Saudi Arabia Ltd.
Candidate Resume –Civil
Name Mario N. Sanchez
Discipline Civil/Structural&Architectural Inspector
Nationality Filipino
Current
Location
KSA
Date of Birth 15th
February 1963 Age 53
Education
 Bachelor of Science, CIVIL EGINEERING
FEATI UNIVERSITY
1988
Total Years of
Experience
28+ ARAMCO Experience
ARAMCO Approved,
SAP#70013034
WORK Experience
Period Company Description
2010 - Present
ApplusVelosi
(Velosi Saudi Arabia Co. Ltd)
Position: Civil/Structural & Architectural
(External/Internal)Finishing Inspector
Project: KAPSARC (King Abdul Aziz Petroleum Studies
and Research Center) and Residential
Community Complex (RCC Housing)
Airport Road, Riyadh ,KSA
Aramco Project-Inspection Division
 Handle for External and Internal finishing such as
masonry works finishing ,CHB Blocks laying
,plasteringandwall paint ,Partitionwall withGibson
board,Ceilingfinishing ,floor tiles ,wall tiles , Toilet
and Bath finishingalsohandle forfaçade LinerDeck,
Top Hat, Rockwool Insulation,calcium silicate,
standing seam and GFRC Panels finish for Roof and
Wall.(Such as material receiving of panels, transom
and mullion frame alignment, GFRC panels surface
Miscoat up to final sealer application.
 Quality Works Inspection in for Structural Steel
Works such as Column Alignment, Bolt Tightening
for Steel Column and Beam Girder and others
related in steel works and also handle for facade
Finishing such as Liner Deck, Top Hat, Rockwool
Insulation,calciumsilicate, standing seam and GFRC
finish for Roof and Wall.
 Do also for Document review such as ITP, Method
Statement and other document that would execute
Saudi Arabia Ltd.
Candidate Resume –Civil
in the Project.
 Monitoring a Progress Accomplishment works for
the Main Contractor for their Evaluation.
 Conducting Meeting for the Contractor need to
discuss Quality Matter regarding the Sequence for
Raising RFI and the Works itself.
 Conducting Ocular Inspection at the Lay Down to
ensure the Materials that it will in Proper Storage
and handling.
 Do Also Materials Receiving Inspection at Site.
2008- 2010 Al- Bader Contracting
Company
Position: Civil Inspector
Project:
12” & 24” Construction of Oil Header and Upgrade of
19 Oil Wheels Pipe Line
NYMM, HAWTAH, KSA.
Upgrade of Waste Water and Sanitary Pipe lines and
Oil Operation at Zone 1, Zone 2 & Zone 3.
Udahliyah and Shedgum Project, KSA
 Do Surveillance first at the site and evaluate the
works if it is completed.
 Alsohandle the weldingworksatsite,scheduling for
the NDT and attending weekly meeting regarding
the accomplishment for NDT Test for Pipe
connection.
 Do a Check the works with the Site Engineer to
ensure that all consequence in the site are
Completed prior to raise RFI (Request for
Inspection).
 Do checkalso forCompactiontestwith the 3rd party
FUGRO suhuimi at the Site.
2004 - 2008 Al- KifahReadymix
Position: QA/QC Supervisor
Project: Government and Aramco Project
Alhassa,Dammam& Hail, KSA
 Handling the Batching Plant Quality Matters
regarding the Raw Materials, Chemicals additives
and batching plant Calibration.
 Supervise the Qualityforthe Concrete which we are
going to delivered at the site to ensure all truck
mixers in good quality.
 Supervise the Site Testing for Concrete regarding
Concrete temperature,Slumpwithmyto ensure the
Concrete still within the design specification.
 Do a Mix Design for our new Customer and conduct
a Trial Batch Mix at the Laboratory and do a record
for the concrete deviation that we need to meet
Saudi Arabia Ltd.
Candidate Resume –Civil
their Standard Specification.
 Do a Random Inspection for the Raw Materials like
Aggregates & Sand to ensure the good quality prior
to deliver at the Batching Plant.
2000 - 2004 SLT Construction Company
Position: Project Engineer
Project:
North Triangle Commercial Complex ( Trinoma),
North Edsa, Quezon City
SM Molino, Molino, Bacoor, Cavite
MCC ( Auto World ), Ugong , Pasig City
 Supervise the works for Steel Structures like
Fabrication and Erection at the Site.
 Supervise for the Lay Outing of the Structural Steel
Frame.
 Do a Schedule time for weekly Look Ahead for the
Site Activities.
 MaterialsProcurementfor1(one) weekusage at the
Site.
 Weekly Submittal to my manager for work
consumption on daily Activities for the Manpower.
 AlsoAttendthe WeeklyMeetingwith the Client and
Main Contractor for the discussion on Weekly
Percentage Accomplishment at the Site.
 Do a Weekly Orientation for the workers regarding
SafetyMattersto avoidthe Incident/accident during
Execution at the Site.
1996 - 2000 DYT Builders Company
Position: Site Engineer
Project: EPZA ( Export Proceesing Zone Authority)
Salinas, Rosario, Cavite
Site Development and Ware House
Construction
 Supervise the EquipmentsOperationatthe Site Likes
Buldozer,Grader,Loader, BackHoe and Dump Truck
as we use for the Site Activities.
 Do also Survey Works for the Boundary line and
Layer by Layer Elevation for the Raw Materials.
 Supervise also for the Ware House Building
Construction for Lay Outing of Structural Frame and
Boundary lines of the Building.
 Arrange for the Manpower Schedule Activities at
Site.
 Material Procurement to be use in one week a
Activities.
Saudi Arabia Ltd.
Candidate Resume –Civil
1
1993 – 1996 National Steel Corporation,
Iligan City
Position: Instrument Man
Project:Upgrade for BilletSteel and Electro Mechanical
Works
 Do a Survey works for the Alignment of Conveyor
Machine, Anchor Bolt Installation for Machinery
Base, Pipe Lines Installation and Structural
Foundation.
1988– 1993
DPWH ( Department Of Public
Works and Highways)
Bangued,Abra
Position: CE Aide
Project: Construction for AbraIlocos – Sur National
Highways
 Supervise the Contractor specially their Batching
plant to ensure the Concrete Mixture.
 Also Supervise the Roads Preparation for the raw
materials placement prior to proceed the
Compaction for each Layer.
 Also Check the Concrete Placement such as the
Slump and Concrete Temperature.
CERTIFICATIONS
 ISO 9001-2008- QUALITY MANAGEMENT SYSTEM ( INTERNAL AUDITOR TRAINING)
KAPSARC SATTELITE OFFICE- May 31-June 01, 2012.Riyadh, Kingdom of Saudi Arabia

More Related Content

What's hot

shakeel cv 19-2-2015
shakeel cv 19-2-2015shakeel cv 19-2-2015
shakeel cv 19-2-2015shakeel anjum
 
stephen canas CV-pipefitter_
stephen canas CV-pipefitter_stephen canas CV-pipefitter_
stephen canas CV-pipefitter_Stephen Canas
 
T.Shaji George - Copy - Copy ts
T.Shaji George - Copy - Copy tsT.Shaji George - Copy - Copy ts
T.Shaji George - Copy - Copy tsSHAJI GEORGE
 
CV of Rafi jadeed01
CV of Rafi jadeed01CV of Rafi jadeed01
CV of Rafi jadeed01RafiUllah U
 
M.Udayakumar CV (1)
M.Udayakumar CV (1)M.Udayakumar CV (1)
M.Udayakumar CV (1)Udaya Kumar
 
Ali Khosrowzadeh Ah Drilling Resume After
Ali Khosrowzadeh   Ah Drilling Resume AfterAli Khosrowzadeh   Ah Drilling Resume After
Ali Khosrowzadeh Ah Drilling Resume Afteramkhosro
 
MG Resume 160727
MG Resume 160727MG Resume 160727
MG Resume 160727Mike Gibson
 
CV_Mark Fayle _Brief
CV_Mark Fayle _BriefCV_Mark Fayle _Brief
CV_Mark Fayle _BriefMark Fayle
 
CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)Ram Atta
 
Resume_updated 2014
Resume_updated 2014Resume_updated 2014
Resume_updated 2014J.D. Squire
 
DEUTSCHOtis - Drilling Supervisor - Resume OD Edit
DEUTSCHOtis - Drilling Supervisor - Resume OD EditDEUTSCHOtis - Drilling Supervisor - Resume OD Edit
DEUTSCHOtis - Drilling Supervisor - Resume OD EditOtis Deutsch
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny Daigrepont
 

What's hot (20)

shakeel cv 19-2-2015
shakeel cv 19-2-2015shakeel cv 19-2-2015
shakeel cv 19-2-2015
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
stephen canas CV-pipefitter_
stephen canas CV-pipefitter_stephen canas CV-pipefitter_
stephen canas CV-pipefitter_
 
T.Shaji George - Copy - Copy ts
T.Shaji George - Copy - Copy tsT.Shaji George - Copy - Copy ts
T.Shaji George - Copy - Copy ts
 
CV of Rafi jadeed01
CV of Rafi jadeed01CV of Rafi jadeed01
CV of Rafi jadeed01
 
M.Udayakumar CV (1)
M.Udayakumar CV (1)M.Udayakumar CV (1)
M.Udayakumar CV (1)
 
WILLIAM HILDING RESUME
WILLIAM HILDING RESUMEWILLIAM HILDING RESUME
WILLIAM HILDING RESUME
 
Ali
AliAli
Ali
 
Ali Khosrowzadeh Ah Drilling Resume After
Ali Khosrowzadeh   Ah Drilling Resume AfterAli Khosrowzadeh   Ah Drilling Resume After
Ali Khosrowzadeh Ah Drilling Resume After
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
 
MG Resume 160727
MG Resume 160727MG Resume 160727
MG Resume 160727
 
CV_Mark Fayle _Brief
CV_Mark Fayle _BriefCV_Mark Fayle _Brief
CV_Mark Fayle _Brief
 
Raymond Resume 2015
Raymond Resume 2015Raymond Resume 2015
Raymond Resume 2015
 
CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)CV Ramadan Workover & Completion rig supervisor (2015)
CV Ramadan Workover & Completion rig supervisor (2015)
 
Resume_updated 2014
Resume_updated 2014Resume_updated 2014
Resume_updated 2014
 
vmg resume 2
vmg resume 2vmg resume 2
vmg resume 2
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
DEUTSCHOtis - Drilling Supervisor - Resume OD Edit
DEUTSCHOtis - Drilling Supervisor - Resume OD EditDEUTSCHOtis - Drilling Supervisor - Resume OD Edit
DEUTSCHOtis - Drilling Supervisor - Resume OD Edit
 
Shane Covington - CV
 Shane Covington - CV Shane Covington - CV
Shane Covington - CV
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)
 

Viewers also liked (20)

Erix
ErixErix
Erix
 
Combined Project
Combined ProjectCombined Project
Combined Project
 
A Voz da Paróquia_Agosto 2012
A Voz da Paróquia_Agosto 2012A Voz da Paróquia_Agosto 2012
A Voz da Paróquia_Agosto 2012
 
Estefiolga
EstefiolgaEstefiolga
Estefiolga
 
Eav
EavEav
Eav
 
2
22
2
 
Video results page 14
Video results page 14Video results page 14
Video results page 14
 
គំនិត​មួយ​
គំនិត​មួយ​គំនិត​មួយ​
គំនិត​មួយ​
 
Photo oct 15, 10 22 50 am
Photo oct 15, 10 22 50 amPhoto oct 15, 10 22 50 am
Photo oct 15, 10 22 50 am
 
Presentation1
Presentation1Presentation1
Presentation1
 
test
testtest
test
 
Experiência de marca
Experiência de marcaExperiência de marca
Experiência de marca
 
C o t i z a c i o n
C o t i z a c i o nC o t i z a c i o n
C o t i z a c i o n
 
A descoberto. jr cordeiro.
A descoberto. jr cordeiro.A descoberto. jr cordeiro.
A descoberto. jr cordeiro.
 
programme_epic_article
programme_epic_articleprogramme_epic_article
programme_epic_article
 
Presentación Milagros Herhuay
Presentación Milagros Herhuay Presentación Milagros Herhuay
Presentación Milagros Herhuay
 
LLB Law Degree
LLB Law DegreeLLB Law Degree
LLB Law Degree
 
Antifraude - Corporativa
Antifraude - CorporativaAntifraude - Corporativa
Antifraude - Corporativa
 
Diploma Profesional
Diploma ProfesionalDiploma Profesional
Diploma Profesional
 
Anime
AnimeAnime
Anime
 

Similar to Mario N. Sanchez - CV (Civil)-2 (1)Updated

Similar to Mario N. Sanchez - CV (Civil)-2 (1)Updated (20)

Shahmeer Resume2-3
Shahmeer Resume2-3Shahmeer Resume2-3
Shahmeer Resume2-3
 
Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015
 
Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.
 
joy S resume
joy S resumejoy S resume
joy S resume
 
Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
 
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
David_Wanless_CV
David_Wanless_CVDavid_Wanless_CV
David_Wanless_CV
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
1. MAQ CV-
1. MAQ CV-1. MAQ CV-
1. MAQ CV-
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
Scott, Gary 20150415
Scott, Gary 20150415Scott, Gary 20150415
Scott, Gary 20150415
 
updated generally 04apr16
updated generally 04apr16updated generally 04apr16
updated generally 04apr16
 

Mario N. Sanchez - CV (Civil)-2 (1)Updated

  • 1. Saudi Arabia Ltd. Candidate Resume –Civil Name Mario N. Sanchez Discipline Civil/Structural&Architectural Inspector Nationality Filipino Current Location KSA Date of Birth 15th February 1963 Age 53 Education  Bachelor of Science, CIVIL EGINEERING FEATI UNIVERSITY 1988 Total Years of Experience 28+ ARAMCO Experience ARAMCO Approved, SAP#70013034 WORK Experience Period Company Description 2010 - Present ApplusVelosi (Velosi Saudi Arabia Co. Ltd) Position: Civil/Structural & Architectural (External/Internal)Finishing Inspector Project: KAPSARC (King Abdul Aziz Petroleum Studies and Research Center) and Residential Community Complex (RCC Housing) Airport Road, Riyadh ,KSA Aramco Project-Inspection Division  Handle for External and Internal finishing such as masonry works finishing ,CHB Blocks laying ,plasteringandwall paint ,Partitionwall withGibson board,Ceilingfinishing ,floor tiles ,wall tiles , Toilet and Bath finishingalsohandle forfaçade LinerDeck, Top Hat, Rockwool Insulation,calcium silicate, standing seam and GFRC Panels finish for Roof and Wall.(Such as material receiving of panels, transom and mullion frame alignment, GFRC panels surface Miscoat up to final sealer application.  Quality Works Inspection in for Structural Steel Works such as Column Alignment, Bolt Tightening for Steel Column and Beam Girder and others related in steel works and also handle for facade Finishing such as Liner Deck, Top Hat, Rockwool Insulation,calciumsilicate, standing seam and GFRC finish for Roof and Wall.  Do also for Document review such as ITP, Method Statement and other document that would execute
  • 2. Saudi Arabia Ltd. Candidate Resume –Civil in the Project.  Monitoring a Progress Accomplishment works for the Main Contractor for their Evaluation.  Conducting Meeting for the Contractor need to discuss Quality Matter regarding the Sequence for Raising RFI and the Works itself.  Conducting Ocular Inspection at the Lay Down to ensure the Materials that it will in Proper Storage and handling.  Do Also Materials Receiving Inspection at Site. 2008- 2010 Al- Bader Contracting Company Position: Civil Inspector Project: 12” & 24” Construction of Oil Header and Upgrade of 19 Oil Wheels Pipe Line NYMM, HAWTAH, KSA. Upgrade of Waste Water and Sanitary Pipe lines and Oil Operation at Zone 1, Zone 2 & Zone 3. Udahliyah and Shedgum Project, KSA  Do Surveillance first at the site and evaluate the works if it is completed.  Alsohandle the weldingworksatsite,scheduling for the NDT and attending weekly meeting regarding the accomplishment for NDT Test for Pipe connection.  Do a Check the works with the Site Engineer to ensure that all consequence in the site are Completed prior to raise RFI (Request for Inspection).  Do checkalso forCompactiontestwith the 3rd party FUGRO suhuimi at the Site. 2004 - 2008 Al- KifahReadymix Position: QA/QC Supervisor Project: Government and Aramco Project Alhassa,Dammam& Hail, KSA  Handling the Batching Plant Quality Matters regarding the Raw Materials, Chemicals additives and batching plant Calibration.  Supervise the Qualityforthe Concrete which we are going to delivered at the site to ensure all truck mixers in good quality.  Supervise the Site Testing for Concrete regarding Concrete temperature,Slumpwithmyto ensure the Concrete still within the design specification.  Do a Mix Design for our new Customer and conduct a Trial Batch Mix at the Laboratory and do a record for the concrete deviation that we need to meet
  • 3. Saudi Arabia Ltd. Candidate Resume –Civil their Standard Specification.  Do a Random Inspection for the Raw Materials like Aggregates & Sand to ensure the good quality prior to deliver at the Batching Plant. 2000 - 2004 SLT Construction Company Position: Project Engineer Project: North Triangle Commercial Complex ( Trinoma), North Edsa, Quezon City SM Molino, Molino, Bacoor, Cavite MCC ( Auto World ), Ugong , Pasig City  Supervise the works for Steel Structures like Fabrication and Erection at the Site.  Supervise for the Lay Outing of the Structural Steel Frame.  Do a Schedule time for weekly Look Ahead for the Site Activities.  MaterialsProcurementfor1(one) weekusage at the Site.  Weekly Submittal to my manager for work consumption on daily Activities for the Manpower.  AlsoAttendthe WeeklyMeetingwith the Client and Main Contractor for the discussion on Weekly Percentage Accomplishment at the Site.  Do a Weekly Orientation for the workers regarding SafetyMattersto avoidthe Incident/accident during Execution at the Site. 1996 - 2000 DYT Builders Company Position: Site Engineer Project: EPZA ( Export Proceesing Zone Authority) Salinas, Rosario, Cavite Site Development and Ware House Construction  Supervise the EquipmentsOperationatthe Site Likes Buldozer,Grader,Loader, BackHoe and Dump Truck as we use for the Site Activities.  Do also Survey Works for the Boundary line and Layer by Layer Elevation for the Raw Materials.  Supervise also for the Ware House Building Construction for Lay Outing of Structural Frame and Boundary lines of the Building.  Arrange for the Manpower Schedule Activities at Site.  Material Procurement to be use in one week a Activities.
  • 4. Saudi Arabia Ltd. Candidate Resume –Civil 1 1993 – 1996 National Steel Corporation, Iligan City Position: Instrument Man Project:Upgrade for BilletSteel and Electro Mechanical Works  Do a Survey works for the Alignment of Conveyor Machine, Anchor Bolt Installation for Machinery Base, Pipe Lines Installation and Structural Foundation. 1988– 1993 DPWH ( Department Of Public Works and Highways) Bangued,Abra Position: CE Aide Project: Construction for AbraIlocos – Sur National Highways  Supervise the Contractor specially their Batching plant to ensure the Concrete Mixture.  Also Supervise the Roads Preparation for the raw materials placement prior to proceed the Compaction for each Layer.  Also Check the Concrete Placement such as the Slump and Concrete Temperature. CERTIFICATIONS  ISO 9001-2008- QUALITY MANAGEMENT SYSTEM ( INTERNAL AUDITOR TRAINING) KAPSARC SATTELITE OFFICE- May 31-June 01, 2012.Riyadh, Kingdom of Saudi Arabia