This curriculum vitae provides information on Achmad Soewarso including personal details, education history, and work experience in quality control and inspection roles spanning 15 years. Soewarso has extensive experience in welding inspection, non-destructive testing, and quality assurance/quality control for oil, gas, and petrochemical projects. His roles have involved reviewing welding procedures, witnessing tests, inspecting materials and work, and compiling quality documents.
1. Page 1 of 9
CURRICULUM VITAE
PERSONAL DATA
Name : Achmad Soewarso
Place and date of Birth : Jakarta, 21 April 1979
Sex : Man
Marital Status : Married
Religion : Islam
Address : Jl. Penjernihan Dalam Rt 010/07 No. 2
Bendungan Hilir, Jakarta 10210
Phone : +628128984840
E mail : soewarso.achmad@gmail.com
Physical Figures : Height : 170 cm
Weight : 80 kg
Illness : None
Allergies : None
EDUCATION BACKGROUND
Formal Education
2002 : Graduated from Krisnadwipayana University, Mechanical
Engineering Department, East Jakarta
1996 : Graduated from STM Negeri 1, Jurusan Otomotif, Jakarta.
1990 : Graduated from SMP Negeri 38, Jakarta.
1987 : Graduated from SD Negeri 01 Petamburan, Jakarta.
Informal Education
2015 : Radiography Interpreter Lev. II, Multi Spec Sinergindo,
Cilegon, Banten, Certificate No. 716/RI/N/15
2015 : Ultrasonic Testing (Plate & Pipe) Lev.II, Multi Spec
Sinergindo, Cilegon, Banten, Certificate No. 1339/UT/N/15
CURRICULUM VITAE
ACHMAD SOEWARSO
QA/QC Inspector
2. Page 2 of 9
2011 : CSWIP 3.1 Course, TWI, Jakarta, Certificate No. 60931
2007 : Radiographic Testing Interpreter Level II Training, PT. SME,
Surabaya, Certificate No. AT 729
2006 : Training Course Basic Offshore Sea Survival, Jakarta.
Certificate No. SS 003518
2004 : Training Course for Welding Inspector, B4T, Bandung.
Certificate No. 0304.12.51.1182
JOB EXPERIENCES
1. PIPING INSPECTOR at Toyo-IKPT CONSORTIUM, CAP ECCX
Project, CILEGON, BANTEN
Client: PT. Chandra Asri Petrochemical, Tbk.
(22 September 2014 up to 31 December 2015)
Responsibilities:
a. Reviewed WPS and PQR to be used in Project.
b. Reviewed and witnessed Welder test
c. Visual Inspection and Monitoring Implementation of WPS,
Quality Control Procedures and Code are according to ITP.
d. Reviewed NDT RT film, witnessed PT and UT as a ITP
requirement.
2. QA/QC ENGINEER at PT. IKPT, EPC 2 ONSHORE EXPORT
PIPELINE SYSTEM, IKPT-KELSRI CONSORTIUM, TUBAN-
BOJONEGORO, EAST JAVA.
Client: Mobil Cepu Ltd.
Owner: Exxon Mobil.
(01 May 2012 up to 31 August 2014)
Responsibilities:
3. Page 3 of 9
a. Prepared and Revised QA/QC Procedure and Work
Instruction to be used in project.
b. Monitor the implementation of quality control procedures
and plans to provide more efficient onsite construction
work
c. Reviewed Mill Certificate base on specification, standard
and codes for Material Inspection verification.
d. Reviewed WPS and PQR.
e. Witness Welder Test and Mechanical Test.
f. Witnessed Cleaning, Gauging, Hydrostatic Test, Swabbing
and Caliper Pigging.
g. Compiled QC Document and hand over to Client.
3. QA/QC INSPECTOR at PT. SUCOFINDO, FABRICATION 4
UNITS TUBE BUNDLE, PT AREZDA PURNAMA LOKA, CITEREUP,
WEST JAVA.
Owner: PERTAMINA UP VI
(08 February 2012 Up to 08 March 2012)
Representative of PT. Pertamina UP VI Balongan to carry out
monitoring and technical verification.
4. SITE INSPECTOR at PT. WILSON WALTON INDONESIA, INCO
FUEL PIPELINE MAINTENANCE, SOROWAKO, SOUTH SULAWESI.
Owner: PT. INCO
(07 February 2011 Up to 31 January 2012)
Responsibilities:
a. Witness for Intelligent Pigging Inspection (Launching and
Receiving).
b. Chatodic Protection Inspection
c. Regular Visual Inspection.
4. Page 4 of 9
d. Prepared for Repair Management Plan.
5. WELDING INSPECTOR at PT. KELSRI, JAMBI MERANG
DEVELOPMENT GAS PRODUCTION FACILITIES, PULAI GADING,
JAMBI, SUMATERA.
Main Contractor: PT. TRIPATRA
Owner: JOB PERTAMINA – TALISMAN
(02 March 2010 Up to 25 January 2011)
Responsibilities:
a. Verify and inspect materials in accordance to the Applicable
Codes, Drawings, Specifications and Project Procedures.
b. Prepared “Quality Procedure” for Welding works, Repair
Welding, Hydrotest or Pneumatic test.
c. Prepared welder performance test for Carbon Steel,
Stainless Steel and Duplex.
d. Welding Inspecting site works on Aboveground and
Underground Piping.
e. Prepared Daily Report and Reviewed NDT report.
f. Checking all related documents before inspection (material
certificates, welder certificates, WPS and PQR).
6. WELDING INSPECTOR at PT. DUTA GRAHA INDAH, ROAD
AND OIL PIPELINE RELINE 1.3 km PROJECT, KAREBBE
HYDROELECTRIC POWER PLANT, KAREBBE SOUTH –
SULAWESI.
Owner: PT. INCO
(01 July Up to 30 November 2009)
Responsibilities:
a. Prepared “METHOD STATEMENT” for welding works
(Production welding, Hot Tap Prepared and Tie In)
5. Page 5 of 9
b. Inspection site works; Material Inspection, Pipe Joint,
Wrapping, Holiday Test, Trenching, Lowering in, and
Backfilling.
c. Prepared for Daily Report, Reviewed NDT reports: RT, MPT.
d. Supervising for Sub Contractor QC and NDT Crew.
e. Witness for Hydrostatic Test, Pigging and Swabbing.
f. Witness for Fitting Hot Tap Welding and Hot Tap work;
Witness Draining Oil Process.
g. Witness Pipe Cutting and Tie In work.
h. Witness Re-Pumping Oil to New Pipeline.
7. WELDING INSPECTOR, WEST JAVA PIPELINE DISTRIBUTION
BRANCHLINE (JAKARTA – BOGOR – BANTEN) at PT. NINDYA
KARYA JAKARTA, Bogor Area.
Owner: PT. Perusahaan Gas Negara
(15 April up to 30 June 2009)
Responsibilities
a. Verify and inspect materials in accordance to the applicable
codes, drawings, Specifications and Project Procedures.
b. Inspecting site works on fit-up, pipe joint welding, tie-in
welding, field joint coating, trenching, lowering, backfilling
and compaction, holiday testing.
c. Checking all related documents before inspection (material
certificates, welder certificates, WPS and PQR)
d. Reviewing NDT reports: RT, MPT and DPT.
e. Notify QA/QC Engineer for if find work non conformances.
f. Prepared QA/QC reports for each inspection.
g. Prepared Punch List prior to working completion
8. PLANT INSPECTOR, PT. SUCOFINDO, TURN AROUND 2008 at
PT. PERTAMINA UP VI BALONGAN, Reliability Department.
6. Page 6 of 9
Owner: PT. PERTAMINA UP VI
(28 October Up to 20 December 2008)
Responsibilities
a. Performed Fit for Service Assessment by Visual Test at DTU
(Distillation and Treating Unit) area, (Unit 11, Unit 23, Unit
24, Unit 25).
b. Prepared Assessment Report and Recommendation.
c. Monitoring Maintenance Activities that are referring to
Recommendation has been made.
9. QC INSPECTOR REPRESENTATIVE, Project Q2 and Q3
Shutdown at PT. International Nickel Indonesia, Sorowako –
South Sulawesi.
Owner: PT. INCO
(07 – 26 April 2008 and 04 – 23 August 2008)
Responsibilities
Inspection, check and witness for Construction Activities on
Follow:
a. Kiln No.5 Partial Reline.
b. Dos No. 2 Hooper 305 and 306 Additional Barrier.
c. Kiln No.3 Shell Repair.
d. Furnace No.3 Roof Replacement.
e. Furnace No.3 Tahu Murray and Feed Tube Modification.
f. Furnace No.3 Bag House Hoper Inlet Modification.
10. QC MECHANICAL of PT. REKAYASA INDUSTRI, Delaney Tire
Shop Project PT. INCO, Underground and aboveground piping,
Sorowako – South Sulawesi.
Owner: PT. INCO
(04 April Up to 04 October 2008)
7. Page 7 of 9
Responsibilities
a. Review Materials for piping.
b. Prepared Holiday Test for Underground piping.
c. Sand Filling check for Underground piping.
11. QC SUPERVISOR at CRW Consortium (PT. REMAJA BANGUN
KENCANA), South Sumatra – West Java PGN CP 4 Onshore
Pipeline Project Bojonegara to Suralaya (16 km).
Main Contractor: Nippon Steel Corp.
Owner: PT. Perusahaan Gas Negara
(13 June 2007 Up to 01 February 2008)
Responsibilities:
a. Supervising for NDT Crew, QA/QC Crew and Coating Crew.
b. Inspecting Site work on pipe material, Fit Up pipe, joint
welding, tie-in welding, field bending, filed joint coating
and Holiday test, Trenching, Lowering and Backfilling.
c. Prepared all related documents (daily report and monthly
progress).
d. Review NDT report (X-Ray and MPT).
12. WELDING INSPECTOR at PT GUNANUSA UTAMA
FABRICATOR, BP TANGGUH Project.
Owner: BP TANGGUH
(01 September 2006 Up to 15 January 2007)
Responsibilities:
a. Inspection and Monitoring Pile and Conductor welding.
b. Inspection and Monitoring Spool Pipe welding (Duplex and
Stainless Steel).
c. Inspection and Monitoring Doublers, Support, and Shoe
welding.
d. Inspection and Monitoring Pig Launcher welding.
8. Page 8 of 9
13. WELDING ENGINEER ASSISTANT at Japan Oil Engineering
(JOE) as Project Management Consultancy (PMC) Consortium
for PT. Perusahaan Gas Negara, SSWJ CP 2 Offshore Pipeline
Project. Labuhan Maringgai to Bojonegara.
Main Contractor: Nippon Steel Corp.
Owner: PT. Perusahaan Gas Negara.
(01 May 2006 Up to 30 August 2006).
Responsibilities:
a. Review all Welding Procedure Specification (WPS) and
Procedure
Qualification Record (PQR).
b. Review all welders and NDE Operator Qualifications are
valid.
c. Review calibration certificates of equipment used.
d. Inspection material and Pipe dimension.
e. Inspection and Witness Fit up and preheat.
f. Check Welding Parameter.
g. Welding Visual inspection.
h. Witness for NDT including MPI, UT, AUT and review
Radiographic Films.
i. Witness for coating process and holiday test.
j. Review QA/QC Document (daily report).
14. QC INSPECTOR at PT. Hobi Oktaprima with WAIJO as Main
Contractor, Aboveground and underground piping of Tuban
Aromatic Project, Tuban – East Java.
Main Contractor: PT. Inti Karya Persada Teknik (PT. IKPT)
Owner: PT. Trans Pacific Petrochemical Indotama (PT. TPPI)
(01 March 2005 Up to 01 April 2006)
Responsibilities
9. Page 9 of 9
a. Review all Welding Procedure Specification (WPS) and
Procedure Qualification Record (PQR).
b. Check all Welder and NDE Operator Qualifications are valid.
c. Check Materials for piping.
d. Performed Welder Qualification Test and Procedure
Qualification Test.
e. Performed Welding Inspection Activities and Reporting.
f. Prepared for Holiday Test Underground Piping.
g. Sand Filling Check for Under Ground Piping.
h. Witnessed and Review Document for NDT Activities (PT,
UT, RT).
i. Preparation of QA/QC Documentation.
j. Line Check, Hydro test and Pneumatic test.
k. Witness Hydrostatic Test and Leak Test.
l. Review Document Test Package and Manufacture Data
Report.
15. Repair and Maintenance Operation of Nikko Hotel Jakarta,
Low Voltage Division.
(01 April 2003 up to 01December 2003)
16. Production Operator of PT. Astra Honda Motor, Finishing
Section.
(01 October 2000 Up to January 2002)
17. Production Operator of PT. Honda Astra Engine
Manufacturing, Assembling Engine Section.
(05 January Up to 30 September 1997)