DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
TABLE OF CONTENT
0 PREFACE.......................................................................................................................
0.1 Purpose of this document ........................................................................................
0.2 Overview ...................................................................................................................
0.3 Abstract......................................................................................................................
0.4 Scope..........................................................................................................................
0.5 Objectives...................................................................................................................
0.6 Time Line...................................................................................................................
EQUIPMENT TECHANICAL DATA ..........................................................................
0.1 Mechanical Screen....................................................................................................
0.2 Penstocks ...................................................................................................................
0.3 Ultrasonic level...........................................................................................................
0.4 Pipes and fittings.........................................................................................................
0.5 Ventilations..................................................................................................................
0.6 Switchboards ...............................................................................................................
0.7 Lighting and cabelling................................................................................................
EQUIPMENT TECHANICAL CATALOGUES ...........................................................
0.1 Mechanical Screen....................................................................................................
0.2 Penstocks ...................................................................................................................
0.3 Ultrasonic level...........................................................................................................
0.4 Pipes and fittings.........................................................................................................
0.5 Ventilations..................................................................................................................
0.6 Switchboards ...............................................................................................................
0.7 Lighting and cabelling................................................................................................
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
0.1 PURPOSE OF THIS DOCUMENT
This document is a generic Technical Proposal Submitted to ICDOC. It provides
guidance to methods and material which is intended to assist in achieving project
goals. It is also useful background reading for developing and monitoring installation
quality.
0.2 OVERVIEW
Design capacities of the lift station
approximately 1670 m3/h. The
GWC’s initial goal for this project
is to develop a prioritized list of
repair/refurbishment projects
based upon a comprehensive
condition assessment and
criticality analysis of IPS lift
station planned to remain in
operation.
The remaining sections constitute a
technical data that should be used to construct the project-technical submissions.
0.3 ABSTRACT
#1 Industrial cities development and operating company (ICDOC) are contracted to
MODON to provide water and wastewater concessionary services to the industrial
cities under a bot contract model
for Dammam 2 industrial city.
#1 The Dammam 2 IPS mechanical
coarse screens, screen refuse
system, dry well pipework, valves,
ventilation fans and control
panels are old and require
immediate
maintenance/replacement in order
to provide security of operation of
the IPS.
#2 The installation of two new
pumps, piping and electrical
works has been completed and is operational. Two further new IPS pumps have been
purchased to replace existing two old pumps.
#3 The following workscope provides details of the work required to achieve the
objective of the IPS being able to accept the current inflows efficiently and provide an
acceptable level of standby facilities.
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
#4 ICDOC is seeking to appoint a
suitably qualified contractor to
undertake the design, supply,
construction and installation,
testing and commissioning of
the required works.
#5 GWC wound up itself in full
competence to do such work
because of their long experience
in this field
#6 This Technical Proposal is
issued in order to receive
proposals to undertake the work as further described in ICDOC RFP document.
#7 This Technical Proposal has been set up to demonstrate our ability to attain this work
executed through the implementation mechanisms and materials clarified under
0.4 SCOPE
#1 Divert the IPS incoming influent from an existing manhole at the plant boundary
directly to the plant head works during execution of the works.
#2 Operation of the equipment and ensure no overflow shall occur during this period.
#3 Dry pumps wet well in order to clean and repair of concrete surfaces and treat the
defected parts.
#4 Remove defected mechanical parts and installing the new ones.
#5 Follow HSE plan
0.5 OBJECTIVES
This project is divided into five (4) objectives:
Objective 1 – Emphasize IPS Lift Station status quo and main Improvement Works
Objective 2 – Wet Well Assessment and Implementation Procedure
Objective 3 – Drawdown Testing Procedure
Objective 4 – Setup bypass pumping system, Install New equipment
Objectives may be performed concurrently.
Objective 1 – Emphasize IPS Lift Station status quo and main Improvement Works
o Collect a detailed information. GWC will request detailed information from the
ICDOC which is required to complete the IPS lift station by pass activities, and will
coordinate with the operation and maintenance department to obtain this information.
The data request is expected to include, at a minimum:
· Lift station operation and maintenance manuals
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
· Plan metric data and sanitary sewer data
· Operation and maintenance data including daily pump run (hours) data
· Maintenance records
· Sanitary sewer overflow (SSO) records of IPS lift station-related spills
o GWC will arrange with appropriate ICDOC staff to become familiar with the IPS
wastewater lift station system and to obtain input on the proposed work plan.
o Engineer will interview IPS operating staff regarding operability and observed
deficiencies at each of the lift stations to be assessed. Engineer will note ICDOC staff
comments about observed deficiencies or problems anticipated to be encountered
during assessment activities. Engineer will communicate results of interviews to IPS
station’s project manager and to field assessment teams.
Objective 2 –Wet Well Assessment and Implementation Procedure
o GWC will perform a multi-gas detection test on the unopened wet well by inserting
the gas detector hose into the wet well hatch hole to measure air quality. The
presence of hydrogen sulfide will be checked as a potential indicator of a corrosive
environment.
o After recording gas concentration, Engineer will request ICDOC staff to turn on the
wet well HVAC (Ventilation System) and open hatches. GWC staff will perform a
permit confined-space entry into wet wells.
o Once the hatch is open, fall prevention devices provided by the Engineer will be
placed over the hatch opening and a quick review of the wet well will be performed to
determine the optimal locations for power washing and scratch testing.
o The water level in the wet well will be lowered by starting the pumps. The pump’s
vent line operation will also be monitored during lowering of the water level.
o A vertical area along one side of the wet well wall will be washed using a power
washer (provided by the GWC) and a scratch test will be performed on concrete wet
well walls.
o Tests will be performed with the aid of a pole-mounted device; staff will perform a
permit confined-space entry into wet wells to conduct scratch tests.
o Condition of the wet well walls, slabs, piping, valves, floats, ladders and rails will be
visually inspected. Digital photographs or video will be collected.
o Measurements will be taken of the wet well across the day hours to determine
operating levels: Low, Lead On, Lag On, High, and other alarm levels. Engineer will
use a portable leveling rod to make measurements. This information will be required
for determining available wet well capacity and for lift station drawdown tests.
o Based on visual assessments, Engineer will provide a detailed report for wet well
structures applied methods to treat surfaces and appropriate materials. For
structures with significant visible degradation.
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
Expected support from ICDOC:
o Providing access to lift stations for Engineer staff
o Opening electrical panels, guards, or hatches for Engineer to visually evaluate
electrical components
o Operating lift station electrical system (i.e. turning the power off/on to the pumps).
This will include drawing down the level of the pumps to allow Engineer to take
measurements of the operating levels.
o Performing pressure washing of an area along one site of wet-well walls to ensure
degreased prior to assessment.
Objective 3 –Drawdown Testing Procedure
o Engineer will perform pump drawdown tests over an approximate seven-day period
for
IPS lift station. The drawdown testing will be used to determine the flow
characteristics of lift station, as well as to diagnose potential problems.
o Engineer will provide and install a suitable number of Diesel Pumps with appropriate
capacity in order to perform a seven-day pump drawdown test.
o The Flow Monitoring process will log and record start and stop times of pumps at the
lift station as the wet well fills and is emptied. Pump activity data will be stored and
data will be analyzed.
Flow Monitoring process with known volumes between level switches in the wet well,
an algorithm provided is used to calculate flow into and out of the IPS lift station.
The Flow Monitoring will be used to determine:
-Total and average inflow
-Minimum and maximum inflow and times of occurrence
-Inflow and outflow for each fill and empty cycle
-Data on combinations on pumps
o Seven or more cycles of filling and pumping are necessary to analyze the filling and
pumping of the lift station. To ensure adequate data is collected for analysis, seven
days will normally be allotted for monitoring. In addition to determining pump
performance, the process may also assist with identifying lift station performance
issues, including alternator failures.
o Upon the completion of flow monitoring, Engineer will collect and analyze data.
o Engineer will evaluate wet well storage capacity and number of pump starts observed
during flow monitoring, and compare with normal pump station operation.
ICDOC responsibilities include:
o Operating lift station electrical system (i.e. turn power off/on to lift station pumps)
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
Objective 4 – Setup bypass pumping system, Install New equipment
Isolating pumping stations from incoming flow
o Sewage generally arrives at a pumping station via a gravity main. Irrespective of the
type of pumping station, there are times when a pumping station must be wholly or
partially closed down for maintenance or further works. This means that sewage must
be prevented from entering the wet well. The wet well is provided in the pumping
station, storage of sewage under shut down conditions must be considered, Hence,
shut down for an extended period is being proposed, bypassing with temporary diesel
pumping are necessary.
o Before the station is taken offline and work begins, a temporary bypass pumping
system must be set up and functioning to ensure wastewater continues to flow to the
treatment plant. The bypass will consist of installing a discharge pipeline with a
suitable diameter with necessary connection between the nearest sewer manhole on
the gravity mail line (900 mm) and the treatment plant existing inlet structure. Diesel
pumps will then be brought in to pump from our wet well to the bypass connection
outside the station. This will isolate the building and allow the proposed work to
commence.
o The arrangement used to cut off sewage flow to pumping stations with diesel pumps is
to take in consideration the required period and inflow regarding drawdown test. The
required pump by ICDOC are 2*625 m3/hr diesel pump which will bypass the whole
sewer with a proximately 300 M of hose line. In addition, this pump is working during
possible periods of extensive power outages, mandatory power reductions, or
uncontrolled sewer events, consideration should be given, which shall be made to
drain to the station wet well.
o After install the diesel pump and switch it on for a proper while to obviously notice
and ensure its adequate for the job to drain the main wet well where mechanical
screens are located. The 2*625 m3/hr diesel pump will be installed near the inlet-
structure above the 900 mm manhole. For the inlet manhole to the IPS station another
diesel pump will be installed to connect that manhole with one of the two minor wet
well where pumps wall connection are located. First it will be the minor wet well
which has the newest pumps. That time will be decided according to the calculations
and measures from the drawdown test and arrangement with ICDOC. While all diesel
pumps are working to drain the pump with the IPS pumps, the 1000 mm balloon will
be immediately installed to isolate the pump station.
o Replacement works on the two wet well will be in sequence. Proper valve selection
and placement is critical to the station's ease of maintenance and operation, overall
station flexibility, and reliability. The following criteria have been developed for
valves at the lift station. Valve location will be selected for accessibility. Submersible
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
pumps will have discharge valves located in a valve vault. All installed valves will be
constructed of material resistant to corrosion and suitable for wastewater service.
Check Valves and Pump Discharge Isolation Valves
o Each pump discharge will include a swing check valve to prevent backflow in the
system from damaging the pump. Each pump will be provided with its own discharge
valve to isolate the pump from the system. There is currently no isolation valve on the
system between the pump station and the discharge line. A manually operated gate
valve is recommended downstream of the flow meter in order to isolate the station
and accommodate maintenance.
Wet-well Isolation Gate(s)
o A type 316 stainless steel slide gates will be provided on the wet-well influent to
isolate the pump station from the gravity system. The gate will be manual or actually
operated as required.
Mechanical Screens
o To be installed after wet well treatment and meanwhile pumping station is out of
service
Electrical panels and control work
o To be installed meanwhile pumping station is out of service.
ProjectTimeLine
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS

More Related Content

What's hot

cv
cvcv
HVAC Chiller BMS Engineer
HVAC Chiller BMS EngineerHVAC Chiller BMS Engineer
HVAC Chiller BMS Engineer
Kamran Saeed
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
Muhammad Yaseen
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
Personal Secret
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
Leon Chacon
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
HIMADRI BANERJI
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
Ronie Chu
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
Tarun Sharna
 
Sr Commi Instrument Technician
Sr Commi Instrument TechnicianSr Commi Instrument Technician
Sr Commi Instrument Technician
chandrabhushan rao
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
Malcolm Kiper
 
Project Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioProject Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-Portfolio
Syed Arafath, PMI-SP certified
 
instrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineinstrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbine
KsPuri
 
parveer
parveerparveer
parveer
Parveer Singh
 
Omega SOQ 11.2014
Omega SOQ 11.2014Omega SOQ 11.2014
Omega SOQ 11.2014
Paul LeBlanc
 
EKPRANGAREDDY2016
EKPRANGAREDDY2016EKPRANGAREDDY2016
EKPRANGAREDDY2016
Ekp Reddy
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
David Karbach
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
Ron Williams
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
Allwyn Stanley
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
Allwyn Stanley
 

What's hot (19)

cv
cvcv
cv
 
HVAC Chiller BMS Engineer
HVAC Chiller BMS EngineerHVAC Chiller BMS Engineer
HVAC Chiller BMS Engineer
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Sr Commi Instrument Technician
Sr Commi Instrument TechnicianSr Commi Instrument Technician
Sr Commi Instrument Technician
 
Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015Kiper,_Malcolm_Resume_Current 6 1 2015
Kiper,_Malcolm_Resume_Current 6 1 2015
 
Project Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-PortfolioProject Controls planning & Scheduling Engineer-Portfolio
Project Controls planning & Scheduling Engineer-Portfolio
 
instrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineinstrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbine
 
parveer
parveerparveer
parveer
 
Omega SOQ 11.2014
Omega SOQ 11.2014Omega SOQ 11.2014
Omega SOQ 11.2014
 
EKPRANGAREDDY2016
EKPRANGAREDDY2016EKPRANGAREDDY2016
EKPRANGAREDDY2016
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 

Viewers also liked

Blog invitation 7th birthday party
Blog invitation 7th birthday partyBlog invitation 7th birthday party
Blog invitation 7th birthday party
Eloise Witbooi
 
Liberian YMCA "Dream Team" to attend Dallas Cup
Liberian YMCA "Dream Team" to attend Dallas CupLiberian YMCA "Dream Team" to attend Dallas Cup
Liberian YMCA "Dream Team" to attend Dallas Cup
csource
 
Shab bday ppt
Shab bday pptShab bday ppt
Shab bday ppt
Saumya Misra
 
01 early humans
01   early humans01   early humans
01 early humans
PJ Harvey
 
Make Your Blog Buzz - Time Out x Clever Boxer - Live & Learn Series 2015
Make Your Blog Buzz - Time Out x Clever Boxer - Live & Learn Series 2015Make Your Blog Buzz - Time Out x Clever Boxer - Live & Learn Series 2015
Make Your Blog Buzz - Time Out x Clever Boxer - Live & Learn Series 2015
Mark Jenkins
 
Workplace Video Conferencing Reinvented
Workplace Video Conferencing ReinventedWorkplace Video Conferencing Reinvented
Workplace Video Conferencing Reinvented
k2m2y21
 
Anti hazing 4.2-lesson 2
Anti hazing 4.2-lesson 2Anti hazing 4.2-lesson 2
Anti hazing 4.2-lesson 2
joeroachex
 
Survey monkey
Survey monkeySurvey monkey
Survey monkey
ninacollins78
 
Depop - "Our first steps towards Material Design" @ London Android Meetup
Depop - "Our first steps towards Material Design" @ London Android MeetupDepop - "Our first steps towards Material Design" @ London Android Meetup
Depop - "Our first steps towards Material Design" @ London Android Meetup
Mark Jenkins
 
Lacey’s repertoire of elements
Lacey’s repertoire of elementsLacey’s repertoire of elements
Lacey’s repertoire of elements
ninacollins78
 
Blog invitation 7th birthday party
Blog invitation 7th birthday partyBlog invitation 7th birthday party
Blog invitation 7th birthday party
Eloise Witbooi
 
Diminishing the negative_impact_of_hazing_on_our
Diminishing the negative_impact_of_hazing_on_ourDiminishing the negative_impact_of_hazing_on_our
Diminishing the negative_impact_of_hazing_on_our
joeroachex
 
Survey monkey
Survey monkeySurvey monkey
Survey monkey
ninacollins78
 
Analysis task music video
Analysis task music videoAnalysis task music video
Analysis task music video
ninacollins78
 
Lacey’s repertoire of elements3
Lacey’s repertoire of elements3Lacey’s repertoire of elements3
Lacey’s repertoire of elements3
ninacollins78
 
Anti hazing 4.2
Anti hazing 4.2Anti hazing 4.2
Anti hazing 4.2
joeroachex
 
Market research results
Market research resultsMarket research results
Market research results
ninacollins78
 
Evaluation q 4
Evaluation q 4Evaluation q 4
Evaluation q 4
ninacollins78
 

Viewers also liked (20)

Blog invitation 7th birthday party
Blog invitation 7th birthday partyBlog invitation 7th birthday party
Blog invitation 7th birthday party
 
Liberian YMCA "Dream Team" to attend Dallas Cup
Liberian YMCA "Dream Team" to attend Dallas CupLiberian YMCA "Dream Team" to attend Dallas Cup
Liberian YMCA "Dream Team" to attend Dallas Cup
 
Shab bday ppt
Shab bday pptShab bday ppt
Shab bday ppt
 
01 early humans
01   early humans01   early humans
01 early humans
 
Make Your Blog Buzz - Time Out x Clever Boxer - Live & Learn Series 2015
Make Your Blog Buzz - Time Out x Clever Boxer - Live & Learn Series 2015Make Your Blog Buzz - Time Out x Clever Boxer - Live & Learn Series 2015
Make Your Blog Buzz - Time Out x Clever Boxer - Live & Learn Series 2015
 
How did you attract
How did you attractHow did you attract
How did you attract
 
Workplace Video Conferencing Reinvented
Workplace Video Conferencing ReinventedWorkplace Video Conferencing Reinvented
Workplace Video Conferencing Reinvented
 
Anti hazing 4.2-lesson 2
Anti hazing 4.2-lesson 2Anti hazing 4.2-lesson 2
Anti hazing 4.2-lesson 2
 
Survey monkey
Survey monkeySurvey monkey
Survey monkey
 
Depop - "Our first steps towards Material Design" @ London Android Meetup
Depop - "Our first steps towards Material Design" @ London Android MeetupDepop - "Our first steps towards Material Design" @ London Android Meetup
Depop - "Our first steps towards Material Design" @ London Android Meetup
 
Lacey’s repertoire of elements
Lacey’s repertoire of elementsLacey’s repertoire of elements
Lacey’s repertoire of elements
 
ФСК ЕЭС
ФСК ЕЭСФСК ЕЭС
ФСК ЕЭС
 
Blog invitation 7th birthday party
Blog invitation 7th birthday partyBlog invitation 7th birthday party
Blog invitation 7th birthday party
 
Diminishing the negative_impact_of_hazing_on_our
Diminishing the negative_impact_of_hazing_on_ourDiminishing the negative_impact_of_hazing_on_our
Diminishing the negative_impact_of_hazing_on_our
 
Survey monkey
Survey monkeySurvey monkey
Survey monkey
 
Analysis task music video
Analysis task music videoAnalysis task music video
Analysis task music video
 
Lacey’s repertoire of elements3
Lacey’s repertoire of elements3Lacey’s repertoire of elements3
Lacey’s repertoire of elements3
 
Anti hazing 4.2
Anti hazing 4.2Anti hazing 4.2
Anti hazing 4.2
 
Market research results
Market research resultsMarket research results
Market research results
 
Evaluation q 4
Evaluation q 4Evaluation q 4
Evaluation q 4
 

Similar to DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS

26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
John Grover
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
Craig M. Moncrieff
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
Craig M. Moncrieff
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
Ankur Singh
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
Jose Verghese Bijoy
 
RESUME 2015 - Copy
RESUME 2015 - CopyRESUME 2015 - Copy
RESUME 2015 - Copy
salimon hassan
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
Muhammad Amjad
 
My Cv 05-2014
My Cv 05-2014My Cv 05-2014
My Cv 05-2014
Ehab Mostafa
 
ind brochure
ind brochureind brochure
ind brochure
Joao Aguero
 
Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00
Sam Kendall, MSc, BSc Civil Eng., PMP®, MIEAust
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
hydrologyproject001
 
Siddharth_resume_Engg.
Siddharth_resume_Engg.Siddharth_resume_Engg.
Siddharth_resume_Engg.
siddharth singh
 
Francis resume
Francis resumeFrancis resume
Francis resume
FRANCIS DCOSTA
 
Plant start up
Plant start upPlant start up
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
Thad Gilbert
 
Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION
SAJJAD KHUDHUR ABBAS
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample Memo
Chad Colton
 
Attachment 38 hpu whb boil out procedure
Attachment 38 hpu whb boil out procedure  Attachment 38 hpu whb boil out procedure
Attachment 38 hpu whb boil out procedure
Joshi Davies
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & Toubro
JAIPRAKASH PATIL
 
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
OKECHUKWU OKWORDU
 

Similar to DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS (20)

26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
 
RESUME 2015 - Copy
RESUME 2015 - CopyRESUME 2015 - Copy
RESUME 2015 - Copy
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
My Cv 05-2014
My Cv 05-2014My Cv 05-2014
My Cv 05-2014
 
ind brochure
ind brochureind brochure
ind brochure
 
Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 
Siddharth_resume_Engg.
Siddharth_resume_Engg.Siddharth_resume_Engg.
Siddharth_resume_Engg.
 
Francis resume
Francis resumeFrancis resume
Francis resume
 
Plant start up
Plant start upPlant start up
Plant start up
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample Memo
 
Attachment 38 hpu whb boil out procedure
Attachment 38 hpu whb boil out procedure  Attachment 38 hpu whb boil out procedure
Attachment 38 hpu whb boil out procedure
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & Toubro
 
Austin Okwordu CV PDF
Austin Okwordu CV PDFAustin Okwordu CV PDF
Austin Okwordu CV PDF
 

Recently uploaded

SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
felixwold
 
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptxEV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
nikshimanasa
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
Dwarkadas J Sanghvi College of Engineering
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Massimo Talia
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
FULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back EndFULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back End
PreethaV16
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 
Beckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview PresentationBeckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview Presentation
VanTuDuong1
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
wafawafa52
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
Height and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdfHeight and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdf
q30122000
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 

Recently uploaded (20)

SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdfAsymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
Asymmetrical Repulsion Magnet Motor Ratio 6-7.pdf
 
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptxEV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
FULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back EndFULL STACK PROGRAMMING - Both Front End and Back End
FULL STACK PROGRAMMING - Both Front End and Back End
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 
Beckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview PresentationBeckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview Presentation
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
Height and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdfHeight and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdf
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 

DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS

  • 1. DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
  • 2. DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS TABLE OF CONTENT 0 PREFACE....................................................................................................................... 0.1 Purpose of this document ........................................................................................ 0.2 Overview ................................................................................................................... 0.3 Abstract...................................................................................................................... 0.4 Scope.......................................................................................................................... 0.5 Objectives................................................................................................................... 0.6 Time Line................................................................................................................... EQUIPMENT TECHANICAL DATA .......................................................................... 0.1 Mechanical Screen.................................................................................................... 0.2 Penstocks ................................................................................................................... 0.3 Ultrasonic level........................................................................................................... 0.4 Pipes and fittings......................................................................................................... 0.5 Ventilations.................................................................................................................. 0.6 Switchboards ............................................................................................................... 0.7 Lighting and cabelling................................................................................................ EQUIPMENT TECHANICAL CATALOGUES ........................................................... 0.1 Mechanical Screen.................................................................................................... 0.2 Penstocks ................................................................................................................... 0.3 Ultrasonic level........................................................................................................... 0.4 Pipes and fittings......................................................................................................... 0.5 Ventilations.................................................................................................................. 0.6 Switchboards ............................................................................................................... 0.7 Lighting and cabelling................................................................................................
  • 3. DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS 0.1 PURPOSE OF THIS DOCUMENT This document is a generic Technical Proposal Submitted to ICDOC. It provides guidance to methods and material which is intended to assist in achieving project goals. It is also useful background reading for developing and monitoring installation quality. 0.2 OVERVIEW Design capacities of the lift station approximately 1670 m3/h. The GWC’s initial goal for this project is to develop a prioritized list of repair/refurbishment projects based upon a comprehensive condition assessment and criticality analysis of IPS lift station planned to remain in operation. The remaining sections constitute a technical data that should be used to construct the project-technical submissions. 0.3 ABSTRACT #1 Industrial cities development and operating company (ICDOC) are contracted to MODON to provide water and wastewater concessionary services to the industrial cities under a bot contract model for Dammam 2 industrial city. #1 The Dammam 2 IPS mechanical coarse screens, screen refuse system, dry well pipework, valves, ventilation fans and control panels are old and require immediate maintenance/replacement in order to provide security of operation of the IPS. #2 The installation of two new pumps, piping and electrical works has been completed and is operational. Two further new IPS pumps have been purchased to replace existing two old pumps. #3 The following workscope provides details of the work required to achieve the objective of the IPS being able to accept the current inflows efficiently and provide an acceptable level of standby facilities.
  • 4. DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS #4 ICDOC is seeking to appoint a suitably qualified contractor to undertake the design, supply, construction and installation, testing and commissioning of the required works. #5 GWC wound up itself in full competence to do such work because of their long experience in this field #6 This Technical Proposal is issued in order to receive proposals to undertake the work as further described in ICDOC RFP document. #7 This Technical Proposal has been set up to demonstrate our ability to attain this work executed through the implementation mechanisms and materials clarified under 0.4 SCOPE #1 Divert the IPS incoming influent from an existing manhole at the plant boundary directly to the plant head works during execution of the works. #2 Operation of the equipment and ensure no overflow shall occur during this period. #3 Dry pumps wet well in order to clean and repair of concrete surfaces and treat the defected parts. #4 Remove defected mechanical parts and installing the new ones. #5 Follow HSE plan 0.5 OBJECTIVES This project is divided into five (4) objectives: Objective 1 – Emphasize IPS Lift Station status quo and main Improvement Works Objective 2 – Wet Well Assessment and Implementation Procedure Objective 3 – Drawdown Testing Procedure Objective 4 – Setup bypass pumping system, Install New equipment Objectives may be performed concurrently. Objective 1 – Emphasize IPS Lift Station status quo and main Improvement Works o Collect a detailed information. GWC will request detailed information from the ICDOC which is required to complete the IPS lift station by pass activities, and will coordinate with the operation and maintenance department to obtain this information. The data request is expected to include, at a minimum: · Lift station operation and maintenance manuals
  • 5. DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS · Plan metric data and sanitary sewer data · Operation and maintenance data including daily pump run (hours) data · Maintenance records · Sanitary sewer overflow (SSO) records of IPS lift station-related spills o GWC will arrange with appropriate ICDOC staff to become familiar with the IPS wastewater lift station system and to obtain input on the proposed work plan. o Engineer will interview IPS operating staff regarding operability and observed deficiencies at each of the lift stations to be assessed. Engineer will note ICDOC staff comments about observed deficiencies or problems anticipated to be encountered during assessment activities. Engineer will communicate results of interviews to IPS station’s project manager and to field assessment teams. Objective 2 –Wet Well Assessment and Implementation Procedure o GWC will perform a multi-gas detection test on the unopened wet well by inserting the gas detector hose into the wet well hatch hole to measure air quality. The presence of hydrogen sulfide will be checked as a potential indicator of a corrosive environment. o After recording gas concentration, Engineer will request ICDOC staff to turn on the wet well HVAC (Ventilation System) and open hatches. GWC staff will perform a permit confined-space entry into wet wells. o Once the hatch is open, fall prevention devices provided by the Engineer will be placed over the hatch opening and a quick review of the wet well will be performed to determine the optimal locations for power washing and scratch testing. o The water level in the wet well will be lowered by starting the pumps. The pump’s vent line operation will also be monitored during lowering of the water level. o A vertical area along one side of the wet well wall will be washed using a power washer (provided by the GWC) and a scratch test will be performed on concrete wet well walls. o Tests will be performed with the aid of a pole-mounted device; staff will perform a permit confined-space entry into wet wells to conduct scratch tests. o Condition of the wet well walls, slabs, piping, valves, floats, ladders and rails will be visually inspected. Digital photographs or video will be collected. o Measurements will be taken of the wet well across the day hours to determine operating levels: Low, Lead On, Lag On, High, and other alarm levels. Engineer will use a portable leveling rod to make measurements. This information will be required for determining available wet well capacity and for lift station drawdown tests. o Based on visual assessments, Engineer will provide a detailed report for wet well structures applied methods to treat surfaces and appropriate materials. For structures with significant visible degradation.
  • 6. DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS Expected support from ICDOC: o Providing access to lift stations for Engineer staff o Opening electrical panels, guards, or hatches for Engineer to visually evaluate electrical components o Operating lift station electrical system (i.e. turning the power off/on to the pumps). This will include drawing down the level of the pumps to allow Engineer to take measurements of the operating levels. o Performing pressure washing of an area along one site of wet-well walls to ensure degreased prior to assessment. Objective 3 –Drawdown Testing Procedure o Engineer will perform pump drawdown tests over an approximate seven-day period for IPS lift station. The drawdown testing will be used to determine the flow characteristics of lift station, as well as to diagnose potential problems. o Engineer will provide and install a suitable number of Diesel Pumps with appropriate capacity in order to perform a seven-day pump drawdown test. o The Flow Monitoring process will log and record start and stop times of pumps at the lift station as the wet well fills and is emptied. Pump activity data will be stored and data will be analyzed. Flow Monitoring process with known volumes between level switches in the wet well, an algorithm provided is used to calculate flow into and out of the IPS lift station. The Flow Monitoring will be used to determine: -Total and average inflow -Minimum and maximum inflow and times of occurrence -Inflow and outflow for each fill and empty cycle -Data on combinations on pumps o Seven or more cycles of filling and pumping are necessary to analyze the filling and pumping of the lift station. To ensure adequate data is collected for analysis, seven days will normally be allotted for monitoring. In addition to determining pump performance, the process may also assist with identifying lift station performance issues, including alternator failures. o Upon the completion of flow monitoring, Engineer will collect and analyze data. o Engineer will evaluate wet well storage capacity and number of pump starts observed during flow monitoring, and compare with normal pump station operation. ICDOC responsibilities include: o Operating lift station electrical system (i.e. turn power off/on to lift station pumps)
  • 7. DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS Objective 4 – Setup bypass pumping system, Install New equipment Isolating pumping stations from incoming flow o Sewage generally arrives at a pumping station via a gravity main. Irrespective of the type of pumping station, there are times when a pumping station must be wholly or partially closed down for maintenance or further works. This means that sewage must be prevented from entering the wet well. The wet well is provided in the pumping station, storage of sewage under shut down conditions must be considered, Hence, shut down for an extended period is being proposed, bypassing with temporary diesel pumping are necessary. o Before the station is taken offline and work begins, a temporary bypass pumping system must be set up and functioning to ensure wastewater continues to flow to the treatment plant. The bypass will consist of installing a discharge pipeline with a suitable diameter with necessary connection between the nearest sewer manhole on the gravity mail line (900 mm) and the treatment plant existing inlet structure. Diesel pumps will then be brought in to pump from our wet well to the bypass connection outside the station. This will isolate the building and allow the proposed work to commence. o The arrangement used to cut off sewage flow to pumping stations with diesel pumps is to take in consideration the required period and inflow regarding drawdown test. The required pump by ICDOC are 2*625 m3/hr diesel pump which will bypass the whole sewer with a proximately 300 M of hose line. In addition, this pump is working during possible periods of extensive power outages, mandatory power reductions, or uncontrolled sewer events, consideration should be given, which shall be made to drain to the station wet well. o After install the diesel pump and switch it on for a proper while to obviously notice and ensure its adequate for the job to drain the main wet well where mechanical screens are located. The 2*625 m3/hr diesel pump will be installed near the inlet- structure above the 900 mm manhole. For the inlet manhole to the IPS station another diesel pump will be installed to connect that manhole with one of the two minor wet well where pumps wall connection are located. First it will be the minor wet well which has the newest pumps. That time will be decided according to the calculations and measures from the drawdown test and arrangement with ICDOC. While all diesel pumps are working to drain the pump with the IPS pumps, the 1000 mm balloon will be immediately installed to isolate the pump station. o Replacement works on the two wet well will be in sequence. Proper valve selection and placement is critical to the station's ease of maintenance and operation, overall station flexibility, and reliability. The following criteria have been developed for valves at the lift station. Valve location will be selected for accessibility. Submersible
  • 8. DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS pumps will have discharge valves located in a valve vault. All installed valves will be constructed of material resistant to corrosion and suitable for wastewater service. Check Valves and Pump Discharge Isolation Valves o Each pump discharge will include a swing check valve to prevent backflow in the system from damaging the pump. Each pump will be provided with its own discharge valve to isolate the pump from the system. There is currently no isolation valve on the system between the pump station and the discharge line. A manually operated gate valve is recommended downstream of the flow meter in order to isolate the station and accommodate maintenance. Wet-well Isolation Gate(s) o A type 316 stainless steel slide gates will be provided on the wet-well influent to isolate the pump station from the gravity system. The gate will be manual or actually operated as required. Mechanical Screens o To be installed after wet well treatment and meanwhile pumping station is out of service Electrical panels and control work o To be installed meanwhile pumping station is out of service.
  • 10. DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS