The document discusses active transport, which uses energy to move molecules against their concentration gradient from a lower concentration area to a higher concentration area. Active transport occurs through membrane proteins that span the cell membrane. These proteins are specific and only transport certain molecules like glucose or calcium ions. Two main types of active transport are discussed - primary active transport, which uses ATP directly as an energy source, and secondary active transport, which couples to the movement of another ion down its concentration gradient.