Expert Ready-Mix Concrete, Production Development, Erecting, Maintenance by checklist, Auditing to reduce cost, Quality Control, design mixes, Experience 30 years
Roadmap to Membership of RICS - Pathways and Routes
Cv fady
1. C - V
Name : Fady Nicolas Dagher
Address: Bsalim, Mount Lebanon
City – Country: Beirut – Lebanon
Mobile: +961 3 248950
E-Mail: fady_nd@hotmail.com
Birthday : 13-4-1963 – Ghadir
Nationality : Lebanese
Gender : Male
CAREER OBJECTIVES
Ready-Mix Plant manager, Audit and Control income raw materials and production line and process,
develop and improve production operation and sequences, quality control Lab.
Education
-1984 – 1988: bachelor electro-mechanical – Saint joseph University
I did not end it because of civil wars in all of Lebanon and for long periode.
-1979 – 1983 technique superior of Industrial electric
-1974 – 1978 Elementary School at Saint Sauveur
Work Experience
Gebran Group – Aamchit from 2010 – 2019 and I still continue a job
-Post quality control manager,
-Audit and control raw materials cost and production
-Lab. Control, all test that should be done, create mix design with frequently trial mix
-Control operation and sequences , check list , calibration, erecting
- Training for company staff, and for fresh graduate,
- Consultant for special project as under water concrete, swimming pool on columns 5 meters
height
Ashada Ready-Mix – Beirut – 2009 – 2010
-Post: quality control raw material, and production
2. -Control and audit the cost of income and output
-Supervisor maintenance, check list for all machinery
-Erecting and operating batching plant
-Calibration all scale with lab equipments.
ElKHABIR FOR CONTRACTION – Khartoum – Sudan 2006 – 2008
-Erecting and operating batching plant steelfield brand
Plant manager, control and audit cost of raw materials, and production quality
GULF READY-MIX – QATAR – 4 Months Ras leffan Mr. Ali bin jasim kuwary
-Erect two batching plant that capacity 3,5 cbm steelfield brand
-Mechanical and electrical and control system installation
- Training for company staff, and for fresh graduate,
- Consultant for special projects
Redland Ready-Mix international, with Mr. david Verdok Vine , Mr. Dave Philips
1996 – 2005 – Plant manager,
-Erect batching plant mechanical, electrical, automation system Command – Alkon
-Control and Audit raw material and spare parts quality and cost
-Control maintenance and check list
-Control operation system and sequences
Knorr Ready-Mix – Lebanon 1995 – 1996
-Erecting Batching plant French made for sportive stadium project by TravelgarHouse company
-supervisor for operation staff, maintenance, production, calibration
- testing and trial mix for all kind of concrete, with supplementary materials
Nakhle Zogheib Ready-Mix – Lebanon - 1992 – 1995
-Control operation, and general maintenance,
- develop production line electrical and mechanical
Sanita – Tissue Plant – 1990 – 1992
- general electric maintenance for 30 production machines
3. Conference presentations and Fair
-Attendance and participation in several conferences and course private and public in concrete,
- Advanced operation system, with all kind of installation of Ready-Mix concrete plant by British
expert and engineers for many years.
- Attendance many conferences of development as problem that happened on site.
And its solutions, and how avoid its
-and how use supplementary materials to improve qualities of fresh concrete by curing handling, in
various weathers
- Attendance every year construction fair, we sport that related concrete, like machinery equipment,
spare parts, and all kind of batching plant especially from Europe as Texnokat (Greec), Steelfield
UK,
Coughi, Cifa, Simem, ITALY, Teka, Stteter, and most construction equipment,
New technical production for getting better quality, reducing cycle time,
In Lebanon, Qatar, Dubai, Germany, Jordan.
Innovation, Research, Concrete Trials
-The most important research, achievement of design mix with low cement content worldwide level
is the durability without micro silica and local raw material it gave 1490 coulomb permeability
resistance,
- create a design mix with low cement content less than 300 kgs/ cbm, same cement content that
used in new world trade center tower – newyork, it reach at 10 days average 58 MPa, at 28 days
gave average 71 MPa, and after 165 days get 77 MPa.
- and same mix design that mention above and without micro silica it result is 50 MPa at 28 days,
tested by standard and reputed laboratory.
- Innovate new method of curing for precast increase the strength to 40 percent after 14 hours,for
mix grade 35 MPa it gave 34 MPa.
- create new concrete mix for hammered piles for foundation gave a result of 84 MPa at 7 days.
Language:
Arabic : Native
English: Good
French : reading and writing