1. CURRICULUM VITAE
PERSONAL IDENTITY
NAME : Hilwan Sulton
PLACE, DATE OF BIRTH : November 24th
, 1981. Cilegon.
SEX : Male
ADDRESS : Kp. Ramabaru Ds. Kebondalem No. 21 Rt. 01/06
Kec. Purwakarta, Cilegon – Banten, Indonesia 42433
MARITAL STATUS : Single
RELIGION : Moslem
NATIONALITY : Indonesian
MOBILE PHONE : +62 823 4964 0925
E-MAIL : hilwan_sulton@yahoo.com
PASSPORT NO. & ID : B 0978039 / 11020 2969 092
CAREER SUMMARY
More than Seven years experience in Welding Inspection of Piping System and Static Mechanical
(LPG/LNG/PETROCHEMICAL); Pressure Vessels; Storage Tank; Heat Exchanger; Coloumn; Silencer; Pig-
Launcher; Repair bottom, shell and roof Storage Tank; Maintenance of Petrochemical (NDT Inspection); and
Modification existing Pressure Vessel and Heat Exchanger (Additional Nozzle, Pipe Distributor, Wedge Baffle,
Vortex Breaker, Internal Tray, and Un-loading/Loading Catalyst). Third Party Inspection on Behalf of ENI
Muara Bakau – Jangkrik Project, (Demin water storage tank, SS HP Flare KO Drum, Lean Meg Filter, Centrate
Drum Collection, dillution Dump Tank, and Flare Package), on be half of PT. Procesindo E&M – Cameroon
Japan-Open Acces Project Pertamina Dumai (Desalter Vessel), on be half of SK engineering &
construction Co. Ltd – Jangmoon unit #10 (Front waterbox condenser module 1, Front waterbox condenser
module 2); Ensure all the specification, procedure, quality plan, ITP, welder register, NDT Personnel qualification
and all related document approved by all parties (Manufacture Data Report).
LAST EDUCATION
Industrial Engineering Graduated from Pasundan University – Bandung, Completed February 1st
, 2007. With Thesis
“ Measurement of Productivity using Objective Matrix Method ”.
Experiences and Responsibility
Duty and Responsibility:
Plans, coordinates, and direct quality control program designed to ensure continous production of
products consistent with established standards, Developes and analyzes statistical data and product
specifications to determine present standard and establish proposed quality and realibility
expectancy of finished product.
Ensure all the specification, procedure, quality plan, ITP, welder register, NDT Personnel
qualification and all related document approved by all parties (Manufactur Data Report);
Inspection receiving material and welding consumables for welding works inclusive of PMI checks;
Verify and monitor in-process welding activity (welding parameters) fit-up, alignment,
dimensional tolerances, according WPS, conducting audit all welding consumables, ensured that
material traceability is recorded, monitor in-process blasting & painting activities, flushing, etc;
Review and record radiographic test film result according with code and rules, monitor and
witness leak test, Post–Weld Heat Treatment, Pneumatic Test Inspection, Vaccum Test Inspection,
Hydro test Inspection, Punchlist, Tightened Bolt Inspection, etc.;
Construction and Inspection Modification existing Pressure Vessel and Heat Exchanger (Additional Nozzle,
Pipe Distributor, Wedge Baffle, Vortex Breaker, Internal Tray, and Un-loading/Loading Catalyst).
May investigate and adjust customer complaints regarding quality.
TRAINING / EXTERNAL EDUCATION
CSWIP 3.1 Certified by TWI SEA – Asia (CSWIP Customer No. : 695306)
Welding Inspector Course at Research Center of Material Science, University of Indonesia for 2 month.
November to Desember 2007, (Cert. No. : RCMS-UI WI 1574).
Non–Destructive Testing ASNT Course “ Radiography Testing Level 2 “ at PT. Surabaya Multi Energindo,
Surabaya. October 11th
to October 23rd
, 2010, (Cert. No. : BE 1066).
Non–Destructive Testing ASNT Course “ Ultrasonic Testing Level 2 “ at PT. Multi Spec Sinergindo,
Cilegon. January 06th
to January 06th
, 2014, (Cert. No. : 1022/UT/N/15).
2. PROFESSIONAL EXPERIENCES
From To Position/Company/Project/Relevant Technical & Management Experience
2014 ~ 2016 ENI Muara Bakau :
As Third Party Inspection of ENI Muara Bakau – Jangkrik Project for :
Demin water storage tank.
SS HP Flare KO Drum.
Lean Meg Filter.
Centrate Drum Collection.
Dillution Dump Tank.
Cameroon Japan - Processindo E&M
As Third Party Inspection of Processindo E&M - Open Acces Project Pertamina Dumai
Desalter Vessel.
SK engineering & construction Co. Ltd
As Third Party Inspection of SK engineering&construction Co. Ltd- Jangmoon unit #10
Front waterbox condenser module 1
Front waterbox condenser module 2).
August 28, 2015 ~
December 31, 2015
PT. TOYO-IKPT CORPORATION
As Welding Inspector for Modification internal/external pressure vessel and Heat
Exchanger at PT. Chandra Asri Petrochemical.
Project :
Ethylene Cracker Complex; Cilegon - Banten, Indonesia.
May 5, 2015 ~ May
17, 2015
PT. RADIANT UTAMA INTERISCO
as Welding Inspector for maintenance petrochemical plant at PT. ASAHIMAS
CHEMICAL.
Project :
PT. ASHIMAS CHEMICAL; Cilegon – Banten, Indonesia.
February 25, 2014 ~
December 31, 2014
PT. JGC
as Welding Inspector for fabrication and erection piping system for Donggi-Senoro
LNG Plant.
Project :
Donggi_ Senoro LNG Plant, Luwuk–Central Sulawesi, Indonesia.
February 11, 2013 ~
October 31, 2013
PT. DAEAH E&C
as Welding Inspector for fabrication and erection piping system for Integrated Steel
Making Plant Krakatau Posco (Blast Furnace).
Project :
Integrated Steel Making Plant Krakatau Posco (BLAST FURNACE); Cilegon-Banten,
Indonesia.
May 5, 2012 ~
February 5, 2013
PT. SHINNETSKO PRIMA
as Welding Inspector for fabrication and erection Repair shell and roof Tank 37T-104
at Pertamina RU-IV Cilacap (Cap. 50000m3)
Project :
Repair shell and roof Tank 37T-104 at Pertamina RU-IV Cilacap (Cap. 50000 m3);
Cilacap-Central Java, Indonesia.
March 29, 2011~May
5, 2012
PT. SATYAMITRA SURYA PERKASA
as QC Piping for fabrication and erection piping system for LPG Processing Plant
II at PT. Media Karya Sentosa.
Non–Destructive Testing ASNT Course “ MT & PT Level 2 “ at PT. Multi Spec Sinergindo, Cilegon. January
12th
to January 25th
, 2015, (Cert. No. : 1598/MT/N/15 and 1585/PT/N/15).
Non–Destructive Testing ASNT Course “Radiography Interpreter Level 2 “ at PT. Multi Spec Sinergindo,
Cilegon. September 07th
to September 20th
, 2015, (Cert. No. : 797/RI/N/15).
3. Project :
MKS LPG Processing Plant II; Gresik-East Java, Indonesia.
Nov 29, 2010~March
28, 2011
PT. SATYAMITRA SURYA PERKASA
as QC Inspector for fabrication and erection piping system and 3 Unit Alumunium
Dome Roof Tank, 7 Unit C/S Dome Roof Tank
Project :
LINC Terminal Ciwandan Phase 3; Cilegon-Banten, Indonesia
Feb 2010~Aug 2010 PT. Multifabrindo Gemilang
as Assistant Fabrication Superintendent for fabrication of heat exchanger, vessel,
coloumn, pig launcher, crossbeam, and silencer.
Project :
PT. Gaspro Sentraco / Heat Exchanger.
PT. JGJ Indonesia / Tuban LPG Recovery.
PT. Alam Bersemi / Fabrication of Stripper.
PT. TriPolyta Indonesia, tbk / 2 Unit Resin Bin.
PT. Nira Murni K. / Pig Launcher – Receiver.
PT. Hanazono Engineering Indonesia / 1 Unit Silencer FDF-A & B.
PT. Gunanusa Utama Fabricator / Crossbeam.
July 2008~July2009 PT. KORINDO HEAVY INDUSTRY
as Production Engineer for Blasting and Painting of Wind Tower unit.
Project :
Production of Wind Tower Unit (Clipper/Gamesa/Vestaz).