Tasksand Responsibilities
1. Technical Office/Tendering/Contracts/Proposal Engineer Roles:
 Prepare tender documents including Bidders Instructions, Form of
Agreement, Conditions of the Contract, BOQ, and specifications.
 Quantities surveying, breakdown and full analysis for all BOQ items.
 Estimate quantities, unit rates and prices for the required resources and
materials to perform different work activities.
 Check on letters, addendum and clarifications.
 Develop bid-forms/proposal packages.
 Prepare final draft status of the pre-construction packages on both lump
sum bid and negotiate project opportunities to standards.
 Review and evaluate submitted bids and prepare Tender evaluation
Report along with Recommendations to the client.
 Prepare and review the method statements, project schedule,
construction plan and temporary works planning.
Mobile Kuwait.: 00965 9985 5821
E-mail: eng.mahmod_reda@hotmail.com
2 | P a g e
Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com
 Manage contract negotiations at tendering stage and ensuring the
satisfactory compilation of contract data.
 Coordinate project planning and implementation, including assessing
needs, setting goals and objectives.
 Participate in project budget planning and development.
 Establish project work plan and schedules; monitor, review, and evaluate
progress.
 Coordinate and attend meetings; establish and maintain internal and
external contacts as necessary.
 Monitor record keeping and file maintenance for the program or project.
 Prepare records of project activities; oversee and ensure the timely
processing in and the delivery of required materials.
 Verify and analyze the accuracy of all data and information used or
generated by the project; resolve any discrepancies or problems.
 Negotiate and Administrate Subcontracts/sub consultancy and service
suppliers.
 Prepare/Review/Comment/Audit various claims (cost of disruption, time
extension, etch) and coordinate with the relevant project stakeholders
(Cost Contractor, Client, Sub consultants, PM).
 Review new contracts during tendering stage, prepare and present
contract review report containing a summary for all
contractual/commercial data with relevant significance (i.e. major
schedule constraints, milestones, terms of payment, major liabilities and
obligations…etc.)
 Attend site/client meetings and assist with determination of project
requirements.
 Assist PM/Department Head in the drafting and issuance of project
proposals, RFP’s, tenders, budgets, cash flows and preliminary
schedules.
 Prepare project organization and communication charts.
 Track the progress and quality of work being performed by design
disciplines/trades.
 Use project scheduling and control tools to monitor projects plans, work
hours, budgets and expenditures.
 Effectively communicate relevant project information to the client and the
project team.
3 | P a g e
Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com
 Review field reports from Contractor throughout the lifecycle of the
project.
 Issue Contracts, Letters of Intent, Purchase Orders, etc. on behalf of the
Client.
 Track and manage contemplated change notices and change orders in
the database.
 Prepare substantial completion certificates and ensure all required project
close out documents are obtained.
2. Site/Field Engineer
 Check on site works to ensure compliance with the specifications,
drawings and basic norms of the industry.
 Concrete works supervision and related works (shuttering, surveying,
reinforcements, casting, insulation, etc.).
 Architecture works supervision (Landscaping, plastering, painting, floors
tiles, walls and ceilings finishing works, accessories, etc.)
 Coordinate with the consultant’s requirements for both civil and
architectural works.
 Ensures that the construction activities are being performed with highest
quality possible and in line with the approved time schedule and the
execution plan.
 Maintain the site works to be in accordance with the Health, Safety and
Environmental Standards and Regulations.
 Ensuring that all materials used and work performed are as per
specifications.
 Monitor and Administrate Subcontractors, traders and suppliers.
Work Experiences/EmploymentRecord
 From 06/2014 till Now
Working at Pace as Project/Contracts Engineer -International Projects
Duties includes:-
1. Contract administration and management from Project awarding till
Project handing over.
2. Country Market Study, Project feasibility Study.
4 | P a g e
Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com
3. Assisting Higher Management in defining Strategies for expanding
Business internationally in fruitful countries and Projects.
4. Identify and target fruitful International Business Opportunities aligned
with Company strategy.
5. Identifying an negotiating with potential International and Local Partners
/ sub-consultants for projects to form solid Consortium to fulfill Projects
technical requirements.
6. Preparation of JV/association/sub-consultancy agreements.
7. Technical and Financial Proposals Coordination and Preparation for
international Projects funded by international and Arab fund.
8. Performing PM activities for ongoing Projects during initiation Stage,
assisting assigned project staff overseas with the required tools,
templates and forms needed to maintain high project management
standards.
9. Cost Management and Budget Control assuring Projects to be on
budget and tracking of Company’s invoices from Clients/Sponsors.
10. Project Monitoring and Control during construction phase to handing
over to the Client to ensure Full Client and Sponsor satisfaction.
 Preparation of several Proposals in Yemen, Iraq, Bahrain,
Uzbekistan, Tajikistan, Ethiopia, Sudan, Malawi, Uganda,
Sri lanka.
 Responsible for PM, Monitoring and Control of ongoing Projects
in Yemen, Morocco, Sudan, Uzbekistan, Ethiopia.
Major Projects Highlights:
1. Proposals
- Consultancy Services for Preparation of Terms of Reference
for Projects Identified under the Short Term Plan of Jeddah
Transportation Master Plan (JTMP) and Management and
Updating of Jeddah Strategic Transportation Model (JSTM)
– Jeddah, Saudi Arabia, Project Cost 1.5 Billion USD.
- Develop and Implement Intelligent Transportation System for
the Public Transportation sector – Jordan, Project cost 65
Million USD.
- Construction of Modern Rural Housing Project – Uzbekistan,
Project Cost 106 Million USD.
- Construction of Infrastructure & Bridges on Islands 13 & 14
(East) of Al Madina Al Shamaliya – Bahrain, Project Cost 70
Million USD.
5 | P a g e
Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com
- Consultancy Services for Widening & Upgrading of Sheikh
Jaber Al Ahmed Al Sabah (SJAS) Highway to Motorway
Standards (from dual – 3 lane to 4 lane) – Bahrain, Project
Cost 140 Million USD.
- Construction Supervision of Three (3) Rural Road Projects –
Yemen, Project Cost 30 Million USD.
- Construction Supervision of Four (4) Rural Road Projects –
Yemen, Project Cost 30 Million USD.
- Construction Supervision of Reconstruction of 25 Bridges –
Srilanka, Project Cost 35 Million USD.
2. Ongoing Projects
- Provision of Management Services for Development
Projects in the Kingdom of Morocco, Project Cost 1.25
Billion USD.
- Consultancy Services for 10 Schools Project - Basra, Iraq.
Project Cost 250 Million USD.
- Consultancy Services for Supervision of Construction Works
for Thara Dam – Yemen. Project Cost 27 Million USD.
- Tashkent Sewerage Project – Uzbekistan, Project cost 35
Million USD.
- Construction Supervision Services for Toker – Garora Road
Project – Sudan, Project cost 55 Million USD.
- Consultancy Services for the Construction Supervision of
Ambo – Wolliso Road Project – Ethiopia, Project cost 55
Million USD.
 From 10/2011 till 05/2014
Working at Nezar Al-Anjari Consulting bureau (NAB) at the State of Kuwait
as Tendering Engineerand Contract Administrator (leading 3 employees).
Main responsibilities:-
 preparation of tender documents (tender procedures and contract
conditions and project specifications)
 preparation of preliminary project time schedule
 prequalification of tenders and tender evaluations
 planning of internal office projects time schedule and coordination
between various departments
 Contract Management
6 | P a g e
Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com
Projects:-
- series of fuel stations for Oula Petrol Company
- Kuwaiti Danish Dairy (KDD) New Factory
- series of fuel stations for Al-Soor Petrol Company
- technical inspection building for Ministry of Interior (3 buildings in
3 governorates in the state of kuwait)
- Aston Martin show room in shuwaikh
- The American University of the Middle East (AUM) headquarters
and educational buildings.
- various residential towers, buildings
 From 20/4/2010 till 10/2011
Working at raafat.miller consulting (rmc) as Technical office engineer
Duties include:-
1. Preparation and reviewing Quantities Takeoff Sheets.
2. Preparation of Bills of Quantities and Project specifications
3. Preparation of Contracts and Contract management.
4. Cost Estimating, Project budgeting.
5. Value Engineering analysis.
6. Feasibility Study and cost breakdown studies.
7. Tender Management, Tender analysis and Tender Evaluation.
Major Projects Highlights:
- Al-Futtaim Cairo Festival City (Business Park A & b) contract BOQ and
preparation of vendor list.
- Travco Giza Palace Hotel and Spa preparation of tender documents and
prequalification of contractors.
- Chedi club Hotel (working as team leader Q.S and Project engineer)
preparation of tender documents.
- SODIC- SOLIDAIRE East town Esplanade (preparation of feasibility
study, value engineering studies, cost breakdown studies, vendor lists and
cost estimated BOQ schematic design phase).
7 | P a g e
Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com
- Cairo Expo City local architect in association with ZAHA HADID
(project engineer and Member of Value Engineering Team ) preparation of
vale engineering study, preparation of vendor list, preparation of feasibility
study and project proposal.
- Eaamar Mivida parcel Palmera twin house Prequalification of
contractors and tender evaluation.
 From 9/2008 to 8/2009
Working at THE ARAB CONTRACTORS – Helwan Branch project of "The
Relocation of Military Factories (27) at Abu Zaabal" as a site engineer
supervising 3 administrative buildings (2 buildings started from excavation
till final finish and submittal and 1 building repairing)
 From 8/2009 to 15/4/2010
Working at THE ARAB CONTRACTORS – Helwan Branch project of "Alobor
Elite Schools at Alobor City" as a Technical Office engineer (Technical
office/Planning engineer)
 Preparation and submission of the Baseline including all resources
loading.
 Preparation of daily report, weekly report, monthly report.
 Progress and schedule update and recovery plan.
 Cost control using earned value technique.
 Quantity surveying all items (Structural ,Architectural) (V.O and P.O
and for monthly progress bill)
Education
 Bachelor degree in civil engineering public works department from faculty of
engineering Ain Shams University
 Graduation Year: 2008.
 Graduation Project: Surveying
 Project Grade: Excellent.
 Accumulative Graduation Grade: Fair (62%)
 Post graduate studies
 Professional Diploma in construction project management at the American
University in Cairo( AUC)
 The Diploma consist of 4 main courses and 2 elective courses
Courses:
 Bids and contracts
 Project planning and control techniques.
8 | P a g e
Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com
 Projects budgeting and financial control
 Projects resources management
 Cost Management
 Value Analysis for Engineering Projects
Extra courses:
 Primavera Project Management (P6).
 Risk management.
 PMP under processing.
Skills
 Computer skills:
 MS Windows and its applications.
 MS Office (Word, Excel, Power Point).
 MS Project
 Primavera (P6)
 Use of Internet and its applications.
 Autodesk Autocad
 Language skills:
 Arabic: Mother tongue
 English: fluently written and spoken

CV_Mahmoud_Reda

  • 1.
    1 | Pa g e Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com Mahmoud Mohammed Reda PMP under Processing PersonalData  Birth date: 21/08/1986  Gender: Male  Military status: Exempted  Marital status: Married  Nationality: Egyptian  Current Country of Residence: Kuwait  Driving license: obtained & valid (both in Egypt and Kuwait) Contactinformation Tasksand Responsibilities 1. Technical Office/Tendering/Contracts/Proposal Engineer Roles:  Prepare tender documents including Bidders Instructions, Form of Agreement, Conditions of the Contract, BOQ, and specifications.  Quantities surveying, breakdown and full analysis for all BOQ items.  Estimate quantities, unit rates and prices for the required resources and materials to perform different work activities.  Check on letters, addendum and clarifications.  Develop bid-forms/proposal packages.  Prepare final draft status of the pre-construction packages on both lump sum bid and negotiate project opportunities to standards.  Review and evaluate submitted bids and prepare Tender evaluation Report along with Recommendations to the client.  Prepare and review the method statements, project schedule, construction plan and temporary works planning. Mobile Kuwait.: 00965 9985 5821 E-mail: eng.mahmod_reda@hotmail.com
  • 2.
    2 | Pa g e Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com  Manage contract negotiations at tendering stage and ensuring the satisfactory compilation of contract data.  Coordinate project planning and implementation, including assessing needs, setting goals and objectives.  Participate in project budget planning and development.  Establish project work plan and schedules; monitor, review, and evaluate progress.  Coordinate and attend meetings; establish and maintain internal and external contacts as necessary.  Monitor record keeping and file maintenance for the program or project.  Prepare records of project activities; oversee and ensure the timely processing in and the delivery of required materials.  Verify and analyze the accuracy of all data and information used or generated by the project; resolve any discrepancies or problems.  Negotiate and Administrate Subcontracts/sub consultancy and service suppliers.  Prepare/Review/Comment/Audit various claims (cost of disruption, time extension, etch) and coordinate with the relevant project stakeholders (Cost Contractor, Client, Sub consultants, PM).  Review new contracts during tendering stage, prepare and present contract review report containing a summary for all contractual/commercial data with relevant significance (i.e. major schedule constraints, milestones, terms of payment, major liabilities and obligations…etc.)  Attend site/client meetings and assist with determination of project requirements.  Assist PM/Department Head in the drafting and issuance of project proposals, RFP’s, tenders, budgets, cash flows and preliminary schedules.  Prepare project organization and communication charts.  Track the progress and quality of work being performed by design disciplines/trades.  Use project scheduling and control tools to monitor projects plans, work hours, budgets and expenditures.  Effectively communicate relevant project information to the client and the project team.
  • 3.
    3 | Pa g e Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com  Review field reports from Contractor throughout the lifecycle of the project.  Issue Contracts, Letters of Intent, Purchase Orders, etc. on behalf of the Client.  Track and manage contemplated change notices and change orders in the database.  Prepare substantial completion certificates and ensure all required project close out documents are obtained. 2. Site/Field Engineer  Check on site works to ensure compliance with the specifications, drawings and basic norms of the industry.  Concrete works supervision and related works (shuttering, surveying, reinforcements, casting, insulation, etc.).  Architecture works supervision (Landscaping, plastering, painting, floors tiles, walls and ceilings finishing works, accessories, etc.)  Coordinate with the consultant’s requirements for both civil and architectural works.  Ensures that the construction activities are being performed with highest quality possible and in line with the approved time schedule and the execution plan.  Maintain the site works to be in accordance with the Health, Safety and Environmental Standards and Regulations.  Ensuring that all materials used and work performed are as per specifications.  Monitor and Administrate Subcontractors, traders and suppliers. Work Experiences/EmploymentRecord  From 06/2014 till Now Working at Pace as Project/Contracts Engineer -International Projects Duties includes:- 1. Contract administration and management from Project awarding till Project handing over. 2. Country Market Study, Project feasibility Study.
  • 4.
    4 | Pa g e Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com 3. Assisting Higher Management in defining Strategies for expanding Business internationally in fruitful countries and Projects. 4. Identify and target fruitful International Business Opportunities aligned with Company strategy. 5. Identifying an negotiating with potential International and Local Partners / sub-consultants for projects to form solid Consortium to fulfill Projects technical requirements. 6. Preparation of JV/association/sub-consultancy agreements. 7. Technical and Financial Proposals Coordination and Preparation for international Projects funded by international and Arab fund. 8. Performing PM activities for ongoing Projects during initiation Stage, assisting assigned project staff overseas with the required tools, templates and forms needed to maintain high project management standards. 9. Cost Management and Budget Control assuring Projects to be on budget and tracking of Company’s invoices from Clients/Sponsors. 10. Project Monitoring and Control during construction phase to handing over to the Client to ensure Full Client and Sponsor satisfaction.  Preparation of several Proposals in Yemen, Iraq, Bahrain, Uzbekistan, Tajikistan, Ethiopia, Sudan, Malawi, Uganda, Sri lanka.  Responsible for PM, Monitoring and Control of ongoing Projects in Yemen, Morocco, Sudan, Uzbekistan, Ethiopia. Major Projects Highlights: 1. Proposals - Consultancy Services for Preparation of Terms of Reference for Projects Identified under the Short Term Plan of Jeddah Transportation Master Plan (JTMP) and Management and Updating of Jeddah Strategic Transportation Model (JSTM) – Jeddah, Saudi Arabia, Project Cost 1.5 Billion USD. - Develop and Implement Intelligent Transportation System for the Public Transportation sector – Jordan, Project cost 65 Million USD. - Construction of Modern Rural Housing Project – Uzbekistan, Project Cost 106 Million USD. - Construction of Infrastructure & Bridges on Islands 13 & 14 (East) of Al Madina Al Shamaliya – Bahrain, Project Cost 70 Million USD.
  • 5.
    5 | Pa g e Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com - Consultancy Services for Widening & Upgrading of Sheikh Jaber Al Ahmed Al Sabah (SJAS) Highway to Motorway Standards (from dual – 3 lane to 4 lane) – Bahrain, Project Cost 140 Million USD. - Construction Supervision of Three (3) Rural Road Projects – Yemen, Project Cost 30 Million USD. - Construction Supervision of Four (4) Rural Road Projects – Yemen, Project Cost 30 Million USD. - Construction Supervision of Reconstruction of 25 Bridges – Srilanka, Project Cost 35 Million USD. 2. Ongoing Projects - Provision of Management Services for Development Projects in the Kingdom of Morocco, Project Cost 1.25 Billion USD. - Consultancy Services for 10 Schools Project - Basra, Iraq. Project Cost 250 Million USD. - Consultancy Services for Supervision of Construction Works for Thara Dam – Yemen. Project Cost 27 Million USD. - Tashkent Sewerage Project – Uzbekistan, Project cost 35 Million USD. - Construction Supervision Services for Toker – Garora Road Project – Sudan, Project cost 55 Million USD. - Consultancy Services for the Construction Supervision of Ambo – Wolliso Road Project – Ethiopia, Project cost 55 Million USD.  From 10/2011 till 05/2014 Working at Nezar Al-Anjari Consulting bureau (NAB) at the State of Kuwait as Tendering Engineerand Contract Administrator (leading 3 employees). Main responsibilities:-  preparation of tender documents (tender procedures and contract conditions and project specifications)  preparation of preliminary project time schedule  prequalification of tenders and tender evaluations  planning of internal office projects time schedule and coordination between various departments  Contract Management
  • 6.
    6 | Pa g e Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com Projects:- - series of fuel stations for Oula Petrol Company - Kuwaiti Danish Dairy (KDD) New Factory - series of fuel stations for Al-Soor Petrol Company - technical inspection building for Ministry of Interior (3 buildings in 3 governorates in the state of kuwait) - Aston Martin show room in shuwaikh - The American University of the Middle East (AUM) headquarters and educational buildings. - various residential towers, buildings  From 20/4/2010 till 10/2011 Working at raafat.miller consulting (rmc) as Technical office engineer Duties include:- 1. Preparation and reviewing Quantities Takeoff Sheets. 2. Preparation of Bills of Quantities and Project specifications 3. Preparation of Contracts and Contract management. 4. Cost Estimating, Project budgeting. 5. Value Engineering analysis. 6. Feasibility Study and cost breakdown studies. 7. Tender Management, Tender analysis and Tender Evaluation. Major Projects Highlights: - Al-Futtaim Cairo Festival City (Business Park A & b) contract BOQ and preparation of vendor list. - Travco Giza Palace Hotel and Spa preparation of tender documents and prequalification of contractors. - Chedi club Hotel (working as team leader Q.S and Project engineer) preparation of tender documents. - SODIC- SOLIDAIRE East town Esplanade (preparation of feasibility study, value engineering studies, cost breakdown studies, vendor lists and cost estimated BOQ schematic design phase).
  • 7.
    7 | Pa g e Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com - Cairo Expo City local architect in association with ZAHA HADID (project engineer and Member of Value Engineering Team ) preparation of vale engineering study, preparation of vendor list, preparation of feasibility study and project proposal. - Eaamar Mivida parcel Palmera twin house Prequalification of contractors and tender evaluation.  From 9/2008 to 8/2009 Working at THE ARAB CONTRACTORS – Helwan Branch project of "The Relocation of Military Factories (27) at Abu Zaabal" as a site engineer supervising 3 administrative buildings (2 buildings started from excavation till final finish and submittal and 1 building repairing)  From 8/2009 to 15/4/2010 Working at THE ARAB CONTRACTORS – Helwan Branch project of "Alobor Elite Schools at Alobor City" as a Technical Office engineer (Technical office/Planning engineer)  Preparation and submission of the Baseline including all resources loading.  Preparation of daily report, weekly report, monthly report.  Progress and schedule update and recovery plan.  Cost control using earned value technique.  Quantity surveying all items (Structural ,Architectural) (V.O and P.O and for monthly progress bill) Education  Bachelor degree in civil engineering public works department from faculty of engineering Ain Shams University  Graduation Year: 2008.  Graduation Project: Surveying  Project Grade: Excellent.  Accumulative Graduation Grade: Fair (62%)  Post graduate studies  Professional Diploma in construction project management at the American University in Cairo( AUC)  The Diploma consist of 4 main courses and 2 elective courses Courses:  Bids and contracts  Project planning and control techniques.
  • 8.
    8 | Pa g e Mahmoud Mohammed Reda eng.mahmod_reda@hotmail.com  Projects budgeting and financial control  Projects resources management  Cost Management  Value Analysis for Engineering Projects Extra courses:  Primavera Project Management (P6).  Risk management.  PMP under processing. Skills  Computer skills:  MS Windows and its applications.  MS Office (Word, Excel, Power Point).  MS Project  Primavera (P6)  Use of Internet and its applications.  Autodesk Autocad  Language skills:  Arabic: Mother tongue  English: fluently written and spoken