CV - AHMED MOUNIR AHMED
Page 1 of 6
CURRICULAM VITAE
NAME: AHMED MOUNIR AHMED
ADDRESS: 306 Airport Road, P. O. Box 1985, Doha, Qatar
E-MAIL: abo_karem2002@yahoo.com
MOBILE NO.: +974 3356 5188
NATIONALITY: Egyptian
DATE OF BIRTH: 25/09/1975
QUALIFICATIONS: B.Sc. CE Higher Technological Institute
MMUP, Grade-A
SOFTWARE USED: Auto CAD & MS Office
LANGUAGES: Arabic, English
CAREER SUMMARY & EXPERIENCE:
17 years of experience in construction of mega projects. The last 14
years exclusively on bridge construction projects and infrastructure
in UAE & Qatar
TRAINING COURSES: ● QMS internal Auditor Training Course, IRCA QMS Internal
Auditor (BVQ)
● Integrated Management System on ISO 14001:2004, TATweer
(Abu Dhabi)
● Traffic Safety Measures, QISC – Qatar International Safety
Center
EMPLOYMENT RECORD:
 June 2015 – Present Projects Manager
Qatar Building Company,
Doha, Qatar
Project: ROAD AND INFRASTRUCTURE IN AL SAILIYAH (DW013 / C286)
Project Value: USD 157.11 Million
Scope of Works:
- Carryout full infrastructure works and road works for two packages with total area
592,000M2
which includes 23.3KM of Sewer pipeline with 438 Manholes, 18.6KM of
Foul Sewer with 457 Manholes, 12.8KM of TSE pipeline with 118 Chambers, 23.4KM of
Roads, Electrical Network, ITS, QNBN, Street Lighting and Additional work for the
construction of the trunk sewer line of approx. 4.5 Km and lifting station PS50A.
- Official completion date is February 2017, expected EOT May 2018.
 Sept. 2013 – Present Projects Manager
Qatar Building Company,
Doha, Qatar
Project: ENERGY CITY QATAR I CIVIL INFRASTRUCTURE WORK (ECQI)
CV - AHMED MOUNIR AHMED
Page 2 of 6
Project Value: USD 86.78 Million
Scope of Works:
- Surface water drainage networks, Foul sewer networks, Road works, Ductile iron water
supply network, Irrigation network, Street Lighting network, Electrical works including
transmission cable 11 KV, Construction of civil works of Ooredoo and District cooling
network.
- Official completion date is December 2016.
 Jan. 2011 – Present Projects Manager
Qatar Building Company,
Doha, Qatar
Project: GTC299/ 2009 – Al Wukair RPS & Associated Pipelines
Project Value: USD 160.27 Million
Scope of Works:
- New pump house and control building along with all necessary civil, mechanical,
electrical, control, fire protection and instrumentation works to accommodate and operate
fifteen pumps (4 VFD pumps, six future slots, (425 lps @ 55 meters head), and 4 fixed
speed pumps and one future slot. (250 lps @ 40 meter head)).
- 4 new pre-stressed reservoirs each of 9 million gallon total capacity including all necessary
works.
- Concrete boundary wall around the station, and guard house near the station entrance.
- Construction of approximately 2.4 kilometers of new 1200 mm distillate transmission
pipelines and associated works chambers from interconnection point of existing distillate
lines and up to inside of the new station.
- Construction of approximately 11.8 kilometer of new 600 mm and 11.4 kilometers of 900
mm, rising mains pipelines and associated works chambers from inside the new water
station and up to interconnection points to existing and future pipelines.
- Construction of new automated tanker filling station (TFS) of 18 filling points.
- Fiber optic cables parallel to new 1200 mm distillate transmission pipelines described
above.
- Replacing old three fixed speed pumps inside Existing Wakra Water Station by new higher
capacities pumps, increase number of variable speed pumps and change associated
electrical equipment’s and instruments.
- GTC299/ 2009 VO # 1 – Construction of the four Additional pre-stressed circular
Reservoirs and the associated pipelines at Mesaimeer RPS
- GTC299/ 2009 VO # 2 – Small and Medium Scale Industrial Area New Pumping Station
additional distillate piping works.
- GTC299/ 2009 VO # 2 – New Boundary Wall at Airport RPS with a total length of 1.54
KM.
- Official completion date is December 2016.
Prime Responsibilities:
- Follow up and Supervise of Construction procedure for structure works and Utilities
works.
- Modifying Construction Techniques to reduce the Time and the cost for different
activates.
- Identifying the resources needed for the Project (manpower, equipment and material).
- Issuance of revisions to the plans and schedules and when required.
CV - AHMED MOUNIR AHMED
Page 3 of 6
- Following up and supervise the preparation of shop drawings, material submittals and
method statements
- Taking off quantities for all the materials required for construction such as (Fittings,
Valves, Steel, Pipes, Concrete and Timber).
- Follow up sub-contractors and suppliers.
- Follow up and supervise the preparation of the work statements and payment certificates.
- Preparing the monthly target and weekly target.
- Coordinate the company management in timely manner with regards to critical activities,
anticipated slippage, anticipated delays and advise corrective actions well in advance.
- Liaise with the engineer for approvals of all inspection requests, shop drawings and
material submittals.
- Attend meetings and liaise with different authorities for the project related matters.
- Attend meetings and liaise with client’s engineers.
- Review the design drawings and liaise with the design consultant for solving the design
problems as per site condition.
 Aug. 2006 – Jan. 2011 Construction Manager
Hedley International Emirates Contracting
(Bin Hafeez General Contracting)
UAE
Project: Contract 800/3a Ras Al Khor Crossing
Project Value: USD 133 Million
Scope of Works:
- Construction of 11 Bridge Decks (Total 3 km length), 96 piers, 14 abutments, 54 pile caps
and 800 piles. Variation Works added for construction of 800 mm long underpass.
- Construction of 2 pump stations, 9200 lm irrigation network, 17100 lm water network,
14200 lm drainage network and 3600 lm sewer line.
Prime Responsibility:
- Value Engineering
o Supervision of bridge construction procedure.
o Bridge construction preceded bearing installation due to non-availability.
o Modified construction techniques to cut on element cycle times.
o PT sequence revised to cut construction time.
o Supervision of utilities works.
- Identifying the resources needed for the works.
- Preparation of the procedure for progress measurement and certification.
- Review of the man hour analysis for the works.
- Issuance of revisions to the plans and schedules as and when required.
- Attend meetings and liaise with Client’s Structural Engineer.
- Advise the Project Manager in timely manner with regards to critical activities, anticipated
slippages, anticipated delays and advice corrective actions as well in advance.
Record Achieved:
Pouring of 3500m3
concrete for the under pass base slab in less than 12 hrs.
 Jun. 2004 – Aug. 2006 Project Engineer
Hedley International Emirates Contracting
CV - AHMED MOUNIR AHMED
Page 4 of 6
(Bin Hafeez General Contracting)
UAE
Project: Sheikh Zayed Bridge Contract No. 3
Project Value: USD 6 Million
Scope of Works:
- Construction of 2 decks post tensioned box Girder Bridge as part of the Third Bridge
Crossing to Abu Dhabi Island crossing over the ceremonial wedding grounds access road
with a total span of 60 m supported by 2 abutments and a central pier along with
associated MSE walls and road services.
Prime Responsibility:
- Supervision of bridge construction procedure.
- Preparation of method statements and shop drawings.
- Identifying the resources needed for the works.
- Preparation of the procedure for progress measurement and certification.
- Preparation of progress reports and arrange for submission for the Client.
- Review of the man hour analysis for the bridge works.
- Issuance of revisions to the plans and schedules as and when required.
- Attend meetings and liaise with Client’s Structural Engineer.
- Liaise with engineer for approvals of al inspection requests.
- Advise the Project Manager in timely manner with regards to critical activities, anticipated
slippages, anticipated delays and advice corrective actions well in advance.
Record Achieved:
Pouring of 1600 m3
concrete for the bridge deck in less than 10 hrs.
 Nov. 2003 – Jun. 2004 Site Engineer
Hedley International Emirates Contracting
UAE
Project: Al Jumera Island (Jebel Ali)
Project Value: USD 8.16 Million
Scope of Works:
- Pipe laying, Horizontal direction drilling, Micro Tunneling, 2 pump stations, Outfall and
sub marine works.
Prime Responsibility:
- Supervision of bridge construction works.
- Liaison with the Engineer’s supervisory staff for approvals of the completed works.
 Jan. 2003 – Nov. 2003 Bridge Engineer
Hedley International Emirates Contracting
UAE
Project: Contract No. 994
Project Value: USD 21.20 Million
CV - AHMED MOUNIR AHMED
Page 5 of 6
Scope of Works:
- Bridge interchange on Abu Dhabi, Al Ain Road at MIP – 3A. Construction of a twin post
tensioned box Girder Bridge supported by 2 abutments and 3 piers spanning a length of
250 m along with 4 loops and 4 slip ramps.
Prime Responsibility:
- Supervision of Structural works.
- Identifying resources need for the works.
- Planning and follow up activities on site related to bridge.
- Liaison with the Engineer’s supervisory staff for approvals of all inspection requests.
 Jun. 2002 – Jan. 2003 Bridge Engineer
Al Masriya Construction Co.
Egypt
Project: Al Rebbat Bridge in Al Mahala Egypt
Project Value: USD 3 Million
Scope of Works:
- 4 spans reinforced concrete slab type – 120 lm bridge length.
Prime Responsibility:
- Supervision of structural works.
- Identifying resources need for the works.
- Planning and follow up activities on site related to bridge.
- Liaison with the Engineer for approvals of all inspection requests.
 Dec. 2001 – June 2002 Bridge Engineer
Al Masriya Construction Co.
Egypt
Project: Al Ghanaian Bridge in Suez City Egypt
Project Value: USD 1 Million
Scope of Works:
- 3 spans reinforced concrete slab type 60 lm bridge length.
Prime Responsibility:
- Supervision of structural works.
- Identifying resources need for the works.
- Planning and follow up activities on site related to bridge.
- Liaison with the Engineer for approvals of all inspection requests.
 Dec. 2000 – Dec. 2001 Bridge Engineer
Al Masriya Construction Co.
Egypt
CV - AHMED MOUNIR AHMED
Page 6 of 6
Project: Meet Nama Bridge, Egypt
Project Value: USD 0.5 Million
Scope of Works:
- 2 spans Pedestrian Steel Bridge – 90 lm length.
Prime Responsibility:
- Supervision of structural works.
- Identifying resources need for the works.
- Planning and follow up activities on site related to bridge.
- Liaison with the Engineer for approvals of all inspection requests.
 May 1999 – Dec. 2000 Bridge Engineer
Al Masriya Construction Co.
Egypt
Project: Barshom Bridge Al Kalubia Egypt
Project Value: USD 3 Million
Scope of Works:
- 6 spans reinforced concrete box girder type with movable steel span (50 m.) – total length
200 lm
Prime Responsibility:
- Supervision of structural works.
- Identifying resources need for the works.
- Planning and follow up activities on site related to bridge.
- Liaison with the Engineer for approvals of all inspection requests.
CV - AHMED MOUNIR AHMED
Page 6 of 6
Project: Meet Nama Bridge, Egypt
Project Value: USD 0.5 Million
Scope of Works:
- 2 spans Pedestrian Steel Bridge – 90 lm length.
Prime Responsibility:
- Supervision of structural works.
- Identifying resources need for the works.
- Planning and follow up activities on site related to bridge.
- Liaison with the Engineer for approvals of all inspection requests.
 May 1999 – Dec. 2000 Bridge Engineer
Al Masriya Construction Co.
Egypt
Project: Barshom Bridge Al Kalubia Egypt
Project Value: USD 3 Million
Scope of Works:
- 6 spans reinforced concrete box girder type with movable steel span (50 m.) – total length
200 lm
Prime Responsibility:
- Supervision of structural works.
- Identifying resources need for the works.
- Planning and follow up activities on site related to bridge.
- Liaison with the Engineer for approvals of all inspection requests.

CV - Ahmed Mounir

  • 1.
    CV - AHMEDMOUNIR AHMED Page 1 of 6 CURRICULAM VITAE NAME: AHMED MOUNIR AHMED ADDRESS: 306 Airport Road, P. O. Box 1985, Doha, Qatar E-MAIL: abo_karem2002@yahoo.com MOBILE NO.: +974 3356 5188 NATIONALITY: Egyptian DATE OF BIRTH: 25/09/1975 QUALIFICATIONS: B.Sc. CE Higher Technological Institute MMUP, Grade-A SOFTWARE USED: Auto CAD & MS Office LANGUAGES: Arabic, English CAREER SUMMARY & EXPERIENCE: 17 years of experience in construction of mega projects. The last 14 years exclusively on bridge construction projects and infrastructure in UAE & Qatar TRAINING COURSES: ● QMS internal Auditor Training Course, IRCA QMS Internal Auditor (BVQ) ● Integrated Management System on ISO 14001:2004, TATweer (Abu Dhabi) ● Traffic Safety Measures, QISC – Qatar International Safety Center EMPLOYMENT RECORD:  June 2015 – Present Projects Manager Qatar Building Company, Doha, Qatar Project: ROAD AND INFRASTRUCTURE IN AL SAILIYAH (DW013 / C286) Project Value: USD 157.11 Million Scope of Works: - Carryout full infrastructure works and road works for two packages with total area 592,000M2 which includes 23.3KM of Sewer pipeline with 438 Manholes, 18.6KM of Foul Sewer with 457 Manholes, 12.8KM of TSE pipeline with 118 Chambers, 23.4KM of Roads, Electrical Network, ITS, QNBN, Street Lighting and Additional work for the construction of the trunk sewer line of approx. 4.5 Km and lifting station PS50A. - Official completion date is February 2017, expected EOT May 2018.  Sept. 2013 – Present Projects Manager Qatar Building Company, Doha, Qatar Project: ENERGY CITY QATAR I CIVIL INFRASTRUCTURE WORK (ECQI)
  • 2.
    CV - AHMEDMOUNIR AHMED Page 2 of 6 Project Value: USD 86.78 Million Scope of Works: - Surface water drainage networks, Foul sewer networks, Road works, Ductile iron water supply network, Irrigation network, Street Lighting network, Electrical works including transmission cable 11 KV, Construction of civil works of Ooredoo and District cooling network. - Official completion date is December 2016.  Jan. 2011 – Present Projects Manager Qatar Building Company, Doha, Qatar Project: GTC299/ 2009 – Al Wukair RPS & Associated Pipelines Project Value: USD 160.27 Million Scope of Works: - New pump house and control building along with all necessary civil, mechanical, electrical, control, fire protection and instrumentation works to accommodate and operate fifteen pumps (4 VFD pumps, six future slots, (425 lps @ 55 meters head), and 4 fixed speed pumps and one future slot. (250 lps @ 40 meter head)). - 4 new pre-stressed reservoirs each of 9 million gallon total capacity including all necessary works. - Concrete boundary wall around the station, and guard house near the station entrance. - Construction of approximately 2.4 kilometers of new 1200 mm distillate transmission pipelines and associated works chambers from interconnection point of existing distillate lines and up to inside of the new station. - Construction of approximately 11.8 kilometer of new 600 mm and 11.4 kilometers of 900 mm, rising mains pipelines and associated works chambers from inside the new water station and up to interconnection points to existing and future pipelines. - Construction of new automated tanker filling station (TFS) of 18 filling points. - Fiber optic cables parallel to new 1200 mm distillate transmission pipelines described above. - Replacing old three fixed speed pumps inside Existing Wakra Water Station by new higher capacities pumps, increase number of variable speed pumps and change associated electrical equipment’s and instruments. - GTC299/ 2009 VO # 1 – Construction of the four Additional pre-stressed circular Reservoirs and the associated pipelines at Mesaimeer RPS - GTC299/ 2009 VO # 2 – Small and Medium Scale Industrial Area New Pumping Station additional distillate piping works. - GTC299/ 2009 VO # 2 – New Boundary Wall at Airport RPS with a total length of 1.54 KM. - Official completion date is December 2016. Prime Responsibilities: - Follow up and Supervise of Construction procedure for structure works and Utilities works. - Modifying Construction Techniques to reduce the Time and the cost for different activates. - Identifying the resources needed for the Project (manpower, equipment and material). - Issuance of revisions to the plans and schedules and when required.
  • 3.
    CV - AHMEDMOUNIR AHMED Page 3 of 6 - Following up and supervise the preparation of shop drawings, material submittals and method statements - Taking off quantities for all the materials required for construction such as (Fittings, Valves, Steel, Pipes, Concrete and Timber). - Follow up sub-contractors and suppliers. - Follow up and supervise the preparation of the work statements and payment certificates. - Preparing the monthly target and weekly target. - Coordinate the company management in timely manner with regards to critical activities, anticipated slippage, anticipated delays and advise corrective actions well in advance. - Liaise with the engineer for approvals of all inspection requests, shop drawings and material submittals. - Attend meetings and liaise with different authorities for the project related matters. - Attend meetings and liaise with client’s engineers. - Review the design drawings and liaise with the design consultant for solving the design problems as per site condition.  Aug. 2006 – Jan. 2011 Construction Manager Hedley International Emirates Contracting (Bin Hafeez General Contracting) UAE Project: Contract 800/3a Ras Al Khor Crossing Project Value: USD 133 Million Scope of Works: - Construction of 11 Bridge Decks (Total 3 km length), 96 piers, 14 abutments, 54 pile caps and 800 piles. Variation Works added for construction of 800 mm long underpass. - Construction of 2 pump stations, 9200 lm irrigation network, 17100 lm water network, 14200 lm drainage network and 3600 lm sewer line. Prime Responsibility: - Value Engineering o Supervision of bridge construction procedure. o Bridge construction preceded bearing installation due to non-availability. o Modified construction techniques to cut on element cycle times. o PT sequence revised to cut construction time. o Supervision of utilities works. - Identifying the resources needed for the works. - Preparation of the procedure for progress measurement and certification. - Review of the man hour analysis for the works. - Issuance of revisions to the plans and schedules as and when required. - Attend meetings and liaise with Client’s Structural Engineer. - Advise the Project Manager in timely manner with regards to critical activities, anticipated slippages, anticipated delays and advice corrective actions as well in advance. Record Achieved: Pouring of 3500m3 concrete for the under pass base slab in less than 12 hrs.  Jun. 2004 – Aug. 2006 Project Engineer Hedley International Emirates Contracting
  • 4.
    CV - AHMEDMOUNIR AHMED Page 4 of 6 (Bin Hafeez General Contracting) UAE Project: Sheikh Zayed Bridge Contract No. 3 Project Value: USD 6 Million Scope of Works: - Construction of 2 decks post tensioned box Girder Bridge as part of the Third Bridge Crossing to Abu Dhabi Island crossing over the ceremonial wedding grounds access road with a total span of 60 m supported by 2 abutments and a central pier along with associated MSE walls and road services. Prime Responsibility: - Supervision of bridge construction procedure. - Preparation of method statements and shop drawings. - Identifying the resources needed for the works. - Preparation of the procedure for progress measurement and certification. - Preparation of progress reports and arrange for submission for the Client. - Review of the man hour analysis for the bridge works. - Issuance of revisions to the plans and schedules as and when required. - Attend meetings and liaise with Client’s Structural Engineer. - Liaise with engineer for approvals of al inspection requests. - Advise the Project Manager in timely manner with regards to critical activities, anticipated slippages, anticipated delays and advice corrective actions well in advance. Record Achieved: Pouring of 1600 m3 concrete for the bridge deck in less than 10 hrs.  Nov. 2003 – Jun. 2004 Site Engineer Hedley International Emirates Contracting UAE Project: Al Jumera Island (Jebel Ali) Project Value: USD 8.16 Million Scope of Works: - Pipe laying, Horizontal direction drilling, Micro Tunneling, 2 pump stations, Outfall and sub marine works. Prime Responsibility: - Supervision of bridge construction works. - Liaison with the Engineer’s supervisory staff for approvals of the completed works.  Jan. 2003 – Nov. 2003 Bridge Engineer Hedley International Emirates Contracting UAE Project: Contract No. 994 Project Value: USD 21.20 Million
  • 5.
    CV - AHMEDMOUNIR AHMED Page 5 of 6 Scope of Works: - Bridge interchange on Abu Dhabi, Al Ain Road at MIP – 3A. Construction of a twin post tensioned box Girder Bridge supported by 2 abutments and 3 piers spanning a length of 250 m along with 4 loops and 4 slip ramps. Prime Responsibility: - Supervision of Structural works. - Identifying resources need for the works. - Planning and follow up activities on site related to bridge. - Liaison with the Engineer’s supervisory staff for approvals of all inspection requests.  Jun. 2002 – Jan. 2003 Bridge Engineer Al Masriya Construction Co. Egypt Project: Al Rebbat Bridge in Al Mahala Egypt Project Value: USD 3 Million Scope of Works: - 4 spans reinforced concrete slab type – 120 lm bridge length. Prime Responsibility: - Supervision of structural works. - Identifying resources need for the works. - Planning and follow up activities on site related to bridge. - Liaison with the Engineer for approvals of all inspection requests.  Dec. 2001 – June 2002 Bridge Engineer Al Masriya Construction Co. Egypt Project: Al Ghanaian Bridge in Suez City Egypt Project Value: USD 1 Million Scope of Works: - 3 spans reinforced concrete slab type 60 lm bridge length. Prime Responsibility: - Supervision of structural works. - Identifying resources need for the works. - Planning and follow up activities on site related to bridge. - Liaison with the Engineer for approvals of all inspection requests.  Dec. 2000 – Dec. 2001 Bridge Engineer Al Masriya Construction Co. Egypt
  • 6.
    CV - AHMEDMOUNIR AHMED Page 6 of 6 Project: Meet Nama Bridge, Egypt Project Value: USD 0.5 Million Scope of Works: - 2 spans Pedestrian Steel Bridge – 90 lm length. Prime Responsibility: - Supervision of structural works. - Identifying resources need for the works. - Planning and follow up activities on site related to bridge. - Liaison with the Engineer for approvals of all inspection requests.  May 1999 – Dec. 2000 Bridge Engineer Al Masriya Construction Co. Egypt Project: Barshom Bridge Al Kalubia Egypt Project Value: USD 3 Million Scope of Works: - 6 spans reinforced concrete box girder type with movable steel span (50 m.) – total length 200 lm Prime Responsibility: - Supervision of structural works. - Identifying resources need for the works. - Planning and follow up activities on site related to bridge. - Liaison with the Engineer for approvals of all inspection requests.
  • 7.
    CV - AHMEDMOUNIR AHMED Page 6 of 6 Project: Meet Nama Bridge, Egypt Project Value: USD 0.5 Million Scope of Works: - 2 spans Pedestrian Steel Bridge – 90 lm length. Prime Responsibility: - Supervision of structural works. - Identifying resources need for the works. - Planning and follow up activities on site related to bridge. - Liaison with the Engineer for approvals of all inspection requests.  May 1999 – Dec. 2000 Bridge Engineer Al Masriya Construction Co. Egypt Project: Barshom Bridge Al Kalubia Egypt Project Value: USD 3 Million Scope of Works: - 6 spans reinforced concrete box girder type with movable steel span (50 m.) – total length 200 lm Prime Responsibility: - Supervision of structural works. - Identifying resources need for the works. - Planning and follow up activities on site related to bridge. - Liaison with the Engineer for approvals of all inspection requests.