Key Skills
Assembly Line set up
Lean/ Six Sigma
Process Engineering
Manufacturing Operations
Supplier Development
Capacity Analysis
Strategic Planning
Audit & Inspections
People Management&
Leadership
Supply Chain Management
Production Planning
Timeline
Proficient in running successful method-oriented
taking initiatives for business excellence through process improvement,
targeting assignments in:
Process Engineering, Supply Chain Management
Industry Preference: Auto Ancillary
Location Preference: Pune & Karnataka
Profile Summary
Result-oriented senior level expert, with 13
production and manpower schedules / plans for smooth execution of
projects at the shop floor within time & cost
Proficient in SMED, PFC, PFMEA, Control Plan, WI, TGW, TGR,LLC,
TAKT time, Lean, TimeStudy, Line Balancing, 5’s, Kaizen &
Yoke, Six Sigma, Capacity Analysis.
Ascertained requirements of jigs & fixtures for existing & new processes in
order to optimize the same
Responsible for Designing, manufacturing, commissioning of new equipment
for the plant & execution of capital proposals.
Coordinated with various departments for ensuring the accom
production & Project targets
Ensured cost reduction by implementing new techniques and work
productivity improvement
Organized review meetings with suppliers and stake
delivery, quality and entire supply chain
Implemented supplier performance management process and improved
supplier maturity / competitiveness
Expertise in Supplier Development Activity,
Vehicle Security Systems, Automotive HVAC & Engine Cooling Systems
Expertise in “Process validation” & Process qualification
Gained international experience of managing supplier in Italy, Chez
Republic & China for pre acceptance of SPM’s & conducted
GURURAJ.A.DESHPANDE
gururaj.guruad@gmail.com
+8956184939, 9325993208
oriented production operations and
taking initiatives for business excellence through process improvement,
targeting assignments in:
, Supply Chain Management
Industry Preference: Auto Ancillary
Location Preference: Pune & Karnataka
years of experience in executing
production and manpower schedules / plans for smooth execution of
ost parameters
SMED, PFC, PFMEA, Control Plan, WI, TGW, TGR,LLC,
Balancing, 5’s, Kaizen & Poka-
requirements of jigs & fixtures for existing & new processes in
Responsible for Designing, manufacturing, commissioning of new equipment
for the plant & execution of capital proposals.
with various departments for ensuring the accomplishment of
reduction by implementing new techniques and working on
Organized review meetings with suppliers and stakeholders to improve on
Implemented supplier performance management process and improved
Development Activity, Turbo Charger Technology,
e HVAC & Engine Cooling Systems
ocess validation” & Process qualification practices.
Gained international experience of managing supplier in Italy, Chez
tance of SPM’s & conducted supplier audit
GURURAJ.A.DESHPANDE
Dura
Automotive
India Pvt. Ltd
2014-till date
Work Experience
Since Jul’14 Dura Auto System India Pvt. Ltd.,
Key Result Areas:
Monitoring progress on the assessment of all targeted Dura suppliers using Dura’s
related Purchasing Supplier Control activities
Ensuring compliance to Dura’s Integrated Management System (IMS) or Dura’s Global Advanced Product Quality Planning
(APQP) processes
Streamlining supplier guidance in the impl
Interacting with suppliers in all continuous improvement systems
within the supplier’s manufacturing scope assuring maximu
Steering detailed costs analysis for purchase of new or revised equipment, including alternative options and comparisons
to maintain optimum cost savings
Implementing benchmarks and cost obtainment models for developing cost justifi
Implementing lean thinking and lean production, variation reduction, problem solv
Highlights:
Received & reviewed technical specifications, bill of quantity, drawings provided by project; checked and discussed with
project managers / Cu to determine /Commodity buyers to se
Implemented supplier performance management process and improved supplier maturity / competitiveness
Monitored daily production inputs into electronic data
correctness
Jul’10-Jul’14 Honeywell Turbo Chargers Pvt. Ltd
Key Result Areas:
Analyzed Capital Expenditure (CAPEX) requests, and the subsequent variances in spending and budgeting
Executed installation & commissioning
Steered overall program management to ensure successful execution of
Managed assembling, tracking and maintaining p
Formulated documentation like PFC, PFMEA,
Implemented manufacturing process during introduction
Nov’07-Jun’10 MindaValeo Security Systems Pvt. Ltd.,
Key Result Areas:
Planned scheduled and ensured smooth plant operations, within budgetary limits, and as per Standard Operating
Procedures (SOP)
Ensuring maintenance of proper working conditions, housekeeping,
workstation
Developing and implementing plans & schedules for maintenance operations & annual turnarounds with focus on
optimum utilization of manpower and material
Estimation of project cost by preparing tentative
Led activities in Jig & Fixture concept design (Specs sheet) &
Designed and implementation of material managing
Implemented 5’s, Kaizen &Poka-Yoke & horizontal deployme
Previous Experience
Jul’07-Nov’07 Tata-Toyo Radiator Ltd., Pune as
Jul’03-Jun’07 Behr India Ltd., Pune as
Highlights:
Bagged Best Kaizen Award for “key code display unit” development
Received appreciation for:
o Designing &manufacturing final functional testing equipment for
o Successful hand over of XYLO Door Handle, Lock Set line, Nissan Lock set, Inside Door Handle & Out side Door
Handle Line & World Truck IDH, ODH & Lock set Lin
o Rejection control through tool design modification
System India Pvt. Ltd., Pune as Supplier Development Engg/Production Supervisor
Monitoring progress on the assessment of all targeted Dura suppliers using Dura’s Supplier Development criteria and
related Purchasing Supplier Control activities
Ensuring compliance to Dura’s Integrated Management System (IMS) or Dura’s Global Advanced Product Quality Planning
supplier guidance in the implementation of a Lean Manufacturing Strategy
all continuous improvement systems (5S, Value Stream Mapping, Gembas, Kaizen initiatives),
within the supplier’s manufacturing scope assuring maximum efficiency and effectiveness
detailed costs analysis for purchase of new or revised equipment, including alternative options and comparisons
benchmarks and cost obtainment models for developing cost justifications within Global Pu
lean thinking and lean production, variation reduction, problem solving and people / team strategies
Received & reviewed technical specifications, bill of quantity, drawings provided by project; checked and discussed with
managers / Cu to determine /Commodity buyers to search suitable manufacturers / suppliers
Implemented supplier performance management process and improved supplier maturity / competitiveness
Monitored daily production inputs into electronic data gathering software and compared input data with output data for
Honeywell Turbo Chargers Pvt. Ltd., Pune
Analyzed Capital Expenditure (CAPEX) requests, and the subsequent variances in spending and budgeting
Executed installation & commissioning of new equipment for the plant & execution of capital proposal
Steered overall program management to ensure successful execution of activities relating to customer program
Managed assembling, tracking and maintaining project timing and the program plan
like PFC, PFMEA, control plan, WI, fixture development plan
manufacturing process during introduction and development of new products
eo Security Systems Pvt. Ltd., Pune
Planned scheduled and ensured smooth plant operations, within budgetary limits, and as per Standard Operating
Ensuring maintenance of proper working conditions, housekeeping, discipline and safety
Developing and implementing plans & schedules for maintenance operations & annual turnarounds with focus on
optimum utilization of manpower and material
n of project cost by preparing tentative process planning sheet
concept design (Specs sheet) &getting manufacturing done
Designed and implementation of material managing facilities and workstation ergonomics
Yoke & horizontal deployment
Toyo Radiator Ltd., Pune as Member Associate
Jun’07 Behr India Ltd., Pune as Engineer
for “key code display unit” development
manufacturing final functional testing equipment for Nissan Lock set with highest(22) Poka
hand over of XYLO Door Handle, Lock Set line, Nissan Lock set, Inside Door Handle & Out side Door
Handle Line & World Truck IDH, ODH & Lock set Line
Rejection control through tool design modification
as Supplier Development Engg/Production Supervisor
Supplier Development criteria and
Ensuring compliance to Dura’s Integrated Management System (IMS) or Dura’s Global Advanced Product Quality Planning
(5S, Value Stream Mapping, Gembas, Kaizen initiatives),
m efficiency and effectiveness
detailed costs analysis for purchase of new or revised equipment, including alternative options and comparisons
cations within Global Purchasing
ing and people / team strategies
Received & reviewed technical specifications, bill of quantity, drawings provided by project; checked and discussed with
arch suitable manufacturers / suppliers
Implemented supplier performance management process and improved supplier maturity / competitiveness
gathering software and compared input data with output data for
Analyzed Capital Expenditure (CAPEX) requests, and the subsequent variances in spending and budgeting
t for the plant & execution of capital proposal
s relating to customer program
and project development plan
and development of new products
Planned scheduled and ensured smooth plant operations, within budgetary limits, and as per Standard Operating
discipline and safety & ergonomics at the
Developing and implementing plans & schedules for maintenance operations & annual turnarounds with focus on
getting manufacturing done
cs
Nissan Lock set with highest(22) Poka-Yoke’s
hand over of XYLO Door Handle, Lock Set line, Nissan Lock set, Inside Door Handle & Out side Door
Education
B. Tech. in Mechanical Engineering from YCMOU, Pune
Diploma in Mechanical Engineeringfrom K.H.KabburInstitute of Engineering, Dharwad in
Trainings
Anand University Training (Toyota Production System
APQP, FMEA, PPAP, SPC, MSA & TS 16949
Six Sigma Green Belt
IT Skills
MS-Office & AutoCAD, MS-Projects, Beginner in SAP & Pro
Personal Details
Date of Birth:22nd
July 1982
Languages Known: English, Hindi, Kannada, Marathi
Address :Flat No C-14, Pragati Icon, Purna Nagar, Chikhali,Chinchwad Pune
in Mechanical Engineering from YCMOU, Pune in 2013
from K.H.KabburInstitute of Engineering, Dharwad in
Production System and Modern Industrial Techniques)
APQP, FMEA, PPAP, SPC, MSA & TS 16949
Projects, Beginner in SAP & Pro-E & Internet Applications
English, Hindi, Kannada, Marathi
14, Pragati Icon, Purna Nagar, Chikhali,Chinchwad Pune-411019
from K.H.KabburInstitute of Engineering, Dharwad in 2003
and Modern Industrial Techniques)

CV Guru_doc

  • 1.
    Key Skills Assembly Lineset up Lean/ Six Sigma Process Engineering Manufacturing Operations Supplier Development Capacity Analysis Strategic Planning Audit & Inspections People Management& Leadership Supply Chain Management Production Planning Timeline Proficient in running successful method-oriented taking initiatives for business excellence through process improvement, targeting assignments in: Process Engineering, Supply Chain Management Industry Preference: Auto Ancillary Location Preference: Pune & Karnataka Profile Summary Result-oriented senior level expert, with 13 production and manpower schedules / plans for smooth execution of projects at the shop floor within time & cost Proficient in SMED, PFC, PFMEA, Control Plan, WI, TGW, TGR,LLC, TAKT time, Lean, TimeStudy, Line Balancing, 5’s, Kaizen & Yoke, Six Sigma, Capacity Analysis. Ascertained requirements of jigs & fixtures for existing & new processes in order to optimize the same Responsible for Designing, manufacturing, commissioning of new equipment for the plant & execution of capital proposals. Coordinated with various departments for ensuring the accom production & Project targets Ensured cost reduction by implementing new techniques and work productivity improvement Organized review meetings with suppliers and stake delivery, quality and entire supply chain Implemented supplier performance management process and improved supplier maturity / competitiveness Expertise in Supplier Development Activity, Vehicle Security Systems, Automotive HVAC & Engine Cooling Systems Expertise in “Process validation” & Process qualification Gained international experience of managing supplier in Italy, Chez Republic & China for pre acceptance of SPM’s & conducted GURURAJ.A.DESHPANDE gururaj.guruad@gmail.com +8956184939, 9325993208 oriented production operations and taking initiatives for business excellence through process improvement, targeting assignments in: , Supply Chain Management Industry Preference: Auto Ancillary Location Preference: Pune & Karnataka years of experience in executing production and manpower schedules / plans for smooth execution of ost parameters SMED, PFC, PFMEA, Control Plan, WI, TGW, TGR,LLC, Balancing, 5’s, Kaizen & Poka- requirements of jigs & fixtures for existing & new processes in Responsible for Designing, manufacturing, commissioning of new equipment for the plant & execution of capital proposals. with various departments for ensuring the accomplishment of reduction by implementing new techniques and working on Organized review meetings with suppliers and stakeholders to improve on Implemented supplier performance management process and improved Development Activity, Turbo Charger Technology, e HVAC & Engine Cooling Systems ocess validation” & Process qualification practices. Gained international experience of managing supplier in Italy, Chez tance of SPM’s & conducted supplier audit GURURAJ.A.DESHPANDE Dura Automotive India Pvt. Ltd 2014-till date
  • 2.
    Work Experience Since Jul’14Dura Auto System India Pvt. Ltd., Key Result Areas: Monitoring progress on the assessment of all targeted Dura suppliers using Dura’s related Purchasing Supplier Control activities Ensuring compliance to Dura’s Integrated Management System (IMS) or Dura’s Global Advanced Product Quality Planning (APQP) processes Streamlining supplier guidance in the impl Interacting with suppliers in all continuous improvement systems within the supplier’s manufacturing scope assuring maximu Steering detailed costs analysis for purchase of new or revised equipment, including alternative options and comparisons to maintain optimum cost savings Implementing benchmarks and cost obtainment models for developing cost justifi Implementing lean thinking and lean production, variation reduction, problem solv Highlights: Received & reviewed technical specifications, bill of quantity, drawings provided by project; checked and discussed with project managers / Cu to determine /Commodity buyers to se Implemented supplier performance management process and improved supplier maturity / competitiveness Monitored daily production inputs into electronic data correctness Jul’10-Jul’14 Honeywell Turbo Chargers Pvt. Ltd Key Result Areas: Analyzed Capital Expenditure (CAPEX) requests, and the subsequent variances in spending and budgeting Executed installation & commissioning Steered overall program management to ensure successful execution of Managed assembling, tracking and maintaining p Formulated documentation like PFC, PFMEA, Implemented manufacturing process during introduction Nov’07-Jun’10 MindaValeo Security Systems Pvt. Ltd., Key Result Areas: Planned scheduled and ensured smooth plant operations, within budgetary limits, and as per Standard Operating Procedures (SOP) Ensuring maintenance of proper working conditions, housekeeping, workstation Developing and implementing plans & schedules for maintenance operations & annual turnarounds with focus on optimum utilization of manpower and material Estimation of project cost by preparing tentative Led activities in Jig & Fixture concept design (Specs sheet) & Designed and implementation of material managing Implemented 5’s, Kaizen &Poka-Yoke & horizontal deployme Previous Experience Jul’07-Nov’07 Tata-Toyo Radiator Ltd., Pune as Jul’03-Jun’07 Behr India Ltd., Pune as Highlights: Bagged Best Kaizen Award for “key code display unit” development Received appreciation for: o Designing &manufacturing final functional testing equipment for o Successful hand over of XYLO Door Handle, Lock Set line, Nissan Lock set, Inside Door Handle & Out side Door Handle Line & World Truck IDH, ODH & Lock set Lin o Rejection control through tool design modification System India Pvt. Ltd., Pune as Supplier Development Engg/Production Supervisor Monitoring progress on the assessment of all targeted Dura suppliers using Dura’s Supplier Development criteria and related Purchasing Supplier Control activities Ensuring compliance to Dura’s Integrated Management System (IMS) or Dura’s Global Advanced Product Quality Planning supplier guidance in the implementation of a Lean Manufacturing Strategy all continuous improvement systems (5S, Value Stream Mapping, Gembas, Kaizen initiatives), within the supplier’s manufacturing scope assuring maximum efficiency and effectiveness detailed costs analysis for purchase of new or revised equipment, including alternative options and comparisons benchmarks and cost obtainment models for developing cost justifications within Global Pu lean thinking and lean production, variation reduction, problem solving and people / team strategies Received & reviewed technical specifications, bill of quantity, drawings provided by project; checked and discussed with managers / Cu to determine /Commodity buyers to search suitable manufacturers / suppliers Implemented supplier performance management process and improved supplier maturity / competitiveness Monitored daily production inputs into electronic data gathering software and compared input data with output data for Honeywell Turbo Chargers Pvt. Ltd., Pune Analyzed Capital Expenditure (CAPEX) requests, and the subsequent variances in spending and budgeting Executed installation & commissioning of new equipment for the plant & execution of capital proposal Steered overall program management to ensure successful execution of activities relating to customer program Managed assembling, tracking and maintaining project timing and the program plan like PFC, PFMEA, control plan, WI, fixture development plan manufacturing process during introduction and development of new products eo Security Systems Pvt. Ltd., Pune Planned scheduled and ensured smooth plant operations, within budgetary limits, and as per Standard Operating Ensuring maintenance of proper working conditions, housekeeping, discipline and safety Developing and implementing plans & schedules for maintenance operations & annual turnarounds with focus on optimum utilization of manpower and material n of project cost by preparing tentative process planning sheet concept design (Specs sheet) &getting manufacturing done Designed and implementation of material managing facilities and workstation ergonomics Yoke & horizontal deployment Toyo Radiator Ltd., Pune as Member Associate Jun’07 Behr India Ltd., Pune as Engineer for “key code display unit” development manufacturing final functional testing equipment for Nissan Lock set with highest(22) Poka hand over of XYLO Door Handle, Lock Set line, Nissan Lock set, Inside Door Handle & Out side Door Handle Line & World Truck IDH, ODH & Lock set Line Rejection control through tool design modification as Supplier Development Engg/Production Supervisor Supplier Development criteria and Ensuring compliance to Dura’s Integrated Management System (IMS) or Dura’s Global Advanced Product Quality Planning (5S, Value Stream Mapping, Gembas, Kaizen initiatives), m efficiency and effectiveness detailed costs analysis for purchase of new or revised equipment, including alternative options and comparisons cations within Global Purchasing ing and people / team strategies Received & reviewed technical specifications, bill of quantity, drawings provided by project; checked and discussed with arch suitable manufacturers / suppliers Implemented supplier performance management process and improved supplier maturity / competitiveness gathering software and compared input data with output data for Analyzed Capital Expenditure (CAPEX) requests, and the subsequent variances in spending and budgeting t for the plant & execution of capital proposal s relating to customer program and project development plan and development of new products Planned scheduled and ensured smooth plant operations, within budgetary limits, and as per Standard Operating discipline and safety & ergonomics at the Developing and implementing plans & schedules for maintenance operations & annual turnarounds with focus on getting manufacturing done cs Nissan Lock set with highest(22) Poka-Yoke’s hand over of XYLO Door Handle, Lock Set line, Nissan Lock set, Inside Door Handle & Out side Door
  • 3.
    Education B. Tech. inMechanical Engineering from YCMOU, Pune Diploma in Mechanical Engineeringfrom K.H.KabburInstitute of Engineering, Dharwad in Trainings Anand University Training (Toyota Production System APQP, FMEA, PPAP, SPC, MSA & TS 16949 Six Sigma Green Belt IT Skills MS-Office & AutoCAD, MS-Projects, Beginner in SAP & Pro Personal Details Date of Birth:22nd July 1982 Languages Known: English, Hindi, Kannada, Marathi Address :Flat No C-14, Pragati Icon, Purna Nagar, Chikhali,Chinchwad Pune in Mechanical Engineering from YCMOU, Pune in 2013 from K.H.KabburInstitute of Engineering, Dharwad in Production System and Modern Industrial Techniques) APQP, FMEA, PPAP, SPC, MSA & TS 16949 Projects, Beginner in SAP & Pro-E & Internet Applications English, Hindi, Kannada, Marathi 14, Pragati Icon, Purna Nagar, Chikhali,Chinchwad Pune-411019 from K.H.KabburInstitute of Engineering, Dharwad in 2003 and Modern Industrial Techniques)