
    6 May 2019 DeepLearning Sigmoid function: Taleb 43 Source: Swan, M. (2019). Blockchain Theory of Programmable Risk: Black Swan Smart Contracts. In Blockchain Economics: Implications of Distributed Ledgers - Markets, communications networks, and algorithmic reality. London: World Scientific.  Thesis: mapping a phenomenon to an s-curve curve (“convexify” it), means its risk may be controlled  Antifragility = convexity = risk-manageable  Fragility = concavity  Non-linear dose response in medicine suggests treatment optimality  U-shaped, j-shaped curves in hormesis (biphasic response); Bell’s theorem
  • 45.
    6 May 2019 DeepLearning Regression (summary)  Logistic regression  Predict binary outcomes:  Perceptron (0 or 1)  Predict probabilities:  Sigmoid Neuron (values 0-1)  Tanh Hyperbolic Tangent Neuron (values (-1)-1) 44 Logistic Regression (Sigmoid function) (0-1) or Tanh ((-1)-1) Linear Regression  Linear regression  Predict continuous set of values (house prices)
  • 46.
    6 May 2019 DeepLearning 2. Lego-like layers of processing units Deep Learning Architecture 45 Source: Michael A. Nielsen, Neural Networks and Deep Learning Modular Processing Units
  • 47.
    6 May 2019 DeepLearning More complicated in actual use  Convolutional neural net scale-up for number recognition  Example data: MNIST dataset  http://yann.lecun.com/exdb/mnist 46 Source: http://www.kdnuggets.com/2016/04/deep-learning-vs-svm-random-forest.html
  • 48.
    6 May 2019 DeepLearning Node Structure: Computation Graph 47 Edge (input value) Architecture Node (operation) Edge (input value) Edge (output value) Example 1 3 4 Add ?? Example 2 3 4 Multiply ??
  • 49.
    6 May 2019 DeepLearning Basic node with Weights and Bias 48 Edge Input value = 4 Edge Input value = 16 Edge Output value = 20 Node Operation = Add Input Values have Weights w Nodes have a Bias bw1* x1 w2*x2 N+b .25*4=1 .75*16=12 13+2 15 Input Processing Output Variable Weights and Biases  Basic node structure is fixed: input-processing-output  Weight and bias are variable parameters that are adjusted as the system iterates and “learns” Source: http://neuralnetworksanddeeplearning.com/chap1.html Mimics NAND gate Basic Node Structure (fixed) Basic Node with Weights and Bias (variable)
  • 50.
    6 May 2019 DeepLearning Image Recognition Log features and trial-and-error test 49 1. Input 2. Hidden layers 3. Output X X X X X X X X X X X X X X X Source: http://deeplearning.stanford.edu/tutorial; MNIST dataset: http://yann.lecun.com/exdb/mnist  Mathematical methods used to update the weights  Linear algebra: matrix multiplications of input vectors  Statistics: logistic regression units (Y/N (0,1)), probability weighting and updating, inference for outcome prediction  Calculus: optimization (minimization), gradient descent in back- propagation to avoid local minima with saddle points Feed-forward pass (0,1) 1.5 Backward pass to update probabilities per correct guess .5.5 .5.5.5 1 10 .75 .25 Inference Guess Actual Feature 1 Feature 2 Feature 3
  • 51.
    6 May 2019 DeepLearning Actual: same structure, more complicated 50
  • 52.
    6 May 2019 DeepLearning 51 Source: https://medium.com/@karpathy/software-2-0-a64152b37c35 Same structure, more complicated values
  • 53.
    6 May 2019 DeepLearning Neural net: massive scale-up of nodes 52 Source: http://neuralnetworksanddeeplearning.com/chap1.html
  • 54.
    6 May 2019 DeepLearning Same Structure 53
  • 55.
    6 May 2019 DeepLearning How does the neural net actually “learn”?  Vary the weights and biases to see if a better outcome is obtained  Repeat until the net correctly classifies the data 54 Source: http://neuralnetworksanddeeplearning.com/chap2.html  Structural system based on cascading layers of neurons with variable parameters: weight and bias
  • 56.
    6 May 2019 DeepLearning 3. Loss function optimization Backpropagation  Problem: Combinatorial complexity  Inefficient to test all possible parameter variations  Solution: Backpropagation (1986 Nature paper)  Optimization method used to calculate the error contribution of each neuron after a batch of data is processed 55 Source: http://neuralnetworksanddeeplearning.com/chap2.html
  • 57.
    6 May 2019 DeepLearning Backpropagation of errors 1. Calculate the total error 2. Calculate the contribution to the error at each step going backwards  Variety of Error Calculation methods: Mean Square Error (MSE), sum of squared errors of prediction (SSE), Cross- Entropy (Softmax), Softplus  Goal: identify which feature solutions have a higher power of potential accuracy 56
  • 58.
    6 May 2019 DeepLearning Backpropagation  Heart of Deep Learning  Backpropagation: algorithm dynamically calculates the gradient (derivative) of the loss function with respect to the weights in a network to find the minimum and optimize the function from there  Algorithms optimize the performance of the network by adjusting the weights, e.g.; in the gradient descent algorithm  Error and gradient are computed for each node  Intermediate errors transmitted backwards through the network (backpropagation)  Objective: optimize the weights so the network can learn how to correctly map arbitrary inputs to outputs 57 Source: http://briandolhansky.com/blog/2013/9/27/artificial-neural-networks-backpropagation-part-4, https://mattmazur.com/2015/03/17/a-step-by-step-backpropagation-example/
  • 59.
    6 May 2019 DeepLearning Gradient Descent  Gradient: derivative to find the minimum of a function  Gradient descent: optimization algorithm to find the biggest errors (minima) most quickly  Error = MSE, log loss, cross-entropy; e.g.; least correct predictions to correctly identify data  Technophysics methods: spin glass, simulated annealing 58 Source: http://briandolhansky.com/blog/2013/9/27/artificial-neural-networks-backpropagation-part-4
  • 60.
    6 May 2019 DeepLearning  Optimization Technique  Mathematical tool used in statistics, finance, decision theory, biological modeling, computational neuroscience  State as non-linear equation to optimize  Minimize loss or cost  Maximize reward, utility, profit, or fitness  Loss function links instance of an event to its cost  Accident (event) means $1,000 damage on average (cost)  5 cm height (event) confers 5% fitness advantage (reward)  Deep learning: system feedback loop  Apply cost penalty for incorrect classifications in training  Methods: CNN (classification): cross-entropy; RNN (regression): MSE Loss Function 59 Laplace
  • 61.
    6 May 2019 DeepLearning Known problems: Overfitting  Regularization  Introduce additional information such as a lambda parameter in the cost function (to update the theta parameters in the gradient descent algorithm)  Dropout: prevent complex adaptations on training data by dropping out units (both hidden and visible)  Test new datasets 60
  • 62.
    6 May 2019 DeepLearning Agenda  Digital Transformation Journey  Artificial Intelligence  Deep Learning  Definition  How does it work?  Technical details  Applications  Near-term  Future  Conclusion  Research and Risks 61 Image Source: http://www.opennn.net
  • 63.
    6 May 2019 DeepLearning Applications: Cats to Cancer to Cognition 62 Source: Yann LeCun, CVPR 2015 keynote (Computer Vision ), "What's wrong with Deep Learning" http://t.co/nPFlPZzMEJ Computational imaging: Machine learning for 3D microscopy https://www.nature.com/nature/journal/v523/n7561/full/523416a.html
  • 64.
    6 May 2019 DeepLearning Radiology: Tumor Image Recognition 63 Source: https://www.nature.com/articles/srep24454  Computer-Aided Diagnosis with Deep Learning  Breast tissue lesions in images  Pulmonary nodules in CT Scans
  • 65.
    6 May 2019 DeepLearning Melanoma Image Recognition 64 Source: Nature volume542, pages115–118 (02 February 2017 http://www.nature.com/nature/journal/v542/n7639/full/nature21056.html 2017
  • 66.
    6 May 2019 DeepLearning Melanoma Classification 65 Source: https://www.techemergence.com/machine-learning-medical-diagnostics-4-current-applications/  Diagnose skin cancer using deep learning CNNs  Algorithm trained to detect skin cancer (melanoma) using 130,000 images of skin lesions representing over 2,000 different diseases
  • 67.
    6 May 2019 DeepLearning DIY Image Recognition: use Contrast 66 Source: https://developer.clarifai.com/modelshttps://developer.clarifai.com/models How many orange pixels? Apple or Orange? Melanoma risk or healthy skin? Degree of contrast in photo colors?
  • 68.
    6 May 2019 DeepLearning Deep Learning and Genomics: RNNs  Large classes of hypothesized but unknown correlations  Genotype-phenotype disease linkage unknown  Computer-identifiable patterns in genomic data  RNN: textual analysis; CNN: genome symmetry 67 Source: http://ieeexplore.ieee.org/document/7347331
  • 69.
    6 May 2019 DeepLearning AI Medical Diagnosis  Earlier stage diagnosis, personalized, world health clinic  Smartphone-based diagnostic tools with AI for optical detection and EVA (enhanced visual assessment) 68 Source: https://spectrum.ieee.org/biomedical/devices/ai-medicine-comes-to-africas-rural-clinics
  • 70.
    6 May 2019 DeepLearning Deep Learning World Clinic  WHO estimates 400 million people without access to essential health services  6% in extreme poverty due to healthcare costs  Next leapfrog technology: Deep Learning  Last-mile build out of brick-and-mortar clinics does not make sense in era of digital medicine  Medical diagnosis via image recognition, natural language processing symptoms description  Convergence Solution: Digital Health Wallet  Deep Learning medical diagnosis + Blockchain- based EMRs (electronic medical records)  Empowerment Effect: Deep learning = “tool I use,” not hierarchically “doctor-administered” 69 Source: http://www.who.int/mediacentre/news/releases/2015/uhc-report/en/ Digital Health Wallet: Deep Learning diagnosis Blockchain-based EMRs
  • 71.
    6 May 2019 DeepLearning Deep Learning and the Brain 70
  • 72.
    6 May 2019 DeepLearning  Deep learning neural networks are inspired by the structure of the cerebral cortex  The processing unit, perceptron, artificial neuron is the mathematical representation of a biological neuron  In the cerebral cortex, there can be several layers of interconnected perceptrons 71 Deep Qualia machine? General purpose AI Mutual inspiration of neurological and computing research
  • 73.
    6 May 2019 DeepLearning Brain is hierarchically organized  Visual cortex is hierarchical with intermediate layers  The ventral (recognition) pathway in the visual cortex has multiple stages: Retina - LGN - V1 - V2 - V4 - PIT – AIT  Human brain simulation projects  Swiss Blue Brain project, European Human Brain Project 72 Source: Jann LeCun, http://www.pamitc.org/cvpr15/files/lecun-20150610-cvpr-keynote.pdf
  • 74.
    6 May 2019 DeepLearning Agenda  Digital Transformation Journey  Artificial Intelligence  Deep Learning  Definition  How does it work?  Technical details  Applications  Near-term  Future  Conclusion  Research and Risks 73 Image Source: http://www.opennn.net
  • 75.
    6 May 2019 DeepLearning 74 the farther future: better horse is a car. new technology. better horse “horseless carriage” => car
  • 76.
    6 May 2019 DeepLearning Autonomous Driving  Deep Learning  Identify what things are  CNNs: core element of machine vision systems  Scenario-based decision-making 75
  • 77.
    6 May 2019 DeepLearning The Very Small Deep Learning in Cells  On-board pacemaker data security, software updates, patient monitoring  Medical nanorobotics for cell repair  Deep Learning: identify what things are (diagnosis)  Blockchain: secure automation technology  Bio-cryptoeconomics: secure automation of medical nanorobotics for cell repair  Medical nanorobotics as coming-onboard repair platform for the human body  High number of agents and “transactions”  Identification and automation is obvious 76 Sources: Swan, M. Blockchain Thinking: The Brain as a DAC (Decentralized Autonomous Corporation)., IEEE 2015; 34(4): 41-52 , Swan, M. Forthcoming. Technophysics, Smart Health Networks, and the Bio-cryptoeconomy: Quantized Fungible Global Health Care Equivalency Units for Health and Well-being. In Boehm, F. Ed., Nanotechnology, Nanomedicine, and AI. Boca Raton FL: CRC Press
  • 78.
    6 May 2019 DeepLearning The Very Small Human Brain/Cloud Interface 77 Sources: Martins, Swan, Freitas Jr., et. al. 2019. Human Brain/Cloud Interface. Front. Neurosci.
  • 79.
    6 May 2019 DeepLearning The Very Large Deep Learning in Space  Satellite networks  Automated space construction bots/agents  Deep Learning: identify what things are (classification)  Blockchain: secure automation technology  Applications: asteroid mining, terraforming, radiation-monitoring, space-based solar power, debris tracking net 78
  • 80.
    6 May 2019 DeepLearning Quantum Machine Learning 79  Quantum Computing: assign an amplitude (not a probability) for possible states of the world  Amplitudes can interfere destructively and cancel out, be complex numbers, not sum to 1  Feynman: “QM boils down to the minus signs”  QC: a device that maintains a state that is a superposition for every configuration of bits  Turn amplitude into probabilities (event probability is the squared absolute value of its amplitude)  Challenge: obtain speed advantage by exploiting amplitudes, need to choreograph a pattern of interference (not measure random configurations) Sources: Scott Aaronson; and Biamonte, Lloyd, et al. (2017). Quantum machine learning. Nature. 549:195–202.
  • 81.
    6 May 2019 DeepLearning Agenda  Digital Transformation Journey  Artificial Intelligence  Deep Learning  Definition  How does it work?  Technical details  Applications  Near-term  Future  Conclusion  Research and Risks 80 Image Source: http://www.opennn.net
  • 82.
    6 May 2019 DeepLearning Research Topics  Layer depth vs. height: (1x9, 3x3, etc.); L1/2 slow-downs  Dark knowledge: data compression, compress dark (unseen) knowledge into a single summary model  Adversarial networks: two networks, adversary network generates false data and discriminator network identifies  Reinforcement networks: goal-oriented algorithm for system to attain a complex objective over many steps 81 Source: http://cs231n.github.io/convolutional-networks, https://arxiv.org/abs/1605.09304, https://www.iro.umontreal.ca/~bengioy/talks/LondonParisMeetup_15April2015.pdf
  • 83.
    6 May 2019 DeepLearning Research Topics 82 Sources: Devlin et al. 2018. BERT: Pre-training of Deep Bidirectional Transformers for Language Understanding, http://prog3.com/sbdm/blog/zouxy09/article/details/8781396  Language representation models  BERT (Bidirectional Encoder Representations from Transformers)  Deep Belief Network  Connections between layers not units  Find initial weighting guesses for units as system pre-processing step  Deep Boltzmann Machine  Stochastic recurrent neural network  Internal representations of learning  Represent and solve combinatoric problems Deep Boltzmann Machine Deep Belief Network
  • 84.
    6 May 2019 DeepLearning Google Deep Dream net  Deep dream generated images  Not random pasting of dog snouts  System synthesizes every pixel in context, and determines good places for dog snouts 83 Source: Georges Seurat, Un dimanche après-midi à l'Île de la Grande Jatte, 1884-1886; http://web.cs.hacettepe.edu.tr/~aykut/classes/spring2016/bil722; Google DeepDream uses algorithmic pareidolia (seeing an image when none is present) to create a dream-like hallucinogenic appearance
  • 85.
    6 May 2019 DeepLearning Hardware and Software Innovation 84
  • 86.
    6 May 2019 DeepLearning Hardware advance TPU and GPU clusters  Chip design and cloud data center architecture  GPU chips (graphics processing unit): 3D graphics cards for fast matrix multiplication  Google TPU chip (tensor processing unit): flow through matrix multiplications without storing interim values in memory (AlphaGo)  Chip design advances  Google Cloud TPUs: ML accelerators for TensorFlow; TPU 3.0 pod (8x more powerful, up to 100 petaflops (2018))  NVIDIA DGX-1 integrated deep learning system (Eight Tesla P100 GPU accelerators) 85 Google TPU Cloud and Chip Source: http://www.techradar.com/news/computing-components/processors/google-s-tensor-processing-unit-explained-this-is-what- the-future-of-computing-looks-like-1326915 NVIDIA DGX-1
  • 87.
    6 May 2019 DeepLearning Software advance What is TensorFlow? 86 Source: https://www.youtube.com/watch?v=uHaKOFPpphU Python code invoking TensorFlowTensorBoard (TensorFlow) visualization Computation graph Design in TensorFlow  “Tensor” = multidimensional arrays used in NN operations  “Flow” directly through tensor operations (matrix multiplications) without needing to store intermediate values in memory Google’s open-source machine learning library
  • 88.
    6 May 2019 DeepLearning Network advance Edge Device-based Machine Learning  Surveillance camera, USB and Browser-based Machine Learning  Intel: Movidius Visual Processing Unit (VPU): USB ML for IOT  Security cameras, industrial equipment, robots, drones  Apple: ML acquisition Turi (Dato)  Browser-based Deep Learning  ConvNetJS; TensorFire  Javascript library to run Deep Learning nets in a browser  Smart Network in a browser  JavaScript Deep Learning  Blockchain EtherWallets 87 Source: http://cs.stanford.edu/people/karpathy/convnetjs/, http://www.infoworld.com/article/3212884/machine-learning/machine-learning- comes-to-your-browser-via-javascript.html
  • 89.
    6 May 2019 DeepLearning Risks and Limitations of Deep Learning 88  Complicated conceptually and technically  Skilled workforce  Limited solution  So far, restricted to a specific range of applications (supervised learning for image and text recognition)  Plateau: cheap hardware and already-labeled data sets; need to model complex network science relationships between data  Non-generalizable intelligence  AlphaGo learns each arcade game from scratch  How does the “black box” system work?  Claim: no “learning,” just a clever mapping of the input data vector space to output solution vector space Source: Battaglia et al. 2018. Relational inductive biases, deep learning, and graph networks. arXiv:1806.01261. 2018
  • 90.
    6 May 2019 DeepLearning Conclusion • Deep learning is not merely an AI technique or a software program, but a new class of smart network information technology that is changing the concept of the modern technology project by offering real-time engagement with reality • Deep learning is a data automation method that replaces hard-coded software with a capacity, in the form of a learning network that is trained to perform a task 89 Conclusion  Deep learning is an AI software technology for identifying objects  Applications: healthcare, autonomous driving, robotics  Deep learning is a new class of smart network information technology that is replacing hard-coded software with a capacity, in the form of a learning network that is trained to perform a task
  • 91.
    6 May 2019 DeepLearning Deep Learning Smart Network Thesis 90 (1) Deep learning (machine learning) is one of the latest and most important Artificial Intelligence technologies. This is in the bigger context that (2) Humanity is embarked on a Digital Transformation Journey, evolving into a Computation-harnessing Society with Smart Network Technologies (Smart networks: autonomous computing networks such as deep learning nets, blockchains, and UAV fleets) Source: Swan, M., and dos Santos, R.P. In prep. Smart Network Field Theory: The Technophysics of Blockchain and Deep Learning. https://www.researchgate.net/publication/328051668_Smart_Network_Field_Theory_The_Technophysics_of_Blockchain_and_Deep_Learning
  • 92.
    6 May 2019 DeepLearning Possibility space of Intelligence 91 Sources: http://hplusmagazine.com/2015/09/02/the-space-of-mind-designs-and-the-human-mental-model/, https://www.nature.com/articles/s41586-019-1138-y  Machine intelligence as its own species
  • 93.
    6 May 2019 DeepLearning Smart networks  The network is the computer 92 Source: https://towardsdatascience.com/a-weird-introduction-to-deep-learning-7828803693b0 Computing networks 2015+ Computer networking 1970-1980 Computer networks 1990-2010
  • 94.
    6 May 2019 DeepLearning  Neural Networks and Deep Learning, Michael Nielsen, http://neuralnetworksanddeeplearning.com/  Deep Learning, Ian Goodfellow, Yoshua Bengio, Aaron Courville, http://www.deeplearningbook.org/Machine learning and deep neural nets  Machine Learning Guide podcast, Tyler Renelle, http://ocdevel.com/podcasts/machine-learning  notMNIST dataset http://yaroslavvb.blogspot.com/2011/09/notmnist-dataset.html  Metacademy; Fast.ai; Keras.io Resources 93 Distill (visual ML journal) http://distill.pubSource: http://cs231n.stanford.edu https://www.deeplearning.ai/
  • 95.
    6 May 2019 DeepLearning Deep Learning frameworks and libraries 94 Source: http://www.infoworld.com/article/3163525/analytics/review-the-best-frameworks-for-machine-learning-and-deep- learning.html#tk.ifw-ifwsb
  • 96.
  • 97.
    Melanie Swan Purdue University melanie@BlockchainStudies.org DeepLearning Explained The future of Artificial Intelligence and Smart Networks Scientech Indianapolis IN, May 6, 2019 Slides: http://slideshare.net/LaBlogga Image credit: NVIDIA Thank You! Questions?
  • 98.
    6 May 2019 DeepLearning Technophysics Research Program: Application of physics principles to technology 97 Econophysics Biophysics • Disease causality: role of cellular dysfunction and environmental degradation • Concentration limits in short and long range inter-cellular signaling • Boltzmann distribution and diffusion limits in RNAi and SiRNA delivery • Path integrals extend point calculations in dynamical systems • General (not only specialized) Schrödinger for Black Scholes option pricing • Quantum game theory (greater than fixed sum options), Quantum finance Smart Networks (intelligent self-operating networks) Technologies Tools • Smart network field theory • Optimal control theory • Blockchain • Deep Learning • UAV, HFT, RTB, IoT • Satellite, nanorobot Steam Light and ElectromagneticsMechanics Information 21c20c18-19c16-17c Scientific Paradigms Computational Complexity, Black Holes, and Quantum Gravity (Aaronson, Susskind, Zenil) General Topics Quantum Computation • Apply renormalization group to system criticality and phase transition detection (Aygun, Goldenfeld) and extend tensor network renormalization (Evenbly, Vidal) • Unifying principles: same probability functions used for spin glasses (statistical physics), error-correcting (LDPC) codes (information theory), and randomized algorithms (computer science) (Mézard) • Define relationships between statistical physics and information theory: generalized temperature and Fisher information, partition functions and free energy, and Gibbs’ inequality and entropy (Merhav) • Apply complexity theory to blockchain and deep learning (dos Santos) • Apply spin glass models to blockchain and deep learning (LeCun, Auffinger, Stein) • Apply deep learning to particle physics (Radovic) Research Topics Data Science Method: Science Modules Technophysics The application of physics principles to the study of technology (particularly statistical physics and information theory for the control of complex networks)
  • 99.
    6 May 2019 DeepLearning Deep Learning Timeline 98 Source: F. Vazquez, https://towardsdatascience.com/a-weird-introduction-to-deep-learning-7828803693b0
  • 100.
    6 May 2019 DeepLearning What is a Neural Net? 99  Structure: input-processing-output  Mimic neuronal signal firing structure of brain with computational processing units Source: https://www.slideshare.net/ThomasDaSilvaPaula/an-introduction-to-machine-learning-and-a-little-bit-of-deep-learning, http://cs231n.github.io/convolutional-networks/
  • 101.
    6 May 2019 DeepLearning Deep Learning vocabulary What do these terms mean?  Deep Learning, Machine Learning, Artificial Intelligence  Perceptron, Artificial Neuron, Logit  Deep Belief Net, Artificial Neural Net, Boltzmann Machine  Google DeepDream, Google Brain, Google DeepMind  Supervised and Unsupervised Learning  Convolutional Neural Nets  Recurrent NN & LSTM (Long Short Term Memory)  Activation Function ReLU (Rectified Linear Unit)  Deep Learning libraries and frameworks  TensorFlow, Caffe, Theano, Torch, DL4J  Backpropagation, gradient descent, loss function 100